This file is an itemized cost breakdown template in Excel format for a federal construction task order. The document is associated with solicitation 36C24126R0120 for the "402-22-794 Modernize Campus Corridors" project at Togus VA Medical Center in Augusta, Maine. This is a set-aside task order opportunity restricted exclusively to contractors within the VISN 1 Construction MATOC IDIQ pool managed by the Department of Veterans Affairs Veterans Health Administration.
The project scope involves a 15,600-square-foot interior renovation of the Main Street Corridor connecting Buildings B209 and B221, including site preparation, demolition, flooring replacement, roofing work, interior finishes upgrades, and HVAC system improvements. The contractor must maintain uninterrupted medical center operations during construction and develop comprehensive phasing, life safety, security, environmental protection, and utility-interruption plans compliant with VA standards. Deliverables include strict facility protection, temporary utility coordination, secure document handling, adherence to safety and infection control protocols, and full restoration of affected areas. All work must comply with project drawings, specifications, VA safety standards, and applicable federal regulations. The itemized cost breakdown template is used to structure and present detailed pricing for labor, materials, equipment, and other cost elements associated with this construction task order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126R0120 0005.pdf | ||
| 36C24126R0120 0004.docx | DOCX document | |
| 230534 111324 Asbestos Spot Survey PDF.pdf | ||
| 21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf | ||
| 36C24126R0120 0003.docx | DOCX document | |
| Statement of Items.docx | DOCX document | |
| 36C24126R0120 0002.docx | DOCX document | |
| Sign in sheet - Site Visit.pdf | ||
| 36C24126R0120 0001.docx | DOCX document | |
| 402-23-794 - PCRA.pdf | ||
| 402-23-794 - Final Bid Drawings.pdf | ||
| 402-23-794 - Final Specifications.pdf | ||
| SOW Attachment - Togus Campus Map.pdf | ||
| 36C24126R0120.docx | DOCX document | |
| SOW Attachment - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment - Security Badge form.pdf | ||
| Construction SOW.pdf | ||
| ME20260009 WR Determination.pdf | ||
| 402-23-794 - ICRA.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | ||
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Labor Detail
| Sample Example | ||||
| Division | Labor Category | Labor Rate | Hours | Total |
| 1 | Plumber | $35.00 | 123 | $4,305.00 |
| 1 | Laborer | 14.75 | 70 | $1,032.50 |
| $5,337.50 |
Materials and Equipment Details
| Sample Example | ||||
| Division | Item | Rate | Units | Total |
| 1 | Pipe - 150' | $1.50 | 150 | $225.00 |
| 1 | 90 Degree Coupling | $1.10 | 5 | $5.50 |
| 1 | Pump Rental - Hour | $200.00 | 6 | $1,200.00 |
| $1,430.50 |