This is a combined synopsis and solicitation for a chilled water system at Fleet Readiness Center Southwest in San Diego, California. The Navy seeks to procure two new Carrier brand chilled water units, pumps, and a water storage tank. The contractor will relocate two existing units and install, test, calibrate, and train personnel on the new system. Quotes are due by June 10, 2022. The requirement is set aside for small businesses. The Navy will award a firm fixed-price contract and evaluate quotes based on technical acceptability and price. The contractor must provide the supplies and services in accordance with the statement of work by no later than 90 days from award. The contractor must warrant the system for a minimum of 12 months following acceptance.

View the file

Other files

File Type Posted
SOW Chiller V6.docx DOCX document
Final QA Chilled Water.pdf PDF
RFQ Full Text Clauses and Provisions.docx DOCX document
RFQ Full Text Clauses and Provisions.docx DOCX document
SOW Chiller V5 (1).docx DOCX document
Addendum to P97595 (Controls Sequencing).docx DOCX document
Contractor Environmental GuidelinesEPO 2021.pdf PDF
M06RevB.pdf PDF
M01RevB.pdf PDF
M04RevB.pdf PDF
M03RevB.pdf PDF
A26 - GFP - Chill Water.xlsx XLSX spreadsheet
Chilled Water Combined Synopsis-Solicitation.docx DOCX document
E-1.pdf PDF
M05RevB.pdf PDF
B1 - JA Chiller_V4_030222_signed.pdf PDF
Schedule of Items.docx DOCX document
M02RevB.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Contract Data Requirements List (DD 1423s)

Procurement of a Chilled Water System

FRCSW, Building 378

April 2022

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM X OTHER

D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Chilled Water System TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A001 Acceptance Test Report None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-QCIC-81891

SOW paragraphs 3.4, 3.4.1 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD

See block 16

A ONE/R

See block 16

See block 16

b. COPIES

8. APP CODE See block 16 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

A N/A N/A Reg Repr o

16. REMARKS See Block 16 2 2

Block 4: Contractor’s format is acceptable.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: A – Requires written approval before distribution of final data.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: Frequency: ONE/R - One time with revisions. Contractor shall submit draft to the Technical Point of Contact (TPOC) for approval within 90 days prior to installation of equipment. Submit revisions within 30 days of receipt of Government comments to the TPOC for final approval.

Block 12: The first submission is due 90 days prior to installation.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the TPOC. If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

04/14/2022 04/14/2022

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 2 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A002 Engineering Drawings None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-DRPR-80651

SOW paragraphs 3.6.2, 3.15.1 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD

See block 16

A 1TIME

See block 16

See block 16 b. COPIES

8. APP CODE See block 16 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS electronic copy 2

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One-time submission

Block 12: Ninety (90) days before delivery of the equipment.

Block 14: Deliveries shall be provided in the form of electronic sets in CD/DVD format and hard copy sets to the TPOC.

hard copy 2

15. Total

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 3 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A003 Validation Report None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80792B

SOW paragraph 3.7.7 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME

See block 16

See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A ` N/A N/A Reg Repr o

16. REMARKS Electronic copy 1

Block 4: Format. The Validation Report format shall be contractor selected. The initially used format shall be used for all subsequent submissions.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A – Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: Frequency: 1TIME – one time to be submitted

Block 12: Ninety (90) days after award of contract.

Hard copy 1

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 4 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A004 Calibration Certificate None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-82319

SOW paragraph 3.7.8 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME

See block 16

See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A ` N/A N/A Reg Repr o

16. REMARKS Electronic copy 1

Block 4: Contractor Format Acceptable.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A – Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: Frequency: 1TIME – one time to be submitted

Block 12: Ninety (90) days after award of contract.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 5 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

Chilled Water System TBD FRCSW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A005 Calibration System Description None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-QCIC-80906

SOW paragraphs 3.7.8, 3.15.4, 4.3.7

FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A

See block 16

1TIME See Block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC 1

Block 4: Format shall be contractor selected.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A – Approval is not required.

Block 9: Approved for public release; distribution is unlimited.

Block 10: 1TIME – one time to be submitted

Block 12: Ninety (90) days after award of contract.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

All technical data shall be written in the English language and be grammatically correct.

All technical data shall identify the manufacturer’s name, model number, serial number, and contact number.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 6 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A006 Training System Operator Manual None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-TMSS-82369

SOW paragraphs 3.10, 3.15.2 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME See Block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC (elec. copy) 2

Block 4: The format shall be in the Contractor’s format.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A: Approval is not required.

Block 9: A: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: Ninety (90) days after award of contract.

Block 14: These Test Program Instructions shall be available in hard copy format, digital format, and PDF format.

All technical data shall be written in the English language and be grammatically correct.

TPOC (hardcopy) 2

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 7 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A007 Training System Maintenance Manual None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-TMSS-82370

SOW paragraphs 3.10, 3.15.2 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME See Block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC (elec. Copy) 2

Block 4: The format shall be in the Contractor’s format.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A: Approval is not required.

Block 9: A: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: 90 Days prior to installation of equipment.

Block 14: Government to receive two (2) electronic sets in CD/DVD format and two (2) hard copy sets of all calibration manuals at no additional cost.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 8 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A008 Training System Support Document None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-PSSS-81527D

SOW paragraphs 3.10, 3.15.2 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC (elec. Copy) 2

Block 4: The contractor format is acceptable.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: Ninety (90) days after award of contract.

hard copy sets of all maintenance manuals at no additional cost.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 9 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A009 Commercial Off-the-Shelf Manuals and Associated Supplemental Data

None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-TMSS-80527D

SOW paragraph 3.15.1 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME

See block 16

See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A ` N/A N/A Reg Repr o

16. REMARKS Electronic copy 1

Block 4: The basic manual shall be presented in the contractor’s format. Supplemental data shall be presented in the format specified by the acquiring activity.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A – Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: Frequency: 1TIME – one time to be submitted

Block 12: Ninety (90) days before delivery of the equipment.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 10 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A010 Full Maintenance Manual (Type III) None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-TMSS-81668A

SOW paragraphs 3.15.2, 4.3.8 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC (elec. Copy) 2

Block 4: The Full Maintenance Manual (Type III) shall be in accordance with the format and style requirements of paragraphs 2-1, 3-1, and 4-1 of DS-56.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: Ninety (90) days after award of contract.

hard copy sets of all maintenance manuals at no additional cost.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 11 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A011 Test Procedure None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80603A

SOW paragraph 3.16 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO A 1TIME See Block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS TPOC (hard copy) 2

Block 4: The test procedures shall be in contractor’s format 8 ½ x 11 inch paper. It shall be bound in such a manner that pages may be removed or inserted without damage or mutilation.

Block 7: NO: No inspection or acceptance required. No DD250 or Letter of Transmittal required.

Block 8: N/A: Approval is not required.

Block 9: A: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: 90 Days prior to installation of equipment.

Block 14: Government to receive two (2) hard copy sets of test procedures at no additional cost. The test procedures shall be in the English language.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 12 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A012 Major Milestone Commonality and Configuration Variance Progress Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-82022

SOW paragraphs 4.0, 4.1 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A WEEKLY See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The report shall be in contractor’s format.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: A – Requires written approval before distribution of final data.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: Weekly update.

Block 12: 7 days from contract award.

All technical data shall be written in the English language and be grammatically correct.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 13 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A013 Project Planning Chart None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80507C

SOW paragraph 4.2 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

A N/A N/A Reg Repr o

16. REMARKS TPOC 1

Block 4: The chart shall be in contractor’s format.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission

Block 12: Seven (7) days from contract award.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of electronic media via CD ROM to the TPOC via overnight mail.

All technical data shall be written in the English language and be grammatically correct.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 14 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A014 Engineering Documentation Information None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-EDRS-80410

SOW paragraph 4.3.1 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The report shall be in contractor’s format.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

Block 10: 1TIME: One time submission.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 15 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A015 Computer Software System Document None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-IPSC-80942

SOW paragraph 4.3.2 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The report shall be in contractor’s format.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 16 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A016 Contractor Validation Plan None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80759A

SOW paragraph 4.3.3 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The Contractor Validation Plan format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for subsequent submissions.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 17 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A017 Validation Report None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80792B

SOW paragraph 4.3.5 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The Validation Report format shall be contractor selected. The initially used format shall be used for all subsequent submissions.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 18 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A014 Software User Manual None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-IPSC-81443A

SOW paragraph 4.3.6 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The specification shall be in Contractor format unless otherwise specified.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 19 of 20 Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A015 Provisioning Technical Documentation Report None

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-PSSS-82301

SOW paragraph 4.3.9 FRCSW

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD A 1TIME See block 16 b. COPIES

8. APP CODE 11. ASN/A OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repr o

16. REMARKS See Block 16 1

Block 4: The report shall be in the Contractor’s format.

Block 7: DD – No source inspection, final inspection at destination; Acceptance at destination.

Block 8: N/A: Approval is not required.

Block 9: Distribution Statement: Approved for public release; distribution is unlimited.

DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 20 of 20 Pages

April 2022
DI-QCIC-81891
See block 16
See Block 16
DI-DRPR-80651
See block 16
electronic copy
DI-SESS-80792B
See block 16
N/A
Electronic copy
DI-SESS-82319
See block 16
N/A
Electronic copy
DI-QCIC-80906
See Block 16
N/A
TPOC
DI-TMSS-82369
See Block 16
N/A
TPOC (elec. copy)
DI-TMSS-82370
See Block 16
N/A
TPOC (elec. Copy)
DI-PSSS-81527D
See block 16
N/A
TPOC (elec. Copy)
DI-TMSS-80527D
See block 16
N/A
Electronic copy
DI-NDTI-80603A
See Block 16
N/A
TPOC (hard copy)
DI-MGMT-82022
See block 16
N/A
See Block 16
DI-EDRS-80410
See block 16
N/A
See Block 16
DI-IPSC-80942
See block 16
N/A
See Block 16
DI-MISC-80759A
See block 16
N/A
See Block 16
DI-SESS-80792B
See block 16
N/A
See Block 16
DI-IPSC-81443A
See block 16
N/A
See Block 16
DI-PSSS-82301
See block 16
N/A
See Block 16

File details come from the government source that posted it. Updated .