This is a Price Proposal form (Exhibit B) for the City of Ocala's Parking Lot Improvement Program, ITB# CIP/250996, which establishes unit pricing for an indefinite-quantity contract covering roadway and parking lot rehabilitation services. The program encompasses a comprehensive scope of work including pavement resurfacing, asphalt milling and overlay placement, limerock base reconstruction, thermoplastic and painted pavement markings, concrete curb and sidewalk installation and removal, stormwater conveyance system repairs and installations, conduit and guardrail work, and restoration services. The form contains over 400 line items organized by work category, each with specified units of measure (linear feet, square yards, cubic yards, tons, each, hours, etc.) and estimated quantities ranging from individual units to quantities exceeding 1,000 units for high-volume items. Bidders must enter their company name, office location, and unit costs for each line item; all pricing fields are currently blank with zero default values. The contract term is identified as "Initial Contract Term" with potential for project assignments distributed on an as-needed basis following plan reviews and quotes submitted by the contractor.
The pricing proposal requires bidders to establish competitive unit rates for materials, labor, and equipment across all specified line items, with the total bid price calculated from the submitted unit costs multiplied by estimated quantities. Bidders must demonstrate three years of experience in roadway resurfacing services and maintain FDOT Pre-Qualification status with reviewed financial statements in applicable work classes. The City of Ocala retains discretion to assign projects from the program based on operational needs and prioritization, with contractors providing detailed quotes upon receipt of individual project plans. No specific contract award amount, funding source, or renewal terms are specified in this pricing exhibit, as pricing is established as an indefinite-quantity framework for future project assignments.
View the file
Other files for this state and local contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 REV 1/9/2026 Exhibit B - PRICE PROPOSAL for SAMPLE PROJECTS CONTRACT# CIP/250996
| Bidder name | Bidder Location |
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| INITIAL CONTRACT TERM PRICING - Parking Lot Improvement Program | |||||
| ITEM NUMBER | DESCRIPTION | UOM | ESTIMATED QUANTITY | UNIT COST | |
| G-02 | Bonds - Lump Sum | 1 | $ - 0 | ||
| G-03 | Project Sign | EA | 2 | $ - 0 | |
| G-06-1 | Silt Fence & Sediment Control (Installation and Removal) | LF | 1 -100 | $ - 0 | |
| G-06-2 | Silt Fence & Sediment Control (Installation and Removal) | LF | 101 - 1000+ | $ - 0 | |
| G-07 | Tree Protection/ Construction Fence | LF | 500 | $ - 0 | |
| G-08-1 | Remove and Relocate Existing Mailboxes | EA | 10 | $ - 0 | |
| G-08-2 | New Mailbox (Furnish&install) | EA | 10 | $ - 0 | |
| G-09 | Clearing and Grubbing - LIGHT | SY | 100 | $ - 0 | |
| G-10 | Clearing and Grubbing - HEAVY | SY | 100 | $ - 0 | |
| G-11-1 | Excavation, General | CY | 0 - 50 | $ - 0 | |
| G-11-2 | Excavation, General | CY | 51 - 500+ | $ - 0 | |
| G-12-1 | Backfill W/Off-site Material | CY | 0 - 50 | $ - 0 | |
| G-12-2 | Backfill W/Off-site Material | CY | 51 - 500+ | $ - 0 | |
| G-15-1 | Finish Grading | SY | 1 - 250 | $ - 0 | |
| G-15-2 | Finish Grading | SY | 251 - 1000+ | $ - 0 | |
| G-17-1 | Remove and Replace Unsuitable Material | CY | 0 - 50 | $ - 0 | |
| G-17-2 | Remove and Replace Unsuitable Material | CY | 51 - 500+ | $ - 0 | |
| G-18-1 | Stabilized subgrade | SY | 1 - 500 | $ - 0 | |
| G-18-2 | Stabilized subgrade | SY | 501 - 2000+ | $ - 0 | |
| G-18-3 | Compacted Subgrade | SY | 1 - 500 | $ - 0 | |
| G-18-4 | Compacted Subgrade | SY | 501 - 2000+ | $ - 0 | |
| G-19-1 | Limerock- New Material for Reworking Base | CY | 1 - 250 | $ - 0 | |
| G-19-2 | Limerock- New Material for Reworking Base | CY | 251 -1000+ | $ - 0 | |
| G-19-3 | Limerock- 4" Base | SY | 1 - 250 | $ - 0 | |
| G-19-4 | Limerock- 4" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-5 | Limerock- 6" Base | SY | 1 - 250 | $ - 0 | |
| G-19-6 | Limerock- 6" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-7 | Limerock- 8" Base | SY | 1 - 250 | $ - 0 | |
| G-19-8 | Limerock- 8" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-9 | Limerock- 10" Base | SY | 1 - 250 | $ - 0 | |
| G-19-10 | Limerock- 10" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-11 | Limerock- 12" Base | SY | 1 - 250 | $ - 0 | |
| G-19-12 | Limerock- 12" Base | SY | 251 - 1000+ | $ - 0 | |
| G-20-1 | Temporary Construction Tracking Pad | LS | 1 | $ - 0 | |
| G-20-2 | No. 57 Stone | CY | 1 - 100 | $ - 0 | |
| G-20-3 | No. 57 Stone | CY | 101 - 500+ | $ - 0 | |
| G-21-1 | Removal of Existing Concrete Sidewalks / Driveways | SY | 0 -75 | $ - 0 | |
| G-21-2 | Removal of Existing Concrete Sidewalks / Driveways | SY | 76 - 500+ | $ - 0 | |
| G-22-1 | Removal of Existing Concrete Curb & Gutter | LF | 0 - 75 | $ - 0 | |
| G-22-2 | Removal of Existing Concrete Curb & Gutter | LF | 76 - 250+ | $ - 0 | |
| G-25-1 | Removal of Existing Asphalt Pavement | SY | 1 - 100 | $ - 0 | |
| G-25-2 | Removal of Existing Asphalt Pavement | SY | 101 -500+ | $ - 0 | |
| G-26-1 | Temporary Asphalt Millings | TN | 1 -100 | $ - 0 | |
| G-26-2 | Temporary Asphalt Millings | TN | 101-500+ | $ - 0 | |
| G-27-1 | Mill Existing Asphalt Pavement at 1" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-2 | Mill Existing Asphalt Pavement at 1" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-27-3 | Mill Existing Asphalt Pavement at 1.5" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-4 | Mill Existing Asphalt Pavement at 1.5" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-27-5 | Mill Existing Asphalt Pavement at 2" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-6 | Mill Existing Asphalt Pavement at 2" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-28-1 | Compacted Roadway Subbase | SY | 1-500 | $ - 0 | |
| G-28-2 | Compacted Roadway Subbase | SY | 501 - 5000+ | $ - 0 | |
| G-29-1 | Reclaimed Asphalt Pavement Base (Reclaim 6" to 8") | SY | 1-500 | $ - 0 | |
| G-29-2 | Reclaimed Asphalt Pavement Base (Reclaim 6" to 8") | SY | 501 - 5000+ | $ - 0 | |
| G-31-1 | Miscellaneous Asphalt (25 ≤ tons) | TN | 0 -25 | $ - 0 | |
| G-31-2 | Asphalt Berms, Speed Bumps & Curbs | TN | 200 | $ - 0 | |
| G-31-3 | Asphalt Leveling Superpave 9.5 | TN | 500 | $ - 0 | |
| G-31-4 | Asphalt Pavement Superpave - 9.5 | TN | 26 -200 | $ - 0 | |
| G-31-5 | Asphalt Pavement Superpave - 9.5 | TN | 201 - 500 | $ - 0 | |
| G-31-6 | Asphalt Pavement Superpave - 9.5 | TN | 501 -1000+ | $ - 0 | |
| G-31-7 | Asphalt Pavement FC 9.5 w/Poly | TN | 1 -200 | $ - 0 | |
| G-31-8 | Asphalt Pavement FC 9.5 w/Poly | TN | 201 - 500 | $ - 0 | |
| G-31-9 | Asphalt Pavement FC 9.5 w/Poly | TN | 501 -1000+ | $ - 0 | |
| G-31-10 | Asphalt Pavement Superpave - 12.5 | TN | 26 -200 | $ - 0 | |
| G-31-11 | Asphalt Pavement Superpave - 12.5 | TN | 201 -500 | $ - 0 | |
| G-31-12 | Asphalt Pavement Superpave - 12.5 | TN | 501 -1000+ | $ - 0 | |
| G-33 | Roadway Guardrail | LF | 1 | $ - 0 | |
| G-34-1 | Object Marker, Type 1 | EA | 10 | $ - 0 | |
| G-34-2 | Object Marker, Type 2 | EA | 10 | $ - 0 | |
| G-34-3 | Object Marker, Type 3 | EA | 10 | $ - 0 | |
| G-34-4 | Object Marker, Type 4 | EA | 10 | $ - 0 | |
| G-35-1 | Delineator, Flexible Tubular | EA | 10 | $ - 0 | |
| G-35-2 | Delineator, non-Flexible | EA | 10 | $ - 0 | |
| G-35-3 | Delineator, Flexible High Visibility Median | EA | 10 | $ - 0 | |
| G-35-4 | Delineator, Flexible High Performance | EA | 10 | $ - 0 | |
| G-40 | Pull and Junction Box, Furnish & Install | EA | 10 | $ - 0 | |
| G-41 | Pull and Junction Box, Install | EA | 15 | $ - 0 | |
| G-42 | Pull and Junction Box, relocate | EA | 15 | $ - 0 | |
| G-43-1 | Type C Stormwater Inlet, 0'-6' | EA | 1 | $ - 0 | |
| G-43-2 | Type C Stormwater Inlet, 6'-12' | EA | 1 | $ - 0 | |
| G-43-3 | Type C Stormwater Inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-4 | Type C Stormwater Inlet, 18' - 24' | EA | 1 | $ - 0 | |
| G-43-5 | Type D Storm water Inlet, 0'-6' | EA | 1 | $ - 0 | |
| G-43-6 | Type D Storm water Inlet, 6'- 12' | EA | 1 | $ - 0 | |
| G-43-7 | Type D Stormwater Inlet, 12'-18' | EA | 1 | $ - 0 | |
| G-43-8 | Type D Stormwater Inlet, 18' - 24' | EA | 1 | $ - 0 | |
| G-43-9 | Type 1 Stormwater Inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-10 | Type 1 Stormwater Inlet, 6'- 1 2' | EA | 1 | $ - 0 | |
| G-43-11 | Type 1 Stormwater Inlet, 12'-18' | EA | 1 | $ - 0 | |
| G-43-12 | Type 1 Stormwater Inlet, 18 ' - 24 ' | EA | 1 | $ - 0 | |
| G-43-13 | Type 2 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-14 | Type 2 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-15 | Type 2 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-16 | Type 2 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-17 | Type 4 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-18 | Type 4 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-19 | Type 4 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-20 | Type 4 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-21 | Type 5 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-22 | Type 5 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-23 | Type 5 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-24 | Type 5 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-25 | Type 6 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-26 | Type 6 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-27 | Type 6 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-28 | Type 6 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-29 | Type 9 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-30 | Type 9 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-31 | Type 9 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-32 | Type 9 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-45 | Stormwater Manhole Cover Adjustments | EA | 15 | $ - 0 | |
| G-46-1 | 12" RCP Stormwater Pipe, 0 ' -6' | LF | 1 | $ - 0 | |
| G-46-2 | 12" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-3 | 12" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-4 | 12" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-5 | 15" RCP Stormwater Pipe, 0 ' - 6' | LF | 1 | $ - 0 | |
| G-46-6 | 15" RCP Stormwater Pipe, 6' -12' | LF | 1 | $ - 0 | |
| G-46-7 | 15" RCP Stormwater Pipe, 1 2 ' - 18 ' | LF | 1 | $ - 0 | |
| G-46-8 | 15" RCP Stormwater Pipe, 18 ' - 24' | LF | 1 | $ - 0 | |
| G-46-9 | 18" RCP Stormwater Pipe, 0'- 6' | LF | 1 | $ - 0 | |
| G-46-10 | 18" RCP S Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-11 | 18" RCP Stormwater Pipe, 12' -18' | LF | 1 | $ - 0 | |
| G-46-12 | 18" RCP Stormwater Pipe, 18' -24' | LF | 1 | $ - 0 | |
| G-46-13 | 24" RCP Stormwater Pipe, 0'-6 ' | LF | 1 | $ - 0 | |
| G-46-14 | 24" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-15 | 24" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-16 | 24" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-17 | 30" RCP Stormwater Pipe, 0 '- 6' | LF | 1 | $ - 0 | |
| G-46-18 | 30" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-19 | 30" RCP Stormwater Pipe, 12' -18' | LF | 1 | $ - 0 | |
| G-46-20 | 30" RCP Stormwater Pipe, 18 '- 24' | LF | 1 | $ - 0 | |
| G-46-21 | 36" RCP Stormwater Pipe, 0' - 6' | LF | 1 | $ - 0 | |
| G-46-22 | 36" RCP Stormwater Pipe, 6'- 12' | LF | 1 | $ - 0 | |
| G-46-23 | 36" RCP Stormwater Pipe, 1 2'-18 ' | LF | 1 | $ - 0 | |
| G-46-24 | 36" RCP Stormwater Pipe, 1 8 - 24' | LF | 1 | $ - 0 | |
| G-46-25 | 42" RCP Stormwater Pipe, 0 ' -6' | LF | 1 | $ - 0 | |
| G-46-26 | 42" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-27 | 42" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-28 | 42" RCP Stormwater Pipe, 1 8'-24' | LF | 1 | $ - 0 | |
| G-46-29 | 48" RCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-30 | 48" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-31 | 48" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-32 | 48" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-33 | 12" X 1 8" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-34 | 12" X 1 8" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-35 | 12" X 1 8" ERCP Stormwater Pipe 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-36 | 12" X 18 " ERCP Stormwater Pipe, 18 '-24' | LF | 1 | $ - 0 | |
| G-46-37 | 14" X 23" ERCP Stormwater Pipe, 0 '-6' | LF | 1 | $ - 0 | |
| G-46-38 | 14" X 23" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-39 | 14" X 23" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-40 | 14" X 23" ERCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-41 | 19" X 30" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-42 | 19" X 30" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-43 | 19" X 30" ERCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-44 | 19" X 30" ERCP Stormwater Pipe, 18 '- 24' | LF | 1 | $ - 0 | |
| G-46-45 | 24" X 38" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-46 | 24" X 38" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-47 | 24" X 38" ERCP Stormwater Pipe, 1 2'- 18' | LF | 1 | $ - 0 | |
| G-46-48 | 24" X 38" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-49 | 29" X 45" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-50 | 29" X 45" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-51 | 29" X 45" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-52 | 29" X 45" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-53 | 34" X 53" ERCP Stormwater Pipe, 0' - 6' | LF | 1 | $ - 0 | |
| G-46-54 | 34" X 53" ERCP Stormwater Pipe, 6'- 12' | LF | 1 | $ - 0 | |
| G-46-55 | 34" X 53" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-56 | 34" X 53" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-57 | Remove & Replace Existing 15" RCP | ||||
| Stormwater Pipe | LF | 1 | $ - 0 | ||
| G-46-58 | Remove & Replace Existing 18" RCP | ||||
| Stormwater Pipe | LF | 1 | $ - 0 | ||
| G-46-59 | 12" CMP Stormwater Piper Pipe | LF | 1 | $ - 0 | |
| G-46-60 | 15" CMP Stormwater Pipe | LF | 1 | $ - 0 | |
| G-46-61 | 18" CMP Stormwater Pipe | LF | 1 | $ - 0 | |
| G-46-62 | Remove & Replace Existing 15" CMP | ||||
| Stormwater Pipe, 0' - 12' | LF | 1 | $ - 0 | ||
| G-46-63 | Remove & Replace Existing 18" CMP | ||||
| Stormwater Pipe, 0' -12' | LF | 1 | $ - 0 | ||
| G-47 | Clean Existing Culverts Pipes | LF | 1 | $ - 0 | |
| G-48 | Clean Existing Inlets | EA | 1 | $ - 0 | |
| G-49-1 | 12" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-2 | 15" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-3 | 18" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-4 | 24" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-5 | 30" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-6 | 36" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-7 | 42" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-8 | 48" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-50-1 | Concrete Flume | SY | 15 | $ - 0 | |
| G-50-2 | Remove & Replace Concrete Flume | SY | 20 | $ - 0 | |
| G-51 | Underdrain | LF | 300 | $ - 0 | |
| G-52 | Construction Roadway Pre-Survey | HR | 40 | $ - 0 | |
| G-53 | As-built Survey | HR | 40 | $ - 0 | |
| G-54-1 | Pipe Handrail - Guiderail, Aluminum | LF | 25 | $ - 0 | |
| G-54-2 | Pedestrian / Bicycle, Railing, Aluminum Only, 42" Picket Rail | LF | 25 | $ - 0 | |
| G-54-3 | Pedestrian / Bicycle, Railing, Aluminum Only, 42" Type 1 | LF | 25 | $ - 0 | |
| G-54-4 | Pipe Handrail, Aluminum | LF | 25 | $ - 0 | |
| G-55-1 | Bollard, 4 Inch | EA | 15 | $ - 0 | |
| G-55-2 | Bollard, 6 Inch | EA | 15 | $ - 0 | |
| G-56-A-1 | Concrete Curb , Type A | LF | 0 -50 | $ - 0 | |
| G-56-A-2 | Concrete Curb , Type A | LF | 51 - 100+ | $ - 0 | |
| G-56-B-1 | Concrete Curb, Type B | LF | 0 - 50 | $ - 0 | |
| G-56-B-2 | Concrete Curb, Type B | LF | 51 - 100+ | $ - 0 | |
| G-56-D-1 | Concrete Curb, Type D | LF | 0 - 50 | $ - 0 | |
| G-56-D-2 | Concrete Curb, Type D | LF | 51 - 100+ | $ - 0 | |
| G-56-E-1 | Concrete Curb Type E | LF | 0 - 50 | $ - 0 | |
| G-56-E-2 | Concrete Curb Type E | LF | 51 - 100+ | $ - 0 | |
| G-56-F-1 | Concrete Curb Type F | LF | 0 - 50 | $ - 0 | |
| G-56-F-2 | Concrete Curb Type F | LF | 51 - 100+ | $ - 0 | |
| G-56-RA-1 | Concrete Curb, Type RA | LF | 0 - 50 | $ - 0 | |
| G-56-RA-2 | Concrete Curb, Type RA | LF | 51 - 100+ | $ - 0 | |
| G-56-DR-1 | Concrete Valley/Drop Curb & Gutter | LF | 0 - 50 | $ - 0 | |
| G-56-DR-2 | Concrete Valley/Drop Curb & Gutter | LF | 51 - 100+ | $ - 0 | |
| G-57 | Concrete Valley/Drop Curb & Gutter Remove | ||||
| & Replace | LF | 250 | $ - 0 | ||
| G-58-1 | 4 inch concrete (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-2 | 4 inch concrete (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-3 | 4 inch concrete (4000 psi /with fiber) | SY | 0 - 50 | $ - 0 | |
| G-58-4 | 4 inch concrete (4000 psi /with fiber) | SY | 51 - 250+ | $ - 0 | |
| G-58-5 | 6 inch concrete with fiber reinforced (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-6 | 6 inch concrete with fiber reinforced (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-7 | 6 inch concrete with fiber reinforced (4000 psi / with fiber) | SY | 0 - 50 | $ - 0 | |
| G-58-8 | 6 inch concrete with fiber reinforced (4000 psi / with fiber) | SY | 51 - 250+ | $ - 0 | |
| G-58-9 | 8 inch concrete with fiber and/or rebar (engineers design dictates, 4000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-10 | 8 inch concrete with fiber and/or rebar (engineers design dictates, 4000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-11 | 4 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-12 | 4 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-13 | 6 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-14 | 6 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-15 | Concrete Edge Beam | LF | 250 | $ - 0 | |
| G-58-16 | Miscellaneous Concrete | CY | 250 | $ - 0 | |
| G-59 | Patterned/Textured Pavement, Vehicular Areas for Crosswalk | SY | 500 | $ - 0 | |
| G-61-1 | Brick Paver Bands (furnish and install) | LF | 500 | $ - 0 | |
| G-61-2 | Architectural Brick (traffic rated, Furnish and install) | SY | 500 | $ - 0 | |
| G-61-3 | Concrete Curb Ramp (CR - A ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-4 | Concrete Curb Ramp (CR - B ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-5 | Concrete Curb Ramp (CR - C ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-6 | Concrete Curb Ramp (CR - D ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-7 | Concrete Curb Ramp (CR - E ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-8 | Concrete Curb Ramp (CR - F ) with Detectable Warning Surface | EA | 10 | $ - 0 | |
| G-61-9 | Concrete Curb Ramp (CR - G ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-10 | Concrete Curb Ramp (CR - L ) with Detectable Warning Surface | EA | 20 | $ - 0 | |
| G-62 | Detectable Warnings on Walking Surfaces (Retrofit) | SF | 520 | $ - 0 | |
| G-63-1 | Roof Drain Assembly, conduit | EA | 10 | $ - 0 | |
| G-63-2 | Roof Drain Assembly, Polylok | EA | 1 | $ - 0 | |
| G-66 | RIP RAP | CY | 20 | $ - 0 | |
| G-67 | Concrete Rubble 2' Thick | SY | 35 | $ - 0 | |
| G-79-1 | Seed and Mulch | SY | 1 -500 | $ - 0 | |
| G-79-2 | Seed and Mulch | SY | 500 -1000+ | $ - 0 | |
| G-80-1 | Sod - St. Augustine | SY | 1 -250 | $ - 0 | |
| G-80-2 | Sod - St. Augustine | SY | 251 -1000+ | $ - 0 | |
| G-80-3 | Sod – Bahia | SY | 1 -250 | $ - 0 | |
| G-80-4 | Sod – Bahia | SY | 251 - 1000+ | $ - 0 | |
| G-88-1 | Inductive Loop Detector Type A w/Homerun | EA | 10 | $ - 0 | |
| G-88-2 | Inductive Loop Detector Type B w/Homerun | EA | 10 | $ - 0 | |
| G-88-3 | Inductive Loop Detector Type F w/Homerun | EA | 10 | $ - 0 | |
| G-89 | Traffic Control Sign Assembly | EA | 10 | $ - 0 | |
| G-90 | Traffic Control Sign Assembly Removal & Relocation | EA | 20 | $ - 0 | |
| G-91-1 | Raised Retro-Reflective Pavement Markers & Bituminous Adhesive | EA | 0 -50 | $ - 0 | |
| G-91-2 | Raised Retro-Reflective Pavement Markers & Bituminous Adhesive | EA | 50 -250+ | $ - 0 | |
| G-92-1 | Standard Wheel Stops | EA | 1 | $ - 0 | |
| G-92-2 | Standard Wheel Stops (Remove and Reinstall) | EA | 1 | $ - 0 | |
| G-93-1 | Painted Pavement Markings, Standard, White, Solid, 6" | LF | 0 - 25 | $ - 0 | |
| G-93-2 | Painted Pavement Markings, Standard, White, Solid, 6" | LF | 26 - 100+ | $ - 0 | |
| G-93-3 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 0 - 25 | $ - 0 | |
| G-93-4 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 26 - 50+ | $ - 0 | |
| G-93-5 | Painted Pavement Markings, Standard, White , Solid, 12" | LF | 0 -25 | $ - 0 | |
| G-93-6 | Painted Pavement Markings, Standard, White , Solid, 12" | LF | 26 -50+ | $ - 0 | |
| G-93-7 | Temporary Skip Stripe 6" Wide 10-30- Yellow or White (gross) | GLF | 1 -250 | $ - 0 | |
| G-93-8 | Temporary Skip Stripe 6" Wide 10-30- Yellow or White (gross) | GLF | 251 - 1000+ | $ - 0 | |
| G-93-9 | Painted Pavement Markings, Standard, White, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 0-25 | $ - 0 | |
| G-93-10 | Painted Pavement Markings, Standard, White, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 26 - 50+ | $ - 0 | |
| G-93-11 | Painted Pavement Markings, Standard, Solid 6" Double Yellow Stripe | LF | 1 - 250 | $ - 0 | |
| G-93-12 | Painted Pavement Markings, Standard, Solid 6" Double Yellow Stripe | LF | 250 - 1000+ | $ - 0 | |
| G-93-13 | Painted Pavement Markings, Standard, Solid 6" Yellow Stripe | LF | 0 -100 | $ - 0 | |
| G-93-14 | Painted Pavement Markings, Standard, Solid 6" Yellow Stripe | LF | 101 - 1000+ | $ - 0 | |
| G-93-15 | Painted Pavement Markings, Standard, Solid 18" Stripe | LF | 0 -25 | $ - 0 | |
| G-93-16 | Painted Pavement Markings, Standard, Solid 18" Stripe | LF | 26 - 75+ | $ - 0 | |
| G-93-17 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2'- 4' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-18 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2'- 4' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-93-19 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-20 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-93-21 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2 - 2' Dotted, Extension, 12" | GLF | 0 - 20 | $ - 0 | |
| G-93-22 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2 - 2' Dotted, Extension, 12" | GLF | 21 - 50+ | $ - 0 | |
| G-93-23 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 3'- 9', Dotted, Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-24 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 3'- 9', Dotted, Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-1 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 6" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-2 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 6" Stripe | LF | 26 - 100+ | $ - 0 | |
| G-94-3 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 12" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-4 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 12" Stripe | LF | 26 - 100+ | $ - 0 | |
| G-94-5 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 24" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-6 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 24" Stripe | LF | 26 - 50+ | $ - 0 | |
| G-94-7 | Thermoplastic Solid 6" Skip Stripe 10' x 30' Yellow or White (Gross) | GLF | 1 -250 | $ - 0 | |
| G-94-8 | Thermoplastic Solid 6" Skip Stripe 10' x 30' Yellow or White (Gross) | GLF | 251 - 1000+ | $ - 0 | |
| G-94-9 | Thermoplastic Traffic Stripes and Markings, Standard, White, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-10 | Thermoplastic Traffic Stripes and Markings, Standard, White, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-11 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 6" Double Yellow Stripe | LF | 1 -250 | $ - 0 | |
| G-94-12 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 6" Double Yellow Stripe | LF | 251 - 1000+ | $ - 0 | |
| G-94-13 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 18" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-14 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 18" Stripe | LF | 26 - 75+ | $ - 0 | |
| G-94-15 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 4' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-16 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 4' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-17 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 2' Gap Extension, 12" | GLF | 0 - 20 | $ - 0 | |
| G-94-18 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 2' Gap Extension, 12" | GLF | 21 - 50+ | $ - 0 | |
| G-94-19 | Thermoplastic Traffic Stripes and Markings, Yellow, Solid, 6" | LF | 0 - 100 | $ - 0 | |
| G-94-20 | Thermoplastic Traffic Stripes and Markings, Yellow, Solid, 6" | LF | 100 - 1000+ | $ - 0 | |
| G-94-21 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-22 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-23 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/3'-9' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-24 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/3'-9' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-95-1 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "STOP" | EA | 1 | $ - 0 | |
| G-95-2 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message " STOP AHEAD " | EA | 1 | $ - 0 | |
| G-95-3 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Arrow | EA | 10 | $ - 0 | |
| G-95-4 | Thermoplastic Traffic Stripes and Markings, Standard, White, Yield Line Symbol | EA | 15 | $ - 0 | |
| G-95-5 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "SCHOOL" | EA | 1 | $ - 0 | |
| G-95-6 | Thermoplastic Traffic Stripes and Markings, White, Message “R & R” Crossing | EA | 1 | $ - 0 | |
| G-95-7 | Thermoplastic Traffic Stripes and Markings, Standard , White, Message “ Bus “ | EA | 1 | $ - 0 | |
| G-95-8 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "HANDICAP" | EA | 1 | $ - 0 | |
| G-95-9 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "Bike symbol" | EA | 1 | $ - 0 | |
| G-96-1 | Painted Pavement Markings, Standard, White, Pavement Message "Stop Ahead" | EA | 1 | $ - 0 | |
| G-96-2 | Painted Pavement Markings, Standard, White, Pavement Message "Stop" | EA | 1 | $ - 0 | |
| G-96-3 | Painted Pavement Markings, Standard, White, White Direction Arrow | EA | 1 | $ - 0 | |
| G-96-4 | Painted Pavement Markings, Standard, White, Yield Line Symbol | EA | 1 | $ - 0 | |
| G-96-5 | Painted Pavement Markings, Standard, Pavement Message "School" | EA | 1 | $ - 0 | |
| G-96-6 | Painted Pavement Markings, Standard, White, “R & R” Crossing | EA | 2 | $ - 0 | |
| G-96-7 | Painted Pavement Markings, Standard, Yellow, Island Nose | LF | 15 | $ - 0 | |
| G-96-8 | Remove Stripe / Pavement / Message (Grind or Waterblast) | SF | 100 | $ - 0 | |
| G-96-9 | Painted Pavement Markings, Standard, Pavement Message "BUS" | EA | 1 | $ - 0 | |
| G-96-10 | Painted Pavement Markings, Standard, White, Pavement Message "Handicap" | EA | 1 | $ - 0 | |
| G-96-11 | Painted Pavement Markings, Standard, White, Pavement Message "Bike Symbol" | EA | 1 | $ - 0 | |
| G-99-1 | Speed Humps | EA | 6 | $ - 0 | |
| G-99-2 | Remove & Reinstall Speed Hump | EA | 6 | $ - 0 | |
| G-100-1 | 1" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-2 | 2" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-3 | 3" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-4 | 4" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-5 | 6" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-101-1 | Directional Bore - 1" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-2 | Directional Bore - 2" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-3 | Directional Bore - 3" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-4 | Directional Bore - 4" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-5 | Directional Bore - 6" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-6 | Directional Bore - 2" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-7 | Directional Bore - 4" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-8 | Directional Bore - 6" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-9 | Directional Bore - 8" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-10 | Directional Bore - 10 " HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-11 | Directional Bore - 12" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-12 | Directional Bore - 14" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-13 | Directional Bore - 16" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-14 | Directional Bore - 18" HDPE PIPE | LF | 1 | $ - 0 | |
| G-102-1 | Traffic Separator Concrete -TYPE I, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-2 | Traffic Separator Concrete -TYPE I, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-3 | Traffic Separator Concrete - TYPE I, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-4 | Traffic Separator Concrete - TYPE II, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-5 | Traffic Separator Concrete - TYPE II, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-6 | Traffic Separator Concrete - TYPE II, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-7 | Traffic Separator Concrete - TYPE IV, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-8 | Traffic Separator Concrete - TYPE IV, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-9 | Traffic Separator Concrete - TYPE IV, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-10 | Traffic Separator Concrete - TYPE V, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-11 | Traffic Separator Concrete - TYPE V, 6' WIDE | LF | 1 | $ - 0 | |
| G-103 | Decorative Stamp installed in concrete finish (City provides stamp) | EA | 100 | $ - 0 | |
| G-104-1 | Joint Sealer for Pavement and Structures: | ||||
| Hot Pour Crack Sealing | GAL | 1-250 | $ - 0 | ||
| G-104-2 | Joint Sealer for Pavement and Structures: | ||||
| Hot Pour Crack Sealing | GAL | 251 - 1000+ | $ - 0 | ||
| S-04-1 | Remove Existing 22" Ring & Cover & | ||||
| Replace W/24" Hinged R/C (Labor Only) | EA | 80 | $ - 0 | ||
| S-04-2 | Remove Existing 32" Ring & Cover & | ||||
| Replace W/32" Hinged R/C (Labor Only) | EA | 30 | $ - 0 | ||
| W-20-1 | Adjust Valve Box to Grade (Traffic rated metal riser ring) | EA | 25 | $ - 0 | |
| W-20-2 | Adjust Valve Box to Grade | EA | 25 | $ - 0 | |
| W-20-3 | Adjust Meter Box to Grade | EA | 25 | $ - 0 | |
| TOTAL BID PRICING | $ - 0 |