Attachment_J32_-_Pricing_template_dtd_17OCT2017_(per_Amendment_0004).xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Combat Convoy Simulator (CCS)
Solicitation number
M67854-17-R-7832
Issued by

About this file

Attachment J32 (M67854-17-R-7832) revised and reissued per Amendment 0004 on 20OCT2017

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing template

Attachment J.32 - revised 17OCT2017
CLINDescriptionQtyTypeU/IUnit PriceSubtotal A10 % factor (If answered "yes" to Q1 and/or "no" to Q2)Subtotal B
0001MCB Camp Pendleton 1 CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0002MCB Camp Pendleton 2 CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0003MCAGCC 29 PALMS CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0004MCB Hawaii (Kaneohe Bay) CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0005MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0006MCB Camp Lejeune 1 CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0007MCB Camp Lejeune 2 CCS System Modification1FFPEA$ - 0$ - 0$ - 0$ - 0
0008CDRLs Systems Modification Modification1NSPLO$ - 0$ - 0$ - 0
0009USMC Travel CCS Systems Modification1Cost- NTELO$ 100,000.00$ 100,000.00
0010USMC Other Direct Costs (ODCs) Systems Modification1Cost- NTELO$ 10,000.00$ 10,000.00
0011CCS System Initial Spare and Repair Parts1Cost- NTEEA$ 516,691.00$ 516,691.00
0100MCB Camp Pendleton 1 CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0101MCB Camp Pendleton 2 CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0102MCAGCC 29 PALMS CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0103MCB Hawaii (Kaneohe Bay) CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0104MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0105MCB Camp Lejeune 1 CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0106MCB Lejeune 2 CCS System Installation1FFPLO$ - 0$ - 0$ - 0$ - 0
0107CDRLs Systems Installation1NSPLO$ - 0
0108USMC Travel CCS Systems Installation1Cost- NTELO$ 225,000.00$ 225,000.00
0109USMC Other Direct Costs (ODCs) Systems Installation1Cost- NTELO$ 40,000.00$ 40,000.00
Sum of CLINs 0001-0011 and 0100-0109$ 891,691.00Note: Any proposal submitted that exceeds $21,500,000 in value for CLINs 0001 through 0011 and 0100 through 0109 inclusive of all FFP with any price evaluation preference and COST CLINs will be considered non-responsive and unawardable.
1000MCB Camp Pendleton 1 CCS System Contractor Logistics Support - (Option Period 1)12FFPMO$ - 0$ - 0$ - 0$ - 0
1001MCB Camp Pendleton 2 CCS System Contractor Logistics Support - (Option Period 1)12FFPMO$ - 0$ - 0$ - 0$ - 0
1002MCAGCC 29 PALMS CCS System Contractor Logistics Support - (Option Period 1)10FFPMO$ - 0$ - 0$ - 0$ - 0
1003MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support - (Option Period 1)9FFPMO$ - 0$ - 0$ - 0$ - 0
1004MCB Camp Smedley D. Butler (Okinawa, Japan)CCS System Contractor Logistics Support - (Option Period 1)8FFPMO$ - 0$ - 0$ - 0$ - 0
1005MCB Camp Lejeune 1 CCS System Contractor Logistics Support - (Option Period 1)7FFPMO$ - 0$ - 0$ - 0$ - 0
1006MCB Lejeune 2 CCS System Contractor Logistics Support - (Option Period 1)7FFPMO$ - 0$ - 0$ - 0$ - 0
1007CDRLs - USMC Contractor Logistics Support (CLS) - (Option Period 1)1NSPLO$ - 0$ - 0
1008Travel - USMC Contractor Logistics Support (CLS) - (Option Period 1)1Cost- NTELO$ 25,000.00$ 25,000.00
1009Other Direct Costs (ODCs) USMC Contractor Logistics Support - (Option Period 1)1Cost- NTELO$ 25,000.00$ 25,000.00
1010Repair and Spare Parts - USMC Contractor Logistics Support - (Option Period 1)1Cost- NTELO$ 416,765.00$ 416,765.00
1100MCB Camp Pendleton 1 CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1101MCB Camp Pendleton 2 CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1102MCAGCC 29 PALMS CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1103MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1104MCB Camp Smedley D. Butler (Okinawa, Japan)CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1105MCB Camp Lejeune 1 CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1106MCB Lejeune 2 CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
1107CDRLs - USMC Contractor Logistics Support (CLS) - (Option Period 2)1NSPLO$ - 0$ - 0
1108Travel - USMC Contractor Logistics Support (CLS) - (Option Period 2)1Cost-NTELO$ 15,000.00$ 15,000.00$ 15,000.00
1109Other Direct Costs (ODCs) USMC Contractor Logistics Support - (Option Period 2)1Cost-NTELO$ 25,000.00$ 25,000.00$ 25,000.00
1110Repair and Spare Parts - USMC Contractor Logistics Support - (Option Period 2)1Cost-NTELO$ 424,830.00$ 424,830.00$ 424,830.00
1200MCB Camp Pendleton 1 CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1201MCB Camp Pendleton 2 CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1202MCAGCC 29 PALMS CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1203MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1204MCB Camp Smedley D. Butler (Okinawa, Japan)CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1205MCB Camp Lejeune 1 CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1206MCB Lejeune 2 CCS System Contractor Logistics Support - (Option Period 3)12FFPMO$ - 0$ - 0$ - 0$ - 0
1207CDRLs - USMC Contractor Logistics Support (CLS) - (Option Period 3)1NSPLO$ - 0$ - 0
1208Travel - USMC Contractor Logistics Support (CLS) - (Option Period 3)1Cost-NTELO$ 15,000.00$ 15,000.00
1209Other Direct Costs (ODCs) USMC Contractor Logistics Support - (Option Period 3)1Cost-NTELO$ 25,000.00$ 25,000.00
1210Repair and Spare Parts - USMC Contractor Logistics Support - (Option Period 3)1Cost-NTELO$ 433,403.00$ 433,403.00
1300MCB Camp Pendleton 1 CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1301MCB Camp Pendleton 2 CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1302MCAGCC 29 PALMS CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1303MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support -Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1304MCB Camp Smedley D. Butler (Okinawa, Japan)CCS System Contractor Logistics Support -Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1305MCB Camp Lejeune 1 CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1306MCB Lejeune 2 CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
1307CDRLs - USMC Contractor Logistics Support (CLS) - Option 6 Month Extension of Services1NSPLO$ - 0$ - 0
1308Travel - USMC Contractor Logistics Support (CLS) - Option 6 Month Extension of Services1Cost-NTELO$ 7,500.00$ 7,500.00
1309Other Direct Costs (ODCs) USMC Contractor Logistics Support - Option 6 Month Extension of Services1Cost-NTELO$ 12,500.00$ 12,500.00
1310Repair and Spare Parts - USMC Contractor Logistics Support - Option 6 Month Extension of Services1Cost-NTELO$ 216,702$ 216,701.50
2000CCS System Post-Deployment Software Support - (Option Period 1)12FFPMO$ - 0$ - 0$ - 0$ - 0
2001CDRLs - USMC Post Deployment Software Support (PDSS)- (Option Period 1)1NSPLO$ - 0$ - 0
2002Travel - USMC Post Deployment Software Support (PDSS) - (Option Period 1)1Cost- NTELO$ 5,000.00$ 5,000.00
2003Other Direct Costs (ODCs) USMC Post Deployment Software Support - (Option Period 1)1Cost- NTELO$ 10,000.00$ 10,000.00
2100CCS System Post-Deployment Software Support - (Option Period 2) Note, CLIN will be divided into SLINS upon award to support USMC and Naval funding.12FFPMO$ - 0$ - 0$ - 0$ - 0
2101CDRLs - USMC Post Deployment Software Support (PDSS)- (Option Period 2)1NSPLO$ - 0$ - 0
2102Travel - USMC Post Deployment Software Support (PDSS) - (Option Period 2)1Cost-NTELO$ 5,000.00$ 5,000.00
2103Other Direct Costs (ODCs) USMC Post Deployment Software Support - (Option Period 2)1Cost-NTELO$ 10,000.00$ 10,000.00
2300CCS System Post-Deployment Software Support - (Option Period 3) Note, CLIN will be divided into SLINS upon award to support USMC and Naval funding.12FFPMO$ - 0$ - 0$ - 0$ - 0
2301CDRLs - USMC Post Deployment Software Support (PDSS)- (Option Period 3)1NSPLO$ - 0
2302Travel - USMC Post Deployment Software Support (PDSS) - (Option Period 3)1Cost-NTELO$ 5,000.00$ 5,000.00
2303Other Direct Costs (ODCs) USMC Post Deployment Software Support - (Option Period 3)1Cost-NTELO$ 10,000.00$ 10,000.00
2400CCS System Post-Deployment Software Support - Option 6 Month Extension of Services. Note, CLIN will be divided into SLINS upon award to support USMC and Naval funding.6FFPMO$ - 0$ - 0$ - 0$ - 0
2401CDRLs - USMC Post Deployment Software Support (PDSS)- Option 6 Month Extension of Services1NSPLO$ - 0
2402Travel - USMC Post Deployment Software Support (PDSS) - Option 6 Month Extension of Services1Cost-NTELO$ 2,500.00$ 2,500.00
2403Other Direct Costs (ODCs) USMC Post Deployment Software Support - Option 6 Month Extension of Services1Cost-NTELO$ 5,000.00$ 5,000.00

3000 USMC CCS Test bed (Option, at any time during contract) 1 FFP EA $ - 0 $ - 0 $ - 0 $ - 0

4000MCB Camp Pendleton 1 CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4001MCB Camp Pendleton 2 CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4002MCB Hawaii (Kaneohe Bay) CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4003MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4004MCAGCC 29 PALMS CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4005MCB Camp Lejeune 1 CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
4006MCB Camp Lejeune 2 CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
Navy Clins
6000Gulfport CCS System Modification (Option)1FFPEA$ - 0$ - 0$ - 0$ - 0
6001Pt. Mugu CCS System Modification (Option)1FFPEA$ - 0$ - 0$ - 0$ - 0
6002CDRLs Systems Modification (Option)1NSPLO$ - 0$ - 0
6003USN Travel CCS Systems Modification (Option)1Cost-NTELO$ 10,000.00$ 10,000.00
6004USN Other Direct Costs (ODCs) Systems Modification (Option)1Cost-NTELO$ 2,500.00$ 2,500.00
6005Gulfport Navy CCS System Installation (Option)1FFPLO$ - 0$ - 0$ - 0$ - 0
6006Pt. Mugu CCS System Installation (Option)1FFPLO$ - 0$ - 0$ - 0$ - 0
6007CDRLs Navy System Installation (Option)1NSPLO$ - 0
6008Navy Travel CCS System Installation (Option)1Cost-NTELO$ 20,000.00$ 20,000.00
6009Navy Other Direct Costs (ODCs) System Installation (Option)1Cost-NTELO$ 7,500.00$ 7,500.00
6010USN CCS System Initial Spare and Repair Parts Gulfport CCS System (Option)1Cost-NTEEA$ 73,620.00$ 73,620.00
6011USN CCS System Initial Spare and Repair Parts Pt. Mugu CCS System(Option)1Cost-NTEEA$ 73,620.00$ 73,620.00
7000Gulfport Navy CCS System Contractor Logistics Support - (Option Period 1)12FFPMO$ - 0$ - 0$ - 0$ - 0
7001Pt. Mugu Navy CCS System Contractor Logistics Support - (Option Period 1)12FFPMO$ - 0$ - 0$ - 0$ - 0
7002CDRLs - Navy CCS System Contractor Logistics Support - (Option Period 1)1NSPLO$ - 0
7003Travel - Navy Contractor Logistics Support - (Option Period 1)1Cost- NTELO$ 10,000.00$ 10,000.00
7004Other Direct Costs (ODCs) - Navy Contractor Logistics Support - (Option Period 1)1Cost- NTELO$ 10,000.00$ 10,000.00
7005Repair and Spare Parts - Navy Contractor Logistics Support - (Option Period 1)1Cost- NTELO$ 126,087.00$ 126,087.00
7100Gulfport Navy CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
7101Pt. Mugu Navy CCS System Contractor Logistics Support - (Option Period 2)12FFPMO$ - 0$ - 0$ - 0$ - 0
7102CDRLs - Navy CCS System Contractor Logistics Support - (Option Period 2)1NSPLO$ - 0
7103Travel - Navy Contractor Logistics Support - (Option Period 2)1Cost- NTELO$ 10,000.00$ 10,000.00
7104Other Direct Costs (ODCs) - Navy Contractor Logistics Support - (Option Period 2)1Cost- NTELO$ 10,000.00$ 10,000.00
7105Repair and Spare Parts - Navy Contractor Logistics Support - (Option Period 2)1Cost- NTELO$ 128,602.00$ 128,602.00
7200Gulfport Navy CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
7201Pt. Mugu Navy CCS System Contractor Logistics Support - Option 6 Month Extension of Services6FFPMO$ - 0$ - 0$ - 0$ - 0
7202CDRLs - Navy CCS System Contractor Logistics Support - Option 6 Month Extension of Services1NSPLO$ - 0
7203Travel - Navy Contractor Logistics Support - Option 6 Month Extension of Services1Cost- NTELO$ 5,000.00$ 5,000.00
7204Other Direct Costs (ODCs) - Navy Contractor Logistics Support - Option 6 Month Extension of Services1Cost- NTELO$ 5,000.00$ 5,000.00
7205Repair and Spare Parts - Navy Contractor Logistics Support - Option 6 Month Extension of Services1Cost- NTELO$ 64,301.00$ 64,301.00
8000Gulfport CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
8001Pt. Mugu CCS System - Disposal1FFPEa$ - 0$ - 0$ - 0$ - 0
Total Evaluated Price$ 3,142,120.50
Q1Is the prime Contractor a HubZone small business concern, but has waived the evaluation preferenceno
Q2Is the prime Contractor a HubZone small business concern.yes

Sheet1

yes
no
USMC CLINS
0001-0012Modification (01 January 2018- 31 March 2019)
0100MCB Camp Pendleton 1 CCS System Installation (01 April 2019- 30 April 2019)
0101MCB Camp Pendleton 2 CCS System Installation (01 May 2019- 31 May 2019)
0102MCB Hawaii (Kaneohe Bay) CCS System Installation (01 June 2019- 30 June 2019)
0103MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Installation (01 July 2019- 31 July 2019)
0104MCAGCC 29 PALMS CCS System Installation (01 August 2019- 31 August 2019)
0105MCB Camp Lejeune 1 CCS System Installation (01 September 2019 - 30 September 2019)
0106MCB Lejeune 2 CCS System Installation (01 October 2019- 31 October 2019)
0107-0110Installation (01 April 2019-31 October 2019)
1000MCB Camp Pendleton 1 CCS System Contractor Logistics Support - (Option Period 1) (01 April 2019- 31 March 2020)
1001MCB Camp Pendleton 2 CCS System Contractor Logistics Support - (Option Period 1) (01 April 2019- 31 March 2020)
1002MCB Hawaii (Kaneohe Bay) CCS System Contractor Logistics Support - (Option Period 1) (01 June 2019- 31 March 2020)
1003MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System Contractor Logistics Support - (Option Period 1) (01 July 2019- 31 March 2020)
1004MCAGCC 29 PALMS CCS System Contractor Logistics Support - (Option Period 1) (01 August 2019- 31 March 2020)
1005MCB Camp Lejeune 1 CCS System Contractor Logistics Support - (Option Period 1) (01 September 2019- 31 March 2020)
1006MCB Lejeune 2 CCS System Contractor Logistics Support - (Option Period 1) (01 September 2019- 31 March 2020)
1007-1010CLS (01 April 2019- 31 March 2020)
1100-1110CLS (01 April 2020- 31 March 2021)
1200-1210CLS (01 April 2021- 31 March 2022)
1300-1310CLS (01 April 2022- 30 September 2022) (see caluse 52.217-8)
2000-2003PDSS (01 April 2019- 31 March 2020)
2100-2103PDSS (01 April 2020- 31 March 2021)
2200-2203PDSS (April 2021- March 2022)
2300-2303PDSS (01 April 2022- 30 September 2022) (see caluse 52.217-8)
3000Can be exercised at any time, one time during contract
4000MCB Camp Pendleton 1 CCS System - Disposal (01 April 2019- 30 April 2019)
4001MCB Camp Pendleton 2 CCS System - Disposal (01 May 2019- 31 May 2019)
4002MCB Hawaii (Kaneohe Bay) CCS System - Disposal (01 June 2019 - 30 June 2019)
4003MCB Camp Smedley D. Butler (Okinawa, Japan) CCS System - Disposal (01 July 2019- 31 July 2019)
4004MCAGCC 29 PALMS CCS System - Disposal (01 August 2019- 31 August 2019)
4005MCB Camp Lejeune 1 CCS System - Disposal (01 September 2019- 30 September 2019)
4006MCB Camp Lejeune 2 CCS System - Disposal (01 October 2019 - 31 October 2019)
Navy CLINS
6000-6004Modification (01 September 2019 - 31 March 2020)
6005Gulfport Navy CCS System Installation (01 April 2020- 30 April 2020)
6006Pt. Mugu CCS System Installation (01 May 2020 - 31 May 2020)
6007-6011Installation (01 April 2020 - 31 May 2020)
7000-7005CLS (01 April 2020- 31 March 2021)
7100-7105CLS (01 April 2021- 31 March 2022)
7200-7205CLS (01 April 2022- 30 September 2022
8000Disposal (01 April 2020- 30 April 2020)
8001Disposal (01 May 2020 - 31 May 2020)