This document is a detailed engineering draft for a MALF (Multiple Articulated Lifting Frame) Assembly designed for the U.S. Army Corps of Engineers. The technical drawing consists of three sheets showing a complex mechanical assembly with multiple components, including a box frame weldment, main pivot assemblies, lifting arm assemblies, hydraulic mounts, horizontal supports, and bottom beam assemblies. The design specifications require strict material and welding standards, including ABS material certification, adherence to AWS welding codes, and comprehensive non-destructive testing (NDT) for critical welds, with 100% volumetric testing of critical butt welds and 100% surface testing of critical fillet welds. The assembly is 28'-1/2" long and appears to be engineered for precise integration with a revetment mat loading operation, specifically designed to work with a new robotic ACM (Articulated Concrete Mattress) laying barge scheduled for delivery in December 2025.

The detailed technical drawing (created by Marc Dickinson on 10/26/2022) provides a comprehensive exploded view and parts list, revealing 10 main pivot assemblies, 10 lifting arm assemblies, 5 hydraulic mount assemblies, 8 bumper spacer assemblies, 2 horizontal support weldments, 1 end alignment assembly, and 2 bottom beam assemblies. The drawing includes precise dimensional tolerances and notes emphasizing the critical nature of material certifications, welding standards, and non-destructive testing requirements. This draft represents a technical specification for manufacturing a specialized lifting frame system intended to support the U.S. Army Corps of Engineers' Regional Channel Improvement revetment sinking mission.

View the file

Other files

File Type Posted
REQUEST FOR INFORMATION (RFI) - ACM LIFTING FRAMES.pdf PDF
MALF-903-A_B (Draft).pdf PDF
MALF-100-101-102-103 (Draft).pdf PDF
MALF-912 (Draft).pdf PDF
MALF-606 (Draft).pdf PDF
MALF-907 (Draft).pdf PDF
MALF-603 (Draft).pdf PDF
MALF-906 (Draft).pdf PDF
MALF-901-A_B (Draft).PDF PDF
MALF-911 (Draft).pdf PDF
MALF-600 (Draft).pdf PDF
MALF-908 (Draft).pdf PDF
MALF-604 (Draft).pdf PDF
MALF-602 (Draft).pdf PDF
MALF-105 (Draft).pdf PDF
MALF-104 (Draft).pdf PDF
MALF-601 (Draft).pdf PDF
MALF-902 (Draft).pdf PDF
MALF-910 (Draft).pdf PDF
MALF-909 (Draft).pdf PDF
MALF-605 (Draft).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28'-1/2"

1675.49 65.964

2026.83 79.796

NOTE:

UNLESS OTHERWISE SPECIFIED ALL MATEIRALS USED IN CONSTRUCTION OF COMPONETNS ARE TO HAVE ABS MATERIAL CERTIFICATION IN ACCORDINATE WITH THE •

APPLICAPLE SECIONS OF "ABS RULES FOR MATERIALS AND WLEDING (PART 2)"

MATERIALS ARE TO BE FURNISHED WITH CERTIFICATES ISSUED BY THE MILL OR MATERIAL MANUFACTURER, INDICATING, AS A MINIMUM AND AS APPLICABLE, THE • MATERIAL SPECIFICATION, GRADE, PROCESS OF MANUFACTURE, HEAT TREATMENT DETAILS, MECHANICAL AND CHEMICAL PROPERTIES, IDENTIFICATION NUMBERS, AND

TEST RESULTS.

ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"• ALL WELDS SHALL BE TESTED USING EITHER VOLUMETRIC RADIOGRAPHIC TESTING (RT) OR ULTRASONIC TESTING (UT) METHODS OR SURFACE NDT TECNIQUES INCLUDING • MAGNETIC PARTICLE INSPECTION (MPI), PENETRANT TESTING (PT), EDDY CURRENT (EC) OR ALTERNATING CURRENT FIELD MEASURMENT (AFCM) CRITICAL WELDS ARE TO BE SUBJECTED TO THE FOLLOWING NONDESTRUCTIVE TESTING TO THE SATISFACTION OF THE ATTENDING SURVEYOR PRIOR TO PROOF LOAD •

TESTING:

100% VOLUMETRIC NDT OF ALL CRITICAL BUTT WELDS•

100% SUFACE NDT ON BOTH SIDES OF CRITICAL FILLET WELDS•

DRAWN BY:

THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED

CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT

DIMENSIONS ARE IN INCHES

TOLERANCES:

ANGULAR: MACH .5 DEG

ONE PLACE DECIMAL .05

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .005

MATERIAL

SEE NOTES

SIZE

B

PART NUMBER: REV

UNLESS OTHERWISE SPECIFIED

SHEET 1 OF 3

MALF

DO NOT SCALE

MALF ASSEMBLYG2 ENGINEERING

CONSULTING

FINISH

SEE NOTES

CREATED:

Marc.Dickinson

10/26/2022

A A

B B

C C

D D

DRAFT

3 11

9 7777

NOTE:

UNLESS OTHERWISE SPECIFIED ALL MATEIRALS USED IN CONSTRUCTION OF COMPONETNS ARE TO HAVE ABS MATERIAL CERTIFICATION IN ACCORDINATE WITH THE •

APPLICAPLE SECIONS OF "ABS RULES FOR MATERIALS AND WLEDING (PART 2)"

MATERIALS ARE TO BE FURNISHED WITH CERTIFICATES ISSUED BY THE MILL OR MATERIAL MANUFACTURER, INDICATING, AS A MINIMUM AND AS APPLICABLE, THE • MATERIAL SPECIFICATION, GRADE, PROCESS OF MANUFACTURE, HEAT TREATMENT DETAILS, MECHANICAL AND CHEMICAL PROPERTIES, IDENTIFICATION NUMBERS, AND

TEST RESULTS.

ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"• ALL WELDS SHALL BE TESTED USING EITHER VOLUMETRIC RADIOGRAPHIC TESTING (RT) OR ULTRASONIC TESTING (UT) METHODS OR SURFACE NDT TECNIQUES INCLUDING • MAGNETIC PARTICLE INSPECTION (MPI), PENETRANT TESTING (PT), EDDY CURRENT (EC) OR ALTERNATING CURRENT FIELD MEASURMENT (AFCM) CRITICAL WELDS ARE TO BE SUBJECTED TO THE FOLLOWING NONDESTRUCTIVE TESTING TO THE SATISFACTION OF THE ATTENDING SURVEYOR PRIOR TO PROOF LOAD •

TESTING:

ITEM

NO. PART NUMBER QTY. DESCRIPTION

1 MALF-905 1 BOX FRAME, WELDMENT

2 MALF-600 10 MAIN PIVOT ASSEMBLY

3 MALF-604 10 LIFTING ARM ASM

4 MALF-601 5 HYDRAULIC MOUNT, ASSEMBLY

5 P/N 10 DESCRIPTION

6 P/N 4 DESCRIPTION

7 MALF-605 8 BUMPER SPACER ASSEMBLY

8 MALF-910 2 HORIZONTAL SUPPORT, WELDMENT

9 MALF-602 1 END ALIGNMENT ASSEMBLY

10 MALF-606 2 BOTTOM BEAM ASSEMBLY

11 P/N 4 DESCRIPTION

DRAWN BY:

THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED

CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT

DIMENSIONS ARE IN INCHES

TOLERANCES:

ANGULAR: MACH .5 DEG

ONE PLACE DECIMAL .05

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .005

MATERIAL

SEE NOTES

SIZE

B

PART NUMBER: REV

UNLESS OTHERWISE SPECIFIED

SHEET 2 OF 3

MALF

DO NOT SCALE

MALF ASSEMBLYG2 ENGINEERING

CONSULTING

FINISH

SEE NOTES

CREATED:

Marc.Dickinson

10/26/2022

A A

B B

C C

D D

HYDRAULIC MOUNT, LIFTING LEG, & SIDE ALIGNMENT ASSEMBLY DETAIL

HARDWARE TYPICAL TO EACH INSTANCE HORIZONTAL SUPPORT, BOTTOM BEAM, & BOTTOM BEAM SHORT ASSEMBLY DETAILS

HARDWARE TYPICAL TO EACH INSTANCE

END ALIGNMENT ASSEMBLY & BUMPER SPACER ASSEMBLY DETAILS

HARDWARE TYPICAL TO EACH INSTANCE

NOTE:

UNLESS OTHERWISE SPECIFIED ALL MATEIRALS USED IN CONSTRUCTION OF COMPONETNS ARE TO HAVE ABS MATERIAL CERTIFICATION IN ACCORDINATE WITH THE •

APPLICAPLE SECIONS OF "ABS RULES FOR MATERIALS AND WLEDING (PART 2)"

MATERIALS ARE TO BE FURNISHED WITH CERTIFICATES ISSUED BY THE MILL OR MATERIAL MANUFACTURER, INDICATING, AS A MINIMUM AND AS APPLICABLE, THE • MATERIAL SPECIFICATION, GRADE, PROCESS OF MANUFACTURE, HEAT TREATMENT DETAILS, MECHANICAL AND CHEMICAL PROPERTIES, IDENTIFICATION NUMBERS, AND

TEST RESULTS.

ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"• ALL WELDS SHALL BE TESTED USING EITHER VOLUMETRIC RADIOGRAPHIC TESTING (RT) OR ULTRASONIC TESTING (UT) METHODS OR SURFACE NDT TECNIQUES INCLUDING • MAGNETIC PARTICLE INSPECTION (MPI), PENETRANT TESTING (PT), EDDY CURRENT (EC) OR ALTERNATING CURRENT FIELD MEASURMENT (AFCM) CRITICAL WELDS ARE TO BE SUBJECTED TO THE FOLLOWING NONDESTRUCTIVE TESTING TO THE SATISFACTION OF THE ATTENDING SURVEYOR PRIOR TO PROOF LOAD •

TESTING:

DRAWN BY:

THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED

CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT

DIMENSIONS ARE IN INCHES

TOLERANCES:

ANGULAR: MACH .5 DEG

ONE PLACE DECIMAL .05

TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .005

MATERIAL

SEE NOTES

SIZE

B

PART NUMBER: REV

UNLESS OTHERWISE SPECIFIED

SHEET 3 OF 3

MALF

DO NOT SCALE

MALF ASSEMBLYG2 ENGINEERING

CONSULTING

FINISH

SEE NOTES

CREATED:

Marc.Dickinson

10/26/2022

A A

B B

C C

D D

Weldment
Drawing View1
Drawing View2
Drawing View3
Drawing View4
Drawing View5
BOM
Drawing View8
Drawing View9
ASSEMBLY
Drawing View10
Drawing View12
Drawing View13

File details come from the government source that posted it. Updated .