This solicitation requests quotes for an upgraded chilled water system at the Fleet Readiness Center Southwest facility in San Diego, California. The Navy seeks to procure two new Carrier brand chilled water units, pumps, a water storage tank, and installation services. Quotes are due by June 10, 2022 and award will be made to the lowest priced technically acceptable offer. The acquisition is set aside for small businesses as a total small business set-aside with a NAICS code of 333415 and size standard of 1,250 employees. The contractor must provide a minimum one year warranty and installation must begin within 90 days of award. The solicitation includes attachments providing the statement of work, technical drawings, and contract provisions to be included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Chiller V6.docx | DOCX document | |
| Final QA Chilled Water.pdf | ||
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| SOW Chiller V5 (1).docx | DOCX document | |
| Addendum to P97595 (Controls Sequencing).docx | DOCX document | |
| Contractor Environmental GuidelinesEPO 2021.pdf | ||
| M06RevB.pdf | ||
| M01RevB.pdf | ||
| M04RevB.pdf | ||
| M03RevB.pdf | ||
| A26 - GFP - Chill Water.xlsx | XLSX spreadsheet | |
| Chilled Water Combined Synopsis-Solicitation.docx | DOCX document | |
| E-1.pdf | ||
| B1 - JA Chiller_V4_030222_signed.pdf | ||
| Schedule of Items.docx | DOCX document | |
| CDRL - Chilled Water.pdf | ||
| M02RevB.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL PLANNING AND DESIGN OFFICE
FRCSW
NAVAL BASE CORONADO, SAN DIEGO, CA
UPGRADE CHILLED WATER SYSTEM IN
GENERATOR SHOP
M-05
DWG NOCODE IDENT NO.SIZE
SHEET OF
AUTOCAD
SCALE:
SHOWN
DESIGN:
CHECKED:
BLDG.
REF
FILE
01/22D. MCADAMS
WR50438 E 91145
5 6
P97595
P97595M05.DWG
WC-4
WT-1
WT-1
CP-10
CP-7
WC-1
WC-2
T
8" STEEL PIPE
2" COPPER
T
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
TEMPERATURE GAUGE AND
TRANSDUCER
LEGEND
FEMALE CAMLOCK HOSE COUPLING
2" COPPER (WATER)
SIGHT
GLASS
M05 M05
VENT (1" COPPER)
TERMINATE VENT AT 48" ABOVE
MEZZANINE DECK AND INSTALL
BALL VALVE.
MEZZANINE IN HANGAR BAY
MEZZANINE IN SHOP AREA
X M-X M-X
DETAIL I.D.
SHOWN ON
REFERENCEED
ON
XX-X
WC = WATER CHILLER
WT = WATER BUFFER TANK
CP = CIRCULATION PUMP
RP = RECIRCULATION PUMP (CHEMICALS)
REFER TO EQUIPMENT SCHEDULES
1" COPPER
CLEAR PVC SIGHT GLASS
1" COPPER
ELEVATION 1
M03 M051
16 SCALEWATER BUFFER TANK, PUMPS AND PIPING INSTALLATION BY CONTRACTOR
ELEVATION 2
M05 M051
16 SCALEWATER BUFFER TANK VENT
BY CONTRACTOR
FROM POT FEEDER
WATER
FROM CHILLED WATER
LOOPS 1 THROUGH 8
2" TYPE "L"
COPPER
(TYP. OF 10)
2" TYPE "L" COPPER
(TYP.)
8" STEEL PIPE
1" COPPER
FOR CONTINUATION
SEE ELEVATION
M03 M05
8" STEEL PIPE
2" TYPE "L" COPPER (TYP.)
CHWR PIPING
FLOOR
FLOOR
FR
O
M C
H -3
FR
O
M C
H -4
FROM CH-2FROM CH-1
CHILLED WATER RETURN
CHILLED WATER SUPPLYCHWS
CHWR
VIBRATION ISOLATION FITTING
VIBRATION ISOLATION FITTING
DIFFERENTIAL PRESSURE BYPASS
VALVE
INSTALL 12" X 12" SIGN ON WALL:
"CHILLED WATER TANK VENT VALVE.
TO REMAIN CLOSED EXCEPT FOR
WHEN FILLING CHILLED WATER TANK."
W6 X 15 PUMP MOUNT BEAMS
(TYP. OF 4)