MP101 - FIRST FLOOR PLAN - PIPING.pdf

PDF 588 KB Posted

Attached to
Y1AA--Infrastructure Deficiencies B408 [552-19-102] Dayton VAMC
Solicitation number
36C25025B0036AMEND0002
Issued by

About this file

This document is a first floor piping plan (MP101) for a Veterans Affairs Medical Center (VAMC) infrastructure improvement project located in Dayton, Ohio. The detailed engineering drawing shows a comprehensive piping layout for a multi-phase facility renovation, featuring numerous mechanical room zones, offices, and support spaces. The plan includes specific piping annotations with detailed pipe sizes ranging from 0.75" to 4" for various systems like hot water supply (HWS), hot water return (HWR), chilled water supply (CHS), and chilled water return (CHR), with multiple fan coil units (FCU) strategically positioned throughout the floor plan.

The project is associated with Solicitation Number 36C25025B0036AMEND0002, with a bid opening date of July 23, 2025, at 10:00 a.m. local time at the Network Contracting Office 10 in Kettering, OH. The infrastructure deficiencies project is being managed by the Department of Veterans Affairs Veterans Health Administration, specifically Veterans Integrated Service Network 10, with design work completed by Guidon Design Inc. and engineering services by Heapy. The drawing is marked as fully sprinkled and includes multiple construction phases (Phase 2, Phase 3, Phase 4), indicating a complex, staged renovation approach for the medical facility.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

408-BT1

FCU-28

FCU-27

FCU-29

FCU-30

FCU-31

FCU-16

F C

U -2

FCU-25 FCU-26

FCU-18

FCU-13

FCU-10A

F C

U -7

F C

U -2

F C

U -1

A

F C

U -6

F C

U -3

FCU-15

FCU-14

FCU-22

FCU-21

FCU-20 FCU-19

FCU-17

FCU-12

FCU-11

FCU-10FCU-9FCU-8

FCU-4

FCU-5

FCU-23A FCU-23B

FCU-23C FCU-23D

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FCU-5A FCU-5B

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-4'-0"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-3'-0"

FT-5'-0" FT-5'-0" FT-5'-0" FT-5'-0"

FT-5'-0"

FT-4'-0"

FT-5'-6"

FT-5'-6"

FT-5'-6"

FT-6'-0"

FT-6'-0"

FT-4'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"

FT-5'-0"

FT-4'-0"

FT-5'-0"

FT-5'-0"

FT-4'-0"FT-4'-0"FT-4'-0"

FT-4'-0"FT-5'-0"

FT-5'-0"FT-5'-0"

FT-5'-0"

FT-4'-0"FT-5'-0"FT-4'-0"

FT-5'-0"

FT-8'-6"

FT-8'-6"

FT-5'-0"

FT-4'-0"

FCU-27A FCU-27B

CHR

HWR

CHS

HWS

FT-5'-0" FT-5'-0"

1.5" 1.5" 1.5" 1.5"

2"2"2" 2"

408-ACCH2 408-ACCH1408-ACCH2 408-ACCH1408-ACCH2

CHR4"4"

4"

4" 4"

0.75" DN

0.75" UP

0.75" UP

0.75" DN

0.75" UP

0.75" UP

FT-10'-0"

FT-10'-0"

FT-8'-0"

FT-10'-0"

FT-9'-6"

FT-9'-6"

F C

U -2

1"

1.

1.

1.5"1.5"

1" 1"

2"2"

1" 1"

1.25" 1.25"

1.

1.

1.5" 1.5"

1" 1"

1" 1"

1" 1"

1.

5"

1.

5"

1" 1"

1.5"1.5"

1.

1.

1.25"1.25"

1" 1"

2" 2"

1.

" 1.

1" 1"

1" 1"

1.25" 1.25" 1" 1"

1.

1.

2"2" 1.5" 1.5" 1" 1"

1" 1"

1.5" 1.5"1" 1"

1"1"

1" DN

1"1"

1" DN

1" 1"

1" 1"

1" 1"

1.

1.

1" 1"

1.25" 1.25" 1" 1"

2" 2"

2" 2"

1" 1"

1" 1"

1" 1"

1.

1.

1.5" 1.5" 1.5"

1.5"

1" 1" 1.

" 1.

1.

2" 2"

3" UP, 4" DN

ALL PIPING

SYSTEMS

1" 1"

H W

R H

W S

1.

1.

1" 1"

1"

0.

0.

0.75" UP (TYP.)

107d

OFC

107e OFC 107f

CONFERENCE

107b

OFC

107c

OFC

107g

OFFICE

107a

OFFICE

106f

OFFICE

106e

OFFICE

106g OFFICE 106h

OFFICE

106d

STORAGE

106c

COPIER

106j

OFFICE

DSS SUITE

106k

OFFICE

106l

OFFICE

106b

OFFICE

106a

OFFICE

KITCHEN

Room

103B

COMM.

MENS

TELE

PHARMACY

103C

CONFERENCE

103D

OFFICE104

OFFICE

103A

OFFICE

101C

OFFICE

101A

OFFICE

101A

OFFICE

ACQUISITION

CHAPLAIN

101D

OFFICE

100c OFFICE100d

OFFICE

Space

100m

OFFICE

100g

OFFICE

100n

OFFICE

100k

OFFICE

100h

OFFICE

100l

OFFICE

100j

OFFICE

WOMENS

101B

COMM

109A

BREAK

ROOM

109C

OFFICE

2"

0.75"

HWS/HWR UP

(TYP.)

0.75"

HWS/HWR UP

(TYP.)

0.75"

HWS/HWR UP

(TYP.)

1"CHS/CHR

1" CHS/CHR

1"CHS/CHR

1"CHS/CHR

0.75"

HWS/HWR UP

(TYP.)

1"CHS/CHR

3" UP, 4" DN

ALL PIPING

SYSTEMS

3" UP, 4" DN

ALL PIPING

SYSTEMS

0.75"

HWS/HWR UP

(TYP.)

FT-4'-0"

0.75"

HWS/HWR UP

(TYP.)

1" 1"

FCU-1B

1"

D

1.25" - D

1" - D

1" - D

1.25" - D

1.25" - D 1" - D

1.25" - D

1" - D

1.

D

1.5" - D

1.

D

1" - D

1.5" - D

AC-1AC-2

CU-3

CU-2

CU-1

PHASE 2

PHASE 3PHASE 4

UP

DN

UP

ELEV

1.5" - D

1.5" - D

1 .

5 "

D

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/9

/2

:2

:3

P M

MP101

FIRST FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES

PLAN NOTES

SCALE: 1/8" = 1'-0"MP101

1 FIRST FLOOR PLAN - NEW WORK

N

A. FIELD VERIFY LOCATIONS FOR ALL EXTERIOR EQUIPMENT AND CONCRETE

PADS WITH COR.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

C. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

1. NOTE OMITTED.

2. EXTEND 2" DRAIN DOWN TO MOP BASIN. INDIRECT DRAIN WITH 45° CHAMFER.

3. EXTEND REFRIGERANT PIPING AND DRAIN FROM AC-3 ON SECOND FLOOR.

REFER TO SHEET MP102 FOR CONTINUATION.

4. PROVIDE REFRIGERANT PIPING AND SPECIALTIES PER MANUFACTURERS

RECOMMENDATIONS. APPROXIMATE ROUTE SHOWN.

5. PROVIDE CONCRETE PAD. MAINTAIN MANUFACTURERS RECOMMENDED

CLEARANCES.

6. PROVIDE PVC PIPE ENCLOSURE TO CONCEAL VERTICAL PIPING. MATCH

BUILDING COLOR.

Revisions: Date:

ADDENDUM #1 07/09/2025

Sheets
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING

File details come from the government source that posted it. Updated .