Statement of Items.docx

DOCX document 15 KB Posted

Attached to
402-23-794 Modernize Campus Corridors
Solicitation number
36C24126R0120
Issued by

About this file

This is a Statement of Items document outlining the pricing structure and scope for a federal construction task order. The document requires the contractor to provide all labor, materials, tools, equipment, supervision, and operations necessary to modernize the Main Street Corridor (Project 402-23-794) connecting Buildings B209 and B221 at the Togus VA Medical Center in Augusta, Maine. The base proposal encompasses a 15,600-square-foot interior renovation including site preparation, demolition, flooring replacement, roofing work, interior finishes, and HVAC system improvements while maintaining uninterrupted medical center operations. Work shall commence upon receipt of the Notice to Proceed and must be completed within the period established in FAR 52.211-10. The contractor must maintain VA-compliant phasing, life safety, security, environmental protection, and utility-interruption plans throughout execution.

The solicitation is set aside exclusively for the VISN 1 Construction MATOC IDIQ Pool under the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1. The pricing structure includes a base proposal line item and two optional deductions: Option 1 removes roof replacement from scope, and Option 2 removes radiator replacement from scope while requiring the contractor to remove, reinstall, and maintain the existing radiators and associated finishes. Offerors must submit itemized cost breakdowns for all line items and are bound by the offer for 120 calendar days following the proposal due date. The contractor must sign the document with company name, printed name, and authorized signature.

View the file

Other files

File Type Posted
36C24126R0120 0005.pdf PDF
36C24126R0120 0004.docx DOCX document
21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf PDF
230534 111324 Asbestos Spot Survey PDF.pdf PDF
36C24126R0120 0003.docx DOCX document
36C24126R0120 0002.docx DOCX document
Sign in sheet - Site Visit.pdf PDF
36C24126R0120 0001.docx DOCX document
402-23-794 - Final Bid Drawings.pdf PDF
402-23-794 - Final Specifications.pdf PDF
SOW Attachment - Togus Campus Map.pdf PDF
Itemized Cost Breakdown.xlsx XLSX spreadsheet
402-23-794 - PCRA.pdf PDF
36C24126R0120.docx DOCX document
SOW Attachment - Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment - Security Badge form.pdf PDF
Construction SOW.pdf PDF
ME20260009 WR Determination.pdf PDF
402-23-794 - ICRA.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF ITEMS

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation if this offer is accepted by the Government in writing within 120 calendar days after the date offers are due.

PROPOSAL ITEM (Base Proposal): Contractor shall provide all labor, materials, tools, equipment, and supervision, and perform all operations necessary for 402-23-794 Modernize Campus Corridors in accordance with all attachments contained herein. Work shall commence upon receipt of the Notice to Proceed (NTP) from the government and shall be completed within the period of performance established in FAR 52.211-10 Commencement, Prosecution, and Completion of Work (i.e. Period of Performance).

PROPOSAL ITEM $_______________________________

Option 1: deduct roof replacement from scope $_______________________________ Option 2: deduct replacement of Radiators from scope. Contractor responsible for removing the radiator for replacement of finishes and reinstalling the existing radiator. Contractor is responsible for ensuring prior to removal that the radiator is operational and upon reinstalling the radiator to function as it did prior to removal. Contractor to clean interior and exterior of radiator prior to reinstallation. $_______________________________

NOTE: Offerors must submit an itemized breakdown of costs.

Company Name:

Printed Name:

Authorized Signature:

File details come from the government source that posted it. Updated .