M04RevB.pdf
PDF 107 KB Posted
- Solicitation number
- N6852022R0010
About this file
This is a combined synopsis and solicitation for a firm fixed price contract to upgrade a chilled water system at a naval base in California. The Navy seeks to procure two new Carrier brand chilled water units, pumps, and a water storage tank. The selected contractor will relocate two existing units, install the new equipment, and calibrate and test the new system. Quotes are due by June 10, 2022. The contract will have a base year with option years and include a warranty period of at least 12 months. The place of performance is a building at Naval Air Station North Island in San Diego, California. The solicitation is a 100% small business set-aside. The contractor must meet wage determinations, safety requirements, and accept the contract via WAWF.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Chiller V6.docx | DOCX document | |
| Final QA Chilled Water.pdf | ||
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| SOW Chiller V5 (1).docx | DOCX document | |
| Addendum to P97595 (Controls Sequencing).docx | DOCX document | |
| Contractor Environmental GuidelinesEPO 2021.pdf | ||
| M06RevB.pdf | ||
| M01RevB.pdf | ||
| M03RevB.pdf | ||
| A26 - GFP - Chill Water.xlsx | XLSX spreadsheet | |
| Chilled Water Combined Synopsis-Solicitation.docx | DOCX document | |
| E-1.pdf | ||
| M05RevB.pdf | ||
| B1 - JA Chiller_V4_030222_signed.pdf | ||
| Schedule of Items.docx | DOCX document | |
| CDRL - Chilled Water.pdf | ||
| M02RevB.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL PLANNING AND DESIGN OFFICE
FRCSW
NAVAL BASE CORONADO, SAN DIEGO, CA
UPGRADE CHILLED WATER SYSTEM IN
GENERATOR SHOP
M-04
DWG NOCODE IDENT NO.SIZE
SHEET OF
AUTOCAD
SCALE:
SHOWN
DESIGN:
CHECKED:
BLDG.
REF
FILE
01/22D. MCADAMS
WR50438 E 91145
4 6
P97595
P97595M4.DWG
CP-3
C P-
C
W S
C P-
C
W R
C P-
C
W S
C P-
C
W R
CP-5 CWS
CP-5 CWR
C P-
C
W S
C P-
C
W R
C P-
C
W S
C P-
C
W R
C P-
C
W S
C P-
C
W R
PARTIAL PLAN VIEW - AREA "B"
WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1
16 SCALE N
PARTIAL PLAN VIEW - AREA "C"
WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1
16 SCALE N
CP-10 CWS
CP-10 CWR
PARTIAL PLAN VIEW - AREA "D"
WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1
16 SCALE N
PENETRATE MODULE CEILING AND
INSTALL BALL VALVES AND DIFFERENTIAL
PRESSURE BYPASS VALVE (4 PLACES)
PENETRATE MODULE CEILING AND
INSTALL BALL VALVES AND DIFFERENTIAL
PRESSURE BYPASS VALVE (2 PLACES)
PENETRATE MODULE CEILING AND
INSTALL BALL VALVES AND DIFFERENTIAL
PRESSURE BYPASS VALVE (1 PLACE ONLY)
PENETRATE MODULE CEILING AND
INSTALL BALL VALVES ONLY
C W
S
C W
R
MODULE CEILING
CALEFFI DIFFERENTIAL
PRESSURE BY-PASS
VALVE 519700A (TYP.)2" BALL VALVE
(24" BELOW
CEILING, TYP.)
TYPICAL MODULAR CEILING PENETRATION
BY GOVERNMENT
NOT TO SCALE
| Sheets and Views |
| Layout1 |