21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf
PDF 77 KB Posted
- Attached to
- 402-23-794 Modernize Campus Corridors
- Solicitation number
- 36C24126R0120
About this file
This is a specification section for wet-pipe sprinkler system installation and modification at the Togus VA Medical Center (Contract No. 402-23-794). The work involves designing, installing, and testing modifications to the existing sprinkler system in accordance with NFPA 13 standards.
The contractor must submit detailed working drawings signed by a NICET Level III or IV Sprinkler Technician or a Registered Professional Engineer licensed in Fire Protection Engineering. All sprinklers shall be FM-approved quick response type, except institutional-type sprinklers in Mental Health and Behavior Units may be UL Listed quick response, with maximum breakaway strength certified at no more than 39 kPa (85 pounds). Standard response sprinklers are permitted only in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms. Sprinkler temperature ratings must comply with NFPA 13, with intermediate temperature minimum for elevator shafts and high temperature minimum for generator rooms. Sprinkler guards are required when heads are positioned below 7 feet 6 inches above finished floor and must be UL listed or FM approved.
The installer must possess a valid state fire sprinkler contractor's license and demonstrate ten years of active commercial sprinkler system installation experience. Submittals must include qualifications documentation, 1:100 scale minimum working drawings, manufacturer data sheets, and final as-built drawings in printed, PDF, and AutoCAD formats on compact disc. Final documentation shall include Material and Testing Certificates per NFPA 13, Operations and Maintenance Manuals with step-by-step procedures, and a mounted copy in an accessible location adjacent to the riser. The contractor must provide preliminary flushing and hydrostatic testing in the presence of the Contracting Officer's Representative, followed by final inspection and testing per NFPA 13, with fire alarm system connection in service for at least ten days before final inspection. The contractor shall furnish competent instruction for a minimum of two hours covering system operation and maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126R0120 0005.pdf | ||
| 36C24126R0120 0004.docx | DOCX document | |
| 36C24126R0120 0003.docx | DOCX document | |
| 230534 111324 Asbestos Spot Survey PDF.pdf | ||
| Statement of Items.docx | DOCX document | |
| 36C24126R0120 0002.docx | DOCX document | |
| Sign in sheet - Site Visit.pdf | ||
| 36C24126R0120 0001.docx | DOCX document | |
| ME20260009 WR Determination.pdf | ||
| 402-23-794 - ICRA.pdf | ||
| Itemized Cost Breakdown.xlsx | XLSX spreadsheet | |
| 402-23-794 - PCRA.pdf | ||
| 402-23-794 - Final Bid Drawings.pdf | ||
| 402-23-794 - Final Specifications.pdf | ||
| SOW Attachment - Togus Campus Map.pdf | ||
| 36C24126R0120.docx | DOCX document | |
| SOW Attachment - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment - Security Badge form.pdf | ||
| Construction SOW.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernize Campus Corridors
Togus VAMC
402-23-794
WET-PIPE SPRINKLER SYSTEMS
21 13 13 - 1
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in accordance with NFPA 13.
B. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 33 10 00, WATER UTILITIES.
C. Section 07 84 00, FIRESTOPPING.
D. Section 09 91 00, PAINTING.
E. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA – NOT USED
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors // fire sprinkler // and state // contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide
402-23-794
WET-PIPE SPRINKLER SYSTEMS
21 13 13 - 2 a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.
d. One paper copy of the Material and Testing Certificates and the Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the
COR.
e. Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of // (insert state in which work is being performed) // fire sprinkler // contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-2022 Installation of Sprinkler Systems
25-2020 Inspection, Testing, and Maintenance of Water-
Based Fire Protection Systems
101-2021 Life Safety Code
170-2021 Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
402-23-794
WET-PIPE SPRINKLER SYSTEMS
21 13 13 - 3
PART 2 - PRODUCTS
2.1 SPRINKLERS
A. All sprinklers shall be FM approved quick response except “institutional” type sprinklers shall be permitted to be UL Listed quick response. // “Institutional” type sprinklers in Mental Health and Behavior Units shall be UL listed or FM approved quick response type. Maximum break away strength shall be certified by the manufacturer to be no more than 39 kPa (85 pounds). // Provide FM approved quick response sprinklers in all areas, except that standard response sprinklers shall be provided in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in generator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.
C. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces.
Request in writing at least one week prior to the planned interruption.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed.
Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test. Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests.
Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test
3.3 INSTRUCTIONS
A. Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.
END OF SECTION