glac01045_Plans.pdf
PDF 25 MB Posted
- Solicitation number
- 69056721B000017
About this file
This solicitation is for rehabilitation and bridge replacement work along the Going-to-the-Sun Road in Montana. The Department of Transportation Federal Highway Administration is seeking bids to rehabilitate the final 9.3 miles of the road and replace the bridge over McDonald Creek under solicitation number 69056721B000017. Bids are due by the date specified in the attached solicitation documents, which describe the scope of work in further detail. The awarded contract will require the successful bidder to complete road and bridge work to applicable federal standards.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 850 50 900
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 500 500
A0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 1.8 1.8 Contract Quantity
A0200 20301-2400 REMOVAL OF SIGN EACH 11 1 12
A0220 20304-2000 REMOVAL OF BRIDGE LPSM ALL
A0240 20401-0000 ROADWAY EXCAVATION CUYD 3,513 71 216 3,800
A0260 20411-0000 SELECT BORROW TON 3,256 164 3,420
A0280 20801-0000 STRUCTURE EXCAVATION CUYD 453 453 Contract Quantity
A0300 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 7 3 10
A0320 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 406 24 430
A0340 25501-1000 MECHANICALLY STABILIZED EARTH
WALL, WELDED WIRE FACE SQFT 1,627 73 1,700
A0360 25701-0200 CONTRACTOR FURNISHED
MECHANICALLY STABILIZED EARTH
WALL DESIGN LPSM ALL
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 57 3 60
A0400 30402-5300 FULL DEPTH RECLAMATION, Contract Quantity
METHOD 2, 6-INCH DEPTH SQYD 99,859 99,859
A0420 30801-0000 RECYCLED AGGREGATE BASE SQYD 4,013 279 218 4,510
A0440 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 384 16 400
A0460 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL (TYPE III ROUGHNESS) TON 33,303 42 655 34,000
A0500 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 332 8 340
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -S ep -2
:5 A
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t
STATE PROJECT
B.1PRA GLAC 10(45)MT
SHEET
NUMBER
NPS Drwg. No. 117/175230
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
A0540 41201-0000 TACK COAT TON 44 1 45
A0560 41301-0000 ASPHALT PAVEMENT MILLING SQYD 99,859 99,859 Contract Quantity
A0580 55101-2200 STEEL PIPE PILE, IN PLACE
(30-INCH DIAMETER x 1/2 INCH) LNFT 621 621
A0600 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 4 6
A0620 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 303 303
A0640 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) (MOMENT SLAB) CUYD 59 59
A0660 55235-0000 EXPANSION JOINTS LNFT 48 48 Contract Quantity
A0680 55401-1000 REINFORCING STEEL LB 4,100 4,100 Contract Quantity
A0700 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 43,124 43,124
A0720 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED (MOMENT SLAB) LB 5,632 5,632
A0740 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity
FABRICATED, AND ERECTED LB 516,548 516,548
A0760 55601-0900 BRIDGE RAILING, STEEL (MOMENT Contract Quantity
SLAB) LNFT 115 115
A0780 55601-0900 BRIDGE RAILING, STEEL LNFT 500 500 Contract Quantity
A0800 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 8 8 Contract Quantity
A0820 57501-0000 MINOR BRIDGE WORK (THIN
BONDED EPOXY OVERLAY) LPSM All ALL
A0840 58501-0000 ULTRA HIGH PERFORMANCE
CONCRETE CUYD 3 3
A0860 62006-0000 CONCRETE MASONRY UNITS SQYD 41 41 Contract Quantity
A0880 62013-2000 STONE MASONRY WALL SQYD 53 53 Contract Quantity
A0900 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A0920 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40
A0940 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A0960 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40
A0980 62301-0000 GENERAL LABOR HOUR 40
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.2PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
A1000 62402-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH ACRE 4.0 0.2 4.2
A1020 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.2 0.1 0.3
A1040 62501-0000 TURF ESTABLISHMENT (HYDRAULIC
METHOD) ACRE 15.4 0.6 16.0
A1060 63302-0000 SIGN SYSTEM SQFT 38 38
A1080 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 167,004 996 168,000
A1100 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 164,422 578 165,000
A1120 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 6 6
A1140 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 750 750
A1160 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 100 100
A1180 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 100 100
A1200 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A1220 63502-3100 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM EACH 1 1
A1240 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 350 350
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 630 630
A1280 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 5,300 5,300
A1300 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,900 1,900
A1320 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 135 135
A1340 63601-3100 SYSTEM INSTALLATION, TELEPHONE LPSM ALL
A1360 63610-0000 CONDUIT (2-INCH HDPE,
COMMUNICATIONS) LNFT 11,235 165 11,400
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (3
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.3PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
A1380 63610-0000 CONDUIT (2-INCH HDPE,
DIRECTIONAL DRILL,
COMMUNICATIONS) LNFT 800 50 850
A1400 63610-0000 CONDUIT (3-INCH HDPE) LNFT 1,560 40 1,600
A1420 63621-1000 UTILITY BOX, PULLBOX
(COMMUNICATIONS) EACH 13 13
A1440 63621-1000 UTILITY BOX, PULLBOX
(ELECTRICAL) EACH 2 2
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (4
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.4PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 850 50 900
B0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 500 500
B0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
B0180 20101-0000 CLEARING AND GRUBBING ACRE 2.3 2.3 Contract Quantity
B0200 20301-2400 REMOVAL OF SIGN EACH 11 1 12
B0220 20304-2000 REMOVAL OF BRIDGE LPSM ALL
B0240 20401-0000 ROADWAY EXCAVATION CUYD 4,491 71 238 4,800
B0260 20411-0000 SELECT BORROW TON 3,791 189 3,980
B0280 20801-0000 STRUCTURE EXCAVATION CUYD 453 453 Contract Quantity
B0300 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 7 3 10
B0320 25101-0500 PLACED RIPRAP, METHOD A,
CLASS 5 CUYD 406 24 430
B0340 25501-1000 MECHANICALLY STABILIZED EARTH
WALL, WELDED WIRE FACE SQFT 1,627 73 1,700
B0360 25701-0200 CONTRACTOR FURNISHED
MECHANICALLY STABILIZED EARTH
WALL DESIGN LPSM ALL
B0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 57 3 60
B0400 30402-5300 FULL DEPTH RECLAMATION, Contract Quantity
METHOD 2, 6-INCH DEPTH SQYD 123,594 123,594
B0420 30801-0000 RECYCLED AGGREGATE BASE SQYD 4,647 279 244 5,170
B0440 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 457 18 475
B0460 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL (TYPE III ROUGHNESS) TON 41,049 42 1,209 42,300
B0500 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 410 13 423
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (5
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.5PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
B0540 41201-0000 TACK COAT TON 54 1 55
B0560 41301-0000 ASPHALT PAVEMENT MILLING SQYD 123,594 123,594 Contract Quantity
B0580 55101-2200 STEEL PIPE PILE, IN PLACE
(30-INCH DIAMETER x 1/2 INCH) LNFT 621 621
B0600 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 4 6
B0620 55201-0200 STRUCTURAL CONCRETE, CLASS A
(AE) CUYD 303
B0640 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) (MOMENT SLAB) CUYD 59 59
B0660 55235-0000 EXPANSION JOINTS LNFT 48 48 Contract Quantity
B0680 55401-1000 REINFORCING STEEL LB 4,100 4,100 Contract Quantity
B0700 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 43,124 43,124
B0720 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED (MOMENT SLAB) LB 5,632 5,632
B0740 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity
FABRICATED, AND ERECTED LB 516,548 516,548
B0760 55601-0900 BRIDGE RAILING, STEEL (MOMENT Contract Quantity
SLAB) LNFT 115 115
B0780 55601-0900 BRIDGE RAILING, STEEL LNFT 500 500 Contract Quantity
B0800 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 8 8 Contract Quantity
B0820 57501-0000 MINOR BRIDGE WORK (THIN
BONDED EPOXY OVERLAY) LPSM All ALL
B0840 58501-0000 ULTRA HIGH PERFORMANCE
CONCRETE CUYD 3 3
B0860 62006-0000 CONCRETE MASONRY UNITS SQYD 41 41 Contract Quantity
B0880 62013-2000 STONE MASONRY WALL SQYD 53 53 Contract Quantity
B0900 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40
B0920 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40
B0940 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
B0960 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40
B0980 62301-0000 GENERAL LABOR HOUR 40
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (6
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.6PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
B1000 62402-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH ACRE 5.1 0.2 5.3
B1020 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.2 0.1 0.3
B1040 62501-0000 TURF ESTABLISHMENT (HYDRAULIC
METHOD) ACRE 16.5 0.5 17.0
B1060 63302-0000 SIGN SYSTEM SQFT 38 38
B1080 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (YELLOW) LNFT 204,012 988 205,000
B1100 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID (WHITE) LNFT 203,662 838 204,500
B1120 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 6 6
B1140 63502-1250 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER, TYPE 42-INCH EACH 750 750
B1160 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 100 100
B1180 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 100 100
B1200 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
B1220 63502-3100 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM EACH 1 1
B1240 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 350 350
B1260 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 630 630
B1280 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 5,300 5,300
B1300 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,900 1,900
B1320 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 135 135
B1340 63601-3100 SYSTEM INSTALLATION, TELEPHONE LPSM ALL
B1360 63610-0000 CONDUIT (2-INCH HDPE,
COMMUNICATIONS) LNFT 18,470 230 18,700
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (7
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.7PRA GLAC 10(45)MT
SHEET
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
TYPICAL
SECTIONS
PLAN &
PROFILE
APPROACH
ROADS
SOIL EROSION
AND SEDIMENT
CONTROL
DRAINAGE
RETAINING
WALLS
GUARDRAIL
AND SAFETY
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BRIDGE ALLOWANCE
Bid
Schedule
B1380 63610-0000 CONDUIT (2-INCH HDPE,
DIRECTIONAL DRILL,
COMMUNICATIONS) LNFT 1,770 80 1,850
B1400 63610-0000 CONDUIT (3-INCH HDPE) LNFT 1,560 40 1,600
B1420 63621-1000 UTILITY BOX, PULLBOX
(COMMUNICATIONS) EACH 22 22
B1440 63621-1000 UTILITY BOX, PULLBOX
(ELECTRICAL) EACH 2 2
-S ep -2
:5 A
M
MileStone: Signoff Date Completed: In Progress Report Date: 09/13/21
F:
\h ig h w a ys
\F H
W A \2 m t-g la c1 U p p er
M cD o n a ld
C re ek B ri d g e\
E st im a te
\P S
E S ig n o ff g la c0 su m m a ry
.x ls m ]S h ee t (8
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.8PRA GLAC 10(45)MT
SHEET
HYDRAULIC DATA
Q(cfs) WS El.
(U/S Bridge Face)
Q2
Q500
Q50 (Design)
Q100
20900
3161.27
3164.14
3165.40
3169.25
V(ft/sec.)
1.91
5.90
6.99
10.13
F lo w
Remove Existing Bridge
Sidewalk
Bridge And Roadway
Sidewalk
Begin Bridge Sta. 7+82.38
El. 3179.35
End Bridge Sta. 10+03.38 El. 3181.56
Wingwall A
CL
Length Of Bridge = 221' - 0"
Wingwall (Typ.)
14' - 6"
Wingwall B
Wingwall C
Wingwall D
El. 3181.11El. 3181.32El. 3178.94
El. 3178.94
El. 3179.11
El. 3179.11
Temporary Shoring
(Both Sides)
Approach Slab (Both Sides)
Abut. Exp. Joint (Both Sides)
Placed Riprap, Class 5. See RDWY Plans For Details
Placed Riprap, Class 5.
See RDWY Plans For Details
Moment Slab & Yellowstone Picket Fence Railing.
See RDWY Plans For Details
P h a s e I
I P h a s e I
El. 3179.16
El. 3179.16El. 3178.97
El. 3178.97
El. 3181.37
El. 3181.37
El. 3181.37
El. 3181.32
El. 3181.47
El. 3181.47
Sidewalk Curb
Sidewalk Curb
(Typ.)
12' - 6"
Yellowstone Picket Fence Steel Bridge Railing
El. 3164.14
Q50 Elev.
Haunched Steel Plate I-Girder
30" Ø Pipe Piles
1.0%
ABUTMENT 1 ABUTMENT 2
Existing U/S Ground El.
Existing RDWY Ground El.CL
Existing D/S Ground El.
1.5
1.5
Placed Riprap, Class 2 & 5. See RDWY Plans For Details
Placed Riprap, Class 5.
See RDWY Plans For Details
Stone Masonry Facing (Typ.)
Bolted Field Splice (Typ.)
Exp.
Exp.
Low Beam El. 3169.04
3,150
3,155
3,160
3,165
3,170
3,175
3,180
3,185
30" Ø Pipe Piles
B e g in
B ri d g e
S ta
.3
E l.
.3
E n d B ri d g e
S ta
.3
E l.
.5
+1.0%
.0
.7
50' VC
50' VC
GRADE DIAGRAM
No Scale
Elevations Are At Profile Grade @ RDWYCL
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-A
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.1PRA GLAC 10(45)
C. HARDAN C. HARDAN 08-20-2021
PLAN AND ELEVATION
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
GLACIER NATIONAL PARK
1" = 20'-0"
PLAN
ELEVATION
NOTES:
1. Upper McDonald Creek Bridge stationing is based on state plane coordinate values (grid station). Bridge plans and dimensions are based on values that are adjusted to project datum (ground distance).
2. See riprap layout detail sheets for riprap details and coordinates.
BRIDGE DRAWING INDEX
Drawing No. Description
RG3184-A PLAN AND ELEVATION
RG3184-B GENERAL NOTES
RG3184-C FOUNDATION PLAN
RG3184-D PHASE CONSTRUCTION DETAILS
RG3184-E ABUTMENT CAPS
RG3184-F BEARING DETAILS
RG3184-G ABUTMENT ENDWALLS
RG3184-H ABUTMENT WINGWALLS
RG3184-I GIRDER LAYOUT (1 OF 2)
RG3184-J GIRDER LAYOUT (2 OF 2) AND CAMBER DIAGRAM
RG3184-K GIRDER FIELD SPLICES
BRIDGE DRAWING INDEX CONTINUED
Drawing No. Description
RG3184-L GIRDER WELD DETAILS
RG3184-M ABUTMENT & INTERMEDIATE CROSS FRAMES
RG3184-N DECK PLAN
RG3184-O TYPICAL SECTION
RG3184-P SIDEWALK CURB, UTILITY DETAILS, & TEMP. BARRIER
RG3184-Q APPROACH SLAB
RG3184-R APPROACH SLAB EXPANSION JOINT
RG3184-S BRIDGE RAILING (1 OF 2)
RG3184-T BRIDGE RAILING (2 OF 2)
RG3184-U STONE MASONRY DETAILS
RG3184-V REBAR LIST
GENERAL NOTES:
SPECIFICATIONS:
DESIGN: AASHTO LRFD Bridge Design Specifications for Highway Bridges, Ninth Edition, 2020.
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and Special Contract Requirements.
DEAD LOADS:
CONCRETE: 150 lbs. per cubic foot.
SOIL: 120 lbs. per cubic foot.
STONE MASONRY: 170 lbs. per cubic foot.
STRUCTURAL STEEL: 490 lbs. per cubic foot.
FUTURE WEARING ALLOWANCE: 25 lbs. per square foot, applied to clear roadway width.
UTILITY ATTACHMENTS: 15 lbs. per linear foot along bridge.
LIVE LOAD:
HL-93, Maximum Dynamic Load Allowance (Impact), IM=33%.
LATERAL EARTH PRESSURE:
ACTIVE PRESSURE: Equivalent to a fluid unit weight of soil = 29 pounds per cubic foot.
AT REST PRESSURE: Equivalent to a fluid unit weight of soil = 50 pounds per cubic foot.
LIVE LOAD SURCHARGE: Equivalent height of soil.
For abutments: heq = 3.0 feet For wingwalls and retaining walls: heq = 2.5 feet
SEISMIC:
Seismic design parameters based on a site specific ground response analysis.
See Geotechnical Report No. 06-21.
Site Class = E. Seismic Zone = 2.
Peak Ground Acceleration (PGA = 0.091 g), Modified by the site coefficient (Fpga = 2.500) to give a spectrum acceleration, As = 0.228 g. Short period acceleration at 0.2 seconds (Ss = 0.214 g) modified by the site coefficient (Fa = 2.500) to give the short period spectrum acceleration, Sds = 0.535 g. Long period acceleration at 1.0 seconds (S1 = 0.079 g) modified by the site coefficient (Fv = 3.500) to give the long spectrum acceleration, Sd1 = 0.277 g.
DESIGN CRITERIA:
Deck slab designed using approximate elastic method (the "strip" method).
CONCRETE:
All cast in place concrete shall be structural concrete Class A(AE) with a minimum 28-day compressive strength f'c=4000 psi. Chamfer exposed edges of all concrete ¾ inch, unless noted otherwise on the plans. All concrete shall be made with Type II cement. All cement shall be low alkali cement. Flexible cellular joint filler shall meet the requirements of AASHTO M153, closed cell rubber. Expansion joint filler shall meet the requirements of
AASHTO M213.
See section 552, 585, and Special Contract Requirements for additional requirements.
REINFORCING STEEL:
All reinforcing steel shall conform to AASHTO M31, or M322, Grade 60 deformed. The minimum concrete covering to the face of any bar shall be 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes shall be as shown below. All superstructure reinforcing steel shall be epoxy coated, as noted on the bar list.
CLASS A (AE) CONCRETE:
Lap #4 bars 2'-0" minimum Lap #5 bars 3'-0" minimum Lap #6 bars 3'-0" minimum Lap #8 bars 4'-10" minimum
UHPC CONCRETE:
Lap #5 bars 0'-5" minimum
STRUCTURAL STEEL:
All structural steel shall be high-strength low alloy corrosion resistant steel conforming to AASHTO M270, Grade 50W unless otherwise shown on the plans. The steel fabricating company shall be fully certified, under the AISC Quality Certification Program. The contractor shall be responsible for the stability of the structure during all phases of construction. All primary longitudinal superstructure components and connections subject to tensile stress due to Strength Load Combination I require mandatory Charpy V-Notch testing. Testing shall conform to AASHTO T243, frequency H for temperature Zone 2. These member components shall consist of all web plates, all web and flange splice plates, and all flange plates located in tension zones as shown on the plans. All field connections are slip critical, friction type, Class B and shall be made with ⅞"Ø fasteners conforming to ASTM F3125, Grade A325, Type 3, Heavy Hex Style, unless noted otherwise on the plans. Welded shear connectors shall conform to AASHTO M169 (ASTM A108).
Paint exposed girder ends and steel members at locations designated in the plans. Provide Type 1 paint system from Table 563-1 in subsection 563.08(b)(1). Use color 30108 (Federal Standard #595) for topcoat. See FP-14 and Special Contract Requirements for additional requirements.
STRUCTURAL EXCAVATION:
Perform all the necessary excavation work to build the foundation to the required depths. Refer to Geotechnical Report for a description of the anticipated materials to be encountered during excavation of the bridge site.
EXISTING BRIDGE PLANS:
See the following for additional information on existing bridge: "McDonald Creek Bridge", dated October 1964, prepared by Bureau of Public Roads and Emergency Repair of Upper McDonald Creek Bridge, dated August 2011, prepared by Western Federal Lands Highway Division.
REMOVE EXISTING STRUCTURE:
Remove the existing bridge in accordance with Section 203. Do not disturb timber piling from the previous bridge downstream while removing the existing bridge.
ESTIMATE
Item Quantity:
20304-2000
55104-1000
20801-0000
55101-2200
Removal Of Bridge
Structure Excavation (Bridge)
Steel Pipe Pile, In-Place (30" Diameter x ½")
Dynamic Pile Load Test
All Req'd
Item No.
55201-0200
58501-0000
55235-0000
55401-1000
55401-2000
55502-0000
55601-0900
56401-1000
62013-2000
Structural Concrete, Class A(AE)
Ultra High Performance Concrete
Expansion Joints
Reinforcing Steel
Reinforcing Steel, Epoxy Coated
Structural Steel, Furnished, Fabricated, And Erected
Bridge Railing, Steel
Bearing Device, Elastomeric
Stone Masonry Wall
Unit:
LPSM
CUYD
LNFT
EACH
CUYD
CUYD
LNFT
LB
LB
LB
LNFT
EACH
SQYD
Notes:
(1)
(5)
(1) (2) (7)
(1)
(1)
(1)
(1)
(1) (3)
(1) (4)
(1)
(1) (6)
4,384
43,124
516,548
62006-0000 Concrete Masonry Units SQYD (1) (8)41
57501-0000 Minor Bridge Work (Thin Bonded Epoxy Overlay) LPSMAll Req'd
ESTIMATE NOTES:
(1) Contract Quantity
(2) Includes cost of furnishing and installing all joint fillers. Includes cost of anchor rod blockouts and non-shrink grout. Includes concrete in decks, endwalls, wingwalls, approach slabs, sleeper beams, abutment caps, utility conduit, sleeves, hangers, and all miscellaneous utility appurtenances. Includes cost of sidewalk curb and roadway aggregate, method 2.
(3) Includes cost of furnishing and installing welded studs, bearing plates, stiffeners, cross frames, gusset plates, splice plates, connection hardware, and anchor rods. Includes cost of painting steel members as designated in the plans.
(4) Includes cost of structural concrete Class A(AE), epoxy coated reinforcing steel, structural steel, connection hardware, painting, and all materials required for construction of the steel railing and concrete curb. Estimated quantity of structural concrete = 23.2 cubic yards. Estimated quantity of epoxy coated reinforcing steel = 6146 lbs.
(5) Includes furnishing and installing pipe piles. Reinforcing steel embedded in pipe pile is included in the pay item for reinforcing steel.
(6) Includes stone masonry for bridge wingwalls. Also includes mortar, dovetail slots, anchors, and all work required to construct stone masonry.
(7) Includes concrete in pile caps and pipe piles to a depth of 4'-0" below the cutoff elevation.
(8) Includes concrete masonry units for bridge wingwalls. Also includes mortar, dovetail slots, anchors, and all work required to construct concrete masonry units.
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-B
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.2PRA GLAC 10(45)
C. HARDAN C. HARDAN 08-20-2021
GENERAL NOTES
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
GLACIER NATIONAL PARK
NO SCALE
2' - 0"
BRG To BRG
213' - 4" 2' - 0"
Abut. 1
Bridge And Roadway
CL
CL
ABUTMENT 1 ABUTMENT 2
F lo w
Abut. 2CL
CL CL
Begin Bridge Sta. 7+82.38
End Bridge Sta. 10+03.38
Wingwall A
Wingwall B
Wingwall C
Wingwall D
(4) 30"Ø Pipe Piles
217' - 4"
4' - 0"4' - 0"
Temporary Shoring
BH19-62
P h a s e I
I P h a s e I
(4) 30"Ø Pipe Piles
4' - 0" 4' - 0"
3' - 10" 3' - 10"
BH19-61
LEGEND
Boring Location
30" Ø Steel Pipe Piles
Brg. Abut. 1CL
3,150
3,155
3,160
3,165
3,170
3,175
3,180
3,185
30" Ø Steel Pipe Piles
Brg. Abut. 2CL
Top Of Pipe Pile El=3164.53 Top Of Pipe Pile El=3166.63
Est. Tip El. 3090.0 Est. Tip El. 3090.0
Existing Ground Line At North Lake McDonald RoadCL
DRIVING CRITERIA DESIGN DATA
LOCATION PILE TYPE
MINIMUM
PENETRATION (FT)
ESTIMATED PILE
TIP ELEVATION (FT)
DRIVING
RESISTANCE (K)
STRENGTH 1
FACTORED LOAD (K)
NOMINAL
RESISTANCE (K)
RESISTANCE
FACTOR, Ø
Abut. 1 30"Øx½" Pipe 40 3090 765 418 645 0.65
Abut. 2 42 3090 765 418 645 0.65
PILE DATA TABLE
30"Øx½" Pipe
NOTE:
The abutments have been designed assuming full scour depths will occur, the resulting in driving resistances greater than nominal resistances.
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-C
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.3PRA GLAC 10(45)
C. HARDAN C. HARDAN 08-20-2021
FOUNDATION PLAN
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
GLACIER NATIONAL PARK
1" = 20'-0"
FOUNDATION PLAN
PIPE PILE NOTES:
1. Install all piles with a minimum pile tip elevation of 3125 ft.
2. Perform Dynamic Load Testing with signal matching on the first pile driven at each abutment. Use Dynamic Load Test results to establish driving criteria for production piling in the abutment. See section 551 and special contract requirements.
3. Do not splice pipe piles above the following elevations:
Abutment 1 = 3150 ft Abutment 2 = 3145 ft
ELEVATION
Travel Lane
14' - 0"
El= 3168.67
Existing Bridge To Remain During
Phase I
New Bridge To Be Built In Phase II
New Bridge
CL New Bridge
CL Existing Bridge
BRIDGE SECTION PHASE I
Depth Of Beams Varies
Temporary Shoring (At Bridge Ends)
Work Zone
13' - 8" 13' - 8"
Existing Bridge To Be Removed
During Phase II
CL New Bridge
CL Existing Bridge
BRIDGE SECTION PHASE II
0' - 4"
Temporary Barrier 1' - 4" Travel Lane
10' - 4"
Outside Rail 1' - 8"
Depth Of Beams Varies
El= 3168.67
New Bridge
Temporary Shoring (At Bridge Ends)
Barrier Attachment.
See Detail Sheet RG3184-P
CL New Bridge
BRIDGE SECTION PHASE III
Thin Bonded Epoxy Overlay
Depth Of Beams Varies
New Bridge
Ultra-High Performance Concrete (UHPC) Closure Pour
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-D
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.4PRA GLAC 10(45)
C. HARDAN C. HARDAN 08-20-2021
PHASE CONSTRUCTION
DETAILS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
GLACIER NATIONAL PARK
3/16" = 1'-0"
NOTES:
1. See sheet RG3184-P for temporary barrier and attachment detail.
PLAN
Girder Spacing
6' - 8" 14' - 0" 6' - 8"
3' - 2" 7' - 0" 7' - 0" 7' - 0" 3' - 2"
Step Spacing
27' - 4"
Gdr. ACLGdr. DCL Gdr. CCL Gdr. BCL
Bridge & Rdwy.
CL
CL
Anchor Rods & Elastomeric Bearing Pad (Typ.). See
RG3184-F For Details
Brg. & Abut.CL CL
4' - 0"
Bridge & Rdwy.
CL
CL
El. 3164.53 (Abut. 1) El. 3166.63 (Abut. 2)
See Table For Bearing Seat Elevations
3' - 2" 7' - 0" 7' - 0" 7' - 0" 3' - 2"
6' - 0" 6' - 0" 3' - 4" 6' - 0" 6' - 0"
A
A
3"Ø Weephole Spa.
30"Ø Pipe Pile Spa.
ELEVATION
3"Ø Weephole (Typ.)
SECTION B-B
CC
SECTION C-C
2' - 6"
30"Ø x½" Steel Pipe Pile
Abutment Cap Bearing Seat Elevations
Girder
Abutment 1
A B C D
3168.48 3168.483168.623168.62
Phase IIPhase I
Phase IIPhase I
#6A9 (6 Tot.)
C lr
E m b e d m e n t
(Typ.)
2" Clr.
#6A5, #6A6 (6 Tot. Top)
#6A9 (6 Tot.)
#5A1 (Typ.)
#5A7, #5A8 (4 Tot.)
#6A3, #6A4 (4 Tot. Bott.)
9"
2 Spa. @6" = 1' - 0"
1' - 5" 1' - 5" 8 Eq. Spa. = 4' - 2" 1' - 5" 1' - 5"
4 Eq. Spa.
= 1' - 10"
3"
4-#6A4
6-#6A6 #6A9 (6 Tot.)#5A7 b.f.
2-#5A1 (Typ.)
(Abutment 1 Shown, Abutment 2 Similar)
(Abutment 1 Shown, Abutment 2 Similar)
/4
4-#5A1 w/ 8-#5A2
(Typ. @ Pile)
Abutment 2 3170.69 3170.693170.833170.83
B
B
Begin Bridge Sta. 7+82.38 End Bridge Sta. 10+03.38
Phase Construction
Joint
4' - 0"
SECTION A-A
3"Ø Weephole CL
C lr
2%
(Typ.)
2" Clr.
#6A5, #6A6 (6 Tot. Top)
#5A1 (Typ.)
#5A7, #5A8 (4 Tot.)
#6A3, #6A4 (4 Tot. Bott.)
1. Adjust location of weepholes to avoid reinforcing, providing minimum 2" clear cover.
2. Abutment caps are mass concrete elements. See special contract requirements for curing requirements.
3. Adjust placement of reinforcement to avoid anchor rods.
Phase Construction Joint
2-#5A1 Sym. About CL
Place Class A(AE) Concrete A Minimum 2'-0" Below Bottom
Face Of Abutment Cap
#5A2 (Typ.)
NOTES:
#5A1 (Typ.)
6-#6A5
4-#6A3
#5A8 b.f.
2-#6A10 (Typ.
Between Piles)
#6A10 (Typ.
Between Piles)
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-E
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.5PRA GLAC 10(45)
T. JIRGES C. HARDAN 08-20-2021
ABUTMENT CAPS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
1/4" = 1'-0"
1. All structural steel plates shall be AASHTO M270, Grade 50W.
2. Steel reinforced elastomeric bearing pad shall conform to AASHTO M251 with 60 Durometer hardness, elastomer Grade 4 or higher. Steel shim plates shall conform to ASTM A36. Design shear modulus, G = 130 psi @ 73°F.
3. AASHTO LRFD Design method "A" used for elastomeric pad design.
4. Anchor rods shall conform to ASTM F1554, Grade 105 including supplementary charpy v-notch test criteria, S4.
Heavy hex nuts shall conform to ASTM A563. Anchor rods and nuts shall be galvanized.
5. The elastomeric pad shall be vulcanized to bottom surface of sole plate.
6. Submit to CO for approval the procedures to prevent heat damage to elastomeric pads during field welding.
Temperature of the steel adjacent to the elastomer shall be kept below 250°F.
7. All bearings shall be marked prior to shipping. The marks shall include the bearing location on the bridge, and a direction arrow that points ahead station. All marks shall be permanent and be visible after the bearing is installed.
8. Non-shrink grout shall conform to ASTM C1107 with a minimum 3-day compressive strength f'c = 5000 psi, and minimum 28-day bond strength = 2000 psi per ASTM C-882.
9. For Information Only:
Abutment design service loads per bearing
a. Dead load = 256 kips
b. Live load = 122 kips
CL
5/16"
5/16"
5/16"
5/16"
5/16
5/16"
SECTION A-A
ELEVATION
PLAN
ABUT. BEARING
ELASTOMERIC PAD DETAIL
DETAIL B
- 3
¼" Thick Elastomeric Washer
¼" x 3" x 8" Washer With 1 9/16"Ø Hole
PL
Anchor Rod Shear Plate 4" x 8" x 3" W/ 1 9/16" x 6" Slotted Hole (Typ.)
Heavy Hex Nut, Snug Tight.
Bearing Seat
Abut. & BrgCL
(Typ.)
1"
7"
8"
7"
8"
See Detail B
CL Gdr.
A
A
Elastomeric Brg. Pad.
See Detail.
3"Ø Formed Hole (Typ.)
1½"Ø Threaded Anchor Rod (Typ.)
Fill With Non-shrink Grout (Typ.)1
/2
2" x 2'-0" Bottom Flange
2" x 1'-4" x 3'-0" Sole Plate
Level Bearing Seat
CL Gdr.
3"
3" 3"
"8
1'-0" 1'-0"
1'-6" 1'-6"
(Typ. @ Abut. 1 & 2)
2" x 2'-0" Bottom Flange 2" x 1'-4" x 3'-0" Sole Plate
Elastomeric Brg. Pad. See Detail.
Anchor Rod, Shear Plate & Washer (Typ.)
CL
PL
¼" x 3" x 8" Washer With 1 9/16"Ø Hole
PL
Brg. & Abut. & 1 9/16"Ø x6" Slotted Holes In Sole Plate.
CL CL CL
Anchor Rod Shear Plate 4" x 8" x 3" W/ 1 9/16" x 6" Slotted Hole (Typ.)
Girder Web
Brg.
Stiffeners
CL Brg.
CL Gdr.
PLAN
ELEVATION
(8 Req'd)
1'-0" 1'-0"
2'-0"
All Around 1/4" Clr.
N o m
/ 1
0.0747" (14 Gauge) Steel Shim Moulded Securely To Pad (6 Per Pad)
1 Elastomeric Layer (Top & Bott.) @¼" And 5 Elastomeric Inner Layers @⅝"
NOTES:
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-F
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.6PRA GLAC 10(45)
C. HARDAN T. JIRGES 08-20-2021
BEARING DETAILS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
NOT TO SCALE
(Typ.)
1' - 2" 12' - 0" 12' - 0"
(Typ. @ Top Of Deck) 1' - 8"
Bridge And Roadway
CL
Begin Bridge Sta. 7+82.38 End Bridge Sta. 10+03.38
Geocomposite Sheet Drain.
Wrap Around Fillet And Along Wingwall 1'-0" (Typ.)
Gdr. DCL Gdr. CCL Gdr. BCL Gdr. ACL
Other Face
Fill Face
4" Flexible Cellular Joint Filler
Phase Construction Joint
Approach Slab Seat
Brg.CL
1'-0" x 1'-0" Fillet (Typ.)
PLAN
(Abutment 1 Shown, Abutment 2 Similar)
Other Face (Typ.)
Stone Masonry (Typ.)
Fill Face (Typ.)
Phase IIPhase I
#6EE5
3-#5EE3
(Typ. @ Gdr.)
#5EE2
(Typ.)
2-#4EE7
#5EE1 (Typ.)
3-#5EE4 (Typ. @ Gdr.)
#6WE7 (Typ.)
2" 26 Spa. @1'-0" = 26' - 0" #5EE8 Approach Slab Dowel 2"
#6EE6
ELEVATION
(Abutment 1 Shown, Abutment 2 Similar)
A
A
3"Ø Weephole (Typ.)
Bridge And Roadway
CL
6"Ø PVC Sleeve For 3" Utility Conduit, See RG3184-P For Utility Details
6"
#5EE1, 2-#5EE2
3 Spa. @8" = 2' - 0"
1' - 0" 1' - 2"
#5EE1, 2-#5EE2
7 Spa. @8" = 4' - 8"
1' - 2"1' - 2"
Phase Construction Joint
#6EE5 b.f. (Typ.)
Adjust Bars To Clear PVC Sleeve
#6EE6 b.f.
(Typ.)
SECTION A-A
4" Flexible Cellular Joint Filler
3"Ø Weephole
Brg.CL
1' - 0" 1' - 6" 2' - 4"
3' - 10"
Abutment Bearing, See RG3184-F For Details
Fill Face
4"x4" Fillet
Scale: ⅜" = 1'-0"
2%
El. 3179.35 (Abutment 1) El. 3181.56 (Abutment 2)
El. 3168.03 (Abutment 1) El. 3170.13 (Abutment 2)
Embedment 10" Girder
#4EE7
#5EE1
#5EE2
#6EE5, #6EE6 (Typ.)
#5EE8 Approach Slab Dowel (26 Spa. @1'-0"= 26'-0")
Begin Or End Bridge
Deck Pour Construction Joint, See RG3184-N For Detail
2' - 0"
2' - 6"
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-G
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.7PRA GLAC 10(45)
T. JIRGES C. HARDAN 08-20-2021
ABUTMENT ENDWALLS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
GLACIER NATIONAL PARK
NOTES:
1. Pipe piles omitted for clarity.
2. See drawing no. RG3184-E for abutment cap reinforcing details.
3/16" = 1'-0"
UNLESS NOTED
El. 3168.03
A
A
B
B
14' - 6" 5' - 10"
30# Double Layer Felt Roofing Paper (Steel Trowel Finish Top
Of Wingwall)
El. 3178.11 El. 3179.14
4" Flexible Cellular Joint Filler
1" Flexible Cellular Joint Filler
ABUTMENT 1 WINGWALL ELEVATION
El. 3179.11 2"
#5WE5 b.f., #5WE9
15 Eq. Spa. = 14' - 6" 2' - 0 3/8" #5WE6 b.f., #5WE8 o.f.
4 Eq. Spa. = 3' - 5 5/8"
#5WE5 b.f.
S p a
W
E o
.f
S p a
W
E f
.f
#6WE3 f.f. & 2-#5WE4 o.f.
#6WE7 (16 Tot.)
(Wingwall B Shown, Wingwall A Similar)
El. 3177.97
SECTION A-A
Concrete Curb
6"
1' - 2"
Approach Slab
C lr
#5WE5
Fill FaceOther Face
#5WE9
#5WE2 #6WE1
#6WE3
#5WE4
SECTION B-B
1" Flexible Cellular Joint Filler
Fill FaceOther Face
#5WE6
#5WE2 #6WE1
#5WE8
1' - 2"
Concrete Deck
See Detail A on Sheet RG3184-U
ABUTMENT 2 WINGWALL ELEVATION
El. 3170.13
A
A
B
B
30# Double Layer Felt Roofing Paper (Steel Trowel Finish Top Of Wingwall)
El. 3180.32 El. 3181.23
14' - 6"5' - 10"
4" Flexible Cellular Joint Filler
1" Flexible Cellular Joint Filler
2"
#5WE5 b.f., #5WE9
15 Eq. Spa. = 14' - 6"2' - 0 3/8"#5WE6 b.f., #5WE8 o.f.
4 Eq. Spa. = 3' - 5 5/8"
S p a
W
E o
.f
S p a
W
E f
.f
#6WE7 (16 Tot.)
(Wingwall D Shown, Wingwall C Similar)
#6WE3 f.f. & 2-#5WE4 o.f.
El. 3181.32
El. 3180.47
#5WE5 b.f.
#5WE9
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-H
/1
/2
:4 :3
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.8PRA GLAC 10(45)
T. JIRGES C. HARDAN 08-20-2021
ABUTMENT WINGWALLS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
3' - 2"
213' - 4" (Compression)
65'-2" ( 1⅞"x24") 89' - 4" ( 2⅜"x24") 65'-2" ( 1⅞"x24")
-213' - 4"
104 Spa. @2'-0⅝"Shear Connector Spacing
Top Flange Stress
PLTop Flange Transitions PLPL
Length Of Span
End Of Girder End Of Girder
2~ 8"x⅞" Bearing Stiffener
PL
2~ 8"x⅞" Jacking Stiffener
PL
5' - 0"
See Girder End Detail See RG3184-J
Brg. Abut. No. 1 Brg. Abut.
No. 2
CL CL
Drip Plate Gdr A & Gdr D Only (See Detail)
89' - 4"62' - 0" 62' - 0"Field Splice Spacing
213' - 4" (Tension)Bottom Flange Stress
65'-2" ( 2"x24") 89' - 4" ( 2⅝"x24") 65'-2" ( 2"x24")PL PL PLBottom Flange Transitions
GIRDER ELEVATION
x ⅝
P L x ⅝
P L x ⅝
P L x ⅝
P L x ⅝
P L x ⅝
P L 8 x ⅝
P L x ⅝
P L x ⅝
P L x ⅝
P L
Web ¾"PL
2~ 8"x⅞" Bearing Stiffener
PL
2~ 8"x⅞" Jacking Stiffener
PL
See Detail D
Limits Of Paint To Exposed Surfaces Of
Girder
Limits Of Paint To Exposed Surfaces Of Girder
5' - 2"
Drip Plate Gdr A & Gdr D Only (See Detail)
GIRDER FRAMING PLAN
Cross-Frame & Stiffener Spacing
End Of Girder End Of Girder
Brg. Abut. No. 1 Brg. Abut.
No. 2
CL CL
3' - 2" 3' - 2"
- 9 Spa. @21'-11⅛" = 197'-4" -
1' - 3" 1' - 3"
Jacking Stiffener Jacking StiffenerCL CLField SpliceCLField SpliceCL
Abut. Crossframe (Typ.)
See RG3184-M
Intermediate Crossframe (Typ.)
See RG3184-M
Gdr. A
Gdr. B
Gdr. C
Gdr. D
CL
CL
CL
CL
8' - 0" 8' - 0"
Field Splice Spacing 62' - 0"62' - 0" 89' - 4"
Length Of Span 213' - 4"
See Detail C
See Detail B
Roadway & Structure
CL
CL
See Detail C
See Detail A
P h a s e I
I P h a s e I
Paint All Exposed Steel Members Within 5'-2" Of Girder End.
GIRDER FABRICATION NOTES:
1. Unless otherwise permitted by the CO, all longitudinal flange to web welds shall be made by fully automatic procedures.
2. The following welding sequence shall be followed: flange and web splices, flange to web welds, intermediate crossframe connection plate to web or flange welds, bearing & jacking stiffener to web or flange welds, then shear connectors to top flanges & web ends.
3. All dimensions shown are either horizontal or vertical. Girders must be fabricated along the bridge grade. Fabricate intermediate crossframe connection plates perpendicular to girder flanges.
4. Transportation, erection and construction methods that require drilling holes or welding to the girders will not be allowed.
5. Under full dead load, beam end and all bearing & jacking stiffeners will be vertical within applicable AASHTO/AWS fabrication and construction tolerance.
6. For weld details, see RG3184-L.
7. For Details A through D, see RG3184-J.
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-I
/1
/2
:4 :4
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.9PRA GLAC 10(45)
C. HARDAN M. MILLER 08-20-2021
GIRDER LAYOUT (1 OF 2)
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
3"
8"6
/2
S p a
/8
S p a
/8
⅞"Øx6" Stud (Typ.)
1"Ø Hole (Typ.)
GIRDER END DETAIL
Scale: ⅜" = 1'-0"
DETAIL A
Scale: ¾" = 1'-0"
3"
3' - 2" 1' - 3"
End Of Gdr.
⅞"Ø x6" Stud
Brg. ⅞"x8" Abut.
Jacking Stiff.
⅞"x8" Brg. Stiff.
¾" Web
CL
PL
PL ⅝"x8" Intermediate Crossframe Connection Plate¾" Web
PL
DETAIL B
Scale: ¾" = 1'-0"
⅝"x8" Intermediate Crossframe Connection Plate¾" Web
PL
DETAIL C
Scale: ¾" = 1'-0"
DETAIL D
Not To Scale
5'-0" Min. Transition Curve
Bend Plate Or Full Penetration Weld When Bending, Permit Transition Curve Between Straight & Haunch Sections.
CAMBER TABLE SPAN 1
ORDINATES
(inches) 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
D L C
A M
B E R
G D
R
A
B
C
D STL. DEFL. 1.751 3.386 4.729 5.625 5.945 5.625 4.729 3.386 1.751
CONC. DEFL. 2.690 5.200 7.260 8.632 9.124 8.632 7.260 5.200 2.690
SUPER DL
DEFL.
0.330 0.638 0.892 1.061 1.121 1.061 0.892 0.638 0.333
TOTAL
CAMBER
4.771 9.225 12.881 15.317 16.190 15.317 12.881 9.225 4.774
CAMBER TABLE LEGEND
STL. DEFL. = Camber due to structural steel deflection
CONC. DEFL. = Camber due to concrete slab deflection (includes 10% increase to account for concrete shrinkage)
SUPER DL DEFL. = Camber due to superimposed dead load deflections (bridge rails and sidewalk)
TOTAL CAMBER = STL. DEFL. + CONC. DEFL.
+ SUPER DL DEFL.
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
CAMBER DIAGRAM
Not To Scale
SPAN 1
10 Equal Spaces
Brg. Abut. 1 Brg. Abut. 2CL CLFully Cambered Fabricated Position
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-J
/1
/2
:4 :4
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.10PRA GLAC 10(45)
C. HARDAN M. MILLER 08-20-2021
GIRDER LAYOUT (2 OF 2)
AND CAMBER DIAGRAM
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
AS SHOWN
/1
S p a
/1
2" 3"
2 1/8" 2 1/8"
3" 2"
2" 11 Spa. @2⅝" = 2' - 4 7/8"
2 1/8"2 1/8"
11 Spa. @2⅝" = 2' - 4 7/8" 2"
1/4" Gap (Max.)
Inside Splice Plate
SpliceCL SpliceCL
TOP FLANGE
SpliceCL 1¼"x24"x5'-6"PL
2⅜"x24"PL
Filler ½"x24"x2'-8⅞"PL
1⅞"x24"PL
2- 1¼"x10"x5'-6"PL
2- ½"x1'-2¼"x5'-4"PL ¾" Thick Web
¾" Thick Web
1/4" Gap (Max.)
2- 1¼"x10"x5'-11¼"PL
2"x24"PL
Filler ⅝"x24"x2'-11½"PL
WEB
Req'd. Rolling Direction For Web And Flange Splice Plates
1¼"x24"x5'-11¼"PL
2⅝"x24"PL
CLPL PL
PL PL
PL
PL
PL
PL
PL
PL
PL
TOP FLANGE
WEB
2" 12 Spa. @2⅝" = 2' - 7 1/2" 2 1/8" 2 1/8" 12 Spa. @2⅝" = 2' - 7 1/2" 2"
SpliceCL
1/4" Gap (Max.)
BOTTOM FLANGE
BOLTED FIELD SPLICE #1
Gdr.CL
Splice
CL
CL
BOTTOM FLANGE
BOLTED FIELD SPLICE #2
NOTES:
1. All bolts are ⅞"Ø fasteners meeting the requirements of ASTM F3125, Grade A325, Type 3, Heavy Hex Style.
2. Bolt threads are excluded from shear planes.
3. All plates shall conform to AASHTO M270, Grade 50W (ASTM A709, Grade 50W).
4. All horizontal dimensions are measured along of girder.
5. All splices shall have the nut located on the inside of the girder or top side of the flanges.
6. Hole size shall be 15/16" unless noted otherwise.
7. For bolted field splice locations, see RG3184-I.
8. Shear connectors are not shown in these details.
CL
Gdr.CL
2"12 Spa. @2⅝" = 2' - 7 1/2"2 1/8"2 1/8"12 Spa. @2⅝" = 2' - 7 1/2"2"
1/4" Gap (Max.)
Gdr.
/1
S p a
/1
2"3"
2 1/8"2 1/8"
3"2"
Splice 1¼"x24"x5'-6"
2⅜"x24"
Filler ½"x24"x2'-8⅞"
1⅞"x24"
2- 1¼"x10"x5'-6"
2- ½"x1'-2¼"x5'-4"¾" Thick Web
¾" Thick Web
1/4" Gap (Max.)
2- 1¼"x10"x5'-11¼"
2"x24"
Filler ⅝"x24"x2'-11½"
Req'd. Rolling Direction For Web And Flange
Splice Plates
1¼"x24"x5'-11¼"
2⅝"x24"
2" 11 Spa. @2⅝" = 2' - 4 7/8"
2 1/8"2 1/8"
11 Spa. @2⅝" = 2' - 4 7/8" 2"
1/4" Gap (Max.)
Inside Splice Plate
Gdr.CL
Inside Splice Plate
Inside Splice Plate
Inside Splice Plate
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-K
/1
/2
:4 :4
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.11PRA GLAC 10(45)
C. HARDAN M. MILLER 08-20-2021
GIRDER FIELD SPLICES
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
G
Or Back Gouge
G
G
G
NOTES:
COPE AND WELD DETAIL
Not To Scale
1. See ANSI/AASHTO/AWS DI.5 Section 2.12 and Section 9.20.
Butt joints of bottom flanges and web plates shall, as a minimum, be ground flush by grinding parallel to the longit. girder direction in accordance with Section 3.6.3 and 3.6.4.
2. Locations of welded splices shall be approved by the CO.
TYPICAL WELDED FLANGE AND WEB SPLICE
Not To Scale
(t y p
. 6
1' - 0"
5' - 0"
2"
DRIP PLATE DETAILS EXTERIOR GIRDERS
Not To Scale
PLAN
SECTION A-A
3/16
5/16" PL
A
A
CL Abut. No. 1 And 2 Bearing
Bott. Flange
Of Ext. Gdr.
Outside Side
Cut Drip Plate To Fit Against Weld
⅞Ø X 6" Shear Connector (Typ.)
SHEAR CONNECTOR DETAIL
Not To Scale
See Weld Table
Cope (Typ.), See Detail
Web
⅝"x8" Intermediate Crossframe Connection Plate (Place On Both Sides Of Interior Girders)
Cope (Typ.), See Detail
PL
INTERMEDIATE CROSSFRAME
CONNECTION PLATE
BEARING AND JACKING
STIFFENERS
GIRDER WELD DETAILS
Not To Scale
See Weld Table
* (See Note) See Weld Table
Web
Bearing Or Jacking Stiffeners ⅞"x8" @ Abutments
PL
Thickness of thickest part joined
¾" or less over ¾"
Min. fillet weld sizes
¼"
5/16"
MINIMUM REQ'D. FILLET WELDS FOR:
-Flange-to-web welds -Intermediate crossframe connection plate to web & flange welds -Bearing & jacking stiffener to web & top flange welds
*NOTE:
Bearing & jacking stiffeners shall be milled to bear against the bottom flange only.
(Typ.)
1½"
"x" "x""x"
(t w
O r
M a x
(t w
M in
"y
"tw"
Flange
Stiffener Or Connection Plate
Note: Cope all intermediate crossframe connection plates, bearing stiffeners and jacking stiffeners top & bottom as shown above.
"x" = ¼" ± ⅛" "y" = ½" ± ¼"
See Weld Table
STATE PROJECT
SHEET
NO.
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
MT
NPS PMIS NO.: 308104 NPS DRWG. NO.: 117/175230
22 RG3184-L
/1
/2
:4 :4
A
M C
U s e rs
\e s w a n s o n \D o c u m e n ts
\2 .0
-U p p e r
M c D o n a ld
C re e k B ri d g e R
V T e s w a n s o n N
P V .r v t
L.12PRA GLAC 10(45)
C. HARDAN M. MILLER 08-20-2021
GIRDER WELD DETAILS
E. SWANSON C. HARDAN
NORTH MCDONALD CREEK BRIDGE
FLATHEAD COUNTY, MONTANA
7' - 0" Interior Gdr.
CL Exterior Gdr.
CL
PL ⅞" x 8" Bearing Stiffener (Typ.)
ABUTMENT CROSSFRAME
/8
L4"x4"x½" (Typ.)
L4"x4"x½" (Typ.)
1/4"
1/4"
(Typ.)
½" Fill Plate
See Detail A
½" Gusset Plate (Typ.)
See Detail B
Working Line
Working Line
6"
6"
7' - 0" Interior Gdr.
CL Exterior Gdr.
CL
PL ⅝" x 8" Connection Plate (Typ.)
INTERMEDIATE CROSSFRAME
(STA 7+94.21 & STA 9+91.55)
/8
6"
6"
See Detail A
½" Gusset Plate (Typ.)
See Detail B
1/4"
1/4"
(Typ.)
Working Line
Working Line
L4"x4"x½" (Typ.)
L4"x4"x½" (Typ.)
7' - 0" Interior Gdr.
CL Exterior Gdr.
CL
PL ⅝" x 8" Connection Plate (Typ.)
INTERMEDIATE CROSSFRAME
(STA 8+16.14 & STA 9+69.63)
/8
6"
6"
See Detail A
½" Gusset Plate (Typ.)
See Detail B
1/4"
1/4"
(Typ.)
Working Line
Working Line
L4"x4"x½" (Typ.)
L4"x4"x½" (Typ.)
7' - 0"
Interior Gdr.
CL Exterior Gdr.
CL
PL ⅝" x 8" Connection Plate (Typ.)
INTERMEDIATE CROSSFRAME
(STA 8+38.07 & STA 9+47.70)
/1
6"
6"
See Detail A
½" Gusset Plate (Typ.)
See Detail B
1/4"
1/4"
(Typ.)
Working Line
Working Line
L4"x4"x½" (Typ.)
L4"x4"x½" (Typ.)
7' - 0"
Interior Gdr.
CL Exterior Gdr.
CL
PL ⅝" x 8" Connection Plate (Typ.)
INTERMEDIATE CROSSFRAME
(STA 8+59.99 & STA 9+25.78)
/4
6"
6"
See Detail A
½" Gusset Plate (Typ.)
See Detail B
1/4"
1/4"
(Typ.)
Working Line
Working Line
L4"x4"x½" (Typ.)
L4"x4"x½" (Typ.)
7' - 0"
Interior Gdr.
CL Exterior Gdr.
CL
PL ⅝" x 8" Connection Plate (Typ.)
INTERMEDIATE CROSSFRAME
(STA 8+81.92 & STA 9+03.85)
/8
6"
6"
See Detail A
½"…