This document is a Basement Floor Plan - Piping (HVAC) schematic for a VA Medical Center infrastructure project in Dayton, Ohio. The detailed architectural drawing shows a basement-level HVAC piping layout, including multiple crawlspaces, engineering storage rooms, and mechanical equipment locations. The plan is part of the VA project 36C25025B0036AMEND0002 for infrastructure deficiencies in Building 408, prepared by Guidon Design Inc. for the Veterans Health Administration, with the bid opening scheduled for July 23, 2025, at 10:00 a.m. local time at the Network Contracting Office 10 in Kettering, OH. The drawing includes precise pipe routing, equipment locations like fan coil units (FCU-71, FCU-72, FCU-73), and is marked as Phase 1 of the project, with specific notes to provide basement piping without disrupting future phases on other floors.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

T

T

T

T

T

T

T

T

T

M P

S

CHS

CHR

HWR

CHS

HWS

CHR

HWR

CHS

HWS

H W

S

C H

S H

W R

C H

R

3"

M P

S 4" 4"4" 4"3"

M P

S 4"

H W

S

5" 5"

4"

5" CHR

HWR

M401

PHASE 1

1" 1"1"

1"

1.25"

1" 1"

1.

" 1.

1.5" 1.5"

.75" UP

.75" UP .75" UP

1" 1"

4" UP

1" UP

1"

1"

1.25" 1.25"

1.

5"

1.

5"4"

4" 4" 4"

2" 2"

1" 1"

1"1.5" 1.5"

1" 1"

1.

5"

1" 1"

2" 2"

2" 2"

1.5" 1.5"

1"

1"

1" 1"

1" 1"

1" UP

1.25"

1.25"

1.

5"

1.

5"

4"

4" 4"

4"

4" UP

1" 1"

1" CHS/CHR UP

1" UP 1" UP

0.75" HWS/HWR

UP (TYP.)

0.75"

0.75"

1"

1"

0.75"

1.25"

LOCKSMITH

ENGINEERING

STORAGE

ROOM

1"

1" 408-CWP1

408-HWP1

408-UH3

408-UH1

408-UH2

408-UH3

408-UH3

408-UH1

408-UH2

4"

FCU-73

FCU-71

FCU-72

0.75"

HWS/HWR UP

(TYP.)

0.75" HWS/HWR

UP (TYP.)

0.75"

HWS/HWR UP

(TYP.)

H W

S H

W R

H W

R H W

S

207N Space

207O Space

207Q Space

109B

CRAWLSPACE

109C

CRAWLSPACE

205K-2

PIPE

SPACE-2

109E

CRAWLSPACE

109F

CRAWLSPACE

109G

CRAWLSPACE

109H

CRAWLSPACE

109I

CRAWLSPACE

109J

CRAWLSPACE

109K

CRAWLSPACE

109L

CRAWLSPACE 205R

Room

C H

R C

H S

0.75" 0.75"

0.75" 0.75"

1.

5"

1.

5"

1.

5"

408-C3

408-C2

408-C1

0.75"

HWS/HWR UP

(TYP.)

H W

S

C H

S

HWR

CHR

H W

S H

W R

H W

S H

W R

C H

S C

H R

1.25" - D

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural Engineer, Civil Engineer

PROJECT NO. STATE COA FIRM NO.2018-05164 01528

/9

/2

:2

:3

P M

MP100

BASEMENT FLOOR PLAN - PIPING CORRECT

INFRASTRUCTURE

DEFICIENCIES, B408

DAYTON, OHIO 45428

552-19-102

PHIL WEST, COR

May 2nd, 2025 GSE WJS

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"MP100

1 BASEMENT-HVAC-PIPING

GENERAL NOTES

PLAN NOTES

A. REFER TO SHEET M001 FOR LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS,

AND ADDITIONAL GENERAL NOTES.

B. HEATING AND CHILLED WATER CONNECTIONS TO FIN TUBE AND FAN COIL

UNITS TO BE 0.75" UNLESS OTHERWISE NOTED.

1. PROVIDE DIRECT BURIED PREINSULATED CHILLED WATER PIPING PER

SPECIFICATION SECTION 23 21 13.

N

Revisions: Date:

ADDENDUM #1 07/09/2025

PROVIDE BASEMENT PIPING IN

PHASE 1 TO THE EXTENT POSSIBLE

WITHOUT DISRUPTING FUTURE

PHASES ON OTHER FLOOR.

Sheets
M601 - SCHEDULES
M602 - SCHEDULES
M603 - SCHEDULES
M701 - CONTROLS AND AUTOMATION
MD100 - BASEMENT FLOOR PLAN - REMOVALS
MD101 - FIRST FLOOR PLAN - REMOVALS
MD102 - SECOND FLOOR PLAN - REMOVALS
MD103 - ATTIC FLOOR PLAN - REMOVALS
MP100 - BASEMENT FLOOR PLAN - PIPING
MP101 - FIRST FLOOR PLAN - PIPING
MP102 - SECOND FLOOR PLAN - PIPING
MP103 - ATTIC FLOOR PLAN - PIPING

File details come from the government source that posted it. Updated .