Additional_Solicitation_Questions_and_Responses.docx

DOCX document 20 KB Posted

Attached to
USN T-45 Aircraft Maintenance and Logistics Support
Solicitation number
N00019-12-R-0001
Issued by

About this file

May 10 2013 posting of Solicitation questions received this week and Government responses. Amendment 2 is in development and intended to be issued later today or Monday.

View the file

Other files

File Type Posted
Att01_T45CLS_PWS_2.3.14.pdf PDF
N00019-12-R-0001_Amendment_0005.pdf PDF
L-9.1_Vol_3_CSDR_Sub_Rpt_Example.xlsx XLSX spreadsheet
Att41_CNATRA_INST_4355.4A.pdf PDF
Att30_NASPAX_05-2103-13.txt TXT text file
Att27_NASK_AWD_05-2508-15.txt TXT text file
Att06_Applicable_Docs.xlsx XLSX spreadsheet
Att01_T45CLS_PWS_12.19.13.doc DOC document
Att33_NASP_CBA_WD-2013-5799.mht MHT file
L-6_Vol_3_B_Matrix.xlsx XLSX spreadsheet
Exhibit_A_signed_12.19.13.pdf PDF
L-13_Vol_3_Manning_Supplement.xlsx XLSX spreadsheet
Att32_NASM_CBA_WD-2013-5802.mht MHT file
Att28_NASM_AWD_05-2300-15.txt TXT text file
Att29_NASP_AWD_05-3034-15.txt TXT text file
Att31_NASK_CBA_WD-2013-5800.mht MHT file
Att02_Supplement_to_the_Exhibits _Explanation_of_Contract_Data_Requirements_List_CDRL.docx DOCX document
Amendment_4.doc DOC document
CDRLs_Exhibit_A_(unsigned).pdf PDF
N00019-12-R-0001_Amendment_0003.pdf PDF
5.22.2013_Q A.docx DOCX document
5.20.2013_Q A.docx DOCX document
N00019-12-R-0001_Amendment_2.doc DOC document
L-9_Vol_3_CSDR_20130509.xlsx XLSX spreadsheet
Exhibit_A_CDRL_Revisions.PDF PDF
Att01_T45CLS_PWS_10MAY2013.doc DOC document
Att40_Requisitioned_GFP_List_30APR2013.pdf PDF
L-8_Vol_3_Sub_CCS_20130429.xlsx XLSX spreadsheet
N00019-12-R-0001_Amendment_0001.doc DOC document
Att39.3_NASP_Scheduled_GFP_List_30APR2013.pdf PDF
Att01_T45CLS_PWS_30APR2013.doc DOC document
Att08_T45_GFP(NALCOMIS)_30APR2013.xlsx XLSX spreadsheet
L-7_Vol_3_Prime_CCS_20130429.xlsx XLSX spreadsheet
Att39.2_NASM_Scheduled_GFP_List_30APR2013.pdf PDF
L-6_Vol_3_B_Matrix_20130429.xlsx XLSX spreadsheet
Att38_Radioactive_Inventory_T45_30APR2013.docx DOCX document
Att39.1_NASK_Scheduled_GFP_List_30APR2013.pdf PDF
Att33.1_NASP_CBA_WD-2013-5799.mht MHT file
Att39.4_NAS_PAX_Scheduled_GFP_List_30APR2013.pdf PDF
Att32.2_NASM_CBA_WD-2013-5802.mht MHT file
Att17_Real_Property_GFP_30APR13.docx DOCX document
Exhibit_A_CDRL_29Apr13.PDF PDF
Att31.2_NASK_CBA_WD-2013-5800.mht MHT file
Final_RFP_Q A.xlsx XLSX spreadsheet
REMAINING_Pre_Conf_Feedback_Responses_4.29.2013.xlsx XLSX spreadsheet
REMAINING_Feedback_Responses_Post-Conf.4.29.2013.docx DOCX document
Att36_CNATRA_Other_GP.xlsx XLSX spreadsheet
Feedback_Responses_Post-Conf_3.22.2013.pdf PDF
PRE_Conf_Feedback_Responses_3.22.2013.xlsx XLSX spreadsheet
T-45_L1 M1_20130128.docx DOCX document
Show 40 more

Latest 50 of 192 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 May 2013 N00019-12-R-0001 Additional Solicitation Questions and Responses

1) Page 483 – says we are to include in the Contract Documents section: “The original signed SF33 for basic solicitation and each amendment (as applicable) with all applicable Blocks completed and acknowledgement of receipt of each amendment (as applicable) to this solicitation. The SF33 Block 12 “fill-in” (proposal validity date) shall be completed;”

Question: Is the Government expecting insertion of all 492 pages of the SF33 and applicable attachments as part of this Section, filled-out as needed or just 1st (signed) page of the SF33 along with copy of Amendment front page, and just the appropriate filled-out pages?

The Government expects just signed cover pages of the Solicitation SF33 and Amendment SF30(s), along with completion of required Blocks, Provisions, and Clauses. Section L-1 Volume 6 Instructions will be revised to be clearer via Solicitation Amendment 2.

2) Reference: Section L, Table 3.1 Proposal Structure; page 451 Discussion: This table states that Attachment L-7 Prime Contractor Summary and Attachment L-8 Subcontractor Summary (for each critical subcontractor) must be submitted within the volume and electronically. The combined estimated pages per volume to print Attachment L-7 and each Attachment L-8 is over 6,000 pages. That totals nearly 40,000 pages for the price volume submission given the requirement for 1 original and 5 copies. Considering that the contractor typically also prints a back-up set that is on standby in case of any delivery emergencies, this instruction requires the contractor to print over 75,000 pages for the price volume. We estimate that this will require over 120 6-inch binders to be printed and made available to the Government.

Question: Considering the current environmental green initiatives, are any of the following alternatives acceptable to the Government:

1. Can instruction be given to only include Attachment L-7 and L-8 electronically? Attachment L-6 would still be submitted within the volume and electronically.

2 . Can instruction be given to only print the Fixed Price Roll Up and LH Roll Up tabs in attachments L-7 and L-8, and only submit the annual detail tabs electronically?

3. Can instruction be given to only print Attachments L-7 and L-8 in the 1 required original, and electronically only in the 5 required copies?

The Government requires the stated amount of copies and does not intend to change the requirement.

3) Will a conformed copy of the solicitation be provided?

A conformed copy is not required to be submitted as a Model Contract with proposals. See Question #1 above.

4) RFP Reference: Section L, Part B, paragraphs 2.2.2 and 6.f Discussion: Final RFP Section L, Part B, paragraph 2.2.2, page 462, requires a copy of the QCPP to be included as part of Volume 6 Contracts Administration.

The requirement was removed from the Volume 6 instructions (paragraph 6.f, page 482) in the final RFP; however, the text was not removed from paragraph 2.2.2.

Question: Does the Government require the QCPP be submitted in both Annex C and Volume 6?

The Government does require the QCPP to be submitted in both volumes since Annex C is part of the technical proposal to be evaluated and Volume 6 includes documents that would become part of the Contract upon award. Section L-1 Volume 6 Instructions will be revised to include the QCPP as part of Volume 6 via Solicitation Amendment 2.

File details come from the government source that posted it. Updated .