MT PRA GLAC 10(44) 10(45) Final Pave Memo.pdf

PDF 214 KB Posted

Attached to
MT PRA GLAC 10(45) Rehabilitate Final 9. 3 Miles of the Going-to-the-Sun Road & Replace Bridge over McDonald Creek
Solicitation number
69056721B000017
Issued by

About this file

This memorandum provides the final structural pavement recommendations for rehabilitating a section of roadway within Glacier National Park. The project will rehabilitate the final 9.3 miles of the Going-to-the-Sun Road and replace the McDonald Creek Bridge. Subgrade investigations indicated existing asphalt pavement depths between 6 to 9 inches with primarily granular base and subgrade materials. The recommended roadway structure includes milling 2 inches of the existing asphalt, full depth reclamation to pulverize any remaining pavement and provide a uniform base, and placement of 6 inches of new asphalt concrete pavement using a -inch or -inch nominal maximum size aggregate and 0.3 to 0.5% asphalt binder. The solicitation was issued by the Department of Transportation Federal Highway Administration to rehabilitate this section of the Going-to-the-Sun Road and replace the McDonald Creek Bridge within Glacier National Park.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_02-03-22.pdf PDF
QA_02-02-22.pdf PDF
QA_01-26-22.pdf PDF
QA_01-25-22.pdf PDF
Amendment A007.pdf PDF
QA_01-20-22.pdf PDF
Amendment A006.pdf PDF
QA_01-18-22.pdf PDF
QA_01-14-22.pdf PDF
Amendment A005_R1.pdf PDF
QA_01-12-22.pdf PDF
QA_01-11-22.pdf PDF
QA_01-10-22.pdf PDF
QA_1-07-22.pdf PDF
QA_12-29-21.pdf PDF
Amendment A004.pdf PDF
QA_12-23-21.pdf PDF
QA_12-22-21.pdf PDF
Amendment A003.pdf PDF
glac01045_GTSR_Earthwork_MAIN_A003.pdf PDF
QA_12-21-21.pdf PDF
QA_12-17-21.pdf PDF
QA_12-15-21.pdf PDF
QA_12-13-21.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_12-10-21.pdf PDF
MT_PRA_GLAC 10(45) Physical SWPPP_Final.pdf PDF
glac01045_Plans.pdf PDF
1430-001P Upper McDonald Lake Bridge Safety Inspection 2019.pdf PDF
glac01045_GTSR_Clearing_MAIN_SchedA.pdf PDF
glac01045_McDonaldCreek_Clearing_MAIN.pdf PDF
glac01045_GTSR_HorizontalAlignmentReport_MAIN.pdf PDF
GR 16-21 MT PRA GLAC 10(45) Final Geotech Report.pdf PDF
glac01045_RevisedFinalHydraulicMemo.pdf PDF
MT PRA GLAC 10(45) IFB.pdf PDF
FLH Bridge Oversized-Overweight Permit Load Request.pdf PDF
Zip folder of files.zip ZIP file
MT PRA GLAC 202(1) As-Builts.pdf PDF
glac01045_X-SECTIONS_Signoff.pdf PDF
glac01045_McDonaldCreek_Clearing_APPROACHES.pdf PDF
glac01045_McDonaldCreek_Earthwork_MAIN.pdf PDF
Upper McDonald Creek Bridge Constructability Report.pdf PDF
glac01045_McDonaldCreek_VerticalAlignmentReport_MAIN.pdf PDF
1430-001P_AsBuilt.pdf PDF
2014 GTSR Phase X Pavement Coring with Photos.pdf PDF
glac01045_GTSR_Earthwork_MAIN.pdf PDF
Asbestos Survey N Mcd Crk Brg.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661-3801

TO: Mike Traffalis, PM

In Reply Refer to: HFL-17

FROM:

Megan Chatfield, Materials Engineer

DATE: November 2, 2020

SUBJECT: INFORMATION:

Final Structural Pavement Recommendation Lake McDonald Utility Relocation / Upper McDonald Creek Bridge Replacement

MT PRA GLAC 10(44) / MT PRA GLAC 10(45)

Project Information This memorandum provides the final structural pavement recommendations for the Lake McDonald roadway rehabilitation. The scope of the project has changed and additional information is provided in this memorandum. The Park has allocated additional funding to this roadway segment to provide a full rehabilitation of the roadway and address isolated shoulder widening to mitigate vehicle off-tracking. The overall final elevation of the roadway will be decreased by 2 inches to facilitate the widening and provide an opportunity to address the roadway profile.

A subgrade investigation was conducted in October 2019. Boring logs indicated existing asphalt concrete pavement depths between 6 to 9 inches, with the majority of the depths being 7 inches. The base and subgrade materials were described primarily as well graded gravel with sand and silty sand with gravel. These descriptions indicate good granular material to provide support for the pavement structure.

The following are the recommended roadway structures.

Going to the Sun Road The existing asphalt concrete pavement has performed well under the current conditions. This indicates the base and subbase materials are providing adequate support for the structure. Asphalt pavement milling is required to reduce the overall final elevation of the roadway 2 inches and to provide enough room for the construction of the new asphalt concrete pavement. A full depth reclamation technique will be utilized to pulverize any remaining existing asphalt concrete pavement and to provide a uniform base structure prior to placement of the new asphalt concrete pavement.

6 inches – Asphalt Concrete Pavement, ½-inch or ¾-inch nominal maximum size aggregate, 0.3 to <3 million ESAL (Section 401, estimated @ 1.94 tons/cuyd)

6 inches - Full Depth Reclamation (Section 304) 8 inches - Asphalt Pavement Milling (Section 413)

Kelly Camp Road Reconstruction of Kelly Camp Road typical section will follow the final structural recommendations for the MT PRA GLAC 10(30) project dated December 23, 2015.

6 inches – Asphalt Concrete Pavement, ½-inch or ¾-inch nominal maximum size aggregate, 0.3 to <3 million ESAL (Section 401, estimated @ 1.94 tons/cuyd)

8 inches – Recycled Aggregate Base (Section 308, estimated @ 1.97 tons/cuyd) 12 inches - Select Borrow (Section 204)

It is advantageous to reuse the existing asphalt pavement within the pavement structure from the material generated from the Lake McDonald segment. The surface layer of the asphalt concrete pavement should be milled and stockpiled for use as recycled aggregate base. The millings can also be used in lieu of the select borrow specified for the Kelly Camp Road.

Specifications The asphalt concrete pavement will be placed in two equal lifts. The pavement roughness designation will by Type III.

The binder grade is designated as PG 58-34.

Items of work required in conjunction with the pavement structure:

Antistrip Additive, Type 3 (estimated @ 1 percent by weight of Asphalt Concrete Pavement) Tack Coat (estimated at 0.10 gal/sqyd, 240 gal/ton. One application will be required between lifts of asphalt concrete pavement.

cc: Materials/Pavement File