This file is an itemized cost breakdown template in Excel format for a federal construction task order. The document is associated with solicitation 36C24126R0120 for the "402-22-794 Modernize Campus Corridors" project at Togus VA Medical Center in Augusta, Maine. This is a set-aside task order opportunity restricted exclusively to contractors within the VISN 1 Construction MATOC IDIQ pool managed by the Department of Veterans Affairs Veterans Health Administration.

The project scope involves a 15,600-square-foot interior renovation of the Main Street Corridor connecting Buildings B209 and B221, including site preparation, demolition, flooring replacement, roofing work, interior finishes upgrades, and HVAC system improvements. The contractor must maintain uninterrupted medical center operations during construction and develop comprehensive phasing, life safety, security, environmental protection, and utility-interruption plans compliant with VA standards. Deliverables include strict facility protection, temporary utility coordination, secure document handling, adherence to safety and infection control protocols, and full restoration of affected areas. All work must comply with project drawings, specifications, VA safety standards, and applicable federal regulations. The itemized cost breakdown template is used to structure and present detailed pricing for labor, materials, equipment, and other cost elements associated with this construction task order.

View the file

Other files

File Type Posted
36C24126R0120 0005.pdf PDF
36C24126R0120 0004.docx DOCX document
230534 111324 Asbestos Spot Survey PDF.pdf PDF
21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf PDF
36C24126R0120 0003.docx DOCX document
Statement of Items.docx DOCX document
36C24126R0120 0002.docx DOCX document
Sign in sheet - Site Visit.pdf PDF
36C24126R0120 0001.docx DOCX document
402-23-794 - PCRA.pdf PDF
402-23-794 - Final Bid Drawings.pdf PDF
402-23-794 - Final Specifications.pdf PDF
SOW Attachment - Togus Campus Map.pdf PDF
36C24126R0120.docx DOCX document
SOW Attachment - Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment - Security Badge form.pdf PDF
Construction SOW.pdf PDF
ME20260009 WR Determination.pdf PDF
402-23-794 - ICRA.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50