This document contains a schedule of material submittals and a related federal contract opportunity solicitation. The schedule of material submittals lists 13 items requiring submittal to the contracting office for a demolition project of Building 1906, including hazard assessment questionnaires and reports, warranty documents, landscaping and utility plans. Submittals are due between 5 days and the end of the contract.
The related federal contract opportunity solicitation seeks demolition services for Buildings 5022 and 1906 with an acquisition value between $500,000 and $1,000,000. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. An on-site visit is scheduled for December 20, 2021 and instructions are provided. Funding is not guaranteed and the solicitation may be cancelled before or after the closing date without reimbursement. The soliciting agency is the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG 21-1035 | Project Title: | ||
| DEMOLITION HERTIAGE BLDG B1906 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HAZMAT Questionaire | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 2 | HAZMAT MSDS | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 3 | HAZMAT Reporting Entry Form | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 4 | HAZMAT Reporting Entry Form | X | X | END OF CONTRACT | ||||||||||||||||||
| 5 | Recycling and Landfill Report | X | X | END OF CONTRACT | ||||||||||||||||||
| 6 | Warranty (Manufacturer's) | X | X | END OF CONTRACT | ||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | X | X | END OF CONTRACT | ||||||||||||||||||
| 8 | Solid Sodding | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 9 | Equipment List | X | 5 DAYS AFTER NTP | |||||||||||||||||||
| 10 | Contractor Dust Control Plan | X | 5 DAYS AFTER NTP | |||||||||||||||||||
| 11 | Select Fill Material (Backfill) | X | X | 5 DAYS AFTER NTP | ||||||||||||||||||
| 12 | Utility Valves & Line Stops | X | X | X | 5 DAYS AFTER NTP | |||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .