This document is a Technical Approach Form (Attachment J.34) for Factor 1, Design Proposal, requiring offerors to submit detailed project information across multiple project categories. The form provides a structured template for documenting project details including project category (1, 2, or 3), project title, location, completion date, customer name, and company role (prime contractor, subcontractor, designer). The form allows entries for six distinct projects: AES, CPDS, EG, ELD, FST, and UPS, with sections to specify the prime contractor, designer/engineering company, and subcontractors.

The related federal contract opportunity is a pre-solicitation by the Federal Aviation Administration (FAA) for Power Systems Design & Install 2, with solicitation number 6973GH-26-R-00018. The procurement anticipates a stand-alone, firm fixed-price contract under NAICS code 238210, with a business size standard of $19M. Contractors must be registered in SAM.gov, and the FAA reserves the right to review program eligibility and communicate with offerors during the solicitation process. Specific submission details and deadlines are to be determined, with questions to be emailed to stefanie.wile@faa.gov.

View the file

Other files

File Type Posted
6973GH-26-R-00018_DRAFT.pdf PDF
J.01 Statement of Work 12.01.25.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets.xlsx XLSX spreadsheet
J.02 Contract Data Requirements List (CDRL).pdf PDF
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.12 FAA-C-1391e INSTALLATION TERMINATION SPLICING AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.14 faa-std-002H.pdf PDF
J.15 FAA-STD-019G.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.32 Phase I Relevant Corporate Experience Form_10.27.25.docx DOCX document
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
J.03 Data Item Description (DID).pdf PDF
J.05 6010-5 CAI Form.pdf PDF
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.23 FST Guidelines.pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.00 Index.pdf PDF
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
J.27 FAA-STD-061.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.34 Technical Approach – Factor 1, Design Proposal Offeror must submit this form, addressing the following fields for Factor 1, Design Proposal.

AES Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role (prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

CPDS Project

A. Select the category for this project submission.
A. Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role (prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

EG Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

ELD Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

FST Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3

UPS Project

A. Select the category for this project submission.
A. Category 1☐ Category 2 ☐ Category 3 ☐
B. Project Title:
B.
C. Location:
C.
D. Date of Completion:
D.
E. Customer Name:
E.
F. Company Role(prime contractor, subcontractor, designer, etc.)
F.
F.1 Name of Prime/General Contractor:
F.1
F.2 Name of Designer/Engineering Company
F.2
F.3 Name of subcontractor(s) (If applicable)
F.3