402-23-794 - Final Bid Drawings.pdf
PDF 42 MB Posted
- Attached to
- 402-23-794 Modernize Campus Corridors
- Solicitation number
- 36C24126R0120
About this file
This file is a final bid drawings document for the 402-23-794 Modernize Campus Corridors project at Togus VA Medical Center in Augusta, Maine. The drawings provide detailed architectural and engineering plans for a 15,600-square-foot interior renovation of the Main Street Corridor connecting Buildings B209 and B221. The drawings specify construction requirements including flooring replacement, roofing upgrades, interior finish modifications, and HVAC system improvements within occupied medical center buildings that must remain operational throughout the project.
The task order is set aside exclusively for the VISN 1 Construction MATOC IDIQ Pool and will be awarded by the Department of Veterans Affairs Veterans Health Administration through Veterans Integrated Service Network 1 (VISN 1). The bid drawings establish the technical specifications and phasing requirements that contractors must follow to complete the modernization work while adhering to VA safety standards, infection control protocols, life safety requirements, security measures, and environmental protection mandates. Contractors are responsible for developing VA-compliant plans for phasing, temporary utility coordination, secure document handling, and full restoration of affected areas upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126R0120 0005.pdf | ||
| 36C24126R0120 0004.docx | DOCX document | |
| 21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf | ||
| 36C24126R0120 0003.docx | DOCX document | |
| 230534 111324 Asbestos Spot Survey PDF.pdf | ||
| Statement of Items.docx | DOCX document | |
| 36C24126R0120 0002.docx | DOCX document | |
| Sign in sheet - Site Visit.pdf | ||
| 36C24126R0120 0001.docx | DOCX document | |
| 402-23-794 - Final Specifications.pdf | ||
| SOW Attachment - Togus Campus Map.pdf | ||
| 36C24126R0120.docx | DOCX document | |
| SOW Attachment - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment - Security Badge form.pdf | ||
| Construction SOW.pdf | ||
| ME20260009 WR Determination.pdf | ||
| 402-23-794 - ICRA.pdf | ||
| Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| 402-23-794 - PCRA.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
TR
U E N
O R
TH
PROJECT NORTH
VA FORM 08-6231
7 8654321
B
A
C
D
E o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
ENGINEER OF RECORDCONSULTANT
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, FIRE ALARM, TELECOM, STRUCTURAL
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
STAMP VA Project No.
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
GI000
COVER SHEET
CNB JKH04/10/2025
TOGUS VAMC
MODERNIZE CAMPUS
CORRIDORS
FINAL BID DOCUMENTS
MODERNIZE CAMPUS CORRIDORS
VAMC - Togus 1 VA Center, Augusta, ME 04330 PROJECT #: 402-23-794
0123052
402-23-794
WBRC
ARCHITECT
701 FOREST AVENUE
PORTLAND, ME 04103
207.828.4511 P
FORCE PROTECT
PHSYCIAL SECURITY
1901 FRONT BEACH ROAD, SUITE 1415
PANAMA CITY BEACH, FL 32407
321.345.9026 P
RPF ENVIRONMENTAL
ENVIRONMENTAL ANALYSIS
254 COMMERCIAL STREET
MERRIL'S WHARF, 2ND FLOOR
PORTLAND, ME 04101
603.942.9164 P
OCMI
COST ESTIMATING
2015 AYRSLEY TOWN BLVD., SUITE 202
CHARLOTTE, NC 28273
419.324.2222 P
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
ARCHITECTURAL
GI001 CODE REVIEW FLOOR PLAN
GI002 FIRST FLOOR PHASING PLAN
GI002.1 FIRST FLOOR PHASING PLAN - SEG 1
GI002.2 FIRST FLOOR PHASING PLAN - SEG 2A & 2B
GI002.3 FIRST FLOOR PHASING PLAN - SEG 3
GI002.4 FIRST FLOOR PHASING PLAN - SEG 4
GI002.5 FIRST FLOOR PHASING PLAN - SEG 5A, 5B & 5C
GI002.6 FIRST FLOOR PHASING PLAN - SEG 6A, 6B & 6C
GI002.7 FIRST FLOOR PHASING PLAN - SEG 7
GI002.8 FIRST FLOOR PHASING PLAN - SEG 8A & 8B
GI002.9 FIRST FLOOR PHASING PLAN - SEG 9 & 10
GI002.10 FIRST FLOOR PHASING PLAN - SEG 11A & 11B
A000 SYMBOLS AND ABBREVIATIONS
A100 ARCHITECHURAL SITE PLAN
AD101 FIRST FLOOR REMOVALS PLAN
AD101.1 FIRST FLOOR REMOVALS PLAN - SEG 1
AD101.2 FIRST FLOOR REMOVALS PLAN - SEG 2A & 2B
AD101.3 FIRST FLOOR REMOVALS PLAN - SEG 3
AD101.4 FIRST FLOOR REMOVALS PLAN - SEG 4
AD101.5 FIRST FLOOR REMOVALS PLAN - SEG 5A, 5B & 5C
AD101.6 FIRST FLOOR REMOVALS PLAN - SEG 6A, 6B & 6C
AD101.7 FIRST FLOOR REMOVALS PLAN - SEG 7
AD101.8 FIRST FLOOR REMOVALS PLAN - SEG 8A & 8B
AD101.9 FIRST FLOOR REMOVALS PLAN - SEG 9 & 10
AD101.10 FIRST FLOOR REMOVALS PLAN - SEG 11A & 11B
AD102 ROOF REMOVALS PLAN
AD102.1 ROOF REMOVALS PLAN - SEG 1
AD102.2 ROOF REMOVALS PLAN - SEG 2A & 2B
AD102.5 ROOF REMOVALS PLAN - SEG 5A, 5B & 5C
AD102.6 ROOF REMOVALS PLAN - SEG 6A, 6B & 6C
AD102.8 ROOF REMOVALS PLAN - SEG 8A & 8B
AD102.10 ROOF REMOVALS PLAN - 11A & 11B
AE101 FIRST FLOOR PLAN
AE101.1 FIRST FLOOR PLAN - SEG 1
AE101.2 FIRST FLOOR PLAN - SEG 2A & 2B
AE101.3 FIRST FLOOR PLAN - SEG 3
AE101.4 FIRST FLOOR PLAN - SEG 4
AE101.5 FIRST FLOOR PLAN - SEG 5A, 5B & 5C
AE101.6 FIRST FLOOR PLAN - SEG 6A, 6B & 6C
AE101.7 FIRST FLOOR PLAN - SEG 7
AE101.8 FIRST FLOOR PLAN - SEG 8
AE101.9 FIRST FLOOR PLAN - SEG 9 & 10
AE101.10 FIRST FLOOR PLAN - SEG 11A & 11B
AE102 ROOF PLAN
AE102.1 ROOF PLAN - SEG 1
AE102.2 ROOF PLAN - SEG 2A & 2B
AE102.5 ROOF PLAN - SEG 5A, 5B & 5C
AE102.6 ROOF PLAN - SEG 6A, 6B & 6C
AE102.8 ROOF PLAN - SEG 8A & 8B
AE102.10 ROOF PLAN - SEG 11A & 11B
AE110 FIRST FLOOR REFLECTED CEILING PLAN
AE110.1 FIRST FLOOR RCP - SEG 1
AE110.2 FIRST FLOOR RCP - SEG 2A & 2B
AE110.3 FIRST FLOOR RCP - SEG 3
AE110.4 FIRST FLOOR RCP - SEG 4
AE110.5 FIRST FLOOR RCP - SEG 5A, 5B & 5C
AE110.6 FIRST FLOOR RCP - SEG 6A, 6B & 6C
AE110.7 FIRST FLOOR RCP - SEG 7
AE110.8 FIRST FLOOR RCP - SEG 8A & 8B
AE110.9 FIRST FLOOR RCP - SEG 9 & 10
AE110.10 FIRST FLOOR RCP - SEG 11A & 11B
SHEET LIST
SHEET NUMBER SHEET NAME
AE202 TYPICAL INTERIOR ELEVATIONS
AE501 INTERIOR DETAILS
AE502 ROOF DETAILS
AE503 ROOF DETAILS
AF701 FIRST FLOOR FINISH PLAN
AF701.1 FINISH PLAN - SEG 1
AF701.2 FINISH PLAN - SEG 2A & 2B
AF701.3 FINISH PLAN - SEG 3
AF701.4 FINISH PLAN - SEG 4
AF701.5 FINISH PLAN - SEG 5A, 5B & 5C
AF701.6 FINISH PLAN - SEG 6A, 6B & 6C
AF701.7 FINISH PLAN - SEG 7
AF701.8 FINISH PLAN - SEG 8A & 8B
AF701.9 FINISH PLAN - SEG 9 & 10
AF701.10 FINISH PLAN - SEG 11A & 11B
AF702 ROOM FINISH SCHEDULE & FINISH TABLE
FIRE PROTECTION
FP001 FIRE PROTECTION LEGENDS & SYMBOLS
FP002 FIRE PROTECTION NOTES
FP100 FIRST FLOOR OVERALL PLAN - FIRE PROTECTION - DEMOLITION
FX101.1 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 1 - DEMOLITION
FX101.2 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 2B - DEMOLITION
FX101.3 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 3 - DEMOLITION
FX101.4 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 4 - DEMOLITION
FX101.5 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 6C - DEMOLITION
FX101.6 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 7 - DEMOLITION
FX101.7 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 11A -
DEMOLITION
FP101 FIRST FLOOR OVERALL PLAN - FIRE PROTECTION - NEW WORK
FP101.1 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 1 - NEW WORK
FP101.2 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 2B - NEW WORK
FP101.3 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 3 - NEW WORK
FP101.4 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 4 - NEW WORK
FP101.5 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 6C - NEW WORK
FP101.6 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 7 - NEW WORK
FP101.7 FIRST FLOOR PLAN - FIRE PROTECTION - SEGMENT 11A - NEW WORK
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MD101 FIRST FLOOR OVERALL PLAN - MECHANICAL - DEMOLITION
MD101.1 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 1 - DEMOLITION
MD101.2 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 2A & 2B - DEMOLITION
MD101.3 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 3 - DEMOLITION
MD101.4 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 4 - DEMOLITION
MD101.5 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 5A, 5B & 5C -
DEMOLITION
MD101.6 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 6A, 6B & 6C -
DEMOLITION
MD101.7 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 7 - DEMOLITION
MD101.8 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 8A & 8B - DEMOLITION
MD101.9 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 9 & 10 - DEMOLITION
MD101.10 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 11A & 11B -
DEMOLITION
MH101 FIRST FLOOR OVERALL PLAN - MECHANICAL - NEW WORK
MH101.1 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 1 - NEW WORK
MH101.2 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 2A & 2B - NEW WORK
MH101.3 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 3 - NEW WORK
MH101.4 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 4 - NEW WORK
MH101.5 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 5A, 5B & 5C - NEW
WORK
MH101.6 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 6A, 6B & 6C - NEW
WORK
MH101.7 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 7 - NEW WORK
MH101.8 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 8A & 8B - NEW WORK
MH101.9 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 9 & 10 - NEW WORK
MH101.10 FIRST FLOOR PLAN - MECHANICAL - SEGMENT 11A & 11B - NEW
WORK
M-501 MECHANICAL DETAILS
M-801 MECHANICAL SCHEDULES
SHEET LIST
SHEET NUMBER SHEET NAME
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
ED101 FIRST FLOOR OVERALL PLAN - LIGHTING - DEMOLITION
ED101.1 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 1
ED101.2 FIRST FLOOR PLAN -LIGHTING -DEMOLITION - SEGMENT 2A & 2B
ED101.3 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 3
ED101.4 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 4
ED101.5 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 5A, 5B & 6C
ED101.6 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 6A, 6B & 6C
ED101.7 FIRST FLOOR PLAN -LIGHTING - DEMOLITION - SEGMENT 7
ED101.8 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 8A & 8B
ED101.9 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 9 & 10
ED101.10 FIRST FLOOR PLAN - LIGHTING - DEMOLITION - SEGMENT 11A & 11B
EL101 FIRST FLOOR OVERALL PLAN - LIGHTING - NEW WORK
EL101.1 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 1
EL101.2 FIRST FLOOR PLAN - LIGHTING - NEW WORK -SEGMENT 2A & 2B
EL101.3 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 3
EL101.4 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 4
EL101.5 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 5A, 5B & 5C
EL101.6 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 6A, 6B & 6C
EL101.7 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 7
EL101.8 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 8A & 8B
EL101.9 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 9 & 10
EL101.10 FIRST FLOOR PLAN - LIGHTING - NEW WORK - SEGMENT 11A & 11B
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
PROJECT LOCATION
© Google Maps
REV. DESCRIPTION DATE
B221
B207 B206
B208
B204
B248
B240
B203
E235BE235A
B235
B210
B255
B209
B205
B232
B200
B200E
EXIT
EXISTING FIRE EXTINGUISHER CABINET
SMOKE PARTITION (NON-RATED)
SCOPE OF WORK LINE
FEC
FIRE BARRIER (1 HR)
LEGEND:
FIRE BARRIER (2 HR)
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
PROVIDED.
1. EXISTING BUILDING CONDITIONS AND WALL RATINGS
BASED ON VA PROVIDED STATEMENT OF CONDITIONS &
LIFE SAFETY ASSESSMENT DRAWINGS DATED
03-16-2023. EXISTING LIFE SAFETY INFORMATION WAS
NOT PROVIDED FOR ALL AREAS. DESIGN INTENT IS TO
KEEP ALL EXISTING RATED WALLS AND PENETRATIONS
IN PLACE.
2. EXISTING FIRE EXTINGUISHERS SHALL NOT BE
REMOVED NOR RELOCATED FROM THEIR EXISTING
LOCATIONS DURING CONSTRUCTION.
3. TEMPORARY FIRE EXTINGUISHERS SHALL BE
PROVIDED AND MADE AVAILABLE FOR GENERAL
ACCESS WHEN PHASING OVERLAPS WITH EXISTING
FIRE EXTINGUISHER LOCATIONS.
4. TEMPORARY LIFE SAFETY PLANS, COORDINATED
WITH PROVIDED PHASING PLANS, TO BE SUBMITTED TO
AND APPROVED BY THE VA PRIOR TO STARTING ANY
WORK.
SEE ENLARGED SEGMENT PLANS FOR IMPROVED
LEGIBILITY OF WALL FIRE RATINGS
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
PUBLIC SIDE
5' - 0" MIN. CLEAR
GENERAL TEMPORARY PARTION NOTES:
1. TEMPORARY WALL SHALL RESIST PASSAGE OF SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER VA REQUEST. GC TO LOCATE ALL TEMPORARY PARTITIONS AND DOORS AS REQUIRED TO PROTECT THE AREA
UNDER CONSTRUCTION. FINAL BARRIER LOCATIONS TO BE COORDINATED WITH THE VA.
2. IN-LIEU OF GYPSUM AND METAL STUD TEMPORARY PARTITIONS, THE CONTRACOTR MAY OPT TO PROVIDE A FIRE-RATED PRE-MANUFACTURED CONTAINMENT WALL & CEILING SOLUTION (STARC SYSTEMS OR EQUAL).
3. IN LOCATIONS WHERE TEMPORARY PARTITIONS FALL ENTIRELY UNDER AN EXISTING GYPSUM CEILING, THE TEMPORARY PARTITIONS MAY BE SEALED TO THE EXISTING CEILING RATHER THAN ADDING A NEW GYPSUM
CEILING AS NOTED BELOW, WITH VA APPROVAL.
VA
R
IE
S
EXISTING STRUCTURAL DECK ABOVE
WHERE EXISTING CONDITIONS ABOVE
CEILING WILL NOT ALLOW FOR PARTITION
TO BE EXTENDED TO DECK, PROVIDE NEW
TYPE X GWB CEILING TO COVER EXISTING
APC CEILING FOR FULL EXTENT OF
TEMPORARY PARTITION ENCLOSURE, AS
APPROVED BY VA
CONSTRUCTION
SIDE
EXISTING APC CEILING
SEAL ALL JOINTS, TYP.
EXISTING PARTITION, TYP.
INSTALL NEW TEMPORARY PARTITION
CONTINOUS TO THE UNDERSIDE OF
STRUCTURAL DECK ABOVE
- 5/8" TYPE X GWB ON BOTH SIDES OF
PARTITION SECURED TO CFMF STUDS.
- GWB TO BE PAINTED ON CORRIDOR SIDE
FLOOR SLAB BELOW
TEMP PARTITION TO BE
1-HR RATED (UL U419)
TEMPORARY PARTITION TO DECK WHERE
FEASIBLE
SEAL ALL JOINTS, TYP.
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI001
CODE REVIEW FLOOR PLAN
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
1" = 60'-0"
E1 CODE REVIEW REFERENCE PLAN
1/2" = 1'-0"
C1 TEMPORARY PARTITION DETAIL
SEG 1 SEG 2A SEG 2B SEG 3 SEG 4
SEG 5A
SEG 5B
SEG 5C
SEG 6A
SEG 6B
SEG 6C
SEG 7
SEG 8A
SEG 8B
SEG 9 SEG 10 SEG 11A SEG 11B
B221
B207
B232
B206 B208
B204
B205
B248
B240
B203
E235A E235B
B210
B255
B209
B235
B200
B200E
GI002.1
E1
GI002.2
C1
GI002.2
E1
GI002.3
E1
GI002.4
E1
GI002.5
E1
GI002.5
E3
GI002.5
E5
GI002.6
E1
GI002.6
E3
GI002.6
E5
GI002.7
E1
GI002.8
E1
GI002.8
E4
GI002.9
C1
GI002.9
E2
GI002.10
C1
GI002.10
E1
PHASING NOTES:
PHASE 2
2A - SOUTH WING RENOVATION
2B - COMMON AREA RENOVATION
PHASE 1 - NORTH WING RENOVATION
PHASING LEGEND:
1. REVIEW ALL DISCIPLINE DRAWINGS FOR FULL EXTENT
OF REMOVAL AND NEW CONSTRUCTION WORK
2. ALL TEMPORARY CONSTRUCTION PARTITIONS TO HAVE
1 HR. WALLS AND 45 MIN. DOORS
3. CONSTRUCTION PHASES DESCRIBED ABOVE ARE
GENERAL IN NATURE AND ARE MEANT TO GUIDE THE
GENERAL CONTRACTOR AS TO WHICH AREAS OF THE
BUILDING SHOULD BE WORKED IN TO MINIMIZE
DISRUPTION OF THE BUILDING'S OCCUPANTS TO THE
GREATEST EXTENT. AS APPROVED BY THE VA, THE
CONTRACTOR MAY PROPOSE CHANGES TO THE
SEQUENCE OF THE PHASES.
4. EACH OF THE NOTED PHASES MAY BE REQUIRED TO BE
FUTHER DIVIDED INTO SUB-PHASES BY THE CONTRACTOR
IN ORDER TO MEET EGRESSING REQUIREMETNS.
5. EGRESS CAPACITIES SHALL NOT BE REDUCED AND A
MINIMUM OF 2 EGRESS PATHWAYS MUST REMAIN
AVAILABLE FROM EACH BUILDING / AREA THROUGHOUT
THE COMPLETION OF EACH PHASE OF THIS WORK.
6. PROVIDE NON-RATED DUST PROTECTION OVER DOORS
LOCATED WITHIN THE CONSTRUCTION BOUNDARY,
TYPICAL. ALL AREAS TO BE CLEANED PRIOR TO BEING
TURNED BACK OVER TO THE VA.
7. ANY WORK CREATING NOISE THAT IS DISRUPTIVE TO VA
MEDICAL CENTER OPERATIONS, SHALL BE COORDINATED
WITH VA.
8. FINAL CONTRACTOR PROVIDED PHASING PLANS TO BE
SUBMITTED TO AND APPROVED BY THE VA PRIOR TO
STARTING ANY WORK. CONTRACTOR PROVIDED
9. TEMPORARY LIFE SAFETY PLANS, COORDINATED WITH
PROVIDED PHASING PLANS, TO BE SUBMITTED TO AND
APPROVED BY THE VA PRIOR TO STARTING ANY WORK.
10. GC RESPONSIBLE FOR REPLACEMENT OF CEILING
TILES AT THE END OF EACH SHIFT FOR WORK AREAS
OUTSIDE OF RATED CONSTRUCTION BARRIERS.
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
PROVIDED.
PHASE 4 - SOUTH WING RENOVATION
PHASE 3 - NORTH WING RENOVATION
PHASE 5
5A - COMMON AREA RENOVATION
5B - NORTH WING RENOVATION
5C - SOUTH WING RENOVATION
PHASE 6
6A - COMMON AREA RENOVATION
6B - NORTH WING RENOVATION
6C - SOUTH WING RENOVATION
PHASE 7- COMMON AREA RENOVATION
PHASE 8
8A - COMMON AREA RENOVATION
8B - NORTH WING RENOVATION
PHASE 9 - SOUTH WING RENOVATION
PHASE 10 - COMMON AREA RENOVATION
PHASE 11
11A - NORTH WING RENOVATION
11B - SOUTH WING RENOVATION
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002
FIRST FLOOR PHASING PLAN
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
1" = 60'-0"
E1 FIRST FLOOR PHASING REFERENCE PLAN
UP
B207
SE
G
M
EN
T
SE
G
M
EN
T 2A
B221
161 SF
CORR
B207-164
191 SF
CORR
B207-163
190 SF
STAIR
B207-173454 SF
CORR
207221
EFE
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.1
FIRST FLOOR PHASING PLAN - SEG 1
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 1
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
PROVIDED.
SE
G
M
EN
T
SE
G
M
EN
T 2A
SE
G
M
EN
T 2A
SE
G
M
EN
T 2B
1189 SF
CORR
206207
SE
G
M
EN
T 2A
SE
G
M
EN
T 2B
SE
G
M
EN
T 2B
SE
G
M
EN
T
1189 SF
CORR
206207
EFE
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.2
FIRST FLOOR PHASING PLAN - SEG 2A &
2B
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
C1 FIRST FLOOR PHASING PLAN - SEG 2A
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 2B
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
B206
SE
G
M
EN
T 2B
SE
G
M
EN
T
SE
G
M
EN
T
SE
G
M
EN
T
381 SF
CORR
B206-187
56 SF
CORR
B206-184
317 SF
STAIR
B206-185
242 SF
CORR
204206
EFE
EFE
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.3
FIRST FLOOR PHASING PLAN - SEG 3
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 3
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
B204
SE
G
M
EN
T
SE
G
M
EN
T
SEGMENT 5A
SEGMENT 4
980 SF
CORR
B204-163
380 SF
CORR
B204-161
608 SF
CORR
B204-160
EFE
EFE
EFE
EAED
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.4
FIRST FLOOR PHASING PLAN - SEG 4
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 4
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
B248
SEGMENT 5A
SEGMENT 4
SEGMENT 5B
SEGMENT 5A
2086 SF
CORR
204248
EFEC
B248
SEGMENT 5B
SEGMENT 5A
SEGMENT 5C
SEGMENT 5B
2086 SF
CORR
204248
EFEC
EFEC
B240
SEGMENT 5C
SEGMENT 5B
SEGMENT 6A
SEGMENT 5C
294 SF
CORR
240203
2086 SF
CORR
204248
EAED
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.5
FIRST FLOOR PHASING PLAN - SEG 5A,
5B & 5C
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 5A
3/16" = 1'-0"
E3 FIRST FLOOR PHASING PLAN - SEG 5B
3/16" = 1'-0"
E5 FIRST FLOOR PHASING PLAN - SEG 5C
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
E235A
B235
SEGMENT 6A
SEGMENT 5C
SEGMENT 6B
SEGMENT 6A
1780 SF
CORR
203210
B235
SEGMENT 6B
SEGMENT 6A
SEGMENT 6B
SEGMENT 6C
1780 SF
CORR
203210
SEGMENT 6BSEGMENT 6C
SEGMENT 6C
SEGMENT 7
1780 SF
CORR
203210
1015 SF
CORR
210255
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.6
FIRST FLOOR PHASING PLAN - SEG 6A,
6B & 6C
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 6A
3/16" = 1'-0"
E3 FIRST FLOOR PHASING PLAN - SEG 6B
3/16" = 1'-0"
E5 FIRST FLOOR PHASING PLAN - SEG 6C
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
B210
SEGMENT 6C
SEGMENT 7
SEGMENT 7
SEGMENT 8A
1015 SF
CORR
210255
229 SF
STAIR
B210-187
EFE
EFEC
EAED
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.7
FIRST FLOOR PHASING PLAN - SEG 7
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 7
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
B255
SEGMENT 7
SEGMENT 8A
SEGMENT 8A
SEGMENT 8B
1513 SF
CORR
255200
SEGMENT 8A
SEGMENT 8B
SEGMENT 8B
SEGMENT 9
1513 SF
CORR
255200
179 SF
CORR
200210
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.8
FIRST FLOOR PHASING PLAN - SEG 8A &
8B
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 8A
3/16" = 1'-0"
E4 FIRST FLOOR PHASING PLAN - SEG 8B
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
G
M
EN
T 8B
SE
G
M
EN
T
SE
G
M
EN
T
SE
G
M
EN
T
816 SF
CORR
B200-74
179 SF
CORR
200210
EFE
SE
G
M
EN
T
SE
G
M
EN
T
10 SE
G M
EN
T
SE
G
M
EN
T
A
150 SF
CORR
B200-72
478 SF
CORR
B200-73
EFE
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.9
FIRST FLOOR PHASING PLAN - SEG 9 &
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
C1 FIRST FLOOR PHASING PLAN - SEG 9
3/16" = 1'-0"
E2 FIRST FLOOR PHASING PLAN - SEG 10
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
SE
G
M
EN
T
SE
G
M
EN
T
A SE
G
M
EN
T
A
SE
G
M
EN
T
B
727 SF
CORR
B200-75
1008 SF
CORR
200209
EFE
EFE EAED
B209
SE
G
M
EN
T
A
SE
G
M
EN
T
B
1008 SF
CORR
200209
EFE EAED
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
NEW WALL
TEMPORARY WALL
TEMPORARY WALL SHALL RESIST PASSAGE OF
SMOKE PER NFPA 241 AND BE 1HR PARTITIONS PER
VA REQUEST. GC TO LOCATE ALL TEMPORARY
PARTITIONS AND DOORS AS REQUIRED
TO PROTECT THE AREA UNDER CONSTRUCTION.
NOT IN SCOPE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
GI002.10
FIRST FLOOR PHASING PLAN - SEG 11A
& 11B
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
C1 FIRST FLOOR PHASING PLAN - SEG 11A
3/16" = 1'-0"
E1 FIRST FLOOR PHASING PLAN - SEG 11B
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
THIS SHEET IS INTENDED TO BE VIEWED/PRINTED IN
COLOR TO FULLY UNDERSTAND THE INFORMATION
NOTE: REFER TO STRUCTURAL, MECHANICAL,
AND/OR ELECTRICAL DRAWINGS FOR
ABBREVIATIONS SPECIFIC TO EACH DISCIPLINE.
AB ANCHOR BOLT, AUGER BORING
ABI ALTERNATE BID ITEM
AC ACOUSTIC AIR CONDITIONING, ASPHALTIC CONCRETE
AD ACCESS DOOR
ADD ALT ADDITIVE ALTERNATE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AUTO AUTOMATIC
AWP ACOUSTIC WALL PANEL
BDRM BEDROOM
BIT. CONC BITUMINOUS CONCRETE
BJ BAR JOIST
BLDG BUILDING
BLK BLOCK
BM BEAM, BENCHMARK
BOT BOTTOM
BRD BOARD
BRG BEARING
BS BOTTOM OF STEP
BSMT BASEMENT
BTWN BETWEEN
BW BOTTOM OF WALL
CAB CABINET
CAP CAPACITY
CC CENTER TO CENTER
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIR CIRCULATING
CJ CONSTRUCTION JOINT, CONTROL JOINT
CLG CEILING
CLO CLOSET
CLR CLEAR
CENTERLINE
CMU CONCRETE MASONRY UNITS
CMU G1 GLAZED CMU, ONE SIDE
CMU G2 GLAZED CMU, TWO SIDES
CO CLEANOUT
COL COLUMN
COMP'T COMPARTMENT
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CS/CI CONTRACTOR SUPPLIED/ CONTRACTOR INSTALLED
CS/OI CONTRACTOR SUPPLIED/OWNER INSTALLED
CSK COUNTER SUNK
CT CERAMIC TILE
CTE CONNECT TO EXISTING
CTR CENTER
CUH CABINET UNIT HEATER
Ø DIAMETER
DF DRINKING FOUNTAIN
DFD DOOR FRAME DIMENSION
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DN DOWN
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EAED EMERGENCY AUTOMATED EXTERNAL DEFIBRILLATOR
EFE EMERGENCY FIRE EXTINGUISHER
EFEC EMERGENCY FIRE EXTINGUISHER CABINET
EL, ELEV ELEVATION
ELEC ELECTRIC
EMERG EMERGENCY
EPS EXTRUDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ETC ETCETERA
EW EACH WAY
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
FBO FURNISHED BY OTHERS
FCO FLOOR CLEAN-OUT
FD FLOOR DRAIN, FOOTING DRAIN
FF FINISH FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISH GRADE, FIBERGLASS
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FO FUEL OIL
FOF FACE OF FOUNDATION
FOR FUEL OIL RETURN
FOS FACE OF STUD, FUEL OIL SUPPLY
FOUND FOUNDATION
FP FIREPROOF
FR FRAME, FIRE RETARDANT
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FT FOOT, FEET, FINNED TUBE
FTG FOOTING
FWP FABRIC WALL PANEL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GF/GI GOVT. FURNISHED/GOVT. INSTALLED
GF/CI GOVT. FURNISHED/CONTRACTOR INSTALLED
GI GALVANIZED IRON
GOV'T GOVERNMENT
GPM GALLONS PER MINUTE
GR GRADE
GRAN GRANULAR
GRD GROUND
GWB GYPSUM WALLBOARD
GYP GYPSUM
HGT HEIGHT
H&V HEATING AND VENTILATING
HB HOSE BIB
HC HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HDC HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
IN INSIDE DIAMETER
INCL INCLUSIVE
INFO INFORMATION
INSUL INSULATION, INSULATED
INT INTERIOR
IWP IMPACT RESISTANT WALL PROTECTION
JAN JANITOR CLOSET
JCT JUNCTION
KV KILOVOLT
KW KILOWATT
LAB LABORATORY
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET
LFC LINOLEUM FLOOR COVERING
LGR LEDGER
LP LOW POINT
LR LIVING ROOM
LT LIGHT
LWC LIGHT WEIGHT CONCRETE
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MC MEDICINE CABINET
MCB METAL CORNER BEAD
MECH MECHANICAL
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS METAL STRIP
MTD MOUNTED
MTL METAL
N NORTH
N.I.C. NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVER ALL
OB GL OBSCURE GLASS
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OS/CI OWNER SUPPLIED/CONTRACTOR INSTALLED
OS/OI OWNER SUPPLIED/OWNER INSTALLED
OVHD, OH OVERHEAD
P-1 PLUMBING FIXTURE TYPE
PART PARTITION
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAST PLASTIC
PLYWD PLYWOOD
PNL PANEL
PNTD PAINTED
POL POLISHED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POINT, PRESSURE TREATED
PT DISP PAPER TOWEL DISPENSER
PVC POLY VINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RADIUS, RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN, ROAD
RECEP RECEPTACLE
REF REFRIGERATOR
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISION
RF RESINOUS FLOOR
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
RS RESILIENT STAIR ACCESSORY
RT RUBBER TILE
S SOUTH
SC SUBCONTRACTORS
S DISP SOAP DISPENSER
S&V STAIN AND VARNISH
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD DOOR
SCH, SCHED SCHEDULE
SCR SUPPLY CEILING REGISTER
SECT SECTION
SF SQUARE FEET
SH SINGLE HUNG
SHT SHEET
SIM SIMILAR
SL SLOPE
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
SS SERVICE SINK, SANITARY SEWER, STAINLESS STEEL
SSURFACE SOLID SURFACE
ST STREET
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUP SUPPORT
SUSP SUSPEND
SV SHEET VINYL
SYM SYMMETRICAL
T TOP, TANGENT, THERMOMETER
TB TACK BOARD
TBA TOILET BATH ACCESSORIES
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T.O.C. TOP OF CONCRETE
T.O.M. TOP OF MASONRY
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
THK THICK
THRU THROUGH
TLT TOILET
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TRAN TRANSOM
TS TOP OF STEP, TOP OF SILL
TV TELEVISION
TYP TYPICAL
TYPE "X" UL APPROVED GWB
U&D UP AND DOWN
UC UNDERCUT
UNO UNLESS NOTED OTHERWISE
UV UNIT VENTILATOR
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WEST
WAIN WAINSCOT
WB RESILIENT WALL BASE
WC WALL COVERING
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION, WOOD
WGL WIRE GLASS
WP WATERPROOF, WEATHERPROOF
WS WEATHERSTRIPPING
WT WEIGHT
WW WELDED WIRE FABRIC
ROWS IDENTIFIED BY
LETTERS INCREASING
TOWARD THE BOTTOM OF
SHEET
DRAWING
REFERENCED
FROM ANOTHER
SHEET
DRAWING TITLE
DRAWING COORDINATE
INDICATOR
SCALE OF DRAWING
COLUMNS IDENTIFIED BY
NUMBERS INCREASING TOWARD
THE RIGHT SIDE OF SHEET.
E
D
C
1 2 3 4
E1
SCALE: 1/8" = 1'-0"
4' 8'0 16'
B3
D
C
B
A
SHEET NUMBER DETAIL
IS DRAWN ON
ROOM NAME
ROOM NUMBER
BREAK LINE
GRAPHIC SCALE
REVISION NUMBER
REVISION CLOUD
ELEVATION MARKER - SECTION
ELEVATION MARKER - PLAN
DOOR
NUMBER
REFERENCE
WINDOW TYPE REFERENCE
WALL TYPE REFERENCE
COLUMN GRID REFERENCE
SHEET NUMBER ELEVATION
IS DRAWN ON
INTERIOR ELEVATION
REFERENCE
BUILDING / WALL
SECTION
NUMBER
SHEET NUMBER BUILDING /
WALL SECTION IS DRAWN
ON
BUILDING ELEVATION
NUMBER
SHEET NUMBER
ELEVATION IS DRAWN ON
MATCH LINE
2 HOUR RATED FIRE BARRIER
1 HOUR RATED FIRE BARRIER
DETAIL NUMBER
SYMBOLS
LINETYPES
SMOKE PARTITION (NON-RATED)
STEEL & OTHER METAL PATTERN
CONCRETE BLOCK PATTERN
STONE CUT PATTERN
TERRA COTTA
CARPET AND PAD PATTERN
TILE, ACOUSTICAL
CEILING PATTERN
WOOD FLOORING PATTERN
BRICK PATTERN, GLAZED
SAND CLAY GRAVEL PATTERN
BRICK PATTERN
EROSION AND
SEDIMENTATION
CONTROL,
FILTRATION BED PATTERN
EARTHWORK GRAVEL
PATTERN, POROUS
FILL
EARTHWORK ROCK PATTERN
EARTHWORK PATTERN,
COMPACTED FILL
PATTERN
RIPRAP PATTERN
SAND PATTERN
GLASS ELEVATION PATTERN
GYPSUM BOARD FINISH PATTERN
SEALANT AND BACKER ROD
INSULATION,
RIGID
BOARD PATTERN
INSULATION,
LOOSE
FILL PATTERN
WOOD FINISH PATTERN
PARTICLE BOARD PATTERN
ORIENTED STRAND BOARD PATTERN
WOOD, GLUED-LAMINATED PATTERN
WOOD FRAMING,
CONTINUOUS
PATTERN
WOOD BLOCKING OR SHIM PATTERN
HATCH PATTERNS
EARTH, UNDISTURBED PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
PLYWOOD PATTERN
10'-0"
Room name
B
M2
A101
SIM
CONCRETE POURED IN
PLACE, PRECAST
ALUMINUM PATTERN
ASPHALT SHINGLE PATTERN
KEYNOTE TAG
A101
1 1
A1
AE101
NOT IN SCOPE PATTERN
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A000
SYMBOLS AND ABBREVIATIONS
JRB KCB04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
12" = 1'-0"
ARCHITECTURAL ABBREVIATIONS
NTS
DRAWING AREA
NTS
ARCHITECTURAL SYMBOLS
UPUP
KNOX STREET
BEAL'S
FO
LL
Y S
TR
EET
VETERANS ROAD
DIRIGO DRIVE
POND ROAD
POND ROAD
NORTH GATE ROAD
NORTH GATE ROAD
POND ROAD
STODDARD STREET
DIX STREET
WEST CEMETERY ROAD
PA
TR
IO
T
ST
RE
ET
SO
U
TH
G
AT
E
R O
AD
FR
EE
D O
M L
AN
E
INDEPENDENCE STREET
LI
BE
R
TY
L
AN
E
CHAMBERLAIN ST.
W
ES
T G
AT
E
R O
AD
MEMORIAL CIRCLE POND ROAD
NORTH GATE ROAD
PATRIOT STREET
POND
ICE
POND
DUCK
S
S
S
S
S
S
S5 S5S5
GREELY BROOK
DAM
M
PH
Z
O N
E
PU
R
PL
E
H
EA
R T
TO ROUTE 226
TO AUGUSTA ROUTE 9
EAST CEMETERY ROAD
48.0000
B221
B207 B206 B208
B204
B248
B240
B203
E235BE235A
B235
B210
B255
B209
SEG 1 SEG 2A SEG 2B SEG 3 SEG 4
SEG 5A
SEG 5B
SEG 5C
SEG 6A
SEG 6B
SEG 6C
SEG 7
SEG 8A
SEG 8B
SEG 9 SEG 10 SEG 11A SEG 11B
B205
B232
B200
B200E
LOCATION OF PROJECT
CONSTRUCTION TRAILERS.
TO BE VERIFIED WITH VA COR
PRIOR TO CONSTRUCTION
LOCATION OF PROJECT
LAYDOWN FOR STORAGE OF
DUMPSTERS, CONEX BOXES,
MATERIALS AND
CONSTRUCTION VEHICLES.
TO BE VERIFIED WITH VA
COR PRIOR TO
CONSTRUCTION.
LOCATION OF PROJECT
LOCATION OF PROJECT
LAYDOWN FOR CONSTRUCTION
DUMPSTERS
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A100
ARCHITECTURAL SITE PLAN
JRB KCB04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
1" = 100'-0"
E1 ARCHITECTURAL SITE PLAN
GENERAL REMOVAL NOTES:
1. GENERAL CONTRACTOR (GC) SHALL FIELD VERIFY &
REPORT EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO REMOVALS. IF DISCREPANCIES ARE FOUND.
GC TO NOTIFY COR AND ARCHITECT FOR
CLARIFICATION BEFORE COMMENCING WITH THE
WORK.
2. GC AND SC FOR EACH TRADE ARE ADVISED THAT
INFORMATION PERTINENT TO THEIR WORK MAY BE
INDICATED OR DESCRIBED IN OTHER PORTIONS OF
THE CONTRACT DOCUMENTS.
3. REFER TO SPECIFIC DRAWINGS FOR PLUMBING,
HVAC AND ELECTRICAL REMOVALS WORK.
4. GC AND SC ARE RESPONSIBLE FOR PROVIDING ALL
REMOVALS AND PATCHING REQUIRED TO COMPLETE
THEIR WORK IN ACCORDANCE WITH THE DESIGN
INTENT.
5. THESE REMOVALS DRAWINGS HAVE BEEN
PREPARED BASED UPON EXISTING CONSTRUCTION
DOCUMENT DRAWINGS AND FIELD OBSERVATIONS.
THE EXACT LOCATION OF THE BUILDING ELEMENTS
MAY BE DIFFERENT IN THE FIELD THAN WHAT IS
INDICATED OR ASSUMED ON THESE DRAWINGS. GC
SHALL FIELD VERIFY THE LOCATION OF ALL BUILDING
ELEMENTS. ALL BUILDING ELEMENTS SHALL REMAIN
UNLESS INDICATED TO BE REMOVED ON THE
DRAWINGS. ANY BUILDING ELEMENT INDICATED AS
BEING REMOVED ON THIS DRAWING SHALL BE
CONFIRMED WITH THE COR AND ARCHITECT PRIOR TO
COMMENCING REMOVALS
6. GC SHALL PROTECT, REPLACE OR REPAIR ANY
EXISTING CONSTRUCTION SCHEDULED TO REMAIN
WHICH IS DAMAGED DURING REMOVALS
7. GC SHALL PROVIDE REQUIRED SHORING OR
TEMPORARY BRACING DURING REMOVALS
8. REMOVE EXISTING CEILINGS AND SUPPORTS WHERE
NEW CEILINGS ARE SCHEDULED IN THE ROOM FINISH
SCHEDULE.
9. REMOVE PARTITIONS, SHELVING, CABINETRY AND
ALL MISCELLANEOUS ITEMS SHOWN WITH DASHED
LINES.
10. PATCH ALL FLOORS, WALLS, BASE AND CEILINGS
WHERE PARTITIONS OR MISCELLANEOUS ITEMS ARE
REMOVED.
11. REMOVE EXISTING FLOORING WHERE NEW
FLOORING IS SCHEDULED IN THE ROOM FINISH
SCHEDULE. PREPARE EXISTING FLOOR SURFACES TO
RECEIVE NEW FLOORING.
12. CONTRACTOR SHALL VERIFY WITH THE OWNER
THOSE REMOVED ITEMS TO BE TURNED OVER TO THE
OWNER.
13. REMOVE LOOSE OR FAILING WALL, CEILING, AND
FLOOR FINISHES, AND PATCH ALL EXISTING DAMAGES
AS NEEDED FOR SMOOTH FINISH, IN PREPARATION
FOR AREAS TO BE PAINTED OR TO RECEIVE NEW
FINISHES.
14. BEFORE COMMENCING WORK, GC IS RESPONSIBLE
FOR WALKING ENTIRETY OF PROJECT WITH COR TO
IDENTIFY ALL WALL AND CEILING MOUNTED ITEMS, AS
WELL AS ANY DISPLAY CASES, TO BE TEMORARILY
REMOVED AND REINSTALLED. GC TO PROTECT AND
CAREFULLY, REMOVE ALL ELEMENTS NOTED BY COR
DURING SITE WALK, STORE IN SAFE, CONDITIONED
LOCATION AND REINSTALL AS DIRECTED.
15. GC RESPONSIBLE FOR REPLACEMENT OF CEILING
TILES AT THE END OF EACH SHIFT FOR WORK AREAS
OUTSIDE OF RATED CONSTRUCTION BARRIERS.
B221
B207 B206 B208
B204
B248
B240
B203
E235A E235B
B235
B210
B255
B209
AD101.1
E1
AD101.2
C1
AD101.2
E1
AD101.4
E1
AD101.5
E1
AD101.5
E5
SEG 1 SEG 2A SEG 2B SEG 3 SEG 4
SEG 5A
SEG 5B
SEG 5C
SEG 6A
SEG 6B
SEG 6C
SEG 7
SEG 8A
SEG 8B
SEG 9 SEG 10 SEG 11A SEG 11B
AD101.6
E1
AD101.6
E3
AD101.6
E5
AD101.7
E4
GI002.8
E1
AD101.9
C1
AD101.9
C1
AD101.9
E1
GI002.10
C1
AD101.10
E1
AD101.3
E1
AD101.5
E3
B232
B205
B200
B200E
EXISTING TO REMOVE
EXISTING TO REMAIN
WALL LEGEND:
SCOPE OF WORK AREA
NEW WALL
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101
FIRST FLOOR REMOVALS PLAN
JRB KRH04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
1" = 60'-0"
E1 FIRST FLOOR REMOVALS REFERENCE PLAN
R1 R2
SE
G
M
EN
T
SE
G
M
EN
T 2A
161 SF
CORR
B207-164
191 SF
CORR
B207-163
190 SF
STAIR
B207-173454 SF
CORR
207221
R5 R6 R6R8
R7 R7
R7 R7 R7
R7 R7 EFE
R7
R8
R7
R1 R1 R1 R2R8
R13 R13
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101.1
FIRST FLOOR REMOVALS PLAN - SEG 1
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR REMOVALS - SEG 1
R1 REMOVE EXISTING VCT FLOORING, RUBBER WALL
BASE, WALL PROTECTION, CORNERGUARDS,
CEILING TILES AND GRIDS, TYP. EXISTING GWB
WALLS AND WINDOW TRIM TO REMAIN.
R2 REMOVE EXISTING VCT FLOORING, TERRAZZO
WALL BASE AND FLOOR STRIP, WALL
PROTECTION, CORNERGUARDS, CEILING TILES
AND GRIDS, TYP. EXISTING GWB WALLS AND
WINDOW TRIM TO REMAIN.
R5 REMOVE EXISTING HANDRAILS
R6 EXISTING EXPANSION JOINT COVER TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR REMOVING
AND RE-INSTALLING AS NEEDED FOR FLOOR
REMOVALS AND INSTALLATION
R7 EXISTING RADIATOR, BASEBOARD HEATER OR
CABINET HEATER TO BE REMOVED, SEE
MECHANICAL DRAWINGS
R8 EXISTING ACCESS PANEL TO REMAIN
R13 REMOVE ALL FLOOR AND WALL FINISHES IN
ALCOVE AND PREP FOR NEW FINISHES
KEYNOTES:
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
R2
SE
G
M
EN
T
SE
G
M
EN
T 2A
SE
G
M
EN
T 2A
SE
G
M
EN
T 2B
1189 SF
CORR
206207 R5
R6
R7
R7 R7
R7
R7
R13
R13 R13
R13
R13
R2
SE
G
M
EN
T 2A
SE
G
M
EN
T 2B
SE
G
M
EN
T 2B
SE
G
M
EN
T
1189 SF
CORR
206207 R5
R6
R7
R7 R7
R7
EFE
R13
R13 R13
R13
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101.2
FIRST FLOOR REMOVALS PLAN - SEG 2A
& 2B
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
C1 FIRST FLOOR REMOVALS - SEG 2A
3/16" = 1'-0"
E1 FIRST FLOOR REMOVALS - SEG 2B
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
R2 REMOVE EXISTING VCT FLOORING, TERRAZZO
WALL BASE AND FLOOR STRIP, WALL
PROTECTION, CORNERGUARDS, CEILING TILES
AND GRIDS, TYP. EXISTING GWB WALLS AND
WINDOW TRIM TO REMAIN.
R5 REMOVE EXISTING HANDRAILS
R6 EXISTING EXPANSION JOINT COVER TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR REMOVING
AND RE-INSTALLING AS NEEDED FOR FLOOR
REMOVALS AND INSTALLATION
R7 EXISTING RADIATOR, BASEBOARD HEATER OR
CABINET HEATER TO BE REMOVED, SEE
MECHANICAL DRAWINGS
R13 REMOVE ALL FLOOR AND WALL FINISHES IN
ALCOVE AND PREP FOR NEW FINISHES
KEYNOTES:
B206
R2
SE
G
M
EN
T 2B
SE
G
M
EN
T
SE
G
M
EN
T
SE
G
M
EN
T
381 SF
CORR
B206-187
56 SF
CORR
B206-184
317 SF
STAIR
B206-185
242 SF
CORR
204206R5
R6
EFE R7 R7 R7
R6 R6
EFE
R1 R2 R1 R2 R1
R13 R13 R13
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101.3
FIRST FLOOR REMOVALS PLAN - SEG 3
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR REMOVALS - SEG 3
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
R1 REMOVE EXISTING VCT FLOORING, RUBBER WALL
BASE, WALL PROTECTION, CORNERGUARDS,
CEILING TILES AND GRIDS, TYP. EXISTING GWB
WALLS AND WINDOW TRIM TO REMAIN.
R2 REMOVE EXISTING VCT FLOORING, TERRAZZO
WALL BASE AND FLOOR STRIP, WALL
PROTECTION, CORNERGUARDS, CEILING TILES
AND GRIDS, TYP. EXISTING GWB WALLS AND
WINDOW TRIM TO REMAIN.
R5 REMOVE EXISTING HANDRAILS
R6 EXISTING EXPANSION JOINT COVER TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR REMOVING
AND RE-INSTALLING AS NEEDED FOR FLOOR
REMOVALS AND INSTALLATION
R7 EXISTING RADIATOR, BASEBOARD HEATER OR
CABINET HEATER TO BE REMOVED, SEE
MECHANICAL DRAWINGS
R13 REMOVE ALL FLOOR AND WALL FINISHES IN
ALCOVE AND PREP FOR NEW FINISHES
R2
R2
R2
SE
G
M
EN
T
SE
G
M
EN
T
SEGMENT 5A
SEGMENT 4
980 SF
CORR
B204-163
380 SF
CORR
B204-161
608 SF
CORR
B204-160
R5
R6
R6
EFE
EFE
EFE
R9
R1
EAED
R1
R10
R1
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101.4
FIRST FLOOR REMOVALS PLAN - SEG 4
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E1 FIRST FLOOR REMOVALS - SEG 4
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
R1 REMOVE EXISTING VCT FLOORING, RUBBER WALL
BASE, WALL PROTECTION, CORNERGUARDS,
CEILING TILES AND GRIDS, TYP. EXISTING GWB
WALLS AND WINDOW TRIM TO REMAIN.
R2 REMOVE EXISTING VCT FLOORING, TERRAZZO
WALL BASE AND FLOOR STRIP, WALL
PROTECTION, CORNERGUARDS, CEILING TILES
AND GRIDS, TYP. EXISTING GWB WALLS AND
WINDOW TRIM TO REMAIN.
R5 REMOVE EXISTING HANDRAILS
R6 EXISTING EXPANSION JOINT COVER TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR REMOVING
AND RE-INSTALLING AS NEEDED FOR FLOOR
REMOVALS AND INSTALLATION
R9 EXISTING STATIONARY WALK OFF MAT TO REMAIN
R10 EXISTING GUARDRAIL TO REMAIN
R1
SEGMENT 5B
SEGMENT 5A
SEGMENT 5C
SEGMENT 5B
2086 SF
CORR
204248
R5
EFEC
R16
U P
R7
R7
R7
R7
B240 R1
SEGMENT 5C
SEGMENT 5B
SEGMENT 6A
SEGMENT 5C
294 SF
CORR
240203
2086 SF
CORR
204248
R5
R6
R6
R7
R2
EAED
R1
B203
R7R7
R7
R5
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
B248
R1
SEGMENT 5A
SEGMENT 4
SEGMENT 5B
SEGMENT 5A
2086 SF
CORR
204248
R5
R6
R6
EFEC
R7
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of Construction and Facilities Management
Building Number
Project Number
Drawing Number
Drawing Title
Approved:
Project Title
Date
Location
Checked Drawn
VA FORM 08-6231
7 8654321
B
A
C
D
E
B
A
C
D
E
7 8654321
VA ME FACILITIES MANAGEMENT SERVICE
402-23-794
U.S. Department of Veterans Affairs
TRUE N
ORTH
PROJECT
NORTH
CONSULTANT ENGINEER OF RECORD
WBRCINC.COM www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
AD101.5
FIRST FLOOR REMOVALS PLAN - SEG 5A,
5B & 5C
JRB ORM04/10/2025
1 VA CENTER, AUGUSTA, ME 04330
VA TOGUS CORRIDORS
04/10/2025FINAL BID DOCUMENTS
WBRC PROJECT NUMBER: 10108.023
3/16" = 1'-0"
E3 FIRST FLOOR REMOVALS - SEG 5B
3/16" = 1'-0"
E5 FIRST FLOOR REMOVALS - SEG 5C
3/16" = 1'-0"
E1 FIRST FLOOR REMOVALS - SEG 5A
KEY PLAN
1 2 3 4
9 10 11
B221
B232
B207 B206 B208 B205
B248 B204
B240
B203
B235
B235A
B210
B255
B200E
B200
B209
N
TRUE NORTH
R1 REMOVE EXISTING VCT FLOORING, RUBBER WALL
BASE, WALL PROTECTION, CORNERGUARDS,
CEILING TILES AND GRIDS, TYP. EXISTING GWB
WALLS AND WINDOW TRIM TO REMAIN.
R2 REMOVE EXISTING VCT FLOORING, TERRAZZO
WALL BASE AND FLOOR STRIP, WALL
PROTECTION, CORNERGUARDS, CEILING TILES
AND GRIDS, TYP. EXISTING GWB WALLS AND
WINDOW TRIM TO REMAIN.
R5 REMOVE EXISTING HANDRAILS
R6 EXISTING EXPANSION JOINT COVER TO REMAIN.
CONTRACTOR IS RESPONSIBLE FOR REMOVING
AND RE-INSTALLING AS NEEDED FOR FLOOR
REMOVALS AND INSTALLATION
R7 EXISTING RADIATOR, BASEBOARD HEATER OR
CABINET HEATER TO BE REMOVED, SEE
MECHANICAL DRAWINGS
R16 CONTRACTOR TO REVIEW THIS JOINT CONIDITION
DURING DEMOLITION AND ADVISE A/E AND COR IF
THIS IS AN EXPANSION JOINT, OR JUST A FLOOR
PLATE TO COVER DAMAGE, ETC. IF AN
EXPANSION JOINT, REMOVE AND RE-INSTALL AS
NEEDED FOR INSTALLATION OF NEW FLOORING.
IF A COVER PLATE FOR A DIFFERENT REASON,
NOTIFY A/E AND COR FOR DIRECTION
E235A
B235
R1
SEGMENT 6A
SEGMENT 5C
SEGMENT 6B
SEGMENT 6A
1780 SF
CORR
203210
R5
R6
R6
R7R7
R7R7
R7R7
R7R7
R7R7
E235B
R7
B235
R1
SEGMENT 6B
SEGMENT 6A
SEGMENT 6B
SEGMENT 6C
1780 SF
CORR
203210
R5
R6
R7R7
R7R7
R7R7
R7
R7R7
R7R7
R6
R6
LEGEND:
EXISTING TO REMOVE
EXISTING TO REMAIN
NOT IN SCOPE AREA
SEGMENT 6BSEGMENT 6C
SEGMENT 6C
SEGMENT 7
1780 SF
CORR
203210
1015 SF
CORR
210255
R5
R16
R6
R7
R7
R7
R7
R7
R7
R7R7
R7R7
R7
R7
R1
R1 R2
R13
R13
R5
HANDRAIL TO REMOVE
TERRAZZO FLOOR TO REMOVE
Office of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .