MAHG211036_Demo B5022_MSS.xls

XLS spreadsheet 56 KB Posted

Attached to
Demolition of Building 5022 & 1906 Federal contract opportunity
Solicitation number
FA301022R0004
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a schedule of material submittals and a related federal contract opportunity solicitation. The schedule of material submittals outlines requirements for various submittals related to a demolition project at Building 5022, including hazardous materials questionnaires and reports, warranty documents, landscaping and utility plans, and material samples. Due dates are provided for each required submittal ranging from five days after notice to proceed to the end of the contract. The related federal contract opportunity solicitation seeks demolition services for Building 5022 and 1906 with an acquisition value between $500,000 and $1,000,000. The solicitation is set aside for 100% service-disabled veteran-owned small businesses. An organized site visit will take place on December 20, 2021, with response pricing to be provided on page three. The solicitation notes that funds are not presently available and no award will be made until funding is in place.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Building 5022 & 1906, newest first.
File Type Posted
Tree Protection Guidance.pdf PDF
Integra CT30 Locks.pdf PDF
B5022 Asbestos Report.pdf PDF
Questions and Answers - Demolition 11 Jan 2022.pdf PDF
FA301022R00040004.pdf PDF
1906 ACM Survey Notes.pdf PDF
1906 HA Sheet.pdf PDF
Demo. Heritage and VQ Buildings- Addendum #1.docx DOCX document
B1906 Asbestos Report.pdf PDF
Demo B5022 and B1906 Site Visit Sign In 6 January 2022.pdf PDF
Q and A - Demolition_3 Jan 2022.pdf PDF
Amendment 003--SF 30.pdf PDF
Site Visit Information_3 Jan 2022.pdf PDF
Environmental Management Contractor Packet_Sep 2021.pdf PDF
Site Visit Information_30 Dec 2021.pdf PDF
Q and A - Demo_30 Dec 2021.pdf PDF
Amendment 002--SF 30.pdf PDF
MAHG211035 - Drawings.pdf PDF
MAHG211035 - Specifications.pdf PDF
MAHG211035 - Demolition Hertiage Bldg B1906 SOW.pdf PDF
MAHG211035 Demolition Heritage Bldg B1906 MSS.xls XLS spreadsheet
FA301022R00040001.pdf PDF
Demo B5022 and B1906 Site Visit sign in.pdf PDF
WD 15-5147_Rev 15_dated 20 OCT 2021.pdf PDF
Notice of Compliance.pdf PDF
3 Line Reference - Past Performance Reference List.pdf PDF
MAHG211036_Demo B5022_SOW.docx DOCX document
SF 1444.pdf PDF
Solicitation - FA301022R0004.pdf PDF
Past Performance Questionnaire.pdf PDF
MAHG211036_Demo B5022_Drawings.pdf PDF
Specifications and Submittals Procedures.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG 21-1036Project Title:
DEMO VQ, B5022Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HAZMAT QuestionaireXX5 DAYS AFTER NTP
2HAZMAT MSDSX5 DAYS AFTER NTP
3HAZMAT Reporting Entry FormXX5 DAYS AFTER NTP
4HAZMAT Reporting Entry FormXXEND OF CONTRACT
5Recycling and Landfill ReportXXEND OF CONTRACT
6Warranty (Manufacturer's)END OF CONTRACT
71-Year Warranty (Contractor's)XEND OF CONTRACT
8Solid SoddingXX5 DAYS AFTER NTP
9Equipment ListX5 DAYS AFTER NTP
10Contractor Dust Control PlanX5 DAYS AFTER NTP
11Select Fill Material (Backfill)XX5 DAYS AFTER NTP
12Utility Valves & Line StopsXXX5 DAYS AFTER NTP
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)