J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Power Systems Design & Install 2
Solicitation number
6973GH-26-R-00018
Issued by

About this file

This file is a Price Proposal Cost Worksheet for the Power Systems Design and Install II contract, detailing pricing instructions and cost breakdown for the Federal Aviation Administration (FAA). The contract is structured as a 10-year opportunity with a 4-year base period and two 3-year option periods, with a total estimated contract value of $857,190,625.59. The solicitation covers multiple Contract Line Item Numbers (CLINs) including site survey travel and labor (both CONUS and OCONUS), site survey reports, engineering design services (spanning roles like Project Manager, Electrical Engineer, Mechanical Engineer, and others), and installation services. Pricing is predominantly firm-fixed price (FFP), with some line items having not-to-exceed (NTE) pricing. The contract includes detailed labor hour estimates across various professional categories for each contract period, with specific emphasis on engineering design services and installation services. Offerors are required to complete blue-highlighted fields in the worksheet, providing unit pricing for each CLIN across the base and option periods.

View the file

Other files

File Type Posted
J.11 FAA-C-1217H Chg 2.pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.04 Government Furnished Equipment (GFE).pdf PDF
J.14 faa-std-002H.pdf PDF
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets.xlsx XLSX spreadsheet
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.27 FAA-STD-061.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.01 Statement of Work 12.01.25.pdf PDF
J.32 Phase I Relevant Corporate Experience Form_10.27.25.docx DOCX document
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
6973GH-26-R-00018_DRAFT.pdf PDF
J.00 Index.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.12 FAA-C-1391e INSTALLATION TERMINATION SPLICING AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.15 FAA-STD-019G.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.05 6010-5 CAI Form.pdf PDF
J.03 Data Item Description (DID).pdf PDF
J.23 FST Guidelines.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

ENTER YOUR COMPANY NAME HERE
Schedule B, Price Proposal Power Systems Design and Install II Cost Worksheet
Instructions:
Overall Offeror Instructions for Price Proposal, Power Systems Design and Install II Cost Worksheet

The Offeror must provide a complete Power Systems Design and Install II Cost Worksheet, inputting pricing for CLINS X001,X003 and X004A-H, except for CLINs X002, X004I, X005 as they are given a not to exceed price which will be used in the proposed total estimated price.

Pricing for all CLINS should include the base period and all option periods.

1. Enter Company Name in cell A1 of this sheet.
BLUE FIELDS are to be completed by the Offeror.
RED FIELDS are Not-to-Exceed
WHITE FIELD are information only no actions are required.
2. Price Schedule Tab Instructions:
a. Pricing Column: Indicates whether the CLIN is Firm Fixed Price (FFP) or FFP Not to Exceed (NTE).
b. Item, Unit; Est. Quantity; Price per Unit; and Est Total: These are self explanatory.
c. FFP and FFP NTE CLINs: The Offerors must complete all sections highlighted in BLUE on FFP CLINs with their unit price.

d. CLIN X005: Offerors must propose CLIN 5, Labor Rates that are fully burdened (overhead, general and administrative (G&A) and profit). The fully burdened rate will be applicable whether the work is performed by the prime contractor or a subcontractor.

Contract Total

CONTRACT PERIOD

(4-YEAR BASE, TWO (2), 3-YEAR OPTION PERIODS; TOTAL OF 10-YEARS POSSIBLE)

CONTRACT TOTAL
Base Period (2027-2031)$355,269,795.77
Option Period 01 (2031-2034)$250,960,414.91
Option Period 02 (2034-2037)$250,960,414.91
Total Estimated Contract Value$857,190,625.59

Base Period(2027-2031)

BASE PERIOD (2027-2031)
CLINSupplies or Services DescriptionCLIN TypeUnitBase Period (Year 1_2027-2028)Base Period (Year 2_2028-2029)Base Period (Year 3_2029-2030)Base Period (Year 4_2030-2031)Total Base Period
Est. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. Total
0001Site Survey Travel and Labor (CONUS) SOW C.3.2.5
0001ACategory 1 or 2 (1 day) SOW C.3.2.5.1FFPEA186$0.00203$0.00201$0.00205$0.00$0.00
0001BCategory 3 (up to 3 days) SOW C.3.2.5.2FFPEA42$0.0042$0.0042$0.0042$0.00$0.00
0002Site Survey Travel and Labor (OCONUS) SOW C.3.2.5FFP NTEFFP$652,661.39
0003Site Survey Report SOW C.3.2.5FFPEA253$0.00251$0.00268$0.00361$0.00$0.00
0004Engineering Design Services SOW C.3.2.6
0004AProject ManagerFFPHours8464$0.009025$0.008899$0.008834$0.00$0.00
0004BElectrical EngineerFFPHours32004$0.0033176$0.0032931$0.0032370$0.00$0.00
0004CMechanical EngineerFFPHours4090$0.004306$0.004292$0.004272$0.00$0.00
0004DStructural EngineerFFPHours2240$0.002420$0.002380$0.002508$0.00$0.00
0004ECivil EngineerFFPHours3525$0.004072$0.004000$0.003960$0.00$0.00
0004FEnvironmental EngineerFFPHours1020$0.001200$0.001180$0.001205$0.00$0.00
0004GCAD Operator/ DesignerFFPHours8856$0.008490$0.009596$0.009237$0.00$0.00
0004HClericalFFPHours5277$0.005592$0.005646$0.005547$0.00$0.00
0004IOther Direct Costs (ODC)FFP NTEFFP$2,720,000.00
0005Installation Services SOW C.3.2.7 and C.3.2.8FFP NTEFFP$351,897,134.38
Estimated Total, Base Period:$355,269,795.77

Option Period 01 (2031-2034)

OPTION PERIOD 1 (2031-2034)
CLINSupplies or Services DescriptionCLIN TypeUnitOption Period 1 (Year 1_2031-2032)Option Period 1 - (Year 2_2032-2033)Option Period 1 - (Year 3_2033-2034)Total Base Period
Est. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. Total
0001Site Survey Travel and Labor (CONUS) SOW C.3.2.5
0001ACategory 1 or 2 (1 day) SOW C.3.2.5.1FFPEA179$0.00194$0.00193$0.00$0.00
0001BCategory 3 (up to 3 days) SOW C.3.2.5.2FFPEA43$0.0042$0.0042$0.00$0.00
0002Site Survey Travel and Labor (OCONUS) SOW C.3.2.5FFP NTEFFP$309,291.97
0003Site Survey Report SOW C.3.2.5FFPEA230$0.00250$0.00251$0.00$0.00
0004Engineering Design Services SOW C.3.2.6
0004AProject ManagerFFPHours7423$0.008452$0.008396$0.00$0.00
0004BElectrical EngineerFFPHours29795$0.0031563$0.0031202$0.00$0.00
0004CMechanical EngineerFFPHours3992$0.004222$0.004164$0.00$0.00
0004DStructural EngineerFFPHours1865$0.002130$0.002120$0.00$0.00
0004ECivil EngineerFFPHours3435$0.003126$0.003879$0.00$0.00
0004FEnvironmental EngineerFFPHours830$0.001090$0.00940$0.00$0.00
0004GCAD Operator/ DesignerFFPHours8152$0.0012158$0.008938$0.00$0.00
0004HClericalFFPHours5386$0.005623$0.005578$0.00$0.00
0004IOther Direct Costs (ODC)FFP NTEFFP$2,040,000.00
0005Installation Services SOW C.3.2.7 and C.3.2.8FFP NTEFFP$248,611,122.94
Estimated Total, Base Period:$250,960,414.91

Option Period 02 (2034-2037)

OPTION PERIOD 1 (2031-2034)
CLINSupplies or Services DescriptionCLIN TypeUnitOption Period 2 (Year 1_2034-2035)Option Period 2 - (Year 2_2035-2036)Option Period 2 - (Year 3_2036-2037)Total Base Period
Est. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. QtyPrice Per UnitEst. TotalEst. Total
0001Site Survey Travel and Labor (CONUS) SOW C.3.2.5
0001ACategory 1 or 2 (1 day) SOW C.3.2.5.1FFPEA185$0.00200$0.00200$0.00$0.00
0001BCategory 3 (up to 3 days) SOW C.3.2.5.2FFPEA42$0.0042$0.0042$0.00$0.00
0002Site Survey Travel and Labor (OCONUS) SOW C.3.2.5FFP NTEFFP$309,291.97
0003Site Survey Report SOW C.3.2.5FFPEA237$0.00251$0.00249$0.00$0.00
0004Engineering Design Services SOW C.3.2.6
0004AProject ManagerFFPHours7371$0.008536$0.008251$0.00$0.00
0004BElectrical EngineerFFPHours28702$0.0030823$0.0030124$0.00$0.00
0004CMechanical EngineerFFPHours4115$0.004288$0.004228$0.00$0.00
0004DStructural EngineerFFPHours2115$0.002300$0.002200$0.00$0.00
0004ECivil EngineerFFPHours3520$0.003966$0.003540$0.00$0.00
0004FEnvironmental EngineerFFPHours950$0.001095$0.001000$0.00$0.00
0004GCAD Operator/ DesignerFFPHours7886$0.008836$0.008444$0.00$0.00
0004HClericalFFPHours6935$0.005518$0.005385$0.00$0.00
0004IOther Direct Costs (ODC)FFP NTEFFP$2,040,000.00
0005Installation Services SOW C.3.2.7 and C.3.2.8FFP NTEFFP$248,611,122.94
Estimated Total, Base Period:$250,960,414.91