M67854-17-R-7832-0004_(CC)_-_FINAL_issued_20OCT2017.pdf
PDF 2 MB Posted
- Attached to
- Combat Convoy Simulator (CCS) Federal contract opportunity
- Solicitation number
- M67854-17-R-7832
- Issued by
- United States Marine Corps
About this file
M67854-17-D-7832 (Conformed Copy) - FINAL issued 20OCT2017
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 27 Oct 2017
X
A
X B
X C X D
EX
X
G
F 95 - 105
106 - 119
H 120 - 129
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 129
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
M67854 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 5 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
(see Section L for all details) conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 49
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
52 - 55
56 - 59 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 60 - 71 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
72 - 92
PART II - CO NTRACT CLAUSES
MARCORSYSCOM
ATTN:EDWARD MCGRAIL/
CT 2.7
12211 SCIENCE DRIVE
ORLANDO FL 32826
407-381-8763
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
93 - 94
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Aug 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
M6785417R7832
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each CPCA 1 Combat Convoy Simulator (CCS)
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 CCS System
Modification
FOB: Destination
NET AMT
0002 1 Each CPCA 2 Combat Convoy Simulator (CCS)
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 CCS System
0003 1 Each MCAGCC 29 Palms CCS System
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
Simulator (CCS) System Modification
0004 1 Each MCB Hawaii Combat Convoy Simulator (CCS)
FFP
Marine Corps Base Hawaii (Kaneohe Bay) CCS System Modification
0005 1 Each Okinawa, Japan Combat Convoy Simulator
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) Combat Convoy
Simulator System Modification
0006 1 Each CLNC 1 Combat Convoy Simulator (CCS)
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
0007 1 Each CLNC 2 Combat Convoy Simulator (CCS)
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
0008 1 Lot Contract Data Requirements List (CDRL)
FFP
CDRLs CCS Systems Modification - Not Separately Priced (NSP)
0009 1 Lot USMC - Wide Travel CCS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Modification - Not To Exceed (NTE) Amount
ESTIMATED COST
0010 1 Lot USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Modification - Not To Exceed (NTE) Amount
0011 1 Lot CCS - Initial Spare and Repair Parts
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval
- be developed concurrently with line items 0001-0010. Not To Exceed (NTE)
Amount
0100 1 Lot OPTION CPCA 1 CCS System Installation
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 Combat Convoy
Simulator System - Installation
0101 1 Lot OPTION CPCA 2 CCS System Installation
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 Combat Convoy
0102 1 Lot OPTION MCAGCC 29 Palms CCS System Installation
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
Simulator (CCS) System Installation
0103 1 Lot OPTION MCB Hawaii CCS Installation
FFP
Marine Corps Base MCB Hawaii (Kaneohe Bay) Combat Convoy Simulator
System - Installation
0104 1 Lot OPTION Okinawa, Japan CCS - Installation
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) Combat Convoy
0105 1 Lot OPTION CLNC 1 CCS Installation
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
Installation
0106 1 Lot OPTION CLNC 2 CCS Installation
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
Installation
0107 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs Systems Installation - Not Separately Priced (NSP)
0108 1 Lot OPTION USMC - Wide Travel CCS Installation
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Installation - Not To Exceed (NTE) Amount
0109 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Modification Installation - Not To Exceed (NTE) Amount
1000 12 Months OPTION CPCA 1 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - Option Period 1
1001 12 Months OPTION CPCA 2 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 Combat Convoy
1002 10 Months OPTION 29 Palms CCS Contractor Logistics Spt.
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
1003 9 Months OPTION Hawaii CCS Contractor Logistics Support
FFP
Marine Corps Base Hawaii (Kaneohe Bay) Combat Convoy Simulator (CCS)
System Contractor Logistics Support (CLS) - Option Period 1
1004 8 Months OPTION Okinawa CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) CCombat Convoy
1005 7 Months OPTION CLNC 1 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
Contractor Logistics Support (CLS) - Option Period 1
1006 7 Months OPTION CLNC 2 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
Contractor Logistics Support (CLS) - Option Period 1
1007 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs CCS Contractor Logistics Support (CLS) - Not Separately Priced (NSP) -
Option Period 1
1008 1 Lot OPTION USMC - Wide Travel CCS CLS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems IContractor Logistics Support (CLS) - Not To Exceed (NTE)
Amount - Option Period 1
1009 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - Option
Period 1
1010 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval
- Not To Exceed (NTE) Amount - Option Period 1
1100 12 Months OPTION CPCA 1 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - Option Period 2
1101 12 Months OPTION CPCA 2 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 Combat Convoy
1102 12 Months OPTION 29 Palms CCS Contractor Logistics Spt.
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
1103 12 Months OPTION Hawaii CCS Contractor Logistics Support
FFP
Marine Corps Base Hawaii (Kaneohe Bay) Combat Convoy Simulator (CCS)
System Contractor Logistics Support (CLS) - Option Period 2
1104 12 Months OPTION Okinawa CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) Combat Convoy
1105 12 Months OPTION CLNC 1 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
Contractor Logistics Support (CLS) - Option Period 2
1106 12 Months OPTION CLNC 2 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
Contractor Logistics Support (CLS) - Option Period 2
1107 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs CCS Contractor Logistics Support (CLS) - Not Separately Priced (NSP) -
Option Period 2
1108 1 Lot OPTION USMC - Wide Travel CCS CLS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems IContractor Logistics Support (CLS) - Not To Exceed (NTE)
Amount - Option Period 2
1109 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - Option
Period 2
1110 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval
- Not To Exceed (NTE) Amount - Option Period 2
1200 12 Months OPTION CPCA 1 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - Option Period 3
1201 12 Months OPTION CPCA 2 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 Combat Convoy
1202 12 Months OPTION 29 Palms CCS Contractor Logistics Spt.
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
1203 12 Months OPTION Hawaii CCS Contractor Logistics Support
FFP
Marine Corps Base Hawaii (Kaneohe Bay) Combat Convoy Simulator (CCS)
System Contractor Logistics Support (CLS) - Option Period 3
1204 12 Months OPTION Okinawa CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) CCombat Convoy
1205 12 Months OPTION CLNC 1 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
Contractor Logistics Support (CLS) - Option Period 3
1206 12 Months OPTION CLNC 2 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
Contractor Logistics Support (CLS) - Option Period 3
1207 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs CCS Contractor Logistics Support (CLS) - Not Separately Priced (NSP) -
Option Period 3
1208 1 Lot OPTION USMC - Wide Travel CCS CLS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems IContractor Logistics Support (CLS) - Not To Exceed (NTE)
Amount - Option Period 3
1209 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - Option
Period 3
1210 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval
- Not To Exceed (NTE) Amount - Option Period 3
1300 6 Months OPTION CPCA 1 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 1 Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - 6 Month Option to
Extend Services per FAR 52.217-8
1301 6 Months OPTION CPCA 2 CCS Contractor Logistics Support
FFP
Marine Corps Base Camp Pendleton, California (CPCA) 2 Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - 6 Month Option to
1302 6 Months OPTION 29 Palms CCS Contractor Logistics Spt.
FFP
Marine Corps Air Ground Combat Center (MCAGCC) 29 Palms Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - 6 Month Option to
1303 6 Months OPTION Hawaii CCS Contractor Logistics Support
FFP
Marine Corps Base Hawaii (Kaneohe Bay) Combat Convoy Simulator (CCS)
System Contractor Logistics Support (CLS) - 6 Month Option to Extend Services per FAR 52.217-8
1304 6 Months OPTION Okinawa CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Smedley D. Butler (Okinawa, Japan) Combat Convoy
Simulator (CCS) System Contractor Logistics Support (CLS) - 6 Month Option to
1305 6 Months OPTION CLNC 1 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 1 CCS System
Contractor Logistics Support (CLS) - 6 Month Option to Extend Services per FAR
52.217-8
1306 6 Months OPTION CLNC 2 CCS Contractor Logistics Spt.
FFP
Marine Corps Base Camp Lejeune, North Carolina (CLNC) 2 CCS System
Contractor Logistics Support (CLS) - 6 Month Option to Extend Services per FAR
1307 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs CCS Contractor Logistics Support (CLS) - Not Separately Priced (NSP) -
6 Month Option to Extend Services per FAR 52.217-8
1308 1 Lot OPTION USMC - Wide Travel CCS CLS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Contractor Logistics Support (CLS) - Not To Exceed (NTE)
Amount - 6 Month Option to Extend Services per FAR 52.217-8
1309 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - 6 Month
Option to Extend Services per FAR 52.217-8
1310 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval
- Not To Exceed (NTE) Amount - 6 Month Option to Extend Services per FAR
2000 12 Months OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 1
2001 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs in support of Post Deployment Software Support (PDSS) for all Combat
Convoy Simulator Systems - Not Separately Priced (NSP) - Option Year 1
2002 1 Lot OPTION USMC - Wide Travel CCS PDSS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Post Deployment Software Support (PDSS) - Not To Exceed
(NTE) Amount - Option Year 1
2003 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems -
Post Deployment Software Support (PDSS) - Not To Exceed (NTE) Amount -
Option Period 1
OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 2
2100AA 1 Lot OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 2. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month").. Billing should be in even monthly increments on a monthly basis. Reason for "1 Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction with DFAS payment office.
2100AB 1 Lot OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 2. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month").. Billing should be in even monthly increments on a monthly basis. Reason for "1 Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction
2101 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs in support of Post Deployment Software Support (PDSS) for all Combat
Convoy Simulator Systems - Not Separately Priced (NSP) - Option Year 2
2102 1 Lot OPTION USMC - Wide Travel CCS PDSS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Post Deployment Software Support (PDSS) - Not To Exceed
(NTE) Amount - Option Year 2
2103 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems -
Post Deployment Software Support (PDSS) - Not To Exceed (NTE) Amount -
Option Period 2
CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 3
2300AA 1 Lot OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 3. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month").. Billing should be in even monthly increments on a monthly basis. Reason for "1 Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction
2300AB 1 Lot OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- Option Year 2. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month").. Billing should be in even monthly increments on a monthly basis. Reason for "1 Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction
2301 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs in support of Post Deployment Software Support (PDSS) for all Combat
Convoy Simulator Systems - Not Separately Priced (NSP) - Option Year 3
2302 1 Lot OPTION USMC - Wide Travel CCS PDSS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Post Deployment Software Support (PDSS) - Not To Exceed
(NTE) Amount - Option Year 3
2303 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems -
Post Deployment Software Support (PDSS) - Not To Exceed (NTE) Amount -
Option Period 3
CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- 6 Month Option to Extend Services per FAR
2400AA 1 Lot OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- 6 Month Option to Extend Services per FAR
52.217-8. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month")..
Billing should be in even monthly increments on a monthly basis. Reason for "1
Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction with DFAS payment office.
2400AB 2 Months OPTION CCS Post Deployment Software Support
FFP
Combat Convoy Simulator (CCS) System Post Deployment Software Support
(PDSS) in support of all systems- 6 Month Option to Extend Services per FAR
52.217-8. "1 Lot" is unit of issue due to multiple funding sponsors tied to this line item (vice, for example, having Quantity of "12" and Unit of Issue of "Month")..
Billing should be in even monthly increments on a monthly basis. Reason for "1
Lot" designation has to do with dynamics of multiple funding sponsors tied to a single line item and interaction with DFAS payment office.
2401 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs in support of Post Deployment Software Support (PDSS) for all Combat
Convoy Simulator Systems - Not Separately Priced (NSP) - 6 Month Option to
Extend Services per FAR 52.217-8.
2402 1 Lot OPTION USMC - Wide Travel CCS PDSS
COST
United States Marine Corps (USMC) Wide Travel - Combat Combat Simulator
(CCS) Systems Post Deployment Software Support (PDSS) - Not To Exceed
(NTE) Amount - 6 Month Option to Extend Services per FAR 52.217-8.
2403 1 Lot OPTION USMC Other Direct Costs (ODCs)
COST
USMC Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems -
Post Deployment Software Support (PDSS) - Not To Exceed (NTE) Amount - 6
Month Option to Extend Services per FAR 52.217-8.
3000 1 Lot OPTION USMC CCS Test Bed
FFP
United States Marine Corps Combat Convoy Simulator Test Bed - Option available to be exercised at any point during the life of this contract. Delivery of CCS Test
Bed will be in the geographic region of the Continental United States (CONUS).
Precise locaion(s) for delivery within CONUS is to-be-determined.
4000 1 Each OPTION CPCA 1 CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base Camp Pendleton, California
(CPCA) 1 CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
4001 1 Each OPTION CPCA 2 CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base Camp Pendleton, California
(CPCA) 2 CCS System Modification, removal and disposal of obsolete CCS
4002 1 Each OPTION MCAGCC 29 Palms CCS System Disposal
FFP
Concurrent with installation of Marine Corps Air Ground Combat Center
(MCAGCC) 29 Palms Combat Convoy Simulator CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
4003 1 Each OPTION MCB Hawaii CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base MCB Hawaii (Kaneohe Bay)
Combat Convoy Simulator CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
4004 1 Each OPTION Okinawa, Japan CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base Camp Smedley D. Butler
(Okinawa, Japan) Combat Convoy Simulator CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
4005 1 Each OPTION CLNC 1 CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base Camp Lejeune, North Carolina
(CLNC) 1 Combat Convoy Simulator CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
4006 1 Each OPTION CLNC 2 CCS System Disposal
FFP
Concurrent with installation of Marine Corps Base Camp Lejeune, North Carolina
(CLNC) 2 Combat Convoy Simulator CCS System Modification, removal and disposal of obsolete CCS system and / or obsolete components is required.
6000 1 Each OPTION USN Gulfport CCS System Modification
FFP
United States Navy (USN) Gulport, Mississippi Combat Convoy Simulator (CCS)
6001 1 Each OPTION USN Point Mugu CCS System Modification
FFP
United States Navy (USN) Point Mugu Naval Base (Ventura County, California)
Combat Convoy Simulator (CCS) Modification
6002 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs USN CCS Systems Modification - Not Separately Priced (NSP)
6003 1 Lot OPTION USN - Wide Travel CCS
COST
United States Navy (USN) Wide Travel - Combat Combat Simulator (CCS)
Systems Modification - Not To Exceed (NTE) Amount
6004 1 Lot OPTION USN Other Direct Costs (ODCs)
COST
USN Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Modification - Not To Exceed (NTE) Amount
6005 1 Lot OPTION USN Gulfport CCS System Installation
FFP
United States Navy (USN) Gulport, Mississippi Combat Convoy Simulator (CCS)
System - Installation
6006 1 Lot OPTION USN Point Mugu CCS System Installation
FFP
United States Navy (USN) Point Mugu Naval Base (Ventura County, California)
Combat Convoy Simulator (CCS) Installation
6007 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs USN Combat Convoy Simulator (CCS) Systems Installation - Not
Separately Priced (NSP)
6008 1 Lot OPTION USN - Wide Travel CCS Installation
COST
United States Navy (USN) Wide Travel - Combat Combat Simulator (CCS)
Systems Installation - Not To Exceed (NTE) Amount
6009 1 Lot OPTION USN Other Direct Costs (ODCs)
COST
USN Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Installation - Not To Exceed (NTE) Amount
6010 1 Lot OPTION CCS Initial Spare and Repair Parts - USN
COST
USN Combat Convoy Simulator (CCS) System (Gulport, Mississippi) Initial
Spare and Repair Parts - Not To Exceed (NTE) Amount
6011 1 Lot OPTION CCS Initial Spare and Repair Parts - USN
COST
USN Combat Convoy Simulator (CCS) System (Point Mugu Naval Base -
Ventura County, California) Initial Spare and Repair Parts - Not To Exceed
(NTE) Amount
7000 12 Months OPTION CCS Contractor Logistics Spt. (Gulfport)
FFP
USN Combat Convoy Simulator (CCS) System (Gulport, Mississippi) Contractor
Logistics Support (CLS) - Option Period 1
7001 12 Months OPTION CCS Contractor Logistics Spt. (Pt.Mugu)
FFP
USN Combat Convoy Simulator (CCS) System (Point Mugu Naval Base - Ventura
County, California) Contractor Logistics Support (CLS) - Option Period 1
7002 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs USN CCS Contractor Logistics Support (CLS) - Not Separately Priced
(NSP) - Option Period 1
7003 1 Lot OPTION USN - Wide Travel CCS CLS
COST
United States Navy (USN) Wide Travel - Combat Combat Simulator (CCS)
Systems Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount -
Option Year 1
7004 1 Lot OPTION USN Other Direct Costs (ODCs)
COST
USN Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - Option
Year 1
7005 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval. - Not To Exceed (NTE) Amount - Option Year 1
7100 12 Months OPTION CCS Contractor Logistics Spt. (Gulfport)
FFP
USN Combat Convoy Simulator (CCS) System (Gulport, Mississippi) Contractor
Logistics Support (CLS) - Option Period 2
7101 12 Months OPTION CCS Contractor Logistics Spt. (Pt.Mugu)
FFP
USN Combat Convoy Simulator (CCS) System (Point Mugu Naval Base - Ventura
County, California) Contractor Logistics Support (CLS) - Option Period 2
7102 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs USN CCS Contractor Logistics Support (CLS) - Not Separately Priced
(NSP) - Option Period 2
7103 1 Lot OPTION USN - Wide Travel CCS CLS
COST
United States Navy (USN) Wide Travel - Combat Combat Simulator (CCS)
Systems Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount -
Option Year 2
7104 1 Lot OPTION USN Other Direct Costs (ODCs)
COST
USN Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - Option
Year 2
7105 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval. - Not To Exceed (NTE) Amount - Option Year 2
7200 12 Months OPTION CCS Contractor Logistics Spt. (Gulfport)
FFP
USN Combat Convoy Simulator (CCS) System (Gulport, Mississippi) Contractor
Logistics Support (CLS) - 6 Month Option to Extend Services per FAR 52.217-8
7201 12 Months OPTION CCS Contractor Logistics Spt. (Pt.Mugu)
FFP
USN Combat Convoy Simulator (CCS) System (Point Mugu Naval Base - Ventura
County, California) Contractor Logistics Support (CLS) - 6 Month Option to
7202 1 Lot OPTION Contract Data Requirements List (CDRL)
FFP
CDRLs USN CCS Contractor Logistics Support (CLS) - Not Separately Priced
(NSP) - 6 Month Option to Extend Services per FAR 52.217-8
7203 1 Lot OPTION USN - Wide Travel CCS CLS
COST
United States Navy (USN) Wide Travel - Combat Combat Simulator (CCS)
Systems Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - 6
Month Option to Extend Services per FAR 52.217-8
7204 1 Lot OPTION USN Other Direct Costs (ODCs)
COST
USN Other Direct Costs (ODCs) Combat Convoy Simulator (CCS) Systems
Contractor Logistics Support (CLS) - Not To Exceed (NTE) Amount - 6 Month
Option to Extend Services per FAR 52.217-8
7205 1 Lot OPTION CCS Repair and Spare Parts (CLS)
COST
Combat Convoy Simulator (CCS) System Repair and Spare Parts in support of
Contractor Logistics Support (CLS). Includes shipping costs and other costs related to installation by a third party contractor as applicable upon COR approval. - Not To Exceed (NTE) Amount - 6 Month Option to Extend Services per FAR 52.217-8
8000 1 Each OPTION USN Gulfport CCS System Disposal
FFP
Concurrent with installation of United States Navy (USN) Gulport, Mississippi
Combat Convoy Simulator (CCS) System, removal and disposal of obsolete CCS
8001 1 Each OPTION USN Point Mugu CCS System Disposal
FFP
Concurrent with installation of United States Navy (USN) Point Mugu Naval Base
(Ventura County, California) Combat Convoy Simulator (CCS) System, removal and disposal of obsolete CCS system and / or obsolete components is required.
SECTION B
Section B - Supplies or Services and Prices
B.1 General Information
This is a Firm Fixed Price (FFP) base effort to perform system modification and installations to 7
CCS systems, as well as the option(s) to perform Contract Logistic Support (CLS) and Post
Deployment Software Support (PDSS) after initial installation.
B.2
This Contract is Full and Open and falls under NAICS CODE 541511.
B.3 Performance Based Requirements
As a FFP Performance Based Requirement, the contractor is required to meet all contract performance requirements, and if the requirements take more staffing than proposed (without a change requested by the Government), the contractor is required to provide additional staffing, at no increase in price, until all contract performance requirements are satisfactorily met. Failure to comply could result in a Termination for Default.
B.5 Indirect Rates
Travel and ODC costs may be burdened with the Contractor’s indirect rate in accordance with the Contractor’s disclosed practices and the applicable DFARS:
If no indirect rate is allowable in accordance with the Contractor’s disclosed practices, no indirect rate shall be applied to or reimbursed on these costs.
If no rate is specified in the contract award, no indirect rate shall be applied to or reimbursed on these costs.
B.6 Government Furnished Property
The Government intends to provide all parts within the existing 7 CCS Systems as Government
Furnished Property (GFP) in the Modification Effort. However, the specific parts to be utilized is based on specifics and individual approaches within the proposals of each Offeror, and the
Government cannot provide a current/exact list of GFP at time of solicitation. With that said, based on the successful offeror’s proposal, a list of GFP will be finalized and incorporated into the contract as an Attachment upon time of award.
Section C - Descriptions and Specifications
SECTION C
Section C - Descriptions and Specifications
DESCRIPTION OF WORK
All efforts shall be performed in accordance with the all Attachments in Section J.
The Contractor’s Technical Proposal, as negotiated and accepted by the Govenrment will be incorporated, in part or whole, into the resultant contract.
Any specific portions of the Contractor's technical proposal that exceed any of the Government's requirements (including, but not limited to dates, performance values, and/or any other measurable criteria) are hereby incorporated by reference with the same force and effect as if they were given in full text, and supersede the Government's threshold requirements that were exceeded and/or the Government's objective requirements that were met and/or exceeded.
Section D - Packaging and Marking
SECTION D
Section D - Packaging and Marking
D-1. Packaging and Marking of Hardware- All supplies/deliverables hereunder shall be prepared, packaged, and marked in accordance with current ASTM (see SOW) and best commercial practices to ensure safe delivery at destination unless otherwise specified in any resulting modifications. Any supplies that may require delivery overseas shall be packaged and marked in accordance with current Military Standard (see SOW).
D-2. For all Controlled Unclassified Information, please review Attachment J8 “CUI
Description & Marking Information”
D-3. Shipments shall be made as FOB Destination.
D-4. Warranties: The contractor shall stamp or mark the supplies delivered or otherwise furnish notice with the supplies of the existence of the warranty. The purpose of the markings or notice is to inform Government personnel who store, stock, or use the supplies that the supplies are under warranty. Markings may be brief but should include:
(a) A brief statement that a warranty exists,
(b) The substance of the warranty
(c) The date or time the warranty expires
(d) Who to notify if the supplies are found to be defective. For commercial items (see 46.709), the contractor’s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies.
(e) Any National Stock Number (NSN) or manufacturer's part number,
(f) A serial number or other item identifier (if the warranty applies to uniquely identified items)
(g) The contract number,
(h) The manufacturer or entity (if other than the contractor) providing the warranty
(i) An indication of whether or not attempted on-site repair by Government personnel will void the warranty.
Section E - Inspection and Acceptance
SECTION E
Section E - Inspection and Acceptance
E-1. Technical Data - Technical Data Requirements will be inspected and accepted by the
Government as specified in accordance with the applicable DD 1423’s. Technical Data will be inspected and accepted as indicated in Block (7) of each Exhibit as follows:
1. Data items submitted under Letter of Transmittal (LT) shall be the responsibility of the initial addressee under Block 14 of the DD Form 1423 as to review for adequacy and contract compliance. Where Code A is entered in Block 8 of the DD Form 1423 and deficiencies or inadequacies are noted, the initial addressee shall so advise the Contractor in writing.
2. Inspection and acceptance of the Data Items requiring shipment under DD Form 250 shall be made in accordance with Block 7 of the DD Form 1423. Destination shall be by the first listed
Block 14 addressee. Addressees other than the initial addressee shall be considered informational. Codes are further explained below:
CODE INSPECTION ACCEPTANCE
SS Source Source
DD Destination Destination
SD Source Destination
LT Letter-Transmittal Only
3. Unless otherwise specifically stated in the applicable DD Form 1423, or associated Data Item
Description (DID), the Government must provide written comment, rejection or acceptance to the Contractor within thirty (30) days after receipt of each data submission.
E-2. Data Approval - Unless specific time limits are identified in the relevant CDRL item, or data item description of this contract, the following general rule(s) shall apply to Government handling of data submissions.
(a) Subject to DFARS 252.246-7001, Warranty of Data, Government comments on the initial data submission shall be complete and shall not be expanded subsequently. Recurring or new defects in subsequent submissions shall, of course, be the subject of fair comment.
(b) The contractor shall notify the Government in writing (PCO) if the Government is at risk of failing to meet the applicable review/approval time requirements.
E-3. Contracting Officer Representative (COR) -
E-3.1. The COR for this program is:
NAME: TBD
TELEPHONE: (407)-38X-XXXX
EMAIL: TBD
E-3.2. Responsibilities- Inspection and acceptance of contract deliverables are the responsibility of the COR or his/her duly authorized representative(s) except as otherwise specified in the contract. Moreover, the COR serves in a supporting role to the Contracting Officer, providing advice and expertise on technical issues. However, only the Contracting Officer has the authority to authorize deviations from the terms and conditions of this contract, including deviations from statement of work requirements. In the event the contractor does deviate without written approval from the Contracting Officer, such deviations shall be at risk of any costs related thereto to be fully be borne by the Contractor.
E-3.3 Point Of Inspection- Should it require, the Government reserves the right to perform quality assurance inspections at the contractor's place of performance identified in this contract.
The Government will inspect the contractor's submissions (deliverables), and products as specified in this contract.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
0010 Destination Government Destination Government
0011 Destination Government Destination Government
0100 Destination Government Destination Government
0101 Destination Government Destination Government
0102 Destination Government Destination Government
0103 Destination Government Destination Government
0104 Destination Government Destination Government
0105 Destination Government Destination Government
0106 Destination Government Destination Government
0107 Destination Government Destination Government
0108 Destination Government Destination Government
0109 Destination Government Destination Government
1000 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
1100 Destination Government Destination Government
1101 Destination Government Destination Government
1102 Destination Government Destination Government
1103 Destination Government Destination Government
1104 Destination Government Destination Government
1105 Destination Government Destination Government
1106 Destination Government Destination Government
1107 Destination Government Destination Government
1108 Destination Government Destination Government
1109 Destination Government Destination Government
1110 Destination Government Destination Government
1200 Destination Government Destination Government
1201 Destination Government Destination Government
1202 Destination Government Destination Government
1203 Destination Government Destination Government
1204 Destination Government Destination Government
1205 Destination Government Destination Government
1206 Destination Government Destination Government
1207 Destination Government Destination Government
1208 Destination Government Destination Government
1209 Destination Government Destination Government
1210 Destination Government Destination Government
1300 Destination Government Destination Government
1301 Destination Government Destination Government
1302 Destination Government Destination Government
1303 Destination Government Destination Government
1304 Destination Government Destination Government
1305 Destination Government Destination Government
1306 Destination Government Destination Government
1307 Destination Government Destination Government
1308 Destination Government Destination Government
1309 Destination Government Destination Government
1310 Destination Government Destination Government
2000 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2100 N/A N/A N/A N/A
2100AA Destination Government Destination Government
2100AB Destination Government Destination Government
2101 Destination Government Destination Government
2102 Destination Government Destination Government
2103 Destination Government Destination Government
2300 N/A N/A N/A N/A
2300AA Destination Government Destination Government
2300AB Destination Government Destination Government
2301 Destination Government Destination Government
2302 Destination Government Destination Government
2303 Destination Government Destination Government
2400 N/A N/A N/A N/A
2400AA Destination Government Destination Government
2400AB Destination Government Destination Government
2401 Destination Government Destination Government
2402 Destination Government Destination Government
2403 Destination Government Destination Government
3000 Destination Government Destination Government
4000 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 Destination Government Destination Government
6000 Destination Government Destination Government
6001 Destination Government Destination Government
6002 Destination Government Destination Government
6003 Destination Government Destination Government
6004 Destination Government Destination Government
6005 Destination Government Destination Government
6006 Destination Government Destination Government
6007 Destination Government Destination Government
6008 Destination Government Destination Government
6009 Destination Government Destination Government
6010 Destination Government Destination Government
6011 Destination Government Destination Government
7000 Destination Government Destination Government
7001 Destination Government Destination Government
7002 Destination Government Destination Government
7003 Destination Government Destination Government
7004 Destination Government Destination Government
7005 Destination Government Destination Government
7100 Destination Government Destination Government
7101 Destination Government Destination Government
7102 Destination Government Destination Government
7103 Destination Government Destination Government
7104 Destination Government Destination Government
7105 Destination Government Destination Government
7200 Destination Government Destination Government
7201 Destination Government Destination Government
7202 Destination Government Destination Government
7203 Destination Government Destination Government
7204 Destination Government Destination Government
7205 Destination Government Destination Government
8000 Destination Government Destination Government
8001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-4 Inspection Of Services--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
Section F - Deliveries or Performance
SECTION F
Section F Deliveries or Performance:
F.1 Order of Deliveries:
1. CCS Camp Pendleton, CA #1
2. CCS Camp Pendleton, CA #2***
3. CCS MCAGCC 29 Palms
4. CCS Marine Corps Base Hawaii (Kaneohe Bay), HI
5. CCS MCB Camp Smedley D. Butler, Okinawa, Japan
6. CCS Camp Lejeune, NC #1
7. CCS Camp Lejeune, NC #2
Remarks:
a) For ease of transition, Contractor will assume CLS responsibility for both CCS Camp
Pendleton Systems at the same time. In addition, Contractor will assume CLS for both CCS
Camp Lejeune at the same time. In both situations, the Contractor will perform CLS when installation begins (see CLIN Structure).
b) In accordance with the Statement of Work (SOW), changes to the modification, installation, and delivery schedule and/or order may be directed by the Government at no additional cost to the Government prior to TRR.
F.2 Delivery Locations
CCS Camp Pendleton, CA (1 and 2 under F.1) Training Support Division, Bldg. 430316 (43 Area) MCB Camp Pendleton, CA 92055
CCS MCAGCC 29 Palms Bldg. 5502R2 Battle Simulation Center Camp Wilson MCAGCC 29 Palms, CA 92278
CCS Marine Corps Base Hawaii (Kaneohe Bay), HI Bldg. 6708C3 Harris Street MCB Hawaii Kaneohe Bay, HI 96863
CCS MCB Camp Smedley D. Butler, Okinawa, Japan 2450 Myers Street, Room 104, Camp Hansen
FPO AP 96367
CCS Camp Lejeune, NC (6 and 7 from F.1)
Bldg T-70 Lyman Rd Camp Lejeune, NC 28542
F-3. Contractor Notice Regarding Late Delivery- In the event the Contractor for any reason anticipates or encounters difficulty in complying with the contract delivery schedule or in meeting any of the other requirements of the contract, it shall immediately notify the Contracting
Officer in writing giving pertinent details and shall provide a proposal for planned compensation.
However, this data shall be considered informational only in character and receipt by the
Government shall not be construed as a waiver by the Government of (a) any delivery schedule or date, or (b) compliance with any other contract requirement by the Contractor, or (c) any other rights or remedies provided to the Government by law or under this contract.
F.4 Performance Delivery:
Currently all Performance/Delivery for USMC CLINS are predicated on Contract Award of 01
April 2018. Any slippage in award day will affect a day for day slip in the schedule presented, and will be adjusted upon award to reflect said change:
USMC CLINS
0001-
Modification (From Estimated Award Date of contract of 01 April 2018 - 30 June 2019)
MCB Camp Pendleton 1 CCS System Installation (01 July 2019 - 31 July 2019)
- Option
MCB Camp Pendleton 2 CCS System Installation (01 August 2019 - 31 August 2019) - Option
MCAGCC 29 PALMS CCS System Installation (01 September 2019 - 30 September 2019) - Option
MCB Hawaii (Kaneohe Bay) CCS System Installation (01 October 2019 - 31 October 2019) - Option
MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Installation (01 November 2019 - 30 November 2019) - Option
MCB Camp Lejeune 1 CCS System Installation (01 December 2019 – 31 December 2019) - Option
MCB Lejeune 2 CCS System Installation (01 January 2020 - 31 January 2020) - Option
0107-
Installation (01 July 2019 - 31 January 2020) - Option
MCB Camp Pendleton 1 CCS System Contractor Logistics Support - (Option Period 1) (01 July 2019 - 30 June 2020)
MCB Camp Pendleton 2 CCS System Contractor Logistics Support - (Option Period 1) (01 July 2019 - 30 June 2020)
MCAGCC 29 PALMS CCS System Contractor Logistics Support - (Option Period
1) (01 September 2019- 30 June 2020)
MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support - (Option Period 1) (01 October 2019 - 30 June 2020)
MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Contractor Logistics Support - (Option Period 1) (01 November 2019 – 30 June 2020)
MCB Camp Lejeune 1 CCS System Contractor Logistics Support - (Option Period 1) (01 December 2019 – 30 June 2020)
MCB Lejeune 2 CCS System Contractor Logistics Support - (Option Period 1) (01 December 2019 – 30 June 2020)
1007- 1010 CLS (01 July 2019 - 30 June 2020) (Option Period 1)
1100- 1110 CLS (01 July 2020 - 30 June 2021) (Option Period 2)
1200- 1210 CLS (01 July 2021- 30 June 2022) (Option Period 3)
1300- 1310 CLS (01 July 2022 – 31 December 2022) (see clause 52.217-8)
2000- 2003 PDSS (01 July 2019 - 30 June 2020) (Option Period 1)
2100- 2103 PDSS (01 July 2020 - 30 June 2021) (Option Period 2)
2200- 2203 PDSS (01 July 2021- 30 June 2022) (Option Period 3)
2300- 2303 PDSS (01 July 2022 – 31 December 2022) (see clause 52.217-8)
3000 Can be exercised at any time, one time during contract
MCB Camp Pendleton 1 CCS System - Disposal (01 July 2019 - 31 July 2019) - Option
MCB Camp Pendleton 2 CCS System - Disposal (01 August 2019 - 31 August 2019) - Option
MCAGCC 29 PALMS CCS System - Disposal (01 September 2019 - 30 September 2019) - Option
MCB Hawaii (Kaneohe Bay) CCS System - Disposal (01 October 2019 - 31 October 2019) - Option
MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System - Disposal (01 November 2019 - 30 November 2019) - Option
MCB Camp Lejeune 1 CCS System - Disposal (01 December 2019 – 31 December…