About this file

This document includes plans for repairing timber piles at the McDonald Creek Bridge in Glacier National Park, Montana. The drawings show existing damage to timber piles at Bent 2 of the bridge and propose installing 4-inch thick steel jackets around the piles with welded shear studs and bolts. Notes specify requirements for grout, bolts, and galvanized steel and require verifying existing pile dimensions before construction.

The related federal contract opportunity is a solicitation to rehabilitate the final 9.3 miles of the Going-to-the-Sun Road and replace the McDonald Creek Bridge in Glacier National Park, Montana. The solicitation is issued by the Federal Highway Administration within the Department of Transportation.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_02-03-22.pdf PDF
QA_02-02-22.pdf PDF
QA_01-26-22.pdf PDF
QA_01-25-22.pdf PDF
Amendment A007.pdf PDF
QA_01-20-22.pdf PDF
Amendment A006.pdf PDF
QA_01-18-22.pdf PDF
QA_01-14-22.pdf PDF
Amendment A005_R1.pdf PDF
QA_01-12-22.pdf PDF
QA_01-11-22.pdf PDF
QA_01-10-22.pdf PDF
QA_1-07-22.pdf PDF
QA_12-29-21.pdf PDF
Amendment A004.pdf PDF
QA_12-23-21.pdf PDF
QA_12-22-21.pdf PDF
Amendment A003.pdf PDF
glac01045_GTSR_Earthwork_MAIN_A003.pdf PDF
QA_12-21-21.pdf PDF
QA_12-17-21.pdf PDF
QA_12-15-21.pdf PDF
QA_12-13-21.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_12-10-21.pdf PDF
MT_PRA_GLAC 10(45) Physical SWPPP_Final.pdf PDF
glac01045_Plans.pdf PDF
1430-001P Upper McDonald Lake Bridge Safety Inspection 2019.pdf PDF
glac01045_GTSR_Clearing_MAIN_SchedA.pdf PDF
glac01045_McDonaldCreek_Clearing_MAIN.pdf PDF
glac01045_GTSR_HorizontalAlignmentReport_MAIN.pdf PDF
GR 16-21 MT PRA GLAC 10(45) Final Geotech Report.pdf PDF
glac01045_RevisedFinalHydraulicMemo.pdf PDF
MT PRA GLAC 10(45) IFB.pdf PDF
FLH Bridge Oversized-Overweight Permit Load Request.pdf PDF
Zip folder of files.zip ZIP file
glac01045_X-SECTIONS_Signoff.pdf PDF
glac01045_McDonaldCreek_Clearing_APPROACHES.pdf PDF
glac01045_McDonaldCreek_Earthwork_MAIN.pdf PDF
Upper McDonald Creek Bridge Constructability Report.pdf PDF
glac01045_McDonaldCreek_VerticalAlignmentReport_MAIN.pdf PDF
1430-001P_AsBuilt.pdf PDF
2014 GTSR Phase X Pavement Coring with Photos.pdf PDF
glac01045_GTSR_Earthwork_MAIN.pdf PDF
Asbestos Survey N Mcd Crk Brg.pdf PDF
glac01045_McDonaldCreek_SuperelevationReport_MAIN.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WESTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

GLACIER NATIONAL PARK

MCDONALD CREEK BRIDGE

UPPER LAKE MCDONALD ROAD

NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER

F. ISMAIL

NO. DATE BY REVISIONS

BRIDGE DRAWING

of

DATE

TIMBER PILE RAPAIR

DRAWING NO.

STATE PROJECT

NUMBER

SHEET

MT

PRA GLAC 202(1)

P

M

J a n u a r y

I n t_ ft

D c m y fi le s p w p r o d u c ti o n d g la c s a .d g n

Down stereamUp stream details for repairs timber pile, see

Existing damaged

EXISTING BENT 2 ELEVATION

(looking back on line)

SECTION B-B

remain in place bracing to

Existing timber

" thick steel jacket4

20"Ø (inside diameter)

B B

Timber pile

A

A

1" Clear

"Ø x 2" weld studs2 to remain in place

Existing 12"Ø timber pile

SECTION A-A

ty p ground surface

Existing ground surface

Existing x w e ld e d s h e a r s tu d s p a c in g bolt with nut (9 tot.)

"Ø x 18" long8

Drill and install ty p

Non-shrink grout

" thick steel jacket4

NTS

NTS

NTS

EXISTING TIMBER PILE ELEVATION

PROPOSED REPAIR

" thick steel jacket4 bolt with nut

"Ø x 18" long8

"6

"6 s e c a p s l a u q e

Non-shrink grout e di s r e ht o .

p yt typ.

typ.

NOTES:

Bolts shall conform to ASTM 307 galvanized.

Repair all damaged galvanized area due to field weld.

strength 4000 psi @ 28 days.

Non-shrink grout shall conform to ASTM C1107, with minimum compressive

Steel jacket shall conform to ASTM A36 hot dip galvanized after fabrication.

Contractor shall verify existing timber pile section prior to construction.

5.

4.

3.

2.

1.

(typ.)

Existing timber pile

S p a c e s

O .C

" 1" Clr.

Michael.Baron Text Box E.4

Michael.Baron Text Box Contract Modification No. 005 Constructed as designed.