This is a Contract Data Requirements List (DD Form 1423-1) for a Power Systems Design & Install (PSDI) contract with the FAA's NAS Power Services Group. The document outlines five key data item submissions required from the contractor:

  1. Program Plan (M001): Due 10 calendar days after contract award, with updates as program management structure changes. 2. Program Management Report (M002): An annual report due 15 calendar days prior to program management reviews. 3. Site Survey Report (E001): To be submitted as directed in task orders. 4. Design Documents (E002): To be submitted as directed in task orders. 5. Site Preparation and Installation Documents (E003): Covering Sections 3.2.7 & 3.2.8 of the Statement of Work, to be submitted as directed in task orders. For all submissions, "Repro" means soft copy via email, while "Reg" means hard copy, with distribution to AAQ-720 and AJW-22 offices.

View the file

Other files

File Type Posted
J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.12 FAA-C-1391e INSTALLATION TERMINATION SPLICING AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.14 faa-std-002H.pdf PDF
J.15 FAA-STD-019G.pdf PDF
J.20 FAA Order 6950_27B.pdf PDF
J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx XLSX spreadsheet
J.32 Phase I Relevant Corporate Experience Form_10.27.25.docx DOCX document
J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx DOCX document
6973GH-26-R-00018_DRAFT.pdf PDF
J.01 Statement of Work 12.01.25.pdf PDF
J.04 Government Furnished Equipment (GFE).pdf PDF
J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.11 FAA-C-1217H Chg 2.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf PDF
J.33 PSDI II Technical Approach Evaluation Worksheets.xlsx XLSX spreadsheet
J.03 Data Item Description (DID).pdf PDF
J.05 6010-5 CAI Form.pdf PDF
J.06 Travel Authorization Form.xlsx XLSX spreadsheet
J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf PDF
J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.21 FAA Order JO 1050 17B.pdf PDF
J.22 FAA Order JO_6950_2F .pdf PDF
J.23 FST Guidelines.pdf PDF
J.30 LPGBS Checklist.xls XLS spreadsheet
J.31 Contractor Release DOT 4220.4 (1).pdf PDF
J.00 Index.pdf PDF
J.08 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.26 FAA-E-99001 - Photovoltaic Specification.pdf PDF
J.27 FAA-STD-061.pdf PDF
J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf PDF
J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

17. PRICE GROUP

18. ESTIMATED

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: Contract Base Award

TDP TM OTHER

D. SYSTEM/ITEMPower Systems Design & Install (PSDI) Program Management

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M001

2. TITLE OF DATA ITEM

Program Plan

3. SUBTITLE

FAA-M001

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

SOW Section 3.1.1

6. REQUIRING OFFICE

AJW-22, NAS Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

One Time

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

Contract Award

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 12 - Ten (10) calendar days after award of contract.

Block 13 - The Contractor must update and submit the program plan as revisions to the program management structure occur.

Block 14 - Repro means emailed, soft copy. Reg means hard copy.

AAQ-720 1

AJW-22 1

15. TOTAL 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

18. ESTIMATED

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: Contract Base Award

TDP TM OTHER

D. SYSTEM/ITEM

PSDI Program Management

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M002

2. TITLE OF DATA ITEM

Program Management Report

3. SUBTITLE

FAA-M002

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

SOW Section 3.1.2

6. REQUIRING OFFICE

AJW-22, NAS Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

Annually

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 11 - Not later than fifteen (15) calendar days prior to the program management review.

Block 12 - The Contractor must submit the annual program management report not later than fifteen (15) calendar days prior to the program management review.

Reports other than the annual PMR and site surveys are at no additional cost to the Government.

Block 13 - The Contractor must update and submit the annual program management report not later than fifteen (15) calendar days prior to program management reviews, unless otherwise directed by the Government.

Block 14 - Repro means emailed, soft copy. Reg means hard copy.

AAQ-720 1

AJW-22 1

18. ESTIMATED

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: Contract Base Award

TDP TM OTHER

D. SYSTEM/ITEM

PSDI Site Survey Task

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

Site Survey Report

3. SUBTITLE

FAA-E001

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

SOW Section 3.2.5

6. REQUIRING OFFICE

AJW-22, NAS Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block's 10, 11, 12, and 13 - The Contractor must submit the site survey report as directed in the task order(s).

Block 14 - Repro means soft copy, "electronic media" emailed.

Reg means hard copy.

AAQ-720 1

AJW-22 1

18. ESTIMATED

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: Contract Base Award

TDP TM OTHER

D. SYSTEM/ITEM

PSDI Design Task

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

Design Documents

3. SUBTITLE

FAA-E002

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

SOW Section 3.2.6

6. REQUIRING OFFICE

AJW-22, NAS Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block's 10, 11, 12, and 13 - The Contractor must submit the design documents as directed in the task order(s).

Block 14 - Repro means soft copy, "electronic media" emailed.

Reg means hard copy.

AAQ-720 1

AJW-22 1

18. ESTIMATED

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY: Contract Base Award

TDP TM OTHER

D. SYSTEM/ITEM

PSDI Site Preparation and Installation

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

Site Preparation and Installation Documents

3. SUBTITLE

FAA-E003

4. AUTHORITY (Data Acquisition Document No.)

N/A

5. CONTRACT REFERENCE

SOW Sections 3.2.7 & 3.2.8

6. REQUIRING OFFICE

AJW-22, NAS Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block's 10, 11, 12, and 13 - The Contractor must submit the necessary documentation, as defined in Section 3.2.7 & 3.2.8 of the SOW, as well as directed in the task order(s).

Block 14 - Repro means soft copy, "electronic media" emailed.

Reg means hard copy.

AAQ-720 1

AJW-22 1

CDRL A001 060320
CDRL A002 060320
CDRL B001 060320
CDRL B002 060320
CDRL B003 060320

File details come from the government source that posted it. Updated .