This document is a first floor HVAC (Heating, Ventilation, and Air Conditioning) removals plan for the VA Medical Center (VAMC) in Dayton, Ohio, prepared by Guidon Design Inc. for the Department of Veterans Affairs Office of Construction and Facilities Management. The architectural drawing (MD101) shows a detailed floor plan with multiple phases (Phase 2 and Phase 4) indicating a phased infrastructure improvement project, specifically focusing on HVAC system removals and modifications. The plan is fully sprinklered and dated July 9, 2025, with the project number 2018-05164, suggesting an ongoing infrastructure deficiency correction initiative at the Dayton VAMC facility.

The drawing includes technical annotations, room layouts, and HVAC system removal details, with the consulting firm Heapy involved in the design process. The project is part of a larger solicitation (36C25025B0036AMEND0002) for infrastructure improvements, with a bid opening scheduled for July 23, 2025, at 10:00 a.m. local time at the Network Contracting Office 10 in Kettering, Ohio. The plan appears to be part of an amendment (Addendum #1) to the original solicitation, indicating ongoing refinements to the project specifications and scope.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

FCU

FCU

FCU

F C

U

FCU

PHASE 2PHASE 2

PHASE 3PHASE 4

10 15

10 15

10 15

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/9

/2

:2

:2

P M

MD101

FIRST FLOOR PLAN - REMOVALS CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MD101

1 FIRST FLOOR-HVAC-REMOVALS

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. EXISTING LOUVER TO REMAIN.

2. REMOVE EXISTING DUCTWORK AND ASSOCIATED ACCESSORIES, SUPPORTS,

ETC.

3. REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, SUPPORTS, ETC.

4. REMOVE EXISTING THERMOSTAT AND ASSOCIATED TUBING, WIRING, CONDUIT,

ETC.

5. REMOVE EXISTING STEAM CONVECTOR AND ASSOCIATED PIPING, VALVES,

CONTROLS, ETC. FOR REPLACEMENT WITH HOT WATER FIN TUBE IN NEW

WORK.

6. REMOVE EXISTING AIR HANDLING UNIT AND ASSOCIATED DUCTWORK, PIPING,

CONTROLS, AIR DEVICES, ETC.

7. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED DUCTWORK, PIPING,

VALVES, CONTROLS, ETC.

8. REMOVE EXISTING WINDOW AIR CONDITIONING UNIT.

9. REMOVE EXISTING AIR CONDITIONING UNIT AND ASSOCIATED PIPING,

CONTROLS, ETC.

10. REMOVE EXISTING CONDENSING UNIT AND ASSOCIATED CONCRETE PAD,

CONTROLS, PIPING, ETC.

11. PROVIDE 2" DOUBLE WALL INSULATED SHEET METAL PANEL BEHIND LOUVER.

SEAL AIR TIGHT.

12. FLOOR REGISTER TO REMAIN.

13. REMOVE EXISTING CHILLER AND ASSOCIATED CONCRETE PAD, PIPING,

CONTROLS, ETC.

14. REMOVE EXISTING FAN COIL UNIT AND ASSOCIATED PIPING, VALVES,

CONTROLS, ETC. PATCH FLOOR TO MATCH EXISTING.

15. PATCH GRADE TO MATCH EXISTING.

16. REMOVE EXTERIOR HVAC EQUIPMENT IN PHASE COORESPONDING TO

INTERIOR WORK.

17. REMOVE EXISTING STEAM AND CONDENSATE PIPE RISERS AND ASSOCIATED

SUPPORTS, ETC.

N

Revisions: Date:

ADDENDUM #1 07/09/2025

Sheets
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING