MAHG211036_Demo B5022_MSS.xls
XLS spreadsheet 56 KB Posted
- Attached to
- Demolition of Building 5022 & 1906 Federal contract opportunity
- Solicitation number
- FA301022R0004
About this file
This document contains a schedule of material submittals and a related federal contract opportunity solicitation. The schedule of material submittals outlines requirements for various submittals related to a demolition project at Building 5022, including hazardous materials questionnaires and reports, warranty documents, landscaping and utility plans, and material samples. Due dates are provided for each required submittal ranging from five days after notice to proceed to the end of the contract. The related federal contract opportunity solicitation seeks demolition services for Building 5022 and 1906 with an acquisition value between $500,000 and $1,000,000. The solicitation is set aside for 100% service-disabled veteran-owned small businesses. An organized site visit will take place on December 20, 2021, with response pricing to be provided on page three. The solicitation notes that funds are not presently available and no award will be made until funding is in place.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG 21-1036 | Project Title: | ||
| DEMO VQ, B5022 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HAZMAT Questionaire | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 2 | HAZMAT MSDS | X | 5 DAYS AFTER NTP | |||||||||||||||||||
| 3 | HAZMAT Reporting Entry Form | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 4 | HAZMAT Reporting Entry Form | X | X | END OF CONTRACT | ||||||||||||||||||
| 5 | Recycling and Landfill Report | X | X | END OF CONTRACT | ||||||||||||||||||
| 6 | Warranty (Manufacturer's) | END OF CONTRACT | ||||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | X | END OF CONTRACT | |||||||||||||||||||
| 8 | Solid Sodding | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 9 | Equipment List | X | 5 DAYS AFTER NTP | |||||||||||||||||||
| 10 | Contractor Dust Control Plan | X | 5 DAYS AFTER NTP | |||||||||||||||||||
| 11 | Select Fill Material (Backfill) | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 12 | Utility Valves & Line Stops | X | X | X | 5 DAYS AFTER NTP | |||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)