CDRLs_Exhibit_A_(unsigned).pdf

PDF 1 MB Posted

Attached to
USN T-45 Aircraft Maintenance and Logistics Support
Solicitation number
N00019-12-R-0001
Issued by

About this file

Exhibit A (unsigned - easier to read)

View the file

Other files

File Type Posted
Att01_T45CLS_PWS_2.3.14.pdf PDF
N00019-12-R-0001_Amendment_0005.pdf PDF
L-9.1_Vol_3_CSDR_Sub_Rpt_Example.xlsx XLSX spreadsheet
Att41_CNATRA_INST_4355.4A.pdf PDF
Att30_NASPAX_05-2103-13.txt TXT text file
Att27_NASK_AWD_05-2508-15.txt TXT text file
Att06_Applicable_Docs.xlsx XLSX spreadsheet
Att01_T45CLS_PWS_12.19.13.doc DOC document
Att33_NASP_CBA_WD-2013-5799.mht MHT file
L-6_Vol_3_B_Matrix.xlsx XLSX spreadsheet
Exhibit_A_signed_12.19.13.pdf PDF
L-13_Vol_3_Manning_Supplement.xlsx XLSX spreadsheet
Att32_NASM_CBA_WD-2013-5802.mht MHT file
Att28_NASM_AWD_05-2300-15.txt TXT text file
Att29_NASP_AWD_05-3034-15.txt TXT text file
Att31_NASK_CBA_WD-2013-5800.mht MHT file
Att02_Supplement_to_the_Exhibits _Explanation_of_Contract_Data_Requirements_List_CDRL.docx DOCX document
Amendment_4.doc DOC document
N00019-12-R-0001_Amendment_0003.pdf PDF
5.22.2013_Q A.docx DOCX document
5.20.2013_Q A.docx DOCX document
N00019-12-R-0001_Amendment_2.doc DOC document
L-9_Vol_3_CSDR_20130509.xlsx XLSX spreadsheet
Exhibit_A_CDRL_Revisions.PDF PDF
Att01_T45CLS_PWS_10MAY2013.doc DOC document
Additional_Solicitation_Questions_and_Responses.docx DOCX document
Att40_Requisitioned_GFP_List_30APR2013.pdf PDF
L-8_Vol_3_Sub_CCS_20130429.xlsx XLSX spreadsheet
N00019-12-R-0001_Amendment_0001.doc DOC document
Att39.3_NASP_Scheduled_GFP_List_30APR2013.pdf PDF
Att01_T45CLS_PWS_30APR2013.doc DOC document
Att08_T45_GFP(NALCOMIS)_30APR2013.xlsx XLSX spreadsheet
L-7_Vol_3_Prime_CCS_20130429.xlsx XLSX spreadsheet
Att39.2_NASM_Scheduled_GFP_List_30APR2013.pdf PDF
L-6_Vol_3_B_Matrix_20130429.xlsx XLSX spreadsheet
Att38_Radioactive_Inventory_T45_30APR2013.docx DOCX document
Att39.1_NASK_Scheduled_GFP_List_30APR2013.pdf PDF
Att33.1_NASP_CBA_WD-2013-5799.mht MHT file
Att39.4_NAS_PAX_Scheduled_GFP_List_30APR2013.pdf PDF
Att32.2_NASM_CBA_WD-2013-5802.mht MHT file
Att17_Real_Property_GFP_30APR13.docx DOCX document
Exhibit_A_CDRL_29Apr13.PDF PDF
Att31.2_NASK_CBA_WD-2013-5800.mht MHT file
Final_RFP_Q A.xlsx XLSX spreadsheet
REMAINING_Pre_Conf_Feedback_Responses_4.29.2013.xlsx XLSX spreadsheet
REMAINING_Feedback_Responses_Post-Conf.4.29.2013.docx DOCX document
Att36_CNATRA_Other_GP.xlsx XLSX spreadsheet
Feedback_Responses_Post-Conf_3.22.2013.pdf PDF
PRE_Conf_Feedback_Responses_3.22.2013.xlsx XLSX spreadsheet
T-45_L1 M1_20130128.docx DOCX document
Show 40 more

Latest 50 of 192 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00019-12-R-0001: T-45CLS CDRL-PWS Cross Reference Locator

BLOCK 1 BLOCK 5 BLOCK 2 BLOCK 3 BLOCK 4 BLOCK 6 BLOCK 7 BLOCK 8

CDRL Data

Item # PWS Title SubTitle DID Requiring Office DD250 APP

A001 5.1.1.6, 5.14.21 Management Plan Contractors Flight & Ground Operations Plan DI-MGMT-80004A CNATRA T-45 Class Desk DD A

A002 5.1.1.12, 5.7.6.14 Corrosion Prevent and Control Plan Corrosion Control Program Plan DI-MFFP-81403 CNATRA T-45 Class Desk DD A

A003 5.1.1.19, 5.2.3 Technical Report - Study /Services Monthly Maintenance Plan (MMP) DI-MISC-80508B CNATRA T-45 Class Desk XX N/A

A004 5.1.1.22, 5.17.1.1.1 Technical Report - Study /Services Daily Aircraft Status Report (DASR) DI-MISC-80508B CNATRA T-45 Class Desk XX A

A005 5.1.1.22 Technical Report - Study /Services Plan of Action and Milestones (POA&M) DI-MISC-80508B CNATRA T-45 Class Desk DD A

A006 5.1.4.3.5 Technical Report - Study /Services Stricken Aircraft Reclamation and Disposal Program (SARDIP) DI-MISC-80508B CNATRA T-45 Class Desk DD A

A007 5.1.5, 5.6.6.17.2.15 Technical Report - Study /Services Over & Above Work Request (OAWR) DI-MISC-80508B DCMA ACO DD A

A008 5.1.6.2.5 Technical Report - Study /Services Ordnance Expenditure and Inventory Report DI-MISC-80508B

CNATRA DET TPOC

(OIC/AOIC) XX N/A

A009 5.1.6.2.10 Technical Report - Study /Services Armament Equipment and Ordnance Device Report DI-MISC-80508B CNATRA T-45 Class Desk XX N/A

A010 5.1.8.1.1 Management Plan Seven (7) Year Depot Maintenance Plan DI-MGMT-80004A PMA-273 T-45 APML XX A

A011 5.1.8.1.5

Request for Programmed Depot

Maintenance (PDM) Integrated Maintenance Program (IMP) and S&P Status Report DI-ILSS-80234A PMA-273 T-45 APML XX N/A

A012 5.3.1.3.6 Technical Report - Study /Services Individual Component Repair List (ICRL) DI-MISC-80508B CNATRA T-45 Class Desk XX N/A

A013 5.12.1.2.1 Technical Report - Study /Services Off-Site Repair of Repairables Report DI-MISC-80508B CNATRA PA XX N/A

A014 5.7.4 Quality System Plan Quality Control Program Plan Updates DI-QCIC-81379 CNATRA QAPM XX A

A015 5.8.6.2 Technical Report - Study /Services FLT Components Summary Report DI-MISC-80508B PMA-273 T-45 IPTL XX N/A

A016 5.8.6.4 Contract Summary Report Aircraft Summary Report DI-ADMN-80447A PMA-273 T-45 IPTL XX N/A

A017 5.8.6.5 Contract Summary Report Flight Matching Report DI-ADMN-80447A PMA-273 T-45 IPTL XX N/A

A018 5.10.1 Parts Management Plan Obsolescence and DMSMS Management Plan DI-SDMP-81748 PMA-273 T-45 IPTL DD A

A019 5.10.2 Parts Management Plan Obsolescence/DMSMS Parts Recommendations DI-SDMP-81748 PMA-273 T-45 IPTL LT N/A

A020 5.10.5 Contract Summary Report DMSMS Status Report DI-ADMN-80447A PMA-273 T-45 IPTL XX N/A

A021 5.10.6

Source Data for Forecasting

Diminishing Manufacturing Sources and Material Shortage (DMSMS) DMSMS Bill of Materials (BOM) DI-SESS-81656 PMA-273 T-45 IPTL XX A

A022 5.10.6 Parts Management Plan Bill of Materials (BOM) Mitigation Plan DI-SDMP-81748 PMA-273 T-45 IPTL XX A

A023 5.10.6.4, 5.22.6 Engineering Change Proposal N/A DI-CMAN-80639C PMA-273 T-45 IPTL XX A

A024 5.11.3.4, 5.12.1 Technical Report - Study /Services Supply Management Performance Report DI-MISC-80508B CNATRA PA XX A

A025 5.12.1.4, 5.13.5

Status of Government Furnished

Equipment (GFE) Report Government Property (GP) - Parts List & Usage DI-MGMT-80269 CNATRA PA XX N/A

A026 5.12.1.8 Contract Summary Report Stock Level Change Request DI-ADMN-80447A CNATRA PA XX N/A

A027

5.12.2, 5.13.1, 5.14.2.2.3, 11.4.1.1 Technical Report - Study /Services Property Management Plan, System and Procedures DI-MISC-80508B CNATRA PA DD A

A028 5.12.2.1 Contract Summary Report Material Requisition Request Report DI-ADMN-80447A CNATRA PA XX N/A

A029 5.12.3.2 Technical Report - Study /Services IUID Items Data Report DI-MISC-80508B PMA-273 T-45 IPTL XX N/A

A030 5.14.24

Radiological Affairs Support

Program RASP Command Inventory Report NAVSEA-S0420-AA-RAD-010 RASO XX N/A

A031 5.12.6, 5.12.6.1 Technical Report – Study/Services NMCS/PMCS Report DI-MISC-80508B CNATRA PA XX N/A

A032 5.12.7 Warranty Performance Report Warranty Items Report DI-SESS-81639 PMA-273 T-45 IPTL XX N/A

A033

5.13.3, 5.14.1.3.1, 7.2.1, 11.4.1.2 Physical Inventory report DLR RPs SL AWP Inv Report DI-MGMT 80259 CNATRA PA XX N/A

A034 5.13.4, 5.15.5 Technical Report - Study /Services Financial Liability Investigation of Property Loss (DD Form 200) DI-MISC-80508B CNATRA PA XX A

A035 5.13.6, 5.13.7 Technical Report - Study/Services BER/BCM DI-MISC-80508B CNATRA PA XX N/A

A036 5.14.9 System Safety Program Plan (SSPP) N/A DI-SAFT-81626 PMA-273 T-45 IPTL DD A

A037 5.13.5

Excess Stock Onhand and Excess

Stock On Order Report N/A DI-MISC-81420 CNATRA PA XX N/A

A038 5.13.8, 5.15.7 Trainer Facilities Report Facility Security Plan DI-FACR-80966 CNATRA N4 & CNATRA PA DD A

A039 5.15.8.4, 5.16.2 Corrosion control facility reporting N/A

40 CFR Parts 350-372 EPCRA, 29 CFR 1910.1200 Base Environmental XX A

A040 5.16

Environmental Operational and

Maintenance (O&M) Plan N/A DI-ENVR-81378 Base Environmental DD A

A041 5.16, 11.3.6 Safety Data Sheets (SDS) N/A

40 CFR Parts 350-372 EPCRA, 29 CFR 1910.1200

Base Environmental, NAVSUP

HazMat Supply, CHRIMP XX A

A042 5.16.2.10 Refrigerant Reporting N/A

40 CFR Part 82, OPNAV

5090.1C, Base Environmental

XX A

A043 5.22.3

Engineering and Technical Services

Accomplishment Report Engineering Investigation Report DI-MGMT-80061A PMA-273 T-45 IPTL XX A

A044 5.22.5 Technical Report - Study /Services Engineering Analysis Report DI-MISC-80508B PMA-273 T-45 IPTL XX A

A045 6.1.2

Contract Funds Status Report

(CFSR) N/A DI-MGMT-81468 PMA-273 T-45 IPTL XX N/A

A046 6.1.2 Contract Work Breakdown Structure N/A DI-FNCL-81334D NAVAIR 4-2 LT N/A

A047 6.1.2

Contractor Sustainment Report (DD

Form1921-4) N/A DI-FNCL-81831 NAVAIR 4-2 LT N/A

A048 5.12.1.3

Status of Government Furnished

Equipment (GFE) Report Government Property – Inventory Stock Level Adjustment Report DI-MGMT-80269 CNATRA PA XX N/A

A049 5.13.3.1

Report of receipts, inventory, adjustments, and shipments of GP Government Furnished Property Inventory Plan DI-MGMT 80442 CNATRA PA XX N/A

A050

5.13.3, 5.13.9,

5.13.10 Physical inventory report Other GFP Inv report DI-MGMT 80259 CNATRA PA XX N/A

A051 5.13.3.2 Physical Inventory report Government Furnished Property Tool Inventory Report DI-MGMT 80259 CNATRA PA XX N/A

A052 5.13.10, 11.4.4 Property Control Report Contractor Owned Property Report DI-MISC-81420 CNATRA PA XX N/A

A053 5.14.24

Radiological Affairs Support

Program Ionizing Radiation Producing Machine/Equipment Registration NAVSEA-S0420-AA-RAD-010 RASO XX N/A

A054 5.14.24 Management Plan

Command RASP Instruction and Operating and Emergency

Procedures DI-MGMT 80004A RASO XX N/A

A055 5.14.24

Aviation Non-Destructive Inspection

Capability Report CNAF4790/143 FORM

COMNAVAIRFORINST4790.2

Series COMNAVAIRFORCE N422C XX N/A

A056 5.14.24

RASO Inspection Corrective Action

Response N/A NAVSEA-S0420-AA-RAD-010 RASO XX N/A

A057

5.13.3.2, 5.14.1.3.1, 11.4.1.2, 11.4.2.2

Government Furnished Property

Attachments to Solicitations and

Awards

Requisitioned and Scheduled Government Furnished Property

Lists DFARS PGI 245.201-71 CNATRA PA XX N/A

A058 5.13.11 Technical Report - Study /Services Government Property Temporary Loan Request/Report DI-MISC80505B CNATRA PA XX N/A http://www.assistdocs.com/search/document_details.cfm?ident_number=204834&StartRow=1&PaginatorPageNumber=1&title=GOVERNMENT%20FURNISHED%20EQUIPMENT&status%5Factive=on&search%5Fmethod=BASIC http://www.assistdocs.com/search/document_details.cfm?ident_number=204834&StartRow=1&PaginatorPageNumber=1&title=GOVERNMENT%20FURNISHED%20EQUIPMENT&status%5Factive=on&search%5Fmethod=BASIC

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP _____ TM _____ OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 MANAGEMENT PLAN

CONTRACTOR’S FLIGHT AND GROUND OPERATIONS

PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80004A (SEE BLK 16) PWS PARAS. 5.1.1.6, 5.14.21 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

C

(SEE BLK 16)

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD

(SEE BLK 16) (SEE BLK 16)

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSSION.

Draft

Final

A

N/A (SEE BLK 16) Reg Repro

16. REMARKS

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LISTS” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: DI-MGMT-80004A PARAGRAPHS 3.2 THROUGH 3.7 ARE REVISED TO READ AS

FOLLOW: THE PLAN SHALL PROVIDE THE INFORMATION REQUIRED BY DCMAINST8210

/NAVAIRINST3210 1F (ATTACHMENT 10 OF NAVAIRINST 3210 1F).

BLOCK 8: THE GOVERNMENT WILL HAVE 5 DAYS TO REVIEW AND COMMENT.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 10, 12 &13: THE INITIAL DRAFT OF THE COMPLETE PLAN IS DUE 15 DAC. FINAL

PLAN SHALL BE SUBMITTED 15 DAYS AFTER RECEIPT OF THE GOVERNMENT’S

COMMENTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE

EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION GOSNET

INSTRUCTIONS”.

PMA 273 T-45 IPTL 1

CNATRA N4 1

SEE BLK 16

15. TOTAL ▬▬▬▬► 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Larry Proctor, CNATRA Contract Administrator

Alja Musarro, PMA-273A Deputy Program Manager

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP _____ TM _____ OTHER MFFP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 CORROSION PREVENTION AND CONTROL PLAN CORROSION CONTROL PROGRAM PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MFFP-81403 (SEE BLOCK 16) PWS PARAS. 5.1.1.12, 5.7.6.14 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD

C

ANNLY

30 DAC

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBM.

N/A (SEE BLK 16) Reg Repro

16. REMARKS

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT

DATA REQUIREMENTS LISTS” FOR ADDITIONAL INFORMATION ON CDRL

INTERPRETATION.

BLOCK 4: TAILORED DID PARAGRAPH 7.1 TO REMOVE CANCELLED MIL-STD-1568 AS

GUIDANCE AND REFER TO SUPPLEMENTAL INSTRUCTION FROM CORROSION

PREVENTION AND CONTROL, PLANNING GUIDEBOOK SPIRAL 3, DTD SEPTEMBER 2007

(LOCATED ON HTTP://WWW.CORRDEFENSE.ORG). SECTION 2.2.4 & APPENDIX C OF

THE CPC GUIDEBOOK PROVIDES FOR CNTENTS OF A CORROSION PREVENTION AND

CONTROL PLAN.

BLOCK 8: THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND COMMENT. THE

CONTRACTOR SHALL SUBMIT THE FINAL PLAN WITHIN 30 DAYS AFTER RECEIPT OF

THE GOVERNMENT’S COMMENTS.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT

TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 13: THE CONTRACTOR SHALL DELIVER SUBSEQUENT SUBMISSIONS AT THE

END OF FY + 5 CALENDAR DAYS AND TO COMPLY WITH CHANGES TO THE CONTRACT

OR MAINTENANCE MANUALS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP _____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 TECHNICAL REPORT - STUDY/SERVICES MONTHLY MAINTENANCE PLAN (MMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) PWS PARAS. 5.1.1.19, 5.2.3 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX

C

MTHLY

45 DAC

a.

ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

N/A

EOM - 5 DAYS Reg Repro

16. REMARKS PMA 273 T-45 IPTL 1

BLOCK 4: TAILOR DID CONTENT TO INCLUDE FOLLOWING:

THE PLAN SHALL PROVIDE THE DATA REQUIRED BY COMNAVAIRFORINST 4790.2 (SERIES) AND

ATTACHMENT 1, PARAGRAPHS 5.1.1.19, 5.2.3 AND INCLUDE A LIST OF PROJECTED SIGNIFICANT MAINTENANCE ACTIONS REQUIRED DURING THE NEXT 3 MONTHS. THE PLAN SHALL INCLUDE THE

FOLLOWING:

A. REPLACEMENT OF LIFE LIMTIED ITEMS BY DD/MM/YYYY (PROJECTED FOR 90 CALENDAR

DAYS FROM DATE OF REPORT)

B. INSPECTION SCHEDULES

C. STRIP, REPAINT AND CORROSION SCHEDULES

D. HIGH FAILURE ITEMS

E. CALIBRATION REQUIREMETNS

F. WEIGHT AND BALANCE INFO

G. PERSONNEL RE-QUALIFICATIONS

H. PERSONNEL CERTIFICATIONS

I. EQUIPMENT AND SUPPORT EQUIPMENT LICENSE RENEWAL

J. ON-SITE CONTRACTOR PERSONNEL ACTUAL HEAD COUNT

K. CONTRACTOR MANAGEMENT CONTACT INFORMATION

L. SIGNATURE AUTHORITIES

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES

ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1

MARKING OF CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE EXHIBITS:

CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION GOSNET INSTRUCTIONS”.

CNATRA DET OIC 1

15. TOTAL▬▬► 3

CDRL DATA ITEM A004 BLOCK 16, BLOCK 4 Continuation (SUBMISSION FORMAT) N00019-12-R-0001

TRAINING WING ____ DAILY AIRCRAFT STATUS REPORT

DATE:

ITEM NO. ACFT REMARKS NOT A-30 AIRCRAFT BUNO/STATUS

ASSIGNED MOD PROCESS

ACTUAL INDUCTION

DATE ECD

NOT A-30

ACO EXEMPT

FCF

NMCS

NMCM

PHASE

125-HOUR

112-DAY DEPOT REPAIR

ACTUAL INDUCTION

DATE ECD

728-DAY

MOD/IMP/S&P

RFT (0700) IMP PROCESS

ACTUAL INDUCTION

DATE ECD

RFT LOCAL (0700)

PREVIOUS DAY RFT (0700)

PREVIOUS DAY RFT (1230)

PREVIOUS DAY RFT (1745)

PREVIOUS DAY RFT (2015)

STRIP AND PAINT

(S&P)

ACTUAL INDUCTION

DATE ECD

CROSS COUNTRY

NON A-30 BFW

A-30 BFW

DET AIRCRAFT

A30 STATUS NON-FLYABLE AIRCRAFT

NMCS AIRCRAFT NMCM AIRCRAFT

MODEX BUNO

DAYS

SINCE

LAST

FLIGHT

DISCREPANCY

NO.

REQS

DOWN

GRIPES

MODEX BUNO

DAYS

SINCE

LAST

FLIGHT

DISCREPANCY

DOWN

GRIPES

FLIGHT DATA SUMMARY

FLIGHT HOURS FLOWN: DAY: WEEK: MONTH: QUARTERLY: FLGHT HOURS FYXX:

FLIGHTS: DAY: WEEKLY: MONTHLY:

DET HOURS: DAY: WEEKLY: MONTHLY:

DET FLIGHTS: DAY: MONTHLY: TRAPS: DAY:

ACCIDENT FREE HOURS:

CORRECTIONS/COMMENTS:

SORTIE SCHEDULED: ADD ON: TOTAL SCHD: SORTIES COMPLETED: MCX:

CANCELLATIONS: OPS: WX: MAINT: ABORT:

CORRECTIONS/COMMENTS:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP _____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A004 TECHNICAL REPORT – STUDY/SERVICES DAILY AIRCRAFT STATUS REPORT (DASR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.1.22, 5.17.1.1.1 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX

C

DAILY

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.

Draft

Final

A

(SEE BLK 16)

16. REMARKS CNATRA N4 1

BLOCK 4: CONTRACTOR FORMAT ON BACK.

BLOCK 8: CONTRACTOR HAS 1 CALENDAR DAY FROM RECEIPT OF THE GOVERNMENT

RESPONSE FOR RE-SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 12 & 13: THE FIRST SUBMISSION SHALL BE ON THE FIRST DAY OF FULL PERFORMANCE.

REPORT SHALL BE SUBMITTED NOT LATER THAN 0800 (CENTRAL TIME) FOR EACH NORMAL

(MONDAY – FRIDAY) AND EACH SURGE WORKDAY. DETACHMENTS SHALL SUBMIT THE

REPORT TO MEET THE CENTRAL TIME SUBMISSION TIME FRAME 0800 (CENTRAL TIME),

WITHOUT REGARDING LOCATION.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

0X23 A TDP _____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 TECHNICAL REPORT – STUDY/SERVICES PLAN OF ACTION AND MILESTONES (POA&M)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED TOTAL

PRICE

DI-MISC-80508B, (SEE BLK 16) PWS PARA 5.1.1.22 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX

C

ASREQ

a.

ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSON

N/A (SEE BLK 16) Reg Repro

16. REMARKS

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LISTS” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: THE POA&M SHALL BE IN MS PROJECT USING A SCHEDULE FORMAT. THE POA&M

SHALL IDENTIFY ALL ACTIONS AND MILESTONES REQUIRED TO RETURN AN AIRCRAFT TO

FLYABLE STATUS.

BLOCK 8: REFER TO SECTION E OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR

INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION.

CONTRACTOR HAS 10 CALENDAR DAYS FROM RECEIPT OF THE GOVERNMENT RESPONSE FOR

RE-SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE

NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1

MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 &13: THE CONTRACTOR SHALL DELIVER THE FIRST SUBMISSION OF POA&M, NLT 30-

CALENDAR DAYS AFTER LAST FLIGHT OF THE AIRCRAFT DEEMED NON-FLYABLE. SUBSEQUENT

SUBMISSIONS SHALL BE DELIVERED WEEKLY UNITL A/C IS DEEMED FLYABLE BY THE

GOVERNMENT. FOR ACTIVATION/DEACTIVATION, FIRST SUBMISSION SHALL BE DELIVERED NLT

30 CALENDAR-DAYS PRIOR TO ESTIMATED ACTIVATION/DEACTIVATION DATE.

CNATRA DET 1

15. TOTAL

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP _____ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 TECHNICAL REPORT - STUDY/SERVICES

STRICKEN AIRCRAFT RECLAMATION AND DISPOSAL

PROGRAM REPORT (SARDIP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.4.3.5 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD

C

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

A

(SEE BLK 16)

16 REMARKS CNATRA N4 1

BLOCK 4: CONTRACTOR’S FORMAT IS ACCEPTABLE. THE REPORT SHALL IDENTIFY THE PARTS

RECOMMENDED FOR REMOVAL PRIOR TO AN AIRCRAFT ENTERING SARDIP. AS A MININUM THE

REPORT WILL PROVIDE THE FOLLOWING INFORMATION FOR EACH PART RECOMMENDED FOR

REMOVAL:

1. AIRCRAFT BUNO

2. PART NUMBER

3. NOMENCLATURE

4. PART UNIT PRICE

BLOCK 8: REFER TO SECTION E OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR

INSPECTIONS AND ACCEPTANCE OF ADMINSITRATIVE TECHNICAL DATA AND INFORMATION.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES

ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D,

D-1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 12 &13: THE CONTRACTOR SHALL DELIVER FIRST AND SUBSEQUENT SUBMISSIONS

WITHIN 10 CALENDAR DAYS UPON GOVERNMENT REQUEST.

PMA-273 T-45 IPTL 1

15. TOTAL▬▬▬► 2

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHER__MISC____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A007 TECHNICAL REPORT – STUDY/SERVICES OVER AND ABOVE WORK REQUEST (OAWR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16)

CLAUSE H-7 & PWS PARAS. 5.1.5,

5.6.6.17.2.15

DCMA ACO

7. DD 250 REQ 9. DIST STATEMENT

DD

(SEE BLK 16)

ASREQ ASREQ

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

A

(SEE BLK 16)

N/A ASREQ Reg Repro

CNATRA N-4 1

BLOCK 4: TAILOR DID CONTENT TO INCLUDE T-45 O, I & D LEVEL REPAIR. SUPPLEMENTAL

INSTRUCTION LISTED BELOW.

THE DATA FOR EACH AIRCRAFT TYPE SHOULD BE REPORTED WITHIN A SEPARATE MS EXCEL

FILE WITH COLUMN HEADINGS AS THE FOLLOWING:

1. DATE OF OAWR

2. ASSIGNED OAWR NUMBERS

3. AIRCRAFT IDENTIFICATION PROGRAM (T-45)

4. BUNO NUMBER

5. CONTRACT NUMBER

6. CLIN/ACRN

7. CONTRACT DATE

8. T/M/S

9. SITE

10. NATIONAL STOCK NUMBER (NSN)

11. NOMENCLATURE (NOUN)

12. SERIAL NUMBER, IF APPLICABLE

13. PART NUMBER

14. ITEMS RETURNED TO THE VENDORS(S) FOR REPAIR OR REPLACEMENT

15. QTY

16. COVERED UNDER WARRANTY DURING THIS PERIOD (COMPLETE DOCUMENTATION ON

WARRANTY LIST CDRL A012)

17. CALENDAR REPORTING PERIOD COVERED BY THE REPORT

18. CONTACTOR’S NAME

19. CONTRACTOR’S CAGE CODE

20. CONTRACTOR’S DODAAC

21. DELIVERY DATE (DATE OF DD250)

22. SHIPPING DATE (DATE ITEM RETURNED TO VENDOR) DESTINATION

23. IN-SERVICE DATES (DATE WHEN ITEM RETURNED TO FIELD)

24. DATE RECEIVED BY REPAIR FACILITY

25. GOVERNMENT REPAIR AUTHORIZATION DATE

26. ESTIMATED WORK BEGIN DATE

27. ESTIMATED WORK END DATE

28. TOTAL DISASSEMBLY MANHOURS

29. CALCULATION OF TOTAL ESTIMATED (MANHOURS X UNIT COST) COST

30. CALCULATION OF TOTAL ACTUAL (MANHOURS X UNITY COST) COST

(CONT’D)

or

NAS PAX TPOC 1

DCMA ACO

PMA 273 T-45 IPTL

15. TOTAL▬▬▬► 1 2

Mary Ann Foran, PMA-273B T-45 IPTL

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHER______

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 (CONT’D) TECHNICAL REPORT – STUDY/SERVICES OVER AND ABOVE WORK REQUEST (OAWR)

16. REMARKS (CONT’D)

BLOCK 4 (CONT’D)

31. ESTIMATED UNIT PRICE

32. ESTIMATED EXTENDED PRICE

33. ESTIMATED MANHOURS

34. ESTIMATED DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

35. SPECIAL REQUIREMENTS NECESSARY (FIXTURE REQUIRED, ETC.)

36. LEVEL OF MAINTENANCE REQUIRED FOR REPAIR (I-, O-, & D-LEVEL)

37. PART(S) REQUIRED

a. NATIONAL STOCK NUMBER (NSN)

b. NOMENCLATURE (NOUN)

c. SERIAL NUMBER, IF APPLICABLE

d. PART NUMBER

e. QT Y REQUIRED

f. CONTRACTOR’S NAME

g. CONTRACTOR’S CAGE CODE

h. CONTRACTOR’S DODAAC

i. QTY IN STOCK (IF NONE)

j. IS THE PART REQUEST AS A RESULT OF D-/O-LEVEL MAINTENANCE?

38. REQUIRED REPAIR ACTIONS

39. ADDITIONALLY, FOR CORROSION, REPORT TYPE AND SEVERITY DEFECTS DISCOVERED DURING ACI INCLUDING

a. COMPLETE DESCRIPTION OF DEFECT INCLUDING SIZE, SEVERITY, AND CRITICALITY, JOR, MINOR

1. ACCURATE LOCATION OF THE DEFECT

2. DESCRIPTION OF CORRECTIVE ACTION TAKEN

3. ACI TASK NUMBER WHEN DEFECT DISCOVERED

4. DESCRIBE ANY SPECIAL WORK REQUESTED BY THE SERVICE, ANY DIFFICUTLIES ENCOUNTED WHILE PERFORMING THE WORK, AND THEN NUMBER OF MANHOURS TO COMPLETE

40. REASON FOR RETURN / MALFUNCTION CODE

41. EXTENT OF THE REPAIRS REQUIRED, INCLUDING MAJOR COMPONENTS TO BE REPAIRED OR REPLACED AND STRUCTURAL REPAIR

REQUIRED

42. TYPE OF PRESERVATION REQUIREMENTS ANTICIPATED, IF ANY

43. PART AND/OR MATERIAL REQUIRED FOR BY PART NUBMER NOMENCLATURE AND PRICE

44. ESTIMATED DELIVERY DATE FOR MATERIAL/PARTS

45. PERCENT OF PARTS RECEIVED

46. ACTUAL UNIT PRICE (AT COMPLETION OF REPAIR)

47. ACTUAL EXTENDED PRICE (AT COMPLETION OF REPAIR)

48. TOTAL ACTUAL DURATION IN NUMBER OF DAYS NECESSARY TO EFFECT REPAIRS

BLOCKS 7 & 8: REFER TO CLAUSE H-7 OF THIS CONTRACT FOR TERMS AND CONDITIONS FOR INSPECTIONS AND ACCEPTANCE OF ADMINISTRATIVE TECHNICAL DATA AND INFORMATION. CONTRACTOR HAS 10 CALENDAR DAYS, FROM RECEIPT OF THE GOVERNMENT

RESPONSE FOR RE-SUBMITTAL, IF REJECTED.

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL)

DATA SUBMISSION GOSNET INSTRUCTIONS”.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ___ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 TECHNICAL REPORT - STUDY/SERVICES ORDNANCE EXPENDITURE REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.6.2.5 CNATRA N4 DET OIC

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

XX

DAILY DAY 1 OF FULL PERFORMANCE

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

N/A N/A DAILY Reg Repro

16. REMARKS

BLOCK 4: MS EXCEL FORMAT IS ACCEPTABLE. THE REPORT SHALL PROVIDE THE

INFORMATION REQURIED BY CNATRAINST 8011.1 (SERIES)

Example/Sample:

Date:

Training Wing & Location:

Nomenclature:

NALC:

Qty Received from Weapons Qty Expended Qty Returned to Weapons List all Ordnance unaccounted for, the circumstances and the CLS contractor’s POC leading the investigation:

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO

THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA

DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY.

REFER TO SECTION D, D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE

CNATRA N4 DET OIC 1

CNATRA N4 CLASS

DESK

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ___ TM _____ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A009 TECHNICAL REPORT - STUDY/SERVICES

ARMAMENT EQUIPMENT AND ORDNANCE DEVICE

REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.1.6.2.10 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

QTRLY 3 MAC + 15 DAYS

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

N/A N/A EOQ + 15 DAYS Reg Repro

16. REMARKS

BLOCK 4: CONTRACTOR’S FORMAT IS ACCEPTABLE. THE REPORT SHALL PROVIDE THE

INFORMATION REQURIED BY CNATRAINST 8382.1 (SERIES)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

0X23 A TDP _____ TM _____ OTHER MGMT

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A010 MANAGEMENT PLAN SEVEN (7) YEAR DEPOT MAINTENANCE PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80004A (SEE BLK 16) PWS PARA. 5.1.8.1.1 PMA 273 T-45 APML

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

D

SEMIA 30 DAYS AFTER FULL PERFORMANCE

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

A

(SEE BLK 16)

BLOCK 4: THE PLAN SHALL INCLUDE SEPARATE TABS TO TRACK ALL DEPOT LEVEL REQUIREMENTS BY FISCAL YEARS. THE PLAN SHALL PROVIDE A LISTING, BY AIRCRAFT, OF PLANNED (FFP) AND UNPLANNED (LH) TD INCORPORATIONS, INTEGRATED MAINTENANCE PLANNING (IMP) EVENTS, AND STRIP AND PAINT EVENTS. FOR EXAMPLE, EACH SUBMISSION SUMMARY SHALL INCLUDE QTY OF

DEPOT EVENTS, INCLUDING IMP, TD, AND STRIP AND PAINT, TO INCLUDE TOTAL MANHOURS

ANTICIPATED FOR LABOR-HOUR TD INCORPORATIONS (WHEN APPLICABLE), AND TOTAL AIRCRAFT (A/C) RECEIVING DEPOT WORK. THE PLAN SHALL ALSO PROVIDE A LISTING BY A/C, OF ALL DEPOT

LEVEL EVENTS COMPLETED DURING THE SIX MONTHS PRECEDING THE PLAN SUBMISSION. THE

PLAN SHALL INCLUDE THE DATA FIELDS SHOWN LISTED BELOW:

1. CUMULATIVE #

2. BUNO

3. MODEX

4. ESTIMATED START

5. ESTIMATED COMPLETION DATE

6. ENGINEERING CHANGE PROPOSAL #

7. TD #

8. REVISION #

9. AMENDMENT #

10. PART #

11. KIT #

12. TD TITLE

13. MAINTENANCE LEVEL

14. COMPLIANCE REQUIREMENT/LIMIT (FLIGHT HOURS, CAT, TRAPS, TYCOM DIRECTION, NEXT

DEPOT EVENT, ETC.)

15. STATUS RELATIVE TO COMPLIANCE REQUIREMENT/LIMIT

16. MAN-HOURS REQUIRED FOR EACH (LH) TD

17. TOTAL COMBINED ANTICIPATED TD HOURS

18. NOTES

BLOCK 8: GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND COMMENT. FINAL PLAN SHALL BE

SUBMITTED NLT 30 DAYS AFTER RECEIPT OF THE GOVERNMENT’S RESPONSE.

(CONT’D)

PMA 273 T-45 APML 1

SEE BLOCK 16

15. TOTAL ▬▬► 1 2

John Jordan, PMA-273 T-45 APML

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 (CONT’D) MANAGEMENT PLAN SEVEN (7) YEAR DEPOT MAINTENANCE PLAN

16. REMARKS (CONT’D)

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-

1 MARKING OF CONTRACTOR REPORTS.

BLOCKS 13: SUBSEQUENT SUBMISSION SHALL BE ON JUN 5

TH

AND DEC 5

TH

OF EACH YEAR.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE EXHIBITS: CONTRACT DATA REQUIREMENTS LIST (CDRL)

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 2 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHER ILSS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A011 REQUEST FOR PROGRAMMED DEPOT MAINTENANCE (PDM) INTEGRATED MAINTENANCE PROGRAM (IMP) AND STRIP &

PAINT (S&P) STATUS REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ILSS-80234A (SEE BLK 16) PWS PARA. 5.1.8.1.5 PMA 273 T-45 APML

7. DD 250 REQ

9. DIST STATEMENT

C (SEE BLK 16)

XX MTHLY

30 DAYS AFTER FULL PERFORMANCE

COMMENCEMENT

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

N/A N/A MTHLY Reg Repro

16. REMARKS PMA 273 IPTL 1

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA REQUIREMENTS

LISTS” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: DID TAILORED AS FOLLOWS: SECTION 10.2 AND 10.3 IN CONTRACTOR’S FORMAT; SECTION 10.3

DELETE INFORMATION IN BLOCK 5, 6, 7 AND 9; SECTION 10.4 APPLIES TO

STRIP/INSPECTION/TREAT/PAINT/MARK COST AND QUANITIES AND IMP COST AND QUANTITIES. THIS

REPORT SHALL INCLUDE THE DATA FIELDS SHOWN LISTED BELOW:

1. BUNO

2. REWORK TYPE (STRIP & PAINT IMP 1/2/3/4/5/6)

3. REWORK LOCATION

4. SCHEDULED INDUCTION DATE (DDMMYYYY)

5. ACTUAL INDUCTION DATE (DDMMYYYY)

6. SCHEDULED COMPLETION DATE (DDMMYYYY)

7. ACTUAL COMPLETION DATE (DDMMYYYY)

8. PLANNED CYCLE TIME (IN HOURS)

9. ACTUAL CYCLE TIME (IN HOURS)

10. PLANNED MATERIAL COST

11. ACTUAL MATERIAL COST

12. PLANNED UNIT COST

13. ACTUAL UNIT COST

14. IMP PARTS & MATERIAL REQUISITION DATA: MATERIAL NOMENCLATURE, INDICATECOMMERICIAL OR

NAVY SUPPLY SYSTEM, PART NUMBER, NSN, QUANTITY, COST, TOTAL COST

15. STRIP & PAINT PARTS & MATERIAL REQUISITION DATA: MATERIAL NOMENCLATURE,

INDICATE COMMERICIAL OR NAVY SUPPLY SYSTEM, PART NUMBER, NSN, QUANTITY, COST, TOTAL

COST

16.(IF APPLICABLE) OVERRUN COMMENTS TO INCLUDE MATERIAL COST AND/OR LABOR HOURS AND SUMMARY OF WHAT THE CASUAL

FACTOR(S) WERE

17. CURRENT YEAR IMP AND S&P FORECASTING

A. T/M/S

B. DEPOT EVENT CATEGORY

C. LOCATION OF EVENT

D. FOR EACH QTR OF FY, PROVIDE QTY, BUNO, AND ESTIMATED INDUCTION DATE

E. TOTAL QTY FOR FY

18. CURRENT AND FOUR SUBSEQUENT FY IMP AND S&P FORECASTING

A. T/M/S

B. DEPOT EVENT CATEGORY

C. LOCATION OF EVENT

D. FOR EACH QTR OF FY, PROVIDE QTY, BUNO, AND ESTIMATED INDUCTION DATE

E. TOTAL QTY FOR FY

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES ARE

NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D, D-1

MARKING OF CONTRACTOR REPORTS.

BLOCK 14: DATA SUBMITTALS SHALL BE IAW ATTACHMENT 4, “SUPPLEMENT TO THE EXHIBITS:

CONTRACT DATA REQUIREMENTS LIST (CDRL) DATA SUBMISSION GOSNET INSTRUCTIONS”.

PMA 273 APML 1

15. TOTAL▬▬▬► 1 1

John Jordan, PMA-273T-45 APML

Alja Musarro, PMA-273 Deputy Program Manager

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A012 TECHNICAL REPORT – STUDY/SERVICES INDIVIDUAL COMPONENT REPAIR LIST (ICRL)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.3.1.3.6 CNATRA N4 T-45 CLASS DESK

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX

C

(SEE BLK 16)

ANNLY 75 DAC

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

N/A N/A (SEE BLK 16) Reg Repro

16. REMARKS

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LISTS” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: CONTRACTOR’S FORMAT IS ACCEPTABLE. THE LIST WILL PROVIDE THE DATA REQUIRED BY

SECNAVINST 4140.2

BLOCK 9: ADMINISTRATIVE OR OPERATIONAL USE IAW ATTACHMENT 3, “SUPPLEMENT TO THE

EXHIBITS: DISTRIBUTION STATEMENTS ON TECHNICAL DOCUMENTS”. DATA DELIVERABLES

ARE NOT PROPRIETARY AND SHALL NOT BE MARKED PROPRIETARY. REFER TO SECTION D,

D-1 MARKING OF CONTRACTOR REPORTS.

BLOCK 13: SUBSEQUENT SUMBISSION SHALL BE ON 31 OCT OF EACH YEAR.

PMA-273 T-45 IPTL 1

15. TOTAL ▬► 2

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X23 A TDP ______ TM ______ OTHERMISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

T-45 CLS N00019-12-R-0001

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A013 TECHNICAL REPORT - STUDY/SERVICES OFF-SITE REPAIR OF REPARABLES REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B (SEE BLK 16) PWS PARA. 5.12.1.2.1 CNATRA PA

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX

C

(SEE BLK 16)

MTHLY (SEE BLK 16)

a. ADDRESSEES

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

Draft Final

N/A N/A EOM + 5 DAYS Reg Repr o

16. REMARKS PMA 273 T-45 IPTL 1

SEE ATTACHMENT 2, “SUPPLEMENT TO THE EXHIBITS: EXPLANATION OF CONTRACT DATA

REQUIREMENTS LISTS” FOR ADDITIONAL INFORMATION ON CDRL INTERPRETATION.

BLOCK 4: TAILOR DID CONTENT TO INCLUDE SUPPLEMENTAL INSTRUCTIONS LISTED BELOW. THE

REPORT SHALL BE IN A SPREADSHEET FORMAT USING MS EXCEL. THE REQUIRED INFORMATION

SHALL BE PROVIDED FOR EACH AIRCRAFT TYPE (T-45A AND T-45C) WITHIN A SINGLE REPORT AND

INCLUDE ALL SITES. THE DATA FOR EACH AIRCRAFT TYPE SHALL BE ARRANGED WITH TABS

IDENTIFIED AS SECTION I AND SECTION II. THE FORMAT FOR EACH SECTION IS LISTED BELOW AND IN

COLUMNAR FORMAT:

REPORT SECTION 1 (DATA ENTRY IN THE CONTRACTOR FORMAT)

1. AIRCRAFT TYPE/MODEL/SERIES

2. CONTRACTOR’S NAME

3. CALENDAR REPORTING PERIOD COVERED BY THE REPORT

4. CONTRACTOR’S CAGE CODE

5. CONTRACTOR’S DODAAC

6. CONTRACT NUMBER

7. CLIN/ACRN

8. CONTRACT DATE

9. REPORT SECTION II – SUPPLY MANAGEMENT DATA AND COST DATA (DATA ENTRY IN COLUMNS

ARE FORMATTED USING THE FOLLOWING COLUMN HEADINGS):WORK SITE LOCATON

10. NOMENCLATURE

11. PART NUMBER

12. SERIAL NUMBER

13. COVERED UNDER WARRANTY (“YES” OR “NO”) AND PERIOD OF WARRANTY (MONTHS

14. DATE ADDED TO REPORT

15. BEYOND CAPABILITY MAITENANCE CODE (BCM)

16. BCM DATE BY MAITENANCE

17. DATE RECEIVED BY SUPPLY DEPARTMENT

18. TOTAL NUMBER OF DAYS FROM BCM DATE TO RECEIPT DATE BY SUPPLY

19. DATE SHIPPED TO VENDOR FOR REPAIR

20. DATE RECEIVED BY VENDOR

21. TOTAL NUMBER OF DAYS FROM SHIP DATE TO RECEIPT BY VENDOR

22. VENDOR NAME

CNATRA PA 1

PMA 273 T-45 APML 1

15. TOTAL▬▬▬► 1 2

Al Swain, CNATRA N4 PA

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .