J.04 Government Furnished Equipment (GFE).pdf
PDF 65 KB Posted
- Attached to
- Power Systems Design & Install 2
- Solicitation number
- 6973GH-26-R-00018
About this file
Attachment J.04 is a Government Furnished Equipment (GFE) list for a Power Services Group contract, detailing specific electrical power distribution equipment that may be provided to support contract requirements. The document lists five equipment categories with vendor, equipment specifications, and lead times, including Electrical Power Distribution Equipment from Schneider Electric/Square D (lead times 6-12 months), Engine Generators from Rehlko (propane and diesel generators 15 kW to 1.5 MW, 12-month lead time), Static Automatic Transfer Switches (TBD vendor, 12-month lead time), Uninterruptible Power Supply from Eaton Electric (30-825 KVA, 12-week lead time), and Direct Current Back-Up System from Oceus (24 volt DC BUS, 60-90 day lead time). A note indicates that some equipment may have longer lead times than those listed in the document.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J.04
POWER SERVICES GROUP GOVERNMENT FURNISHED EQUIPMENT (GFE)
In support of the requirements of the Statement of Work and contract, below is a sample list of equipment that may be provided as GFE:
ELECTRICAL POWER DISTRIBUTION EQUIPMENT (EDE)
Vendor:
Equipment:
Lead-time:
Schneider Electric/Square D
Switchboards, Switchgear, Panel boards, Circuit Breakers, Transformers, and Monitoring
Software and Hardware
Switchboards 9-12 months, Panel boards 6 months, Transformers 1-3 months Switchgear
9-12 months
ENGINE GENERATOR (EG)
Vendor:
Equipment:
Rehlko Propane engine generators 20 kW to 100 kW
Diesel engine generators 15 kW to 1.5 MW
Automatic Transfer Switches, Load Banks, Day Tanks/Sub-Base Tanks and Mufflers
Voltages 480, 208, 240 three phase, 240 single phase
Lead-Time: 12 months
STATIC AUTOMATIC TRANSFER SWITCH (STS)
Vendor:
Equipment:
Lead-Time:
UNINTERRUPTIBLE POWER SUPPLY (UPS)
Vendor: Eaton Electric
Equipment: 480 volt 30 KVA to 825 KVA
208 volt 10 KVA to 160 kVA
Battery strings, battery monitors, and bypass panels.
Lead-Time: small to medium UPSs and associated equipment 12-weeks
DIRECT CURRENT BACK-UP SYSTEM (DC BUS)
Vendor: Oceus
Equipment: 24 volt DC BUS, UXTM, ERMS, batteries, battery rack and strings
Lead-Time: 60-90 days
Note: Some equipment may have longer lead times than listed above.
TBD
480 volt, 200 amp to 600 amp
208 volt, 3 or 4-pole, 150 amp to 600 amp
12 months
File details come from the government source that posted it. Updated .