glac01045_McDonaldCreek_Clearing_MAIN.pdf
PDF 342 KB Posted
- Solicitation number
- 69056721B000017
About this file
This document contains a quantities report and related federal contract opportunity for rehabilitation work along the Going-to-the-Sun Road in Montana. The quantities report provides cut and fill volumes, baseline elevations, and cross-sectional areas for various materials across two segments totaling 9.3 miles of roadway. The related solicitation is for rehabilitation of this road section and replacement of the McDonald Creek bridge. It was issued by the Federal Highway Administration Department of Transportation with an opportunity type of solicitation. The work includes final rehabilitation of 9.3 miles of the Going-to-the-Sun Road, including replacement of the bridge over McDonald Creek. No other salient details are provided regarding response dates, pricing terms, set-asides, or incumbent contractors.
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upper McDonald Creek Road - Quantities Report by Named Boundary
Report Created: Monday, August 23, 2021 Time: 3:14:43 PM
Named Boundary Group:
McD Quantaties
Alignment Name:
Input Grid Factor:
Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
1718.776 McD Quant-1
Volumes_Cut: 8288.309 9993.002
Volumes_Fill: 12367.563 51914.457
Baseline: 492.251
XS_TL_Fill: 88.165
XS_TL_Centerline: 412.874
XS_TL_Subgrade: 1882.882
AUX_10: 412.874
XS_TL_Edge of Pavt 3: 1470.562
XS_TL_Centerline 1: 412.874
XS_TL_Edge of Pavt 1: 1416.205
XS_TL_Centerline 3: 412.874
XS_TL_Cut: 678.000
XS_TL_Slopes: 751.678
XS_TL_Centerline 2: 412.874
XS_TL_Edge of Pavt 2: 797.006
XS_TL_Edge of Pavt: 761.940
XS_TL_Edge of Shld 2: 673.868
XS_TL_MSE Wall Foundation: 175.748
XS_TL_Curb Face Top: 115.365
XS_TL_MSE Wall Front: 203.671
XS_TL_Curb Front Bot: 115.675
XS_TL_MSE Wall Backfill 1: 175.761
XS_TL_MSE Wall Excavation: 263.636
XS_TL_Subex_Backfill1: 175.748
XS_TL_Curb Front Top: 115.675
XS_TL_Curb Back Top: 115.300
XS_TL_Curb Back Bot: 115.300
XS_TC_Fill: 2645.142
XS_TC_Cut: 2290.232
XS_TC_Pavement Layer 3: 11390.342 7099.975
XS_TC_Pavement Layer 1: 10465.743 4838.533
XS_TC_Pavement Layer 4: 14626.621 12909.912
XS_TC_Foreslope: 4506.819
XS_TC_Pavement Layer 5: 175.737 175.737
XS_TC_Curb Surface: 1168.305 1575.433
XS_TC_Exist Rock: 4207.505 35084.706
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 1 of 3Volumes Report
8/23/2021file:///C:/Users/stephen/AppData/Local/Temp/RPTlwovhyag.html
XS_TC_MSE Wall Front: 1849.789 3123.644
XS_TC_MSE Wall Veneer: 1604.542
XS_TC_Parkway: 1314.347
XS_TC_MSE Wall Backfill 1: 2844.306 16188.511
XS_TC_Draft-DNC: 1658.957
XS_TC_Exist Topsoil: 7832.208 2567.170
XS_TC_Sidewalk Layer 2: 248.883 145.666
1803.888 McD Quant-2
Volumes_Cut: 4146.913 4195.464
Volumes_Fill: 12582.460 35877.103
Baseline: 659.122
Road_EdgeOfPavement: 0.000
XS_TL_Edge of Pavt: 622.981
XS_TL_Fill: 0.812
Matchline: 0.000
XS_TL_Centerline: 342.113
XS_TL_Subgrade: 1585.600
AUX_10: 342.113
XS_TL_Edge of Pavt 3: 1244.204
XS_TL_Centerline 1: 342.113
XS_TL_Edge of Pavt 1: 1245.056
XS_TL_Centerline 3: 342.113
XS_TL_Cut: 626.889
XS_TL_Slopes: 57.468
XS_TL_Centerline 2: 342.113
XS_TL_Edge of Pavt 2: 622.981
XS_TL_Edge of Shld 2: 621.707
XS_TC_Fill: 4065.641
XS_TC_Pavement Layer 1: 8882.637 4278.055
XS_TC_Pavement Layer 3: 10568.595 6587.350
XS_TC_Pavement Layer 4: 12498.071 11470.469
XS_TC_Cut: 148.769
XS_TC_Foreslope: 4359.485
XS_TC_Exist Topsoil: 7276.161 2381.768
XS_TC_Draft-DNC:
XS_TL_MSE Wall Foundation:
XS_TL_Curb Face Top:
XS_TL_MSE Wall Front:
XS_TL_Curb Front Bot:
XS_TL_MSE Wall Backfill 1:
XS_TL_MSE Wall Excavation:
XS_TL_Subex_Backfill1:
XS_TL_Curb Front Top:
XS_TL_Curb Back Top:
XS_TL_Curb Back Bot:
XS_TC_Pavement Layer 5:
XS_TC_Curb Surface:
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 2 of 3Volumes Report
XS_TC_MSE Wall Front:
XS_TC_MSE Wall Veneer:
XS_TC_Parkway:
XS_TC_MSE Wall Backfill 1:
XS_TC_Sidewalk Layer 2:
Station Named Boundary Name Material Count Length Top Sloped Area Volume
Page 3 of 3Volumes Report