M03RevB.pdf

PDF 114 KB Posted

Attached to
Chilled Water System (FRCSW) Combined Synopsis/Solicitation
Solicitation number
N6852022R0010
Issued by

About this file

This combined synopsis and solicitation from the Department of the Navy Naval Air Systems Command seeks quotes for an upgraded chilled water system at the Fleet Readiness Center Southwest in San Diego, California. The requirement includes procuring two Carrier brand chilled water units, necessary pumps and a water storage tank, and installing the new equipment along with relocating two existing units. Quotes are due by June 10, 2022 and award will be made to the lowest priced technically acceptable offer from a small business. The fixed price contract includes installation within 90 days of award, warranties for 12 months after system acceptance, and delivery to the Fleet Readiness Center Southwest facility.

View the file

Other files

File Type Posted
SOW Chiller V6.docx DOCX document
Final QA Chilled Water.pdf PDF
RFQ Full Text Clauses and Provisions.docx DOCX document
RFQ Full Text Clauses and Provisions.docx DOCX document
SOW Chiller V5 (1).docx DOCX document
Addendum to P97595 (Controls Sequencing).docx DOCX document
Contractor Environmental GuidelinesEPO 2021.pdf PDF
M06RevB.pdf PDF
M01RevB.pdf PDF
M04RevB.pdf PDF
A26 - GFP - Chill Water.xlsx XLSX spreadsheet
Chilled Water Combined Synopsis-Solicitation.docx DOCX document
E-1.pdf PDF
M05RevB.pdf PDF
B1 - JA Chiller_V4_030222_signed.pdf PDF
Schedule of Items.docx DOCX document
CDRL - Chilled Water.pdf PDF
M02RevB.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRIAL PLANNING AND DESIGN OFFICE

FRCSW

NAVAL BASE CORONADO, SAN DIEGO, CA

UPGRADE CHILLED WATER SYSTEM IN

GENERATOR SHOP

M-03

DWG NOCODE IDENT NO.SIZE

SHEET OF

AUTOCAD

SCALE:

SHOWN

DESIGN:

CHECKED:

BLDG.

REF

FILE

01/22D. MCADAMS

WR50438 E 91145

3 6

P97595

P97595M3.DWG

CP-1

CP-4CP-5CP-6CP-7 CP-3 CP-2

CP-8

CP-9

CP-10

WC-2

WC-1

WT-1

RP-1

(WITH POT FEEDER)

LADDER TO MEZZANINE

4' CLEARANCE LINE AROUND WATER CHILLERS

2" TYPE "L" COPPER (OVERHEAD)

2" TYPE "L" COPPER (OVERHEAD)

8" STEEL

PIPE

8" STEEL PIPE MANIFOLD

3" FLANGED STEEL PIPE

(TYP. FOR ALL PUMPS)

BLANK FLANGE

(TYP. 4 PLACES)

2" TYPE "L" COPPER

(OVERHEAD)

MEZZANINE BASE

CONCRETE SHOP FLOOR UNDER MEZZANINE

GENERATOR

SHOP AREA

PARTIAL PLAN VIEW - AREA "A"

WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY CONTRACTOR 1

16 SCALE N

M03 M05

2" TYPE "L" COPPER OVERHEAD. FOR

CONTINUATION, SEE SHEET M-03.

8" STEEL PIPE

2" TYPE "L"

COPPER

(NEAR

FLOOR)

2" TYPE "L" COPPER

(OVERHEAD)

WATER SUPPLY (1

2" TYPE "L"

COPPER). CONTINUE PER

NOTE

POT

FEED

EXISTING 2" COPPER PIPING TO NORTHEAST CORNER OF

BUILDING TO REMAIN (OVERHEAD - TO BECOME CP9-CWS AND

CP9-CWR).

INSTALL NEW PIPE ELBOW AND ROUTE TO

CHILLED WATER RETURN MANIFOLD ON

WT-1 (2" TYPE "L" COPPER)

INSTALL NEW PIPE ELBOW AND ROUTE TO

DISCHARGE ON PUMP CP-9 (2" TYPE "L" COPPER)

REMOVE PIPING (OVERHEAD) SHOWN WITH HATCHES

BETWEEN NEW ELBOWS AND EXISTING WATER CHILLERS

ON MEZZANINE IN AIRCRAFT HANGAR.

CP3-CWS

CP4-CWS

CP5-CWS

CP6-CWS

CP7-CWS

CP8-CWS

C P9

-C W

S C

P9 -C

W R

CP3-CWR

CP4-CWR

CP5-CWR

CP6-CWR

CP7-CWR

CP8-CWR

CP10-CWRCP10-CWS (OVERHEAD, 2" TYPE "L" COPPER)

ROUTE VENT PIPE UP WALL TO

4 FEET ABOVE MEZZANINE DECK

AND INSTALL BALL VALVE. PROVIDE

SIGN ON WALL TO READ "THIS VALVE

TO REMAIN CLOSED EXCEPT WHEN

MANUALLY FILLING CHILLED WATER

TANK AND PIPING."

VENT (OVERHEAD, 1" TYPE "L" COPPER)

ROUTE TO INLET ON WATER CHILLER

WC-3 (2" TYPE "L" COPPER)

ROUTE TO INLET ON WATER CHILLER WC-4

(2" TYPE "L" COPPER)

SIGHT GLASS

W6 X 15 BEAM (PUMP MOUNT BEAMS

TYP. OF 4)

ROUTE TO OUTLET ON WATER CHILLER

WC-4 (2" TYPE "L" COPPER)

ROUTE TO OUTLET ON WATER CHILLER

WC-3 (2" TYPE "L" COPPER)

Sheets and Views
Model

File details come from the government source that posted it. Updated .