glac01045_McDonaldCreek_Clearing_MAIN.pdf

PDF 342 KB Posted

Attached to
MT PRA GLAC 10(45) Rehabilitate Final 9. 3 Miles of the Going-to-the-Sun Road & Replace Bridge over McDonald Creek
Solicitation number
69056721B000017
Issued by

About this file

This document contains a quantities report and related federal contract opportunity for rehabilitation work along the Going-to-the-Sun Road in Montana. The quantities report provides cut and fill volumes, baseline elevations, and cross-sectional areas for various materials across two segments totaling 9.3 miles of roadway. The related solicitation is for rehabilitation of this road section and replacement of the McDonald Creek bridge. It was issued by the Federal Highway Administration Department of Transportation with an opportunity type of solicitation. The work includes final rehabilitation of 9.3 miles of the Going-to-the-Sun Road, including replacement of the bridge over McDonald Creek. No other salient details are provided regarding response dates, pricing terms, set-asides, or incumbent contractors.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_02-03-22.pdf PDF
QA_02-02-22.pdf PDF
QA_01-26-22.pdf PDF
QA_01-25-22.pdf PDF
Amendment A007.pdf PDF
QA_01-20-22.pdf PDF
Amendment A006.pdf PDF
QA_01-18-22.pdf PDF
QA_01-14-22.pdf PDF
Amendment A005_R1.pdf PDF
QA_01-12-22.pdf PDF
QA_01-11-22.pdf PDF
QA_01-10-22.pdf PDF
QA_1-07-22.pdf PDF
QA_12-29-21.pdf PDF
Amendment A004.pdf PDF
QA_12-23-21.pdf PDF
QA_12-22-21.pdf PDF
Amendment A003.pdf PDF
glac01045_GTSR_Earthwork_MAIN_A003.pdf PDF
QA_12-21-21.pdf PDF
QA_12-17-21.pdf PDF
QA_12-15-21.pdf PDF
QA_12-13-21.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_12-10-21.pdf PDF
MT_PRA_GLAC 10(45) Physical SWPPP_Final.pdf PDF
glac01045_Plans.pdf PDF
1430-001P Upper McDonald Lake Bridge Safety Inspection 2019.pdf PDF
glac01045_GTSR_Clearing_MAIN_SchedA.pdf PDF
glac01045_GTSR_HorizontalAlignmentReport_MAIN.pdf PDF
GR 16-21 MT PRA GLAC 10(45) Final Geotech Report.pdf PDF
glac01045_RevisedFinalHydraulicMemo.pdf PDF
MT PRA GLAC 10(45) IFB.pdf PDF
FLH Bridge Oversized-Overweight Permit Load Request.pdf PDF
Zip folder of files.zip ZIP file
MT PRA GLAC 202(1) As-Builts.pdf PDF
glac01045_X-SECTIONS_Signoff.pdf PDF
glac01045_McDonaldCreek_Clearing_APPROACHES.pdf PDF
glac01045_McDonaldCreek_Earthwork_MAIN.pdf PDF
Upper McDonald Creek Bridge Constructability Report.pdf PDF
glac01045_McDonaldCreek_VerticalAlignmentReport_MAIN.pdf PDF
1430-001P_AsBuilt.pdf PDF
2014 GTSR Phase X Pavement Coring with Photos.pdf PDF
glac01045_GTSR_Earthwork_MAIN.pdf PDF
Asbestos Survey N Mcd Crk Brg.pdf PDF
glac01045_McDonaldCreek_SuperelevationReport_MAIN.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upper McDonald Creek Road - Quantities Report by Named Boundary

Report Created: Monday, August 23, 2021 Time: 3:14:43 PM

Named Boundary Group:

McD Quantaties

Alignment Name:

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.

1718.776 McD Quant-1

Volumes_Cut: 8288.309 9993.002

Volumes_Fill: 12367.563 51914.457

Baseline: 492.251

XS_TL_Fill: 88.165

XS_TL_Centerline: 412.874

XS_TL_Subgrade: 1882.882

AUX_10: 412.874

XS_TL_Edge of Pavt 3: 1470.562

XS_TL_Centerline 1: 412.874

XS_TL_Edge of Pavt 1: 1416.205

XS_TL_Centerline 3: 412.874

XS_TL_Cut: 678.000

XS_TL_Slopes: 751.678

XS_TL_Centerline 2: 412.874

XS_TL_Edge of Pavt 2: 797.006

XS_TL_Edge of Pavt: 761.940

XS_TL_Edge of Shld 2: 673.868

XS_TL_MSE Wall Foundation: 175.748

XS_TL_Curb Face Top: 115.365

XS_TL_MSE Wall Front: 203.671

XS_TL_Curb Front Bot: 115.675

XS_TL_MSE Wall Backfill 1: 175.761

XS_TL_MSE Wall Excavation: 263.636

XS_TL_Subex_Backfill1: 175.748

XS_TL_Curb Front Top: 115.675

XS_TL_Curb Back Top: 115.300

XS_TL_Curb Back Bot: 115.300

XS_TC_Fill: 2645.142

XS_TC_Cut: 2290.232

XS_TC_Pavement Layer 3: 11390.342 7099.975

XS_TC_Pavement Layer 1: 10465.743 4838.533

XS_TC_Pavement Layer 4: 14626.621 12909.912

XS_TC_Foreslope: 4506.819

XS_TC_Pavement Layer 5: 175.737 175.737

XS_TC_Curb Surface: 1168.305 1575.433

XS_TC_Exist Rock: 4207.505 35084.706

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 1 of 3Volumes Report

8/23/2021file:///C:/Users/stephen/AppData/Local/Temp/RPTlwovhyag.html

XS_TC_MSE Wall Front: 1849.789 3123.644

XS_TC_MSE Wall Veneer: 1604.542

XS_TC_Parkway: 1314.347

XS_TC_MSE Wall Backfill 1: 2844.306 16188.511

XS_TC_Draft-DNC: 1658.957

XS_TC_Exist Topsoil: 7832.208 2567.170

XS_TC_Sidewalk Layer 2: 248.883 145.666

1803.888 McD Quant-2

Volumes_Cut: 4146.913 4195.464

Volumes_Fill: 12582.460 35877.103

Baseline: 659.122

Road_EdgeOfPavement: 0.000

XS_TL_Edge of Pavt: 622.981

XS_TL_Fill: 0.812

Matchline: 0.000

XS_TL_Centerline: 342.113

XS_TL_Subgrade: 1585.600

AUX_10: 342.113

XS_TL_Edge of Pavt 3: 1244.204

XS_TL_Centerline 1: 342.113

XS_TL_Edge of Pavt 1: 1245.056

XS_TL_Centerline 3: 342.113

XS_TL_Cut: 626.889

XS_TL_Slopes: 57.468

XS_TL_Centerline 2: 342.113

XS_TL_Edge of Pavt 2: 622.981

XS_TL_Edge of Shld 2: 621.707

XS_TC_Fill: 4065.641

XS_TC_Pavement Layer 1: 8882.637 4278.055

XS_TC_Pavement Layer 3: 10568.595 6587.350

XS_TC_Pavement Layer 4: 12498.071 11470.469

XS_TC_Cut: 148.769

XS_TC_Foreslope: 4359.485

XS_TC_Exist Topsoil: 7276.161 2381.768

XS_TC_Draft-DNC:

XS_TL_MSE Wall Foundation:

XS_TL_Curb Face Top:

XS_TL_MSE Wall Front:

XS_TL_Curb Front Bot:

XS_TL_MSE Wall Backfill 1:

XS_TL_MSE Wall Excavation:

XS_TL_Subex_Backfill1:

XS_TL_Curb Front Top:

XS_TL_Curb Back Top:

XS_TL_Curb Back Bot:

XS_TC_Pavement Layer 5:

XS_TC_Curb Surface:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 2 of 3Volumes Report

XS_TC_MSE Wall Front:

XS_TC_MSE Wall Veneer:

XS_TC_Parkway:

XS_TC_MSE Wall Backfill 1:

XS_TC_Sidewalk Layer 2:

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Page 3 of 3Volumes Report