glac01045_McDonaldCreek_VerticalAlignmentReport_MAIN.pdf

PDF 331 KB Posted

Attached to
MT PRA GLAC 10(45) Rehabilitate Final 9. 3 Miles of the Going-to-the-Sun Road & Replace Bridge over McDonald Creek
Solicitation number
69056721B000017
Issued by

About this file

This vertical alignment report details the grade and station elevations for a proposed road rehabilitation project on the Going-to-the-Sun Road over McDonald Creek in Montana. The report includes 14 elements consisting of tangent sections, symmetrical parabolas, and linear sections. Entrance and exit grades, length, and middle ordinate are provided for each element. The related federal contract opportunity is a solicitation to rehabilitate the final 9.3 miles of the Going-to-the-Sun Road and replace the bridge over McDonald Creek for the Department of Transportation Federal Highway Administration. The solicitation number and additional details about the project scope are included.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
BidSum.pdf PDF
QA_02-03-22.pdf PDF
QA_02-02-22.pdf PDF
QA_01-26-22.pdf PDF
QA_01-25-22.pdf PDF
Amendment A007.pdf PDF
QA_01-20-22.pdf PDF
Amendment A006.pdf PDF
QA_01-18-22.pdf PDF
QA_01-14-22.pdf PDF
Amendment A005_R1.pdf PDF
QA_01-12-22.pdf PDF
QA_01-11-22.pdf PDF
QA_01-10-22.pdf PDF
QA_1-07-22.pdf PDF
QA_12-29-21.pdf PDF
Amendment A004.pdf PDF
QA_12-23-21.pdf PDF
QA_12-22-21.pdf PDF
Amendment A003.pdf PDF
glac01045_GTSR_Earthwork_MAIN_A003.pdf PDF
QA_12-21-21.pdf PDF
QA_12-17-21.pdf PDF
QA_12-15-21.pdf PDF
QA_12-13-21.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_12-10-21.pdf PDF
MT_PRA_GLAC 10(45) Physical SWPPP_Final.pdf PDF
glac01045_Plans.pdf PDF
1430-001P Upper McDonald Lake Bridge Safety Inspection 2019.pdf PDF
glac01045_GTSR_Clearing_MAIN_SchedA.pdf PDF
glac01045_McDonaldCreek_Clearing_MAIN.pdf PDF
glac01045_GTSR_HorizontalAlignmentReport_MAIN.pdf PDF
GR 16-21 MT PRA GLAC 10(45) Final Geotech Report.pdf PDF
glac01045_RevisedFinalHydraulicMemo.pdf PDF
MT PRA GLAC 10(45) IFB.pdf PDF
FLH Bridge Oversized-Overweight Permit Load Request.pdf PDF
Zip folder of files.zip ZIP file
MT PRA GLAC 202(1) As-Builts.pdf PDF
glac01045_X-SECTIONS_Signoff.pdf PDF
glac01045_McDonaldCreek_Clearing_APPROACHES.pdf PDF
glac01045_McDonaldCreek_Earthwork_MAIN.pdf PDF
Upper McDonald Creek Bridge Constructability Report.pdf PDF
1430-001P_AsBuilt.pdf PDF
2014 GTSR Phase X Pavement Coring with Photos.pdf PDF
glac01045_GTSR_Earthwork_MAIN.pdf PDF
Asbestos Survey N Mcd Crk Brg.pdf PDF
glac01045_McDonaldCreek_SuperelevationReport_MAIN.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Upper McDonald Creek Road - Vertical Alignment Review Report

Report Created: Monday, August 23, 2021 Time: 2:47:43 PM

Project: Default

Description:

File Name:

F:\highways\FHWA\21500007_mt-glac1045_UpperMcDonaldCreekBridge\Upper McDonald Creek Bridge\dgn\mt-glac01045_ha01.dgn

Last Revised:

8/23/2021 14:36:16

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: MAIN

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: MAIN_PR

Vertical Description:

Vertical Style: Alignment\Baseline

Station Elevation

Element: Linear

START 354.993 3170.640

VPC 355.000 3170.640

Tangent Grade: 0.000

Tangent Length: 0.007

Element: Symmetrical Parabola

VPC 355.000 3170.640

VPI 480.000 3170.650

VPT 605.000 3174.798

Length: 250.000

Entrance Grade: 0.000

Exit Grade: 0.033 r = (g2 - g1) / L: 1.324

K = l / (g2 - g1): 75.519

Middle Ordinate: 1.035

Element: Linear

VPT 605.000 3174.798

VPC 700.000 3177.951

Tangent Grade: 0.033

Tangent Length: 95.000

Element: Symmetrical Parabola

VPC 700.000 3177.951

VPI 725.000 3178.780

Page 1 of 3Vertical Alignment Review Report

8/23/2021file:///C:/Users/stephen/AppData/Local/Temp/RPTp13c5ies.html

VPT 750.000 3179.030

Length: 50.000

Entrance Grade: 0.033

Exit Grade: 0.010 r = (g2 - g1) / L: -4.638

K = l / (g2 - g1): 21.562

Middle Ordinate: -0.145

Element: Linear

VPT 750.000 3179.030

VPC 1025.000 3181.779

Tangent Grade: 0.010

Tangent Length: 275.000

Element: Symmetrical Parabola

VPC 1025.000 3181.779

VPI 1050.000 3182.029

VPT 1075.000 3181.411

VHP 1039.399 3181.851

Length: 50.000

Entrance Grade: 0.010

Exit Grade: -0.025 r = (g2 - g1) / L: -6.942

K = l / (g2 - g1): 14.405

Middle Ordinate: -0.217

Element: Linear

VPT 1075.000 3181.411

VPC 1212.500 3178.013

Tangent Grade: -0.025

Tangent Length: 137.500

Element: Symmetrical Parabola

VPC 1212.500 3178.013

VPI 1300.000 3175.850

VPT 1387.500 3176.881

VLP 1331.019 3176.548

Length: 175.000

Entrance Grade: -0.025

Exit Grade: 0.012 r = (g2 - g1) / L: 2.085

K = l / (g2 - g1): 47.955

Middle Ordinate: 0.798

Element: Linear

VPT 1387.500 3176.881

VPC 1475.000 3177.911

Tangent Grade: 0.012

Tangent Length: 87.500

Page 2 of 3Vertical Alignment Review Report

Element: Symmetrical Parabola

VPC 1475.000 3177.911

VPI 1525.000 3178.500

VPT 1575.000 3178.621

Length: 100.000

Entrance Grade: 0.012

Exit Grade: 0.002 r = (g2 - g1) / L: -0.935

K = l / (g2 - g1): 106.940

Middle Ordinate: -0.117

Element: Linear

VPT 1575.000 3178.621

END 1851.811 3179.293

Tangent Grade: 0.002

Tangent Length: 276.811

Page 3 of 3Vertical Alignment Review Report

File details come from the government source that posted it. Updated .