M04RevB.pdf

PDF 107 KB Posted

Attached to
Chilled Water System (FRCSW) Combined Synopsis/Solicitation
Solicitation number
N6852022R0010
Issued by

About this file

This is a combined synopsis and solicitation for a firm fixed price contract to upgrade a chilled water system at a naval base in California. The Navy seeks to procure two new Carrier brand chilled water units, pumps, and a water storage tank. The selected contractor will relocate two existing units, install the new equipment, and calibrate and test the new system. Quotes are due by June 10, 2022. The contract will have a base year with option years and include a warranty period of at least 12 months. The place of performance is a building at Naval Air Station North Island in San Diego, California. The solicitation is a 100% small business set-aside. The contractor must meet wage determinations, safety requirements, and accept the contract via WAWF.

View the file

Other files

File Type Posted
SOW Chiller V6.docx DOCX document
Final QA Chilled Water.pdf PDF
RFQ Full Text Clauses and Provisions.docx DOCX document
RFQ Full Text Clauses and Provisions.docx DOCX document
SOW Chiller V5 (1).docx DOCX document
Addendum to P97595 (Controls Sequencing).docx DOCX document
Contractor Environmental GuidelinesEPO 2021.pdf PDF
M06RevB.pdf PDF
M01RevB.pdf PDF
M03RevB.pdf PDF
A26 - GFP - Chill Water.xlsx XLSX spreadsheet
Chilled Water Combined Synopsis-Solicitation.docx DOCX document
E-1.pdf PDF
M05RevB.pdf PDF
B1 - JA Chiller_V4_030222_signed.pdf PDF
Schedule of Items.docx DOCX document
CDRL - Chilled Water.pdf PDF
M02RevB.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRIAL PLANNING AND DESIGN OFFICE

FRCSW

NAVAL BASE CORONADO, SAN DIEGO, CA

UPGRADE CHILLED WATER SYSTEM IN

GENERATOR SHOP

M-04

DWG NOCODE IDENT NO.SIZE

SHEET OF

AUTOCAD

SCALE:

SHOWN

DESIGN:

CHECKED:

BLDG.

REF

FILE

01/22D. MCADAMS

WR50438 E 91145

4 6

P97595

P97595M4.DWG

CP-3

C P-

C

W S

C P-

C

W R

C P-

C

W S

C P-

C

W R

CP-5 CWS

CP-5 CWR

C P-

C

W S

C P-

C

W R

C P-

C

W S

C P-

C

W R

C P-

C

W S

C P-

C

W R

PARTIAL PLAN VIEW - AREA "B"

WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1

16 SCALE N

PARTIAL PLAN VIEW - AREA "C"

WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1

16 SCALE N

CP-10 CWS

CP-10 CWR

PARTIAL PLAN VIEW - AREA "D"

WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY GOVERNMENT 1

16 SCALE N

PENETRATE MODULE CEILING AND

INSTALL BALL VALVES AND DIFFERENTIAL

PRESSURE BYPASS VALVE (4 PLACES)

PENETRATE MODULE CEILING AND

INSTALL BALL VALVES AND DIFFERENTIAL

PRESSURE BYPASS VALVE (2 PLACES)

PENETRATE MODULE CEILING AND

INSTALL BALL VALVES AND DIFFERENTIAL

PRESSURE BYPASS VALVE (1 PLACE ONLY)

PENETRATE MODULE CEILING AND

INSTALL BALL VALVES ONLY

C W

S

C W

R

MODULE CEILING

CALEFFI DIFFERENTIAL

PRESSURE BY-PASS

VALVE 519700A (TYP.)2" BALL VALVE

(24" BELOW

CEILING, TYP.)

TYPICAL MODULAR CEILING PENETRATION

BY GOVERNMENT