MP102 - SECOND FLOOR PLAN - PIPING.pdf

PDF 466 KB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036AMEND0002
Issued by

About this file

The document is a second floor plan and HVAC piping schematic for a Department of Veterans Affairs (VA) project at the Dayton VA Medical Center. The architectural drawing, prepared by Guidon Design Inc. for the VA Office of Construction and Facilities Management, shows a detailed floor plan with multiple office spaces, including safety offices, NNU offices, a chaplain's office, conference rooms, and support areas. The plan is labeled as part of a phased project (Phases 2 and 4 are specifically noted), and includes detailed measurements, room numbering, and HVAC piping layout. The drawing is dated 7/9/2025, with a project number 2018-05164, and is part of an infrastructure deficiencies correction project for the medical center's Building 408.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T T

T

T

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T T

T T

T

T

TT

T

T

T

T

T

T

FT-4'-0"

FT-5'-0"

FT-27'-0"

FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-4'-0"

FT-4'-0"

FT-5'-0" FT-5'-0"

FT-4'-0"

FT-4'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-4'-0" FT-5'-0" FT-4'-0"

FT-5'-0"

FT-5'-0"

FCU-142

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

FT-3'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

AC-3

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"FT-5'-0"

CHR

CHS

HWR

HWS

3" 3" 3" 3"

FT-10'-0"

FT-10'-0"

FT-27'-0"

FT-10'-0"

FT-10'-0"

1.

5"

1.

5"

1.

5"

1.

5"C

H R

C H

S H

W S

H W

R

UP & DN

CHR

CHS

HWR

HWS

3" 3" 3" 3"

UP & DN

UP & DN

UP & DN

UP & DN

DOWN

UP

TOILET

207H

OFFICE

207G

OFFICE

207I

OFFICE

207F

OFFICE

207E

OFFICE 207D

OFFICE

107v

OFFICE

208B

OFFICE

208C

OFFICE

208D

OFFICE

208E

OFFICE

CHAPLAIN

OFFICE

208F

OFFICE

208G

OFFICE

208H

OFFICE

205H

SAFETY

OFFICE

205G

SAFETY

OFFICE

205F

SAFETY

OFFICE

205E

SAFETY

OFFICE205D

OIT OFFICE

205C

NNU

OFFICE

205B

NNU

OFFICE

205A

NNU

OFFICE

202G

OFFICE

202F

OFFICE202E

OFFICE

202D

OFFICE

202C

OFFICE

202B

OFFICE

202A

OFFICE

203B

OFFICE

203C

OFFICE

SUITE

203D

OFFICE

203E

CONFERENCE

ROOM

203F

OFFICE

TOILET

109A

BREAK

ROOM

205l

LOUNGE

201A

OFFICE

207B

OFFICE

AFCU

SUITE

208A

202H

FCU-65FCU-66

0.75" - D0.75" - D

PHASE 2

PHASE 3PHASE 4

UP

UP DN

DN

DN

DN

DN

DN

ELEV

1.5" D UP

1.5" D UP

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/9

/2

:2

:3

P M

MP102

SECOND FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

SCALE: 1/8" = 1'-0"MP102

1 SECOND FLOOR-HVAC-PIPING

N

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

1. NOTE OMITTED.

2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.

Revisions: Date:

ADDENDUM #1 07/09/2025

Sheets
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING

File details come from the government source that posted it. Updated .