L-9_Vol_3_CSDR_20130509.xlsx

XLSX spreadsheet 183 KB Posted

Attached to
USN T-45 Aircraft Maintenance and Logistics Support
Solicitation number
N00019-12-R-0001
Issued by

About this file

L-9 Attachment (revised)

View the file

Other files

File Type Posted
Att01_T45CLS_PWS_2.3.14.pdf PDF
N00019-12-R-0001_Amendment_0005.pdf PDF
L-9.1_Vol_3_CSDR_Sub_Rpt_Example.xlsx XLSX spreadsheet
Att41_CNATRA_INST_4355.4A.pdf PDF
Att30_NASPAX_05-2103-13.txt TXT text file
Att27_NASK_AWD_05-2508-15.txt TXT text file
Att06_Applicable_Docs.xlsx XLSX spreadsheet
Att01_T45CLS_PWS_12.19.13.doc DOC document
Att33_NASP_CBA_WD-2013-5799.mht MHT file
L-6_Vol_3_B_Matrix.xlsx XLSX spreadsheet
Exhibit_A_signed_12.19.13.pdf PDF
L-13_Vol_3_Manning_Supplement.xlsx XLSX spreadsheet
Att32_NASM_CBA_WD-2013-5802.mht MHT file
Att28_NASM_AWD_05-2300-15.txt TXT text file
Att29_NASP_AWD_05-3034-15.txt TXT text file
Att31_NASK_CBA_WD-2013-5800.mht MHT file
Att02_Supplement_to_the_Exhibits _Explanation_of_Contract_Data_Requirements_List_CDRL.docx DOCX document
Amendment_4.doc DOC document
CDRLs_Exhibit_A_(unsigned).pdf PDF
N00019-12-R-0001_Amendment_0003.pdf PDF
5.22.2013_Q A.docx DOCX document
5.20.2013_Q A.docx DOCX document
N00019-12-R-0001_Amendment_2.doc DOC document
Exhibit_A_CDRL_Revisions.PDF PDF
Att01_T45CLS_PWS_10MAY2013.doc DOC document
Additional_Solicitation_Questions_and_Responses.docx DOCX document
Att40_Requisitioned_GFP_List_30APR2013.pdf PDF
L-8_Vol_3_Sub_CCS_20130429.xlsx XLSX spreadsheet
N00019-12-R-0001_Amendment_0001.doc DOC document
Att39.3_NASP_Scheduled_GFP_List_30APR2013.pdf PDF
Att01_T45CLS_PWS_30APR2013.doc DOC document
Att08_T45_GFP(NALCOMIS)_30APR2013.xlsx XLSX spreadsheet
L-7_Vol_3_Prime_CCS_20130429.xlsx XLSX spreadsheet
Att39.2_NASM_Scheduled_GFP_List_30APR2013.pdf PDF
L-6_Vol_3_B_Matrix_20130429.xlsx XLSX spreadsheet
Att38_Radioactive_Inventory_T45_30APR2013.docx DOCX document
Att39.1_NASK_Scheduled_GFP_List_30APR2013.pdf PDF
Att33.1_NASP_CBA_WD-2013-5799.mht MHT file
Att39.4_NAS_PAX_Scheduled_GFP_List_30APR2013.pdf PDF
Att32.2_NASM_CBA_WD-2013-5802.mht MHT file
Att17_Real_Property_GFP_30APR13.docx DOCX document
Exhibit_A_CDRL_29Apr13.PDF PDF
Att31.2_NASK_CBA_WD-2013-5800.mht MHT file
Final_RFP_Q A.xlsx XLSX spreadsheet
REMAINING_Pre_Conf_Feedback_Responses_4.29.2013.xlsx XLSX spreadsheet
REMAINING_Feedback_Responses_Post-Conf.4.29.2013.docx DOCX document
Att36_CNATRA_Other_GP.xlsx XLSX spreadsheet
Feedback_Responses_Post-Conf_3.22.2013.pdf PDF
PRE_Conf_Feedback_Responses_3.22.2013.xlsx XLSX spreadsheet
T-45_L1 M1_20130128.docx DOCX document
Show 40 more

Latest 50 of 192 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RDT

Resource Distribution Table (RDT)
T-45 Contractor Logistics Support (Excluding Engine Contract) - TBD, TBD
Prime ContractorSubcontractors
Prime Contractor or Sub-ContractorTotalIn-HouseTotalSubSub
Description
Contractor/Organization NameTBD, TBD
Contractor/Organization Location
Contract NumberTBD
Total Program Office or Contract/Effort Value (Estimated), TY$M
Subtotal Software Contract Value (Estimated), TY$M
Government Organization or PARM
CSDR Direct Reporting per CWIPT (Yes/No)
SRDR Direct Reporting per CWIPT (Yes/No)
WBS NUMBERSWBS Element Name
L1L2L3L4L5
1.0UNIT-LEVEL MANPOWER (SYSTEM LEVEL COST ONLY)
1.1OPERATIONS MANPOWER
1.1.1OPERATORS
1.1.2TRAINING
1.1.3SCHEDULES
1.1.4SAFETY
1.2UNIT-LEVEL MAINTENANCE MANPOWER
1.2.1FIXED MAINTENANCE
1.2.1.1QUALITY ASSURANCE DIVISION
1.2.1.2AIRCRAFT DIVISION
1.2.1.3AVIONICS/ARMAMENT DIVISION
1.2.1.4LINE DIVISION
1.2.1.5MAINTENANCE/ADMINISTRATION
1.2.2VARIABLE MAINTENANCE
1.2.2.1QUALITY ASSURANCE DIVISION
1.2.2.2AIRCRAFT DIVISION
1.2.2.3AVIONICS/ARMAMENT DIVISION
1.2.2.4LINE DIVISION
1.2.2.5MAINTENANCE/ADMINISTRATION
1.3OTHER UNIT-LEVEL MANPOWER (Specify in Remarks)
2.0UNIT OPERATIONS (SYSTEM LEVEL COST ONLY)
2.1OPERATING MATERIAL
2.1.1ENERGY (Fuel; Petroleum, Oil, and Lubricants (POL) ; Electricity)
2.1.2TRAINING MUNITIONS/EXPENDABLE STORES
2.1.3OTHER OPERATING MATERIAL (Specify in Remarks)
2.2SUPPORT SERVICES (INCLUDING NON-MAINTENANCE FSRs)
2.3TEMPORARY DUTY
3.0MAINTENANCE
3.1OVERHAUL OF END ITEMS
3.1.1SCHEDULED OVERHAUL
3.1.1.1VEHICLE/PLATFORM OVERHAUL
3.1.1.1.1LABOR
3.1.1.1.2MATERIAL
3.1.1.2PROPULSION OVERHAUL
3.1.1.2.1LABOR
3.1.1.2.2MATERIAL
3.1.1.3OTHER OVERHAUL
3.1.1.3.1LABOR
3.1.1.3.2MATERIAL
3.1.2UNSCHEDULED OVERHAUL
3.1.2.1VEHICLE/PLATFORM OVERHAUL
3.1.2.1.1LABOR
3.1.2.1.2MATERIAL
3.1.2.2PROPULSION OVERHAUL
3.1.2.2.1LABOR
3.1.2.2.2MATERIAL
3.1.2.3OTHER OVERHAUL
3.1.2.3.1LABOR
3.1.2.3.2MATERIAL
3.2DEPOT LEVEL REPARABLES (DLR)/REPAIR OF REPARABLES (ROR)
3.2.1AIRFRAME
3.2.1.1#1 WUC (Highest Cost Driver)
3.2.1.2#2 WUC (Second Highest Cost Driver)
3.2.1.3#3 WUC (Third Highest Cost Driver)
3.2.1.4OTHER
3.2.2AVIONICS
3.2.2.1#1 WUC (Highest Cost Driver)
3.2.2.2#2 WUC (Second Highest Cost Driver)
3.2.2.3#3 WUC (Third Highest Cost Driver)
3.2.2.4OTHER
3.2.3PROPULSION/POWER PLANT
3.2.3.1#1 WUC (Highest Cost Driver)
3.2.3.2#2 WUC (Second Highest Cost Driver)
3.2.3.3#3 WUC (Third Highest Cost Driver)
3.2.3.4OTHER
3.3CONSUMABLES AND REPAIR PARTS
3.3.1AIRFRAME
3.3.1.1#1 WUC (Highest Cost Driver)
3.3.1.2#2 WUC (Second Highest Cost Driver)
3.3.1.3#3 WUC (Third Highest Cost Driver)
3.3.1.4OTHER
3.3.2AVIONICS
3.3.2.1#1 WUC (Highest Cost Driver)
3.3.2.2#2 WUC (Second Highest Cost Driver)
3.3.2.3#3 WUC (Third Highest Cost Driver)
3.3.2.4OTHER
3.3.3PROPULSION/POWER PLANT
3.3.3.1#1 WUC (Highest Cost Driver)
3.3.3.2#2 WUC (Second Highest Cost Driver)
3.3.3.3#3 WUC (Third Highest Cost Driver)
3.3.3.4OTHER
3.4OTHER MAINTENANCE SERVICES (INCLUDING FSRs) (Specify in Remarks)
3.4.1O-LEVEL MAINTENANCE SERVICES
3.4.2I-LEVEL MAINTENANCE SERVICES
3.4.3DEPOT LEVEL MAINTENANCE SERVICES
3.5PACKING, HANDLING, SHIPPING, AND TRANSPORTATION (PHS&T)
4.0SUSTAINING SUPPORT (SYSTEM LEVEL COST ONLY)
4.1SYSTEM SPECIFIC TRAINING
4.1.1TRAINING
4.1.1.1OPERATOR TRAINING
4.1.1.2MAINTENANCE TRAINING
4.1.1.3OTHER TRAINING (Specify in Remarks)
4.2SUPPORT EQUIPMENT REPLACEMENT
4.2.1PECULIAR SUPPORT EQUIPMENT
4.2.2COMMON SUPPORT EQUIPMENT
4.3SUSTAINING/SYSTEMS ENGINEERING
4.3.1RELIABILITY AND MAINTAINABILITY ENGINEERING
4.3.2LOGISTICS ENGINEERING (LSA updates, logistics analysis)
4.3.3SUPPLY ANALYSIS EFFORTS
4.3.4SAFETY/HUMAN SYSTEMS INTEGRATION ENGINEERING
4.3.5AFFORDABILITY ENGINEERING
4.3.6OBSOLESCENCE ENGINEERING
4.3.7AVAILABILITY MANAGEMENT
4.3.8PRODUCT ENGINEERING SUPPORT
4.3.9INFORMATION ASSURANCE
4.3.10CONFIGURATION MANAGEMENT
4.3.11SYSTEM PERFORMANCE ANALYSIS
4.3.12SUPPLY
4.3.13DATA ANALYSIS
4.3.14PHYSICAL SECURITY
4.4PROGRAM MANAGEMENT
4.4.1CONTRACTOR LOGISTICS SUPPORT (CLS) MANAGEMENT
4.4.2CLS SUPPLY MANAGEMENT
4.4.3FINANCIAL/SCHEDULE PLANNING AND REPORTING
4.4.4TRANSITION TO LEAD SERVICE
4.4.5QUALITY ASSURANCE (Program Level)
4.4.6ADMINISTRATIVE SECURITY
4.4.7TRANSITION TO PERFORMANCE BASED LOGISTICS (PBL)
4.4.8RISK MITIGATION
4.5INFORMATION SYSTEMS
4.5.1TECH REFRESH
4.5.2LICENSE FEES
4.5.3MAINTENANCE
4.5.4NMCI
4.6DATA AND TECHNICAL PUBLICATIONS
4.6.1DATA
4.6.2TECHNICAL PUBLICATIONS
4.7SIMULATOR OPERATIONS
4.7.1SIMULATOR OPERATIONS HARDWARE SUPPORT
4.7.2SIMULATOR OPERATIONS MANPOWER
4.7.3SIMULATOR TECH REFRESH
4.8OTHER SUSTAINING SUPPORT (Specify in Remarks)
5.0CONTINUING SYSTEM IMPROVEMENTS
5.1HARDWARE MODIFICATIONS OR MODERNIZATION
5.1.1MOD KIT DEVELOPMENT
5.1.2MOD KIT PROCUREMENT
5.1.3MOD KIT INITIAL SPARES
5.1.4MOD KIT INSTALLATION
5.2SOFTWARE MAINTENANCE OR MODIFICATION (SOFTWARE RELEASE 1...N)
6.0INSTALLATION AND PERSONNEL SUPPORT (SYSTEM LEVEL COST ONLY)
6.1OPERATIONAL/SITE ACTIVATION
6.1.1LABOR
6.1.2MATERIAL
6.2INDUSTRIAL FACILITIES
6.2.1LABOR
6.2.2MATERIAL
1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the
Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform
to the applicable rules established for the Program Plan RDT
2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.

L-9 Vol 3 CSDR N00019-12-R-0001

&12&A, Pg. &P

DD Form 2794, Pg 1 (CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1. MAJOR PROGRAMa. NAME:T-45 Contractor Logistics Support
b. PHASE/MILESTONEc. PRIME MISSION PRODUCT2. WBS SYSTEM TYPE3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
Pre-ABC-FRPOperations and SustainmentAircraft SystemXINITIAL
AC-LRIPXO&SCHANGE20130131
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
Burapa Parkjitta

47254 Davis Spur Rd, Bldg. 2855

Patuxent River, MD 20670301-342-9144301-757-1801Burapa.Parkjitta@navy.mil
7. PLAN TYPE8. PREPARING ORGANIZATION9a. CONTRACTOR NAME/ADDRESS9b. CONTRACT NUMBER9c. APPROPRIATION10. APPROVED PLAN NUMBER
PROGRAMXCONTRACT (PRIME)i. PERFORMING ORGANIZATIONii. DIVISIONN00019-12-R-0001RDT&EN-13-D-C1
CONTRACT (SUB)NAVAIR 4.2.2TBDTBDXPROCUREMENT
XO&M
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

0.00.0T-45 Contractor Logistics Support (Excluding Engine Contract)XX
1.01.0UNIT-LEVEL MANPOWER (SYSTEM LEVEL COST ONLY)XX
1.11.1OPERATIONS MANPOWERX
1.1.11.1.1OPERATORSX
1.1.21.1.2TRAININGX
1.1.31.1.3SCHEDULESX
1.1.41.1.4SAFETYX
1.21.2UNIT-LEVEL MAINTENANCE MANPOWERX
1.2.11.2.1FIXED MAINTENANCEX
1.2.1.11.2.1.1QUALITY ASSURANCE DIVISIONX
1.2.1.21.2.1.2AIRCRAFT DIVISIONX
1.2.1.31.2.1.3AVIONICS/ARMAMENT DIVISIONX
1.2.1.41.2.1.4LINE DIVISIONX
1.2.1.51.2.1.5MAINTENANCE/ADMINISTRATIONX
1.2.21.2.2VARIABLE MAINTENANCEX
1.2.2.11.2.2.1QUALITY ASSURANCE DIVISIONX
1.2.2.21.2.2.2AIRCRAFT DIVISIONX
1.2.2.31.2.2.3AVIONICS/ARMAMENT DIVISIONX
1.2.2.41.2.2.4LINE DIVISIONX
1.2.2.51.2.2.5MAINTENANCE/ADMINISTRATIONX
1.31.3OTHER UNIT-LEVEL MANPOWER (Specify in Remarks)X
2.02.0UNIT OPERATIONS (SYSTEM LEVEL COST ONLY)XX
2.12.1OPERATING MATERIALX
2.1.12.1.1ENERGY (Fuel; Petroleum, Oil, and Lubricants (POL) ; Electricity)X
2.1.22.1.2TRAINING MUNITIONS/EXPENDABLE STORESX
2.1.32.1.3OTHER OPERATING MATERIAL (Specify in Remarks)X
2.22.2SUPPORT SERVICES (INCLUDING NON-MAINTENANCE FSRs)X
2.32.3TEMPORARY DUTYX
3.03.0MAINTENANCEXX
3.13.1OVERHAUL OF END ITEMSXX
3.1.13.1.1SCHEDULED OVERHAULXX
3.1.1.13.1.1.1VEHICLE/PLATFORM OVERHAULXX
3.1.1.1.13.1.1.1.1LABORX
3.1.1.1.23.1.1.1.2MATERIALXX
3.1.1.23.1.1.2PROPULSION OVERHAULXX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

3.1.1.2.13.1.1.2.1LABORX
3.1.1.2.23.1.1.2.2MATERIALXX
3.1.1.33.1.1.3OTHER OVERHAULXX
3.1.1.3.13.1.1.3.1LABORX
3.1.1.3.23.1.1.3.2MATERIALXX
3.1.23.1.2UNSCHEDULED OVERHAULXX
3.1.2.13.1.2.1VEHICLE/PLATFORM OVERHAULXX
3.1.2.1.13.1.2.1.1LABORX
3.1.2.1.23.1.2.1.2MATERIALXX
3.1.2.23.1.2.2PROPULSION OVERHAULXX
3.1.2.2.13.1.2.2.1LABORX
3.1.2.2.23.1.2.2.2MATERIALXX
3.1.2.33.1.2.3OTHER OVERHAULXX
3.1.2.3.13.1.2.3.1LABORX
3.1.2.3.23.1.2.3.2MATERIALXX
3.23.2DEPOT LEVEL REPARABLES (DLR)/REPAIR OF REPARABLES (ROR)X
3.2.13.2.1AIRFRAMEX
3.2.1.13.2.1.1#1 WUC (Highest Cost Driver)X
3.2.1.23.2.1.2#2 WUC (Second Highest Cost Driver)X
3.2.1.33.2.1.3#3 WUC (Third Highest Cost Driver)X
3.2.1.43.2.1.4OTHERX
3.2.23.2.2AVIONICSX
3.2.2.13.2.2.1#1 WUC (Highest Cost Driver)X
3.2.2.23.2.2.2#2 WUC (Second Highest Cost Driver)X
3.2.2.33.2.2.3#3 WUC (Third Highest Cost Driver)X
3.2.2.43.2.2.4OTHERX
3.2.33.2.3PROPULSION/POWER PLANTX
3.2.3.13.2.3.1#1 WUC (Highest Cost Driver)X
3.2.3.23.2.3.2#2 WUC (Second Highest Cost Driver)X
3.2.3.33.2.3.3#3 WUC (Third Highest Cost Driver)X
3.2.3.43.2.3.4OTHERX
3.33.3CONSUMABLES AND REPAIR PARTSX
3.3.13.3.1AIRFRAMEX
3.3.1.13.3.1.1#1 WUC (Highest Cost Driver)X
3.3.1.23.3.1.2#2 WUC (Second Highest Cost Driver)X
3.3.1.33.3.1.3#3 WUC (Third Highest Cost Driver)X
3.3.1.43.3.1.4OTHERX
3.3.23.3.2AVIONICSX
3.3.2.13.3.2.1#1 WUC (Highest Cost Driver)X
3.3.2.23.3.2.2#2 WUC (Second Highest Cost Driver)X
3.3.2.33.3.2.3#3 WUC (Third Highest Cost Driver)X
3.3.2.43.3.2.4OTHERX
3.3.33.3.3PROPULSION/POWER PLANTX
3.3.3.13.3.3.1#1 WUC (Highest Cost Driver)X
3.3.3.23.3.3.2#2 WUC (Second Highest Cost Driver)X
3.3.3.33.3.3.3#3 WUC (Third Highest Cost Driver)X
3.3.3.43.3.3.4OTHERX
3.43.4OTHER MAINTENANCE SERVICESX
3.4.13.4.1O-LEVEL MAINTENANCE SERVICESX
3.4.23.4.2I-LEVEL MAINTENANCE SERVICESX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

3.4.33.4.3DEPOT LEVEL MAINTENANCE SERVICESX
3.53.5PACKING, HANDLING, SHIPPING, AND TRANSPORTATION (PHS&T)X
4.04.0SUSTAINING SUPPORT (SYSTEM LEVEL COST ONLY)XX
4.14.1SYSTEM SPECIFIC TRAININGX
4.1.14.1.1TRAININGX
4.1.1.14.1.1.1OPERATOR TRAININGX
4.1.1.24.1.1.2MAINTENANCE TRAININGX
4.1.1.34.1.1.3OTHER TRAINING (Specify in Remarks)X
4.24.2SUPPORT EQUIPMENT REPLACEMENTX
4.2.14.2.1PECULIAR SUPPORT EQUIPMENTX
4.2.24.2.2COMMON SUPPORT EQUIPMENTX
4.34.3SUSTAINING/SYSTEMS ENGINEERINGX
4.3.14.3.1RELIABILITY AND MAINTAINABILITY ENGINEERINGX
4.3.24.3.2LOGISTICS ENGINEERING (LSA updates, logistics analysis)X
4.3.34.3.3SUPPLY ANALYSIS EFFORTSX
4.3.44.3.4SAFETY/HUMAN SYSTEMS INTEGRATION ENGINEERINGX
4.3.54.3.5AFFORDABILITY ENGINEERINGX
4.3.64.3.6OBSOLESCENCE ENGINEERINGX
4.3.74.3.7AVAILABILITY MANAGEMENTX
4.3.84.3.8PRODUCT ENGINEERING SUPPORTX
4.3.94.3.9INFORMATION ASSURANCEX
4.3.104.3.10CONFIGURATION MANAGEMENTX
4.3.114.3.11SYSTEM PERFORMANCE ANALYSISX
4.3.124.3.12SUPPLYX
4.3.134.3.13DATA ANALYSISX
4.3.144.3.14PHYSICAL SECURITYX
4.44.4PROGRAM MANAGEMENTX
4.4.14.4.1CONTRACTOR LOGISTICS SUPPORT (CLS) MANAGEMENTX
4.4.24.4.2CLS SUPPLY MANAGEMENTX
4.4.34.4.3FINANCIAL/SCHEDULE PLANNING AND REPORTINGX
4.4.44.4.4TRANSITION TO LEAD SERVICEX
4.4.54.4.5QUALITY ASSURANCE (Program Level)X
4.4.64.4.6ADMINISTRATIVE SECURITYX
4.4.74.4.7TRANSITION TO PERFORMANCE BASED LOGISTICS (PBL)X
4.4.84.4.8RISK MITIGATIONX
4.54.5INFORMATION SYSTEMSX
4.5.14.5.1TECH REFRESHX
4.5.24.5.2LICENSE FEESX
4.5.34.5.3MAINTENANCEX
4.5.44.5.4NMCIX
4.64.6DATA AND TECHNICAL PUBLICATIONSX
4.6.14.6.1DATAX
4.6.24.6.2TECHNICAL PUBLICATIONSX
4.74.7SIMULATOR OPERATIONSX
4.7.14.7.1SIMULATOR OPERATIONS HARDWARE SUPPORTX
4.7.24.7.2SIMULATOR OPERATIONS MANPOWERX
4.7.34.7.3SIMULATOR TECH REFRESHX
4.84.8OTHER SUSTAINING SUPPORT (Specify in Remarks)X
5.05.0CONTINUING SYSTEM IMPROVEMENTSXX
5.15.1HARDWARE MODIFICATIONS OR MODERNIZATIONX
DD FORM 2794, MAY 2011PREVIOUS EDITION IS OBSOLETE
11. WBS ELEMENT CODE12.
WBS REPORTING ELEMENTS13. REPORTS REQUIRED
(X if applicable)DD 1921-3 (CBDR):
X
a. PROGRAM/
CONTRACT/ SUBCONTRACTb. CONTRACT/
SUBCONTRACTa. CWBS
DICTIONARYb. DD 1921
(CDSR)c. DD 1921-1
(FCHR)d. DD 1921-2
(PCR)e. DD 1921-4
(CSR)f. SRDR

FORMATS

5.1.15.1.1MOD KIT DEVELOPMENTX
5.1.25.1.2MOD KIT PROCUREMENTX
5.1.35.1.3MOD KIT INITIAL SPARESX
5.1.45.1.4MOD KIT INSTALLATIONX
5.25.2SOFTWARE MAINTENANCE OR MODIFICATION (SOFTWARE RELEASE 1...N)X
6.06.0INSTALLATION AND PERSONNEL SUPPORT (SYSTEM LEVEL COST ONLY)XX
6.16.1OPERATIONAL/SITE ACTIVATIONXX
6.1.16.1.1LABORX
6.1.26.1.2MATERIALXX
6.26.2INDUSTRIAL FACILITIESXX
6.2.16.2.1LABORX
6.2.26.2.2MATERIALXX

Subtotal Cost X

Reporting Contractor G&AX
Reporting Contractor Undistributed BudgetX
Reporting Contractor Management ReserveX
Reporting Contractor FCCMX
Total CostX

Reporting Contractor Profit/Loss or Fee X

Total Price X

DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

L-9 Vol 3 CSDR N00019-12-R-0001

&A

DD Form 2794, Pg 2 (CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1WBS DictionaryCLS FY2014 - CWBS Dictionary2014103020141230
21921-4CLS FY2014 - Initial Report2014103020141230
31921-4CLS FY2015 - Annual Report2015103020151230
41921-4CLS FY2016 - Annual Report2016103020161230
51921-4CLS FY2017 - Annual Report2017103020171230
61921-4CLS FY2018 - Annual Report2018103020181230
71921-4CLS FY2019 - Annual Report - Option Year 12019103020191230
81921-4CLS FY2020 - Annual Report - Option Year 22020103020201230
91921-4Total Contract Complete - CLS FY2014 thru FY2020 Final Report2020103020201230
*Note: When 95% of contract costs have been incurred
15. REMARKS
Special Instructions - Reporting Detail: The contractor will provide a summary level report. The contractor will also submit a separate report for each cost element shown with an X in column 13e. Summary elements such as G&A, FCCM and profit shall be reported in each subsidiary report. Example of subsidiary report is attached.
1. Describe significant accounting changes from previous accounting period, if applicable.

2. DD Form 1921-3 Contractor Business Data Report:

a. The Contractor Business Data Report is prepared by and for the business entity (e,g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

DD FORM 2794 (PAGE 2), MAY 2011 PREVIOUS EDITION IS OBSOLETE

L-9 Vol 3 CSDR N00019-12-R-0001

&A

WBS Data Dictionary

L-9 Vol 3 CSDR N00019-12-R-0001

&A, Pg. &P

Microsoft_Office_Word_Document1.docx

Cost Element Structure Definitions:

1.0 UNIT-LEVEL MANPOWER – Technical Metric: Hours - Unit-Level Manpower includes the costs of all contractor operators, contractor maintenance personnel, such as Field Service Representatives (FSRs), and other contractor-provided support manpower working in operating units (or in maintenance and support units that are organizationally related and adjacent to the operating units).

1.1 Operations Manpower – Technical Metric: Hours - The costs of all contractor manpower required to operate a system.

For example:

− Aircraft and Helicopters – Aircrews including pilots, navigators, mission specialists, load masters, etc.

− Ships – Command staff, combat information center personnel, fire control (if operations, maintenance and other support categories are separate)

− Electronic Systems – Console operators

− Armored Vehicles – Crew chief, tank commander, gunner, driver, loader

For cases where contractors operate more than one system, manpower costs should be allocated on a relative workload basis.

1.1.1.1 Operator – Technical Metric: Hours – includes the cost of all contractor personnel that operate the system

1.1.1.2 Training - Technical Metric: Hours - includes the costs of all contractor personnel that perform and ensure trainings are conducted and up-to-date in support of the daily operations.

1.1.1.3 Schedules – Technical Metric: Hours - includes the costs of all contractor personnel that perform and maintain the daily schedule of all flight operations.

1.1.1.4 Safety – Technical Metric: Hours - includes the costs of all contractor personnel that perform aircraft and maintenance safety checks in support of all flight operations

1.2 Unit-Level Maintenance Manpower - Technical Metric: Hours - This element includes the costs of all contractor manpower performing unit-level maintenance on a primary system, associated support equipment, and unit-level training devices. This element includes the costs of organizational maintenance manpower (usually resident in the system operating unit) and unit-level intermediate maintenance personnel. The costs of intermediate-level maintenance personnel resident in a support organization that is not unit-level relative to the operating unit, such as a Navy shore-based Intermediate Maintenance Activity, are included in Element 3.4.2 (I-Level Maintenance Services). For cases where contractors maintain more than one system, manpower costs should be allocated on a relative workload basis.

1.2.1 Fixed Maintenance – Technical Metric: Hours - This element includes cost of all contractor manpower of organizational maintenance and intermediate level maintenance needed to perform scheduled maintenance. These maintenance activities can be based on flight hours flown or time interval (every two weeks, or every month, etc.)

1.2.1.1 Quality Assurance Division - Technical Metric: Hours - Costs of all organizational and intermediate level maintenance contractor manpower that performs quality assurance check on repairs and preventative maintenance services for all aircrafts.

1.2.1.2 Aircraft Division – Technical Metric: Hours - Cost of all organizational and intermediate level maintenance contractor manpower that performs daily maintenance on the aircrafts, excluding electronics and avionics equipment.

1.2.1.3 Avionics/Armament Division – Technical Metric: Hours - Cost of all organizational and intermediate level maintenance contractor manpower that performs maintenance on all aircraft avionic and armament systems

1.2.1.4 Line Division – Cost of all organizational and intermediate level contractor manpower that performs maintenance on the aircraft flight line, i.e. for emergency repairs.

1.2.1.5 Maintenance/Administration – Technical Metric: Hours - Cost of contractor manpower required to perform daily administrative tasks in support of all maintenance and flight operations.

1.2.2 Variable Maintenance – Technical Metric: Hours - This element includes cost of all contractor manpower of organizational maintenance and intermediate level maintenance needed to perform any unscheduled maintenance on the aircraft. These maintenance activities can be due to unforeseen bird-strike, electrical, or mechanical problems to the aircraft.

1.2.2.1 Quality Assurance Division - Technical Metric: Hours - Costs of all organizational and intermediate level maintenance contractor manpower that performs quality assurance check on repair services for all aircrafts.

1.2.2.2 Aircraft Division – Technical Metric: Hours - Cost of all organizational and intermediate level maintenance contractor manpower that performs maintenance on the aircrafts, excluding electronics and avionics equipment.

1.2.2.3 Avionics/Armament Division – Technical Metric: Hours - Cost of all organizational and intermediate level maintenance contractor manpower that performs maintenance on all aircraft avionic and armament systems

1.2.2.4 Line Division – Technical Metric: Hours - Cost of all organizational and intermediate level contractor manpower that performs maintenance on the aircraft flight line, i.e. for emergency repairs.

1.2.2.5 Maintenance/Administration – Technical Metric: Hours - Cost of contractor manpower required to perform daily administrative tasks in support of all maintenance and flight operations.

1.3 Other Unit-Level Manpower - Technical Metric: Hours - This element includes the cost of contractor manpower performing administrative, security, logistics, safety, engineering, field support, and other mission support functions at the unit level. These costs include only the costs of manpower positions that exist to wholly or predominately support the system under consideration. For systems that deploy, these costs include the costs of manpower positions that routinely deploy to support the system. Some examples are:

− Unit Administrative Staff. Manpower required for unit command, administration, supervision, operations control, planning, scheduling, safety, quality control of crew training and operational proficiency, etc.

− Security. Manpower required for system security. Duties may include system level entry control, close and distant boundary support, and security alert operations. (Does not include base level access control unless the entire facility exists solely to support the weapon system.)

− Logistics. Manpower required for logistics support. Functions may include supply, transportation, inventory control, fuel handling, etc.

− Ordnance Support. Includes manpower providing munitions handling, weapons assembly, etc. Excludes any ordnance support manpower included in Element 1.2 (Unit-Level Maintenance).

− Other Support. Manpower required to provide system specific fixed and mobile communications, information, intelligence, photo interpretation, and other special mission support or to operate unit simulators and training devices.

2.0 UNIT OPERATIONS - Unit Operations includes the unit-level consumption of operating materials that contractors provide. Examples include fuel, electricity, expendable stores, training munitions and other operating materials. Also included are any support activities; training devices or simulator operations that uniquely support an operational unit; and other services. Unit-funded service contracts for administrative equipment as well as unit-funded equipment and software leases are included in this element.

Simulator costs that provide support to multiple units should be included in 4.1 Sustaining Support/System Specific Training.

2.1 Operating Material - Technical Metric: Units Consumed

2.1.1 Energy (Fuel; Petroleum, Oil and Lubricants [POL]; Electricity) - Technical Metric: Gallons - These costs include cost of contractor-provided POL, propulsion fuel, and fuel additives used by systems in performing their normal peacetime missions. These costs also include the cost of contractor-provided field-generated electricity and commercial electricity necessary to support the operation of a system.

2.1.2 Training Munitions/Expendable Stores - Technical Metric: End Items - These are the costs of contractor-provided training munitions, rockets, missiles, and expendable stores consumed in the course of normal peacetime training missions. This element includes the cost of live and inert ammunition, bombs, rockets, training missiles, sonobuoys, and pyrotechnics expended in training and non-combat firings such as firepower demonstrations. This category also includes other expendable stores such as chaff, flares, fuel tanks, travel pods or other items that lose their identity in use.

2.1.3 Other Operating Material - This element includes costs for contractor-provided operating materials other than energy, training munitions, or expendable stores. The costs identified must be related to the system whose O&S requirements are being assessed. Illustrative examples include computer supplies, paper, diskettes, ribbons, charts, maps, and administrative supplies used for housekeeping, health and safety.

2.2 Support Services (including non-maintenance FSRs) - Technical Metric: Hours - This includes contractor-provided support services. These services may include, but are not limited to:

− Cost of FSRs for non-maintenance activities such as training, data collection, software support, and IT support.

− Cost of un-reimbursed food services, rations, postal services (postage/box rental), and laundry services.

− Cost of lease or rental of administrative, computational, or support equipment or software.

− Lease costs of special facilities or land (e.g., for storage of warheads and missiles)

− Contractor-provided service contracts for administrative, computational, or support equipment.

− Communications services (e.g., data/voice links, dedicated lines, microwave channels), port services, and other unit-funded utilities not part of base operating support costs.

− Transportation costs for moving equipment (e.g., communications equipment, combat vehicles, and missiles) to and from test ranges or training areas

− Transportation of personnel and material to remote operating sites for operations, maintenance, or support.

2.3 Temporary Duty - Technical Metric: Hours - This element includes costs for additional duty or temporary duty for training, administrative, or regularly scheduled training away from a unit’s permanent operating location. Contractor costs will be included here when those costs are considered to be significant. Costs include transportation, car rental, mileage allowance, and subsistence expense.

3.0 MAINTENANCE - Technical Metric: End Items Processed - This element includes the costs of contractor manpower above the unit level and materials at all levels in support of the primary system, simulators, training devices, and associated support equipment. There may be instances in which government personnel are acting in a sub-contract role with the primary contractor, e.g., a public-private partnership. In these instances, this element includes the costs of government personnel and other government costs. Where costs cannot be separately identified to distinct levels of maintenance, the category that represents the predominant costs should be used.

*For illustration purposes, Work Unit Codes (WUCs) are used as cost drivers. Other elements or logistic structure codes may be used as cost drivers if the given system does not utilize WUCs.

3.1 Overhaul of End Items - Technical Metric: End Items Processed - Overhauls are periodic, frequently scheduled, major maintenance events whereby a system undergoes general maintenance and alterations at a depot-level repair activity. The system generally undergoes the installation of alterations and modifications to update its capabilities and large-scale maintenance that cannot be undertaken at other times. The overhaul constitutes extensive renovation including disassembly, inspection, maintenance, repair, reassembly, and test; and upgrade to the latest desired configuration. Multiple subsystems may be repaired and/or upgraded. End items other than prime mission product, such as support equipment and test equipment, are also subject to overhaul.

3.1.1 Scheduled Overhaul - Technical Metric: End Items Processed - This element captures the cost of scheduled overhaul at the depot level.

3.1.1.1 Vehicle/Platform Overhaul – Technical Metric: Items Contractually Complete – This element captures the cost of scheduled overhaul of the vehicle or platform at the depot level.

3.1.1.1.1 Labor – Technical Metric: Hours - Cost of all labor required to perform scheduled overhaul work

3.1.1.1.2 Material – Cost of all materials required to scheduled overhaul work

3.1.1.2 Propulsion Overhaul - Technical Metric: Items Contractually Complete - This element captures the cost of scheduled overhaul of the propulsion system, engines, prime movers, turbines, etc. at the depot level.

3.1.1.2.1 Labor – Technical Metric: Hours - Cost of all labor required to perform scheduled overhaul work

3.1.1.2.2 Material – Cost of all materials required to scheduled overhaul work

3.1.1.3 Other Overhaul - Technical Metric: Items Contractually Complete - This element captures the cost of scheduled overhaul of other items not captured in 3.1.1.1 or 3.1.1.2 above.

3.1.1.3.1 Labor – Technical Metric: Hours - Cost of all labor required to perform scheduled overhaul work

3.1.1.3.2 Material – Cost of all materials required to scheduled overhaul work

3.1.2 Unscheduled Overhaul - Technical Metric: End Items Processed - This element captures the cost of unscheduled overhaul at the depot level.

3.1.2.1 Vehicle/Platform Overhaul - Technical Metric: Items Contractually Complete - This element captures the cost of unscheduled overhaul of the vehicle or platform at the depot level.

3.1.2.1.1 Labor – Technical Metric: Hours - Cost of all labor required to perform unscheduled overhaul work

3.1.2.1.2 Material – Cost of all materials required to unscheduled overhaul work

3.1.2.2 Propulsion Overhaul - Technical Metric: Items Contractually Complete – This element captures the cost of unscheduled overhaul of the propulsion system, engines, prime movers, turbines, etc. at the depot level.

3.1.2.2.1 Labor – Technical Metric: Hours - Cost of all labor required to perform unscheduled overhaul work

3.1.2.2.2 Material – Cost of all materials required to unscheduled overhaul work

3.1.2.3 Other Overhaul - Technical Metric: Items Contractually Complete – This element captures the cost of unscheduled overhaul of other items not captured in 3.1.1.1 or 3.1.1.2 above.

3.1.2.3.1 Labor – Technical Metric: Hours - Cost of all labor required to perform unscheduled overhaul work

3.1.2.3.2 Material – Cost of all materials required to unscheduled overhaul work

3.2 Depot Level Reparable (DLR) / Repair of Reparable (ROR) – Technical Metric: Items Repaired – This element captures the cost of repairing reparable items. To the extent possible, reparable costs for the primary system, support equipment, training devices, and simulators should be separately identified. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost. These latter costs are captured in another cost element – see Element 4.4.2 CLS Supply Management below.

3.2.1 Airframe – Technical Metric: Items Repaired – This element captures the cost of repairing airframes. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost.

3.2.1.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.1.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the second highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.1.3 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the third highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.1.4 #4 Remaining Work Unit Code – Technical Metric: Items Repaired – This element represents the remaining total Work Unit Codes that are the cost drivers for airframe.

3.2.2 Avionics – Technical Metric: Items Repaired – This element captures the cost of repairing the aircraft avionics. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost.

3.2.2.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.2.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the second highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.2.3 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the third highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.2.4 #4 Remaining Work Unit Code – Technical Metric: Items Repaired – This element represents the remaining total Work Unit Codes that are the cost drivers for avionics.

3.2.3 Power Plant – Technical Metric: Items Repaired – This element captures the cost of repairing the aircraft power plant. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost.

3.2.3.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the second highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.2 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Repaired – This element represents the Work Unit Code that contributes to the third highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.4 #4 Remaining Work Unit Code – Technical Metric: Items Repaired – This element represents the remaining total Work Unit Codes that are the cost drivers for power plant.

3.3. Consumables and Repair Parts - Technical Metric: Items Replaced – Consumable maintenance material is material used for the maintenance and support of a primary system and its associated support and training equipment, at any organizational level. Illustrative types of maintenance consumables are coolants and deicing fluids. Repair parts are materials that are used to repair primary systems and associated support and training equipment. Items may include circuit cards, transistors, capacitors, gaskets, fuses, filters, batteries, tires, and other materials that are not repaired.

3.3.1 Airframe – Technical Metric: Items Replaced – This element captures the cost all consumable material and parts used for the maintenance and support of an airframe and its associated support and training equipment, at any organizational level.

3.3.1.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.3.1.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the second highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.3.1.3 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the third highest airframe cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.4.1.4 #4 Remaining Work Unit Code – Technical Metric: Items Replaced – This element represents the remaining total Work Unit Codes that are the cost drivers for airframe.

3.3.2 Avionics – Technical Metric: Items Replaced – This element captures the cost of repairing the aircraft avionics. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost.

3.3.2.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.3.2.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the second highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.3.2.3 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the third highest avionics cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.3.2.4 #4 Remaining Work Unit Code – Technical Metric: Items Replaced – This element represents the remaining total Work Unit Codes that are the cost drivers for avionics.

3.3.2 Power Plant – Technical Metric: Items Replaced – This element captures the cost of repairing the aircraft power plant. The cost includes labor, material, purchased parts, other direct charges, and subcontract costs, but excludes any supply chain management costs such as inventory control, handling and packaging, as well as transportation cost.

3.2.3.1 #1 Work Unit Code (Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.2 #2 Work Unit Code (Second Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the second highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.2 #3 Work Unit Code (Third Highest Cost Driver) – Technical Metric: Items Replaced – This element represents the Work Unit Code that contributes to the third highest power plant cost, to include the labor, materials, parts, and other direct charges required to perform repair work under this WUC.

3.2.3.4 #4 Remaining Work Unit Code – Technical Metric: Items Replaced – This element represents the remaining total Work Unit Codes that are the cost drivers for power plant.

3.4 Other Maintenance Services - Technical Metric: Hours - This element includes costs incurred in providing maintenance not otherwise accounted for. Items may include the cost of environmental protection or cleanup, transportation of repair parts, calibration, and technical assistance that are unique to the system.

3.4.1 O-Level Maintenance Services - Technical Metric: Hours - This element captures other maintenance services (not otherwise accounted for) at the organizational level.

3.4.2 I-Level Maintenance Services - Technical Metric: Hours - This element captures other maintenance services (not otherwise accounted for) at the intermediate level.

3.4.3 Depot Level Maintenance Services - Technical Metric: Hours - This element captures other maintenance services (not otherwise accounted for) at the depot level.

3.5 Packing, Handling, Shipping, Transportation (PHS&T) - Technical Metric: Items Processed

− Packaging provides for product security, transportability, and storability, with the added utility of serving as a medium of communication from the producer/provider to the user. The nature of an item determines the type and extent of protection needed to prevent its deterioration during transport. Shipping mode and any special handling requirements, as well as the length and type of storage considerations, dictate materials selected for preservation in addition to packaging.

− Handling involves the moving of items from one place to another within a limited range and is normally confined to a single area, such as between warehouses, storage areas, or operational areas, or movement from storage to the mode of transportation.

− Storage involves the short or long term stockpiling of items. Storage can be accomplished in either temporary or permanent facilities. It may be a function of the transportation timeline or it may be required for material in reserve.

− Transportation is the movement of equipment and supplies using standard modes of transportation for shipment by land, air and sea. Modes of transportation include cargo, vehicle, rail, ship and aircraft.

4.0 SUSTAINING SUPPORT - Technical Metric: Items Processed - This category includes support services provided by centrally managed support activities external to the units that own the operating systems. It is intended that costs included in this category represent costs that can be identified to a specific system and exclude costs that must be arbitrarily allocated.

4.1 System Specific Training - Technical Metric: Number of People Trained - This element includes the contractor’s costs provide system-specific specialty training for individuals that need to be replaced due to attrition and normal rotation. Training costs should include the costs of instructors, instructor travel, training support personnel, training devices, course support costs, and course materials.

4.1.1 Operator Training - Technical Metric: Number of People Trained - This element captures the contractor’s cost to provide training at primary training sites for personnel to become proficient in specific system knowledge. It includes units such as Air Force wings assigned a primary mission of weapon-specific aircrew training, Navy air readiness training units, Navy Afloat Training Groups, and the Army Armor Center. Alternately, these costs may be included as unit costs and included in elements 1.0, 2.0, and 3.0, or they may be tracked separately under sustaining support. If included in other cost elements, costs should be clearly shown. (These costs do not include costs associated with providing skill training unrelated to a specific system, e.g., undergraduate aviation training.)

4.1.2 Maintenance Training - Technical Metric: Number of People Trained - These are costs associated with the contractor providing advanced system-specific training associated with maintenance in units designated as primary training facilities.

4.1.3 Other Training - Technical Metric: Number of People Trained - These are the costs of system-specific training associated with support functions other than maintenance, in units designated as primary training facilities.

4.2 Support Equipment Replacement - Technical Metric: End Items Processed - These are the contractor’s costs incurred to maintain and/or replace equipment that is needed to operate or support a primary system, subsystems, training systems, and other support equipment. The support equipment being replaced (e.g., tools and test sets) may be unique to the system or it may be common to a number of systems, in which case the costs must be allocated among the respective systems.

4.2.1 Peculiar Support Equipment – Technical Metric: End Items Processed - This element contain the contractor’s costs incurred to maintain and/or replace any support equipments that are unique to the primary system.

4.2.2 Common Support Equipment – Technical Metric: End Items Processed - This element contain the contractor’s costs incurred to maintain and/or replace the common support equipment that is needed to operate the primary system or perform support tasks.

4.3 Sustaining/Systems Engineering - Technical Metric: Hours - Costs reported in this element may include, but are not limited to contract engineering services, studies, and technical advice. Examples might include aircraft structural integrity monitoring or corrosion monitoring; planning and control of technical program efforts; continuing system requirements definition; and continuing specialty engineering, such as R&M Engineering. Specific modifications to hardware or software are included in Element 5.0, Continuing System Improvements. Sustaining support costs provided through a system support contract should be separately identified within the appropriate cost element, if possible.

4.3.1 Reliability and Maintainability Engineering - Technical Metric: Hours - Reliability and Maintainability Engineering focuses on increasing system or component availability over its life cycle. Reliability Engineering addresses the ability of a system or component to function within a given environment for a specified period of time. It may include engineering and analytical activities such as life data analysis, life testing, reliability modeling, reliability growth analysis, and design of experiments. These costs should not include reliability design or analysis efforts during development or production, but may include continuing reliability engineering efforts during the sustainment phase. Maintainability engineering activities focus on maintenance activities related to down time – the time it takes to return a failed system or component to operational status. These costs should not include maintainability design efforts during development or production, but may include continuing maintainability efforts during the sustainment phase. These costs may include, for example, maintainability validation activities in a maintainability assessment process, utilizing both analyses and testing. Continuing maintainability modeling and maintainability design improvement efforts may be included.

4.3.2 Logistics Engineering - Technical Metric: Hours - This element includes costs for engineering activities to plan, resource and implement supportability…