About this file

This document package includes construction drawings and specifications for the demolition of Building 5022 located at Keesler Air Force Base in Mississippi. The drawings depict the building layout and call for the full demolition and removal of the three-story 31,500 square foot structure down to three feet below grade, including all foundations. Utilities running to and from the building must also be fully removed. The specifications require backfilling excavated areas with select fill, grading and sodding the site, and disposing of demolished materials in accordance with applicable regulations. Erosion control measures must be implemented and maintained throughout construction. This opportunity also includes the demolition of Building 1906, with a magnitude between $500,000 and $1,000,000. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and responses are due by the date specified in the document. The site visit is scheduled for December 20, 2021 and the Air Force reserves the right to cancel the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of Building 5022 & 1906, newest first.
File Type Posted
Tree Protection Guidance.pdf PDF
Integra CT30 Locks.pdf PDF
Questions and Answers - Demolition 11 Jan 2022.pdf PDF
FA301022R00040004.pdf PDF
1906 ACM Survey Notes.pdf PDF
1906 HA Sheet.pdf PDF
Demo. Heritage and VQ Buildings- Addendum #1.docx DOCX document
B1906 Asbestos Report.pdf PDF
B5022 Asbestos Report.pdf PDF
Demo B5022 and B1906 Site Visit Sign In 6 January 2022.pdf PDF
Q and A - Demolition_3 Jan 2022.pdf PDF
Amendment 003--SF 30.pdf PDF
Site Visit Information_3 Jan 2022.pdf PDF
Environmental Management Contractor Packet_Sep 2021.pdf PDF
Q and A - Demo_30 Dec 2021.pdf PDF
Amendment 002--SF 30.pdf PDF
Site Visit Information_30 Dec 2021.pdf PDF
MAHG211035 - Drawings.pdf PDF
MAHG211035 - Specifications.pdf PDF
MAHG211035 - Demolition Hertiage Bldg B1906 SOW.pdf PDF
MAHG211035 Demolition Heritage Bldg B1906 MSS.xls XLS spreadsheet
FA301022R00040001.pdf PDF
Demo B5022 and B1906 Site Visit sign in.pdf PDF
WD 15-5147_Rev 15_dated 20 OCT 2021.pdf PDF
Notice of Compliance.pdf PDF
3 Line Reference - Past Performance Reference List.pdf PDF
MAHG211036_Demo B5022_SOW.docx DOCX document
SF 1444.pdf PDF
Solicitation - FA301022R0004.pdf PDF
Past Performance Questionnaire.pdf PDF
Specifications and Submittals Procedures.pdf PDF
MAHG211036_Demo B5022_MSS.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. REED

A. MARASCA G. REED

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

VARIES

N / A

INDEX OF DRAWINGS

DEMO VQ, B5022

KEESLER AFB, MS

D1.0 - STRUCTURE & CONCRETE DEMO

1 T1.0 - TITLE SHEET

KEESLER AFB, MISSISSIPPI

25 AUGUST 2021

NOT TO SCALE

LOCATION PLAN BLDG. 5022

MAHG21-1036

D2.0 - UTILITY REMOVAL3

NOT TO SCALE

VICINITY MAP

NOT TO SCALE

LOCATION MAP - KEESLER AIR FORCE BASE

BX PARKING LOT

PROJECT LOCATION

E1.0 - B5022 FIRST FLOOR PLAN4

E2.0 - B5022 SECOND FLOOR PLAN5

BLDG. 5022

WHITE AVE. GATE

BASE ENTRANCE

E3.0 - B5022 THIRD FLOOR PLAN6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text T1.0

AutoCAD SHX Text

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

1" = 30'-0"

N / A

1. CONTRACTOR ENCOURAGED TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO BID AND START

OF CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY CONDITIONS DETRIMENTAL TO THE COMPLETION

OF THE WORK AS DESIGNED.

2. PROTECT ALL ELEMENTS TO REMAIN SUCH AS EXISTING UTILITIES, FACILITY, ROADS, CURBS, DRIVES, SIDEWALKS, METAL CARPORTS, SOLID SOD, ETC. CONTRACTOR TO RESTORE ANY DAMAGED ELEMENTS TO

THE ORIGINAL CONDITIONS.

3. CONFINE ALL WORK TO SPECIFIC AREAS AS DESIGNATED IN THE SCOPE OF WORK AND SCHEDULE.

4. REFER TO MATERIAL SPECIFICATIONS IN SCOPE OF WORK FOR REQUIREMENTS AND APPLICATIONS.

5. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL LOCATE ALL UTILITIES, ANY UTILITY ADJUSTMENTS, EXISTING OR PROPOSED, REQUIRED TO COMPLETE CONSTRUCTION IS THE RESPONSIBILITY OF THE

CONTRACTOR. THIS ITEM INCLUDES, BUT IS NOT LIMITED TO; THE TEMPORARY RELOCATION OF EXISTING

OVERHEAD POWER LINES. ALL WORK IN THE VICINITY OF OVERHEAD POWER LINES SHALL CONFORM TO

OSHA REQUIREMENTS AND ANY OTHER APPLICABLE (LOCAL) SAFETY REQUIREMENTS. THE CONTRACTOR IS

TO REPAIR ANY DAMAGES TO EXISTING UTILITIES THAT ARE TO REMAIN IN SERVICE IMMEDIATELY AT NO

ADDITIONAL COSTS OR EXPENSE TO THE GOVERNMENT.

6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A MANNER THAT ALLOWS

EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAYS TO EMERGENCY

VEHICLES RESPONSE TIMES.

7. CONTRACTOR IS REQUIRED TO GPS LOCATE ALL UTILITY LINES AND APPURTENANCES IMMEDIATELY AFTER

INSTALLATION FOR UPDATING RED-LINE AS-BUILT DRAWINGS MAINTAINED ON-SITE BY CONTRACTOR.

8. ALL CRANES COMING ON BASE MUST BE FIRST COORDINATED WITH WITH COE/BASE TO GET FULL EXTENSION

AND EXPECTED DURATION. THIS MUST BE SUPPLIED TO THE AIRFIELD 6 WEEKS PRIOR TO CRANE'S ARRIVAL.

CONTRACTOR MUST HAVE FAA TEMPORARY CRANE PERMIT IN HAND PRIOR TO ANY CRANE ACTIVITY.

9. CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE

CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING

WORKING HOURS WHILE JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE DESIGNATED THE

RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE

CONTRACTOR'S REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATIVE

REPRESENTATIVE SHALL BE PROVIDED.

10. EROSION CONTROL MEASURES MUST BE IN PLACE PRIOR TO ANY DISTURBANCE.

11. EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND ANY MATERIAL STOCKPILES WHEN

NECESSARY TO CONTROL EROSION AND STORMWATER RUNOFF.

12. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT ITS MOVEMENT BY WIND FORCES.

13. LIMITS OF CONSTRUCTION IS DEFINED AS THOSE AREAS AFFECTED BY THE CONTRACTOR'S OPERATIONS

INVOLVING EXCAVATION, EMBANKMENT AND FINAL GRADING REQUIRED TO COMPLETE THE WORK IN

ACCORDANCE WITH THE ELEVATIONS, GRADES AND SECTIONS SHOWN IN THESE DRAWINGS.

14. CONTRACTOR SHALL UTILIZE EROSION CONTROL DEVICES AND PROCEDURES AS SET FORTH IN MDOT

STANDARD DETAILS, 2018 EDITION.

15. BE ADVISED THAT CONTRACTOR'S WORK MAY BE SUSPENDED WHEN LIGHTNING IS WITHIN 5 MILES.

16. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION (OSHA) REGULATIONS AND USACE SAFETY MANUAL EM385-1-1.

BUILDING AND CONCRETE REMOVAL

SCALE: 1" = 30'-0"

DEMO CONCRETE PIT AND

VENT HOOD, PIT DIMENTIONS

APPROX. 10'x10'x8'

DEMO 32'x15' CANOPY

AND SLAB, FILL HOLE WITH

SELECT FILL GRADE TO

DRAIN

DEMO 40'x22' CANOPY

AND SLAB, FILL HOLE

WITH SELECT FILL

GRADE TO DRAIN

DEMO 3-STORY BUILDING &

FOUNDATION, BUILDING

FOOTPRINT APPROX. 31,500

SQ. FT.

DEMO 45'x25' REINFORCED

CONCRETE SLAB

DEMO APPROX. 1800 LIN.

FT. OF REINFORCED

CONCRETE SIDEWALK ON

NORTH SIDE OF BUILDING

1. FLOOR PLANS FOR ALL BUILDING FLOOR LEVELS ARE INCLUDED ON SHEETS E-1 THROUGH E-3.

2. BUILDINGS TO INCLUDE ANY AND ALL FOUNDATIONS ARE TO BE REMOVED AND SELECT FILL IS TO BE

BROUGHT ON SITE AND COMPACTED TO FILL ANY VOIDS. ALL BARE SOIL IS TO BE SODDED WITH CENTIPEDE

SOD AND MAINTAINED FOR A MINIMUM OF 6 WEEKS.

3. ALL UTILITY REMOVAL IS SHOWN ON SHEET D-2.

4. NO TREES ARE TO BE REMOVED OR DAMAGED.

5. PERIMETER FENCE IS TO BE SET UP AROUND ANY AREA WORK IS TAKING PLACE.

6. SEE SOW FOR SPECIFICATIONS ON SELECT FILL MATERIAL USED TO FILL EXCAVATIONS TO GRADE.

7. ALL STRUCTURES ARE TO BE REMOVED TO A MINIMUM OF THREE (3) FEET BELOW GRADE. B5022 FOUNDATION

IS TO BE REMOVED IN ITS ENTIRETY.

8. KEESLER AIR FORCE BASE RECYCLING STANDARDS ARE TO BE FOLLOWED FOR ALL RECYCLABLE MATERIAL.

9. DUST CONTROL WILL BE STRICTLY ENFORCED. FIRE HYDRANTS ARE LOCATED WITHIN THE IMMEDIATE AREA

OF B5022 AND CAN BE UTILIZED FOR DUST CONTROL OPERATIONS BY NOTIFYING VECTRUS SHOPS.

CONCRETE ON WEST SIDE

OF BUILDING TO REMAIN

DEMO OF

SIDEWALK

CONTINUES

TO ROAD

DEMO APPROX. 750 LIN. FT.

OF REINFORCED

CONCRETE SIDEWALK ON

SOUTH SIDE OF BUILDING

LEGEND

STRUCTURE REMOVAL

CONCRETE REMOVAL

ELECTRICAL JUNCTION

BOX TO REMAIN

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text D1.0

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text

REMOVAL NOTES

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

1" = 30'-0"

N / A

UTILITY REMOVALS

SCALE: 1" = 30'-0"

REMOVE APPROX. 270' OF

STORMWATER LINE TO

INCLUDE 3 MANHOLES

REMOVE APPROX. 175' OF

GAS LINE AND CAP AT MAIN

REMOVE APPROX. 30' OF

WATER SERVICE LINE AND

CAP WHERE SHOWN

REMOVE APPROX. 20' OF GAS

LINE AND CAP AT MAIN

REMOVE APPROX. 350' OF

SANITARY SEWER LINE AND

CAP APPROX. 30' FROM MAIN

REMOVE APPROX. 60'

OF GAS LINE AND CAP

AT MAIN

REMOVE APPROX. 260'

OF WATER LINE AND CAP

AT MAIN

REMOVE APPROX. 180'

OF SANITARY SEWER

LINE AND CAP AT LAST

ACTIVE MANHOLE

1. ALL EXCAVATIONS MUST BE FILLED BACK IN TO EXISTING GRADE

AND MUST BE COVERED WITH CENTIPEDE SOD AND MAINTAINED FOR

A MINIMUM OF 6 WEEKS FROM PROJECT CLOSEOUT DATE.

2. ANY ADDITIONAL STRUCTURES WHICH SUPPORT UTILITY LINES

SHOWN TO BE REMOVED SUCH AS MANHOLES, JUNCTION BOXES OR

CONFLICT BOXES MUST ALSO BE REMOVED.

3. UTILITY LINES WHICH ARE TO BE REMOVED ARE SHOWN THIS SHEET

TO END AT B5022 ARE ALSO TO BE FULLY REMOVED FROM B5022.

4. DEWATERING OPERATIONS ARE TO BE USED AS NEEDED TO KEEP

TIE-IN AND CAP AREAS FREE FROM WATER WHILE WORKING.

5. ALL GAS TIE-INS TO B5022 HAVE GAS METERS WHICH ALSO MUST BE

REMOVED AND DISPOSED OF.

6. ALL DISPOSAL OF DEMOLISHED MATERIAL MUST BE DONE IN

ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL

CODES AND REGULATIONS.

7. COORDINATE WITH VECTRUS SHOPS FOR ANY NECESSARY UTILITY

SHUTDOWNS WHICH MAY BE NECESSARY.

8. REMOVE ANY CABLE TV LINES RUNNING FROM B5022 TO ADJACENT

BUILDINGS.

9. THE "CAP" REFERRED TO THIS SHEET SHALL BE A LINE STOP AND

VALVE FOR WATER AND GAS.

10. SITE MUST BE RE-GRADED AFTER STORMWATER REMOVAL TO

ENSURE NO PONDING AND POSITIVE DRAINAGE.

11. EROSION CONTROL STANDARDS WILL FOLLOW MDOT EROSION

CONTROL STANDARDS, 2018.

REMOVE APPROX. 180'

OF POWER SUPPLY LINE

REMOVE APPROX. 70' OF

POWER SERVICE LINE

ELECTRICAL JUNCTION

BOX TO REMAIN

REMOVE APPROX. 500' OF

CABLE TV LINE FROM BOX

TO BUILDING

REMOVE APPROX. 375' OF

WATER SERVICE LINE AND

APPROX. 30' FROM MAIN

REMOVE APPROX. 370' OF

STORMWATER LINE TO

INCLUDE 4 MANHOLES, CAP

APPROX. 30' FROM MAIN

LEGEND

POWER SUPPLY LINE

POWER SUPPLY LINE DEMO

GAS LINE

GAS LINE DEMO

SANITARY SEWER LINE

SANITARY SEWER LINE DEMO

STORMWATER LINE

STORMWATER LINE DEMO

WATER LINE

WATER LINE DEMO

COMMUNICATION LINE

COMMUNICATION LINE DEMO

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text D2.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text

UTILITY REMOVAL NOTES

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

N / A

N / A

BLDG. 5022 1ST FLOOR PLAN

NOT TO SCALE

"A"

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text E1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

N / A

N / A

BLDG. 5022 2ND FLOOR PLAN

NOT TO SCALE

AutoCAD SHX Text

JANITOR'S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

BATH

AutoCAD SHX Text

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

MECH. ROOM

AutoCAD SHX Text

EMPLOYEE

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

DAY ROOM

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OFFICES

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text E2.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

MAHG21-103625 AUG 2021

M. KIRKLAND

M. KIRKLAND

DEMO VQ, B5022

N / A

N / A

BLDG. 5022 3RD FLOOR PLAN

NOT TO SCALE

AutoCAD SHX Text

JANITOR

AutoCAD SHX Text

AutoCAD SHX Text

BATH

AutoCAD SHX Text

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

DAY

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

DAY ROOM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

CLOS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DAY

AutoCAD SHX Text

ROOM

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text E3.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

T1.0.pdf
Sheets and Views
T1.0
D1.0.pdf
Sheets and Views
D1.0
D2.0.1.pdf
Sheets and Views
D2.0
E1.0.pdf
Sheets and Views
E1.0
E2.0.pdf
Sheets and Views
E2.0
E3.0.pdf
Sheets and Views
E3.0

File details come from the government source that posted it. Updated .