About this file

This bid opening summary document outlines the responses received for Solicitation Number 69056721B000017 from the Department of Transportation Federal Highway Administration. Three contractors submitted bids by the February 10th, 2022 deadline to rehabilitate the final 9.3 miles of the Going-to-the-Sun Road and replace the bridge over McDonald Creek in Montana for Schedules A and B. JH Missouri River Contractors bid $18,801,685 for Schedule A and $20,955,565 for Schedule B. Brice Civil Contractors, Inc. provided the lowest bid at $17,990,203 for Schedule A and $20,629,373 for Schedule B. The engineer's estimate was $12,209,049.50 for Schedule A and $12,640,732 for Schedule B. The bid opening was held on February 10th, 2022 at 2:00 pm and was overseen by Andres Arredondo with Robert Kolln assisting.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
QA_02-03-22.pdf PDF
QA_02-02-22.pdf PDF
QA_01-26-22.pdf PDF
QA_01-25-22.pdf PDF
Amendment A007.pdf PDF
QA_01-20-22.pdf PDF
Amendment A006.pdf PDF
QA_01-18-22.pdf PDF
QA_01-14-22.pdf PDF
Amendment A005_R1.pdf PDF
QA_01-12-22.pdf PDF
QA_01-11-22.pdf PDF
QA_01-10-22.pdf PDF
QA_1-07-22.pdf PDF
QA_12-29-21.pdf PDF
Amendment A004.pdf PDF
QA_12-23-21.pdf PDF
QA_12-22-21.pdf PDF
Amendment A003.pdf PDF
glac01045_GTSR_Earthwork_MAIN_A003.pdf PDF
QA_12-21-21.pdf PDF
QA_12-17-21.pdf PDF
QA_12-15-21.pdf PDF
QA_12-13-21.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_12-10-21.pdf PDF
MT_PRA_GLAC 10(45) Physical SWPPP_Final.pdf PDF
glac01045_Plans.pdf PDF
1430-001P Upper McDonald Lake Bridge Safety Inspection 2019.pdf PDF
glac01045_GTSR_Clearing_MAIN_SchedA.pdf PDF
glac01045_McDonaldCreek_Clearing_MAIN.pdf PDF
glac01045_GTSR_HorizontalAlignmentReport_MAIN.pdf PDF
GR 16-21 MT PRA GLAC 10(45) Final Geotech Report.pdf PDF
glac01045_RevisedFinalHydraulicMemo.pdf PDF
MT PRA GLAC 10(45) IFB.pdf PDF
FLH Bridge Oversized-Overweight Permit Load Request.pdf PDF
Zip folder of files.zip ZIP file
MT PRA GLAC 202(1) As-Builts.pdf PDF
glac01045_X-SECTIONS_Signoff.pdf PDF
glac01045_McDonaldCreek_Clearing_APPROACHES.pdf PDF
glac01045_McDonaldCreek_Earthwork_MAIN.pdf PDF
Upper McDonald Creek Bridge Constructability Report.pdf PDF
glac01045_McDonaldCreek_VerticalAlignmentReport_MAIN.pdf PDF
1430-001P_AsBuilt.pdf PDF
2014 GTSR Phase X Pavement Coring with Photos.pdf PDF
glac01045_GTSR_Earthwork_MAIN.pdf PDF
Asbestos Survey N Mcd Crk Brg.pdf PDF
glac01045_McDonaldCreek_SuperelevationReport_MAIN.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING SUMMARY

Solicitation No. 69056721B000017 Bid Opening Date – 2/10/2022 Time 2:00 p.m.

Project Name/Number: MT PRA GLAC 10(45) Rehabilitate Final 9.3 Miles of the Going-to-the-Sun Road & Replace Bridge over McDonald Creek

OFFER RECEIVED

REC'D

BY

CONTRACTOR

DATE

TIME

Schedule A Schedule B

1.

2/09/22 10:30

AM

JH Missouri River Contractors $18,801,685.00 20,955,565.00

2.

2/10/22 1:35

PM

AA Shellinger Construction Company, Inc.

$18,936,762.25 $20,995,852.00

3.

2/10/22 1:35

PM

AA Brice Civil Contractors, Inc. $17,990,203.33 $20,629,373.00

4.

5.

6.

7.

8.

9.

10.

Engineer’s Estimate $12,209,049.50 $12,640,732.00

LOW BIDDER'S

PHONE NUMBER:

Attendance: 5

Bid Opening Officer: Andres Arredondo Assistant: Robert Kolln