M03RevB.pdf
PDF 114 KB Posted
- Solicitation number
- N6852022R0010
About this file
This combined synopsis and solicitation from the Department of the Navy Naval Air Systems Command seeks quotes for an upgraded chilled water system at the Fleet Readiness Center Southwest in San Diego, California. The requirement includes procuring two Carrier brand chilled water units, necessary pumps and a water storage tank, and installing the new equipment along with relocating two existing units. Quotes are due by June 10, 2022 and award will be made to the lowest priced technically acceptable offer from a small business. The fixed price contract includes installation within 90 days of award, warranties for 12 months after system acceptance, and delivery to the Fleet Readiness Center Southwest facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Chiller V6.docx | DOCX document | |
| Final QA Chilled Water.pdf | ||
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| RFQ Full Text Clauses and Provisions.docx | DOCX document | |
| SOW Chiller V5 (1).docx | DOCX document | |
| Addendum to P97595 (Controls Sequencing).docx | DOCX document | |
| Contractor Environmental GuidelinesEPO 2021.pdf | ||
| M06RevB.pdf | ||
| M01RevB.pdf | ||
| M04RevB.pdf | ||
| A26 - GFP - Chill Water.xlsx | XLSX spreadsheet | |
| Chilled Water Combined Synopsis-Solicitation.docx | DOCX document | |
| E-1.pdf | ||
| M05RevB.pdf | ||
| B1 - JA Chiller_V4_030222_signed.pdf | ||
| Schedule of Items.docx | DOCX document | |
| CDRL - Chilled Water.pdf | ||
| M02RevB.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL PLANNING AND DESIGN OFFICE
FRCSW
NAVAL BASE CORONADO, SAN DIEGO, CA
UPGRADE CHILLED WATER SYSTEM IN
GENERATOR SHOP
M-03
DWG NOCODE IDENT NO.SIZE
SHEET OF
AUTOCAD
SCALE:
SHOWN
DESIGN:
CHECKED:
BLDG.
REF
FILE
01/22D. MCADAMS
WR50438 E 91145
3 6
P97595
P97595M3.DWG
CP-1
CP-4CP-5CP-6CP-7 CP-3 CP-2
CP-8
CP-9
CP-10
WC-2
WC-1
WT-1
RP-1
(WITH POT FEEDER)
LADDER TO MEZZANINE
4' CLEARANCE LINE AROUND WATER CHILLERS
2" TYPE "L" COPPER (OVERHEAD)
2" TYPE "L" COPPER (OVERHEAD)
8" STEEL
PIPE
8" STEEL PIPE MANIFOLD
3" FLANGED STEEL PIPE
(TYP. FOR ALL PUMPS)
BLANK FLANGE
(TYP. 4 PLACES)
2" TYPE "L" COPPER
(OVERHEAD)
MEZZANINE BASE
CONCRETE SHOP FLOOR UNDER MEZZANINE
GENERATOR
SHOP AREA
PARTIAL PLAN VIEW - AREA "A"
WATER DISTRIBUTION AND EQUIPMENT INSTALLATION BY CONTRACTOR 1
16 SCALE N
M03 M05
2" TYPE "L" COPPER OVERHEAD. FOR
CONTINUATION, SEE SHEET M-03.
8" STEEL PIPE
2" TYPE "L"
COPPER
(NEAR
FLOOR)
2" TYPE "L" COPPER
(OVERHEAD)
WATER SUPPLY (1
2" TYPE "L"
COPPER). CONTINUE PER
NOTE
POT
FEED
EXISTING 2" COPPER PIPING TO NORTHEAST CORNER OF
BUILDING TO REMAIN (OVERHEAD - TO BECOME CP9-CWS AND
CP9-CWR).
INSTALL NEW PIPE ELBOW AND ROUTE TO
CHILLED WATER RETURN MANIFOLD ON
WT-1 (2" TYPE "L" COPPER)
INSTALL NEW PIPE ELBOW AND ROUTE TO
DISCHARGE ON PUMP CP-9 (2" TYPE "L" COPPER)
REMOVE PIPING (OVERHEAD) SHOWN WITH HATCHES
BETWEEN NEW ELBOWS AND EXISTING WATER CHILLERS
ON MEZZANINE IN AIRCRAFT HANGAR.
CP3-CWS
CP4-CWS
CP5-CWS
CP6-CWS
CP7-CWS
CP8-CWS
C P9
-C W
S C
P9 -C
W R
CP3-CWR
CP4-CWR
CP5-CWR
CP6-CWR
CP7-CWR
CP8-CWR
CP10-CWRCP10-CWS (OVERHEAD, 2" TYPE "L" COPPER)
ROUTE VENT PIPE UP WALL TO
4 FEET ABOVE MEZZANINE DECK
AND INSTALL BALL VALVE. PROVIDE
SIGN ON WALL TO READ "THIS VALVE
TO REMAIN CLOSED EXCEPT WHEN
MANUALLY FILLING CHILLED WATER
TANK AND PIPING."
VENT (OVERHEAD, 1" TYPE "L" COPPER)
ROUTE TO INLET ON WATER CHILLER
WC-3 (2" TYPE "L" COPPER)
ROUTE TO INLET ON WATER CHILLER WC-4
(2" TYPE "L" COPPER)
SIGHT GLASS
W6 X 15 BEAM (PUMP MOUNT BEAMS
TYP. OF 4)
ROUTE TO OUTLET ON WATER CHILLER
WC-4 (2" TYPE "L" COPPER)
ROUTE TO OUTLET ON WATER CHILLER
WC-3 (2" TYPE "L" COPPER)