MALF-912 (Draft).pdf
PDF 821 KB Posted
- Solicitation number
- W912EQ25SS0010
About this file
This document is a draft engineering drawing for a Bottom Beam Tube Weldment, specifically for Short Bottom Beam designs. The technical drawing includes multiple detailed views and specifications for tube weldments, with part numbers MALF-912 variants for short and V-style configurations.
The drawing provides comprehensive technical specifications, including critical welding requirements such as material certification, welding in accordance with AWS structural welding code, and non-destructive testing protocols. The document specifies that all materials must be furnished with certificates from the mill or material manufacturer, indicating material specifications, manufacturing process, heat treatment details, mechanical and chemical properties, identification numbers, and test results. Welding testing methods include volumetric radiographic testing, ultrasonic testing, surface end techniques, and various inspection methods like magnetic particle inspection and penetrant testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MALF-901-A_B (Draft).PDF | ||
| MALF-911 (Draft).pdf | ||
| MALF-600 (Draft).pdf | ||
| MALF-908 (Draft).pdf | ||
| MALF-604 (Draft).pdf | ||
| MALF-602 (Draft).pdf | ||
| MALF-105 (Draft).pdf | ||
| MALF-104 (Draft).pdf | ||
| MALF-601 (Draft).pdf | ||
| MALF-902 (Draft).pdf | ||
| MALF-910 (Draft).pdf | ||
| REQUEST FOR INFORMATION (RFI) - ACM LIFTING FRAMES.pdf | ||
| MALF-903-A_B (Draft).pdf | ||
| MALF-100-101-102-103 (Draft).pdf | ||
| MALF (Draft).pdf | ||
| MALF-606 (Draft).pdf | ||
| MALF-907 (Draft).pdf | ||
| MALF-603 (Draft).pdf | ||
| MALF-906 (Draft).pdf | ||
| MALF-909 (Draft).pdf | ||
| MALF-605 (Draft).pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'4-1/2"
6"
2"
3-1/2"
A
A
1-1/2" TYP.
SECTION A-A
NOTE:
UNLESS OTHERWISE SPECIFIED ALL MATEIRALS USED IN CONSTRUCTION OF COMPONETNS ARE TO HAVE ABS MATERIAL CERTIFICATION IN ACCORDINATE WITH THE Å
APPLICAPLE SECIONS OF "ABS RULES FOR MATERIALS AND WLEDING (PART 2)"
MATERIALS ARE TO BE FURNISHED WITH CERTIFICATES ISSUED BY THE MILL OR MATERIAL MANUFACTURER, INDICATING, AS A MINIMUM AND AS APPLICABLE, THE Å MATERIAL SPECIFICATION, GRADE, PROCESS OF MANUFACTURE, HEAT TREATMENT DETAILS, MECHANICAL AND CHEMICAL PROPERTIES, IDENTIFICATION NUMBERS, AND
TEST RESULTS.
ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"Å ALL WELDS SHALL BE TESTED USING EITHER VOLUMETRIC RADIOGRAPHIC TESTING (RT) OR ULTRASONIC TESTING (UT) METHODS OR SURFACE NDT TECNIQUES INCLUDING Å MAGNETIC PARTICLE INSPECTION (MPI), PENETRANT TESTING (PT), EDDY CURRENT (EC) OR ALTERNATING CURRENT FIELD MEASURMENT (AFCM) CRITICAL WELDS ARE TO BE SUBJECTED TO THE FOLLOWING NONDESTRUCTIVE TESTING TO THE SATISFACTION OF THE ATTENDING SURVEYOR PRIOR TO PROOF LOAD Å
TESTING:
100% VOLUMETRIC NDT OF ALL CRITICAL BUTT WELDSÅ
100% SUFACE NDT ON BOTH SIDES OF CRITICAL FILLET WELDSÅ
DRAWN BY:
THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED
CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT
DIMENSIONS ARE IN INCHES
TOLERANCES:
ANGULAR: MACH .5 DEG
ONE PLACE DECIMAL .05
TWO PLACE DECIMAL .01
THREE PLACE DECIMAL .005
MATERIAL
SEE NOTES
SIZE
B
PART NUMBER: REV
UNLESS OTHERWISE SPECIFIED
SHEET 1 OF 3
MALF-912
DO NOT SCALE
SHORT BOTTOM BEAM WELDMENTG2 ENGINEERING
CONSULTING
FINISH
SEE NOTES
CREATED:
Marc.Dickinson
11/19/2022
A A
B B
C C
D D
DRAFT
NOTE:
UNLESS OTHERWISE SPECIFIED ALL MATEIRALS USED IN CONSTRUCTION OF COMPONETNS ARE TO HAVE ABS MATERIAL CERTIFICATION IN ACCORDINATE WITH THE Å
APPLICAPLE SECIONS OF "ABS RULES FOR MATERIALS AND WLEDING (PART 2)"
MATERIALS ARE TO BE FURNISHED WITH CERTIFICATES ISSUED BY THE MILL OR MATERIAL MANUFACTURER, INDICATING, AS A MINIMUM AND AS APPLICABLE, THE Å MATERIAL SPECIFICATION, GRADE, PROCESS OF MANUFACTURE, HEAT TREATMENT DETAILS, MECHANICAL AND CHEMICAL PROPERTIES, IDENTIFICATION NUMBERS, AND
TEST RESULTS.
ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF AWS D1.1 "STRUCTURAL WELDING CODE - STEEL"Å ALL WELDS SHALL BE TESTED USING EITHER VOLUMETRIC RADIOGRAPHIC TESTING (RT) OR ULTRASONIC TESTING (UT) METHODS OR SURFACE NDT TECNIQUES INCLUDING Å MAGNETIC PARTICLE INSPECTION (MPI), PENETRANT TESTING (PT), EDDY CURRENT (EC) OR ALTERNATING CURRENT FIELD MEASURMENT (AFCM) CRITICAL WELDS ARE TO BE SUBJECTED TO THE FOLLOWING NONDESTRUCTIVE TESTING TO THE SATISFACTION OF THE ATTENDING SURVEYOR PRIOR TO PROOF LOAD Å
TESTING:
100% VOLUMETRIC NDT OF ALL CRITICAL BUTT WELDSÅ
100% SUFACE NDT ON BOTH SIDES OF CRITICAL FILLET WELDSÅ
ITEM
NO. PART NUMBER QTY. DESCRIPTION
1 MALF-912-001 1 Bottom Beam Tube Weldment Short.01
2 MALF-912-002 2 Bottom Beam Tube Weldment Short.02
3 MALF-911-001 2 Bottom Beam Tube Weldment V 3.01
4 MALF-911-002 2 Bottom Beam Tube Weldment V 3.02
DRAWN BY:
THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED
CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT
DIMENSIONS ARE IN INCHES
TOLERANCES:
ANGULAR: MACH .5 DEG
ONE PLACE DECIMAL .05
TWO PLACE DECIMAL .01
THREE PLACE DECIMAL .005
MATERIAL
SEE NOTES
SIZE
B
PART NUMBER: REV
UNLESS OTHERWISE SPECIFIED
SHEET 2 OF 3
MALF-912
DO NOT SCALE
SHORT BOTTOM BEAM WELDMENTG2 ENGINEERING
CONSULTING
FINISH
SEE NOTES
CREATED:
Marc.Dickinson
11/19/2022
A A
B B
C C
D D
1"
'5
'4
B
B
2"
2"
1/4"
MALF-912-001
3/4"
SECTION B-B
2"
2"
1/4"
MALF-912-002
'4
1-1/8" 2-3/8"
3/4"
1" 1/4" X 45Á
3-1/2"
3/4-10 THREADS
MALF-911-001
VIEW SCALE: 1:2
1-1/2"
5-1/2"
R1/8"
MALF-911-002
VIEW SCALE: 1:2
1/4"
DRAWN BY:
THE INFORMATION CONTAINED IN THIS DRAWING IS CONSIDERED
CONFIDENTIAL. CONTENT SHOULD NOT BE DISTRIBUTED WITHOUT CONSENT
DIMENSIONS ARE IN INCHES
TOLERANCES:
ANGULAR: MACH .5 DEG
ONE PLACE DECIMAL .05
TWO PLACE DECIMAL .01
THREE PLACE DECIMAL .005
MATERIAL
SEE NOTES
SIZE
B
PART NUMBER: REV
UNLESS OTHERWISE SPECIFIED
SHEET 3 OF 3
MALF-912
DO NOT SCALE
SHORT BOTTOM BEAM WELDMENTG2 ENGINEERING
CONSULTING
FINISH
SEE NOTES
CREATED:
Marc.Dickinson
11/19/2022
A A
B B
C C
D D
| Weldment |
| Drawing View1 |
| Drawing View2 |
| Drawing View3 |
| Drawing View4 |
| Section View A-A |
| Drawing View7 |
| BOM |
| Drawing View8 |
| Components |
| Drawing View9 |
| Drawing View10 |
| Section View B-B |
| Drawing View12 |
| Drawing View13 |
| Drawing View14 |
| Drawing View15 |
| Drawing View16 |
| Drawing View17 |
File details come from the government source that posted it. Updated .