About this file
This is a price proposal exhibit for an Invitation to Bid (ITB) issued by the City of Ocala, Florida for the Parking Lot Improvement Program (Contract #CIP/250996). The document serves as Exhibit B and requires bidders to provide unit pricing for sample projects across a comprehensive range of parking lot and roadway improvement services. The scope of work encompasses site preparation activities (clearing, grubbing, excavation, backfill), base preparation (limerock and subgrade materials), asphalt and concrete pavement work (milling, placement, overlays), stormwater infrastructure (pipes, inlets, manholes), concrete curbs and sidewalks, traffic control and marking systems (painted and thermoplastic markings, delineators, signs), utility conduit installation, erosion control, and restoration work (seeding, sodding). Bidders must enter their company name, office location, and unit costs for 490 individual line items organized by category, with quantities varying from single units to ranges exceeding 1,000 units depending on the work type.
Pricing is structured on a unit cost basis with tiered quantity breakdowns for many items, allowing the City to apply bid prices to individual projects as they are defined and assigned throughout the contract term. The document indicates this represents initial contract term pricing, suggesting potential for contract extensions or renewals. Bidders must be FDOT pre-qualified with reviewed financial statements and possess a minimum of three years' experience in roadway resurfacing services. The City retains flexibility to request services on an "as needed" basis for rehabilitation of existing infrastructure, with contractors responsible for providing all materials, labor, equipment, and traffic control. No specific award date, contract term length, or funding source is detailed in this exhibit; however, the program structure indicates an ongoing relationship with projects distributed to selected contractors for completion upon receipt of detailed construction plans and City approval of project-specific quotes.
View the file
Other files for this state and local contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 REV 1/5/2026 Exhibit B - PRICE PROPOSAL for SAMPLE PROJECTS CONTRACT# CIP/250996
| Bidder name | Bidder Location |
| ENTER COMPANY NAME HERE | ENTER OFFICE LOCATION HERE |
| INITIAL CONTRACT TERM PRICING - Parking Lot Improvement Program | |||||
| ITEM NUMBER | DESCRIPTION | UOM | ESTIMATED QUANTITY | UNIT COST | |
| G-02 | Bonds - Lump Sum | 1 | $ - 0 | ||
| G-03 | Project Sign | EA | 2 | $ - 0 | |
| G-06-1 | Silt Fence & Sediment Control (Installation and Removal) | LF | 1 -100 | $ - 0 | |
| G-06-2 | Silt Fence & Sediment Control (Installation and Removal) | LF | 101 - 1000+ | $ - 0 | |
| G-07 | Tree Protection/ Construction Fence | LF | 500 | $ - 0 | |
| G-08-1 | Remove and Relocate Existing Mailboxes | EA | 10 | $ - 0 | |
| G-08-2 | New Mailbox (Furnish&install) | EA | 10 | $ - 0 | |
| G-09 | Clearing and Grubbing - LIGHT | SY | 100 | $ - 0 | |
| G-10 | Clearing and Grubbing - HEAVY | SY | 100 | $ - 0 | |
| G-11-1 | Excavation, General | CY | 0 - 50 | $ - 0 | |
| G-11-2 | Excavation, General | CY | 51 - 500+ | $ - 0 | |
| G-12-1 | Backfill W/Off-site Material | CY | 0 - 50 | $ - 0 | |
| G-12-2 | Backfill W/Off-site Material | CY | 51 - 500+ | $ - 0 | |
| G-15-1 | Finish Grading | SY | 1 - 250 | $ - 0 | |
| G-15-2 | Finish Grading | SY | 251 - 1000+ | $ - 0 | |
| G-17-1 | Remove and Replace Unsuitable Material | CY | 0 - 50 | $ - 0 | |
| G-17-2 | Remove and Replace Unsuitable Material | CY | 51 - 500+ | $ - 0 | |
| G-18-1 | Stabilized subgrade | SY | 1 - 500 | $ - 0 | |
| G-18-2 | Stabilized subgrade | SY | 501 - 2000+ | $ - 0 | |
| G-18-3 | Compacted Subgrade | SY | 1 - 500 | $ - 0 | |
| G-18-4 | Compacted Subgrade | SY | 501 - 2000+ | $ - 0 | |
| G-19-1 | Limerock- New Material for Reworking Base | CY | 1 - 250 | $ - 0 | |
| G-19-2 | Limerock- New Material for Reworking Base | CY | 251 -1000+ | $ - 0 | |
| G-19-3 | Limerock- 4" Base | SY | 1 - 250 | $ - 0 | |
| G-19-4 | Limerock- 4" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-5 | Limerock- 6" Base | SY | 1 - 250 | $ - 0 | |
| G-19-6 | Limerock- 6" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-7 | Limerock- 8" Base | SY | 1 - 250 | $ - 0 | |
| G-19-8 | Limerock- 8" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-9 | Limerock- 10" Base | SY | 1 - 250 | $ - 0 | |
| G-19-10 | Limerock- 10" Base | SY | 251 - 1000+ | $ - 0 | |
| G-19-11 | Limerock- 12" Base | SY | 1 - 250 | $ - 0 | |
| G-19-12 | Limerock- 12" Base | SY | 251 - 1000+ | $ - 0 | |
| G-20-1 | Temporary Construction Tracking Pad | LS | 1 | $ - 0 | |
| G-20-2 | No. 57 Stone | CY | 1 - 100 | $ - 0 | |
| G-20-3 | No. 57 Stone | CY | 101 - 500+ | $ - 0 | |
| G-21-1 | Removal of Existing Concrete Sidewalks / Driveways | SY | 0 -75 | $ - 0 | |
| G-21-2 | Removal of Existing Concrete Sidewalks / Driveways | SY | 76 - 500+ | $ - 0 | |
| G-22-1 | Removal of Existing Concrete Curb & Gutter | LF | 0 - 75 | $ - 0 | |
| G-22-2 | Removal of Existing Concrete Curb & Gutter | LF | 76 - 250+ | $ - 0 | |
| G-25-1 | Removal of Existing Asphalt Pavement | SY | 1 - 100 | $ - 0 | |
| G-25-2 | Removal of Existing Asphalt Pavement | SY | 101 -500+ | $ - 0 | |
| G-26-1 | Temporary Asphalt Millings | TN | 1 -100 | $ - 0 | |
| G-26-2 | Temporary Asphalt Millings | TN | 101-500+ | $ - 0 | |
| G-27-1 | Mill Existing Asphalt Pavement at 1" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-2 | Mill Existing Asphalt Pavement at 1" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-27-3 | Mill Existing Asphalt Pavement at 1.5" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-4 | Mill Existing Asphalt Pavement at 1.5" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-27-5 | Mill Existing Asphalt Pavement at 2" Depth | SY | 1 - 750 | $ - 0 | |
| G-27-6 | Mill Existing Asphalt Pavement at 2" Depth | SY | 751 - 5000+ | $ - 0 | |
| G-28-1 | Compacted Roadway Subbase | SY | 1-500 | $ - 0 | |
| G-28-2 | Compacted Roadway Subbase | SY | 501 - 5000+ | $ - 0 | |
| G-29-1 | Reclaimed Asphalt Pavement Base (Reclaim 6" to 8") | SY | 1-500 | $ - 0 | |
| G-29-2 | Reclaimed Asphalt Pavement Base (Reclaim 6" to 8") | SY | 501 - 5000+ | $ - 0 | |
| G-31-1 | Miscellaneous Asphalt (25 ≤ tons) | TN | 0 -25 | $ - 0 | |
| G-31-2 | Asphalt Berms, Speed Bumps & Curbs | TN | 200 | $ - 0 | |
| G-31-3 | Asphalt Leveling Superpave 9.5 | TN | 500 | $ - 0 | |
| G-31-4 | Asphalt Pavement Superpave - 9.5 | TN | 26 -200 | $ - 0 | |
| G-31-5 | Asphalt Pavement Superpave - 9.5 | TN | 201 - 500 | $ - 0 | |
| G-31-6 | Asphalt Pavement Superpave - 9.5 | TN | 501 -1000+ | $ - 0 | |
| G-31-7 | Asphalt Pavement FC 9.5 w/Poly | TN | 1 -200 | $ - 0 | |
| G-31-8 | Asphalt Pavement FC 9.5 w/Poly | TN | 201 - 500 | $ - 0 | |
| G-31-9 | Asphalt Pavement FC 9.5 w/Poly | TN | 501 -1000+ | $ - 0 | |
| G-31-10 | Asphalt Pavement Superpave - 12.5 | TN | 26 -200 | $ - 0 | |
| G-31-11 | Asphalt Pavement Superpave - 12.5 | TN | 201 -500 | $ - 0 | |
| G-31-12 | Asphalt Pavement Superpave - 12.5 | TN | 501 -1000+ | $ - 0 | |
| G-33 | Roadway Guardrail | LF | 1 | $ - 0 | |
| G-34-1 | Object Marker, Type 1 | EA | 10 | $ - 0 | |
| G-34-2 | Object Marker, Type 2 | EA | 10 | $ - 0 | |
| G-34-3 | Object Marker, Type 3 | EA | 10 | $ - 0 | |
| G-34-4 | Object Marker, Type 4 | EA | 10 | $ - 0 | |
| G-35-1 | Delineator, Flexible Tubular | EA | 10 | $ - 0 | |
| G-35-2 | Delineator, non-Flexible | EA | 10 | $ - 0 | |
| G-35-3 | Delineator, Flexible High Visibility Median | EA | 10 | $ - 0 | |
| G-35-4 | Delineator, Flexible High Performance | EA | 10 | $ - 0 | |
| G-40 | Pull and Junction Box, Furnish & Install | EA | 10 | $ - 0 | |
| G-41 | Pull and Junction Box, Install | EA | 15 | $ - 0 | |
| G-42 | Pull and Junction Box, relocate | EA | 15 | $ - 0 | |
| G-43-1 | Type C Stormwater Inlet, 0'-6' | EA | 1 | $ - 0 | |
| G-43-2 | Type C Stormwater Inlet, 6'-12' | EA | 1 | $ - 0 | |
| G-43-3 | Type C Stormwater Inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-4 | Type C Stormwater Inlet, 18' - 24' | EA | 1 | $ - 0 | |
| G-43-5 | Type D Storm water Inlet, 0'-6' | EA | 1 | $ - 0 | |
| G-43-6 | Type D Storm water Inlet, 6'- 12' | EA | 1 | $ - 0 | |
| G-43-7 | Type D Stormwater Inlet, 12'-18' | EA | 1 | $ - 0 | |
| G-43-8 | Type D Stormwater Inlet, 18' - 24' | EA | 1 | $ - 0 | |
| G-43-9 | Type 1 Stormwater Inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-10 | Type 1 Stormwater Inlet, 6'- 1 2' | EA | 1 | $ - 0 | |
| G-43-11 | Type 1 Stormwater Inlet, 12'-18' | EA | 1 | $ - 0 | |
| G-43-12 | Type 1 Stormwater Inlet, 18 ' - 24 ' | EA | 1 | $ - 0 | |
| G-43-13 | Type 2 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-14 | Type 2 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-15 | Type 2 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-16 | Type 2 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-17 | Type 4 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-18 | Type 4 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-19 | Type 4 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-20 | Type 4 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-21 | Type 5 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-22 | Type 5 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-23 | Type 5 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-24 | Type 5 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-25 | Type 6 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-26 | Type 6 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-27 | Type 6 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-28 | Type 6 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-43-29 | Type 9 Stormwater inlet, 0'- 6' | EA | 1 | $ - 0 | |
| G-43-30 | Type 9 Stormwater inlet, 6' - 12' | EA | 1 | $ - 0 | |
| G-43-31 | Type 9 Stormwater inlet, 12' - 18' | EA | 1 | $ - 0 | |
| G-43-32 | Type 9 Stormwater inlet, 18' -24' | EA | 1 | $ - 0 | |
| G-45 | Stormwater Manhole Cover Adjustments | EA | 15 | $ - 0 | |
| G-46-1 | 12" RCP Stormwater Pipe, 0 ' -6' | LF | 1 | $ - 0 | |
| G-46-2 | 12" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-3 | 12" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-4 | 12" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-5 | 15" RCP Stormwater Pipe, 0 ' - 6' | LF | 1 | $ - 0 | |
| G-46-6 | 15" RCP Stormwater Pipe, 6' -12' | LF | 1 | $ - 0 | |
| G-46-7 | 15" RCP Stormwater Pipe, 1 2 ' - 18 ' | LF | 1 | $ - 0 | |
| G-46-8 | 15" RCP Stormwater Pipe, 18 ' - 24' | LF | 1 | $ - 0 | |
| G-46-9 | 18" RCP Stormwater Pipe, 0'- 6' | LF | 1 | $ - 0 | |
| G-46-10 | 18" RCP S Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-11 | 18" RCP Stormwater Pipe, 12' -18' | LF | 1 | $ - 0 | |
| G-46-12 | 18" RCP Stormwater Pipe, 18' -24' | LF | 1 | $ - 0 | |
| G-46-13 | 24" RCP Stormwater Pipe, 0'-6 ' | LF | 1 | $ - 0 | |
| G-46-14 | 24" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-15 | 24" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-16 | 24" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-17 | 30" RCP Stormwater Pipe, 0 '- 6' | LF | 1 | $ - 0 | |
| G-46-18 | 30" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-19 | 30" RCP Stormwater Pipe, 12' -18' | LF | 1 | $ - 0 | |
| G-46-20 | 30" RCP Stormwater Pipe, 18 '- 24' | LF | 1 | $ - 0 | |
| G-46-21 | 36" RCP Stormwater Pipe, 0' - 6' | LF | 1 | $ - 0 | |
| G-46-22 | 36" RCP Stormwater Pipe, 6'- 12' | LF | 1 | $ - 0 | |
| G-46-23 | 36" RCP Stormwater Pipe, 1 2'-18 ' | LF | 1 | $ - 0 | |
| G-46-24 | 36" RCP Stormwater Pipe, 1 8 - 24' | LF | 1 | $ - 0 | |
| G-46-25 | 42" RCP Stormwater Pipe, 0 ' -6' | LF | 1 | $ - 0 | |
| G-46-26 | 42" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-27 | 42" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-28 | 42" RCP Stormwater Pipe, 1 8'-24' | LF | 1 | $ - 0 | |
| G-46-29 | 48" RCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-30 | 48" RCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-31 | 48" RCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-32 | 48" RCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-33 | 12" X 1 8" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-34 | 12" X 1 8" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-35 | 12" X 1 8" ERCP Stormwater Pipe 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-36 | 12" X 18 " ERCP Stormwater Pipe, 18 '-24' | LF | 1 | $ - 0 | |
| G-46-37 | 14" X 23" ERCP Stormwater Pipe, 0 '-6' | LF | 1 | $ - 0 | |
| G-46-38 | 14" X 23" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-39 | 14" X 23" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-40 | 14" X 23" ERCP Stormwater Pipe, 18'-24' | LF | 1 | $ - 0 | |
| G-46-41 | 19" X 30" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-42 | 19" X 30" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-43 | 19" X 30" ERCP Stormwater Pipe, 12'-18' | LF | 1 | $ - 0 | |
| G-46-44 | 19" X 30" ERCP Stormwater Pipe, 18 '- 24' | LF | 1 | $ - 0 | |
| G-46-45 | 24" X 38" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-46 | 24" X 38" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-47 | 24" X 38" ERCP Stormwater Pipe, 1 2'- 18' | LF | 1 | $ - 0 | |
| G-46-48 | 24" X 38" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-49 | 29" X 45" ERCP Stormwater Pipe, 0'-6' | LF | 1 | $ - 0 | |
| G-46-50 | 29" X 45" ERCP Stormwater Pipe, 6'-12' | LF | 1 | $ - 0 | |
| G-46-51 | 29" X 45" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-52 | 29" X 45" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-53 | 34" X 53" ERCP Stormwater Pipe, 0' - 6' | LF | 1 | $ - 0 | |
| G-46-54 | 34" X 53" ERCP Stormwater Pipe, 6'- 12' | LF | 1 | $ - 0 | |
| G-46-55 | 34" X 53" ERCP Stormwater Pipe, 1 2'-18' | LF | 1 | $ - 0 | |
| G-46-56 | 34" X 53" ERCP Stormwater Pipe, 18' - 24' | LF | 1 | $ - 0 | |
| G-46-57 | Remove & Replace Existing 15" RCP | ||||
| Stormwater Pipe | LF | 1 | $ - 0 | ||
| G-46-58 | Remove & Replace Existing 18" RCP | ||||
| Stormwater Pipe | LF | 1 | $ - 0 | ||
| G-46-59 | 12" CMP Stormwater Piper Pipe | LF | 1 | $ - 0 | |
| G-46-60 | 15" CMP Stormwater Pipe | LF | 1 | $ - 0 | |
| G-46-61 | 18" CMP Stormwater Pipe | LF | 1 | $ - 0 | |
| G-46-62 | Remove & Replace Existing 15" CMP | ||||
| Stormwater Pipe, 0' - 12' | LF | 1 | $ - 0 | ||
| G-46-63 | Remove & Replace Existing 18" CMP | ||||
| Stormwater Pipe, 0' -12' | LF | 1 | $ - 0 | ||
| G-47 | Clean Existing Culverts Pipes | LF | 1 | $ - 0 | |
| G-48 | Clean Existing Inlets | EA | 1 | $ - 0 | |
| G-49-1 | 12" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-2 | 15" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-3 | 18" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-4 | 24" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-5 | 30" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-6 | 36" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-7 | 42" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-49-8 | 48" Concrete Mitered End | EA | 1 | $ - 0 | |
| G-50-1 | Concrete Flume | SY | 15 | $ - 0 | |
| G-50-2 | Remove & Replace Concrete Flume | SY | 20 | $ - 0 | |
| G-51 | Underdrain | LF | 300 | $ - 0 | |
| G-52 | Construction Roadway Pre-Survey | HR | 40 | $ - 0 | |
| G-53 | As-built Survey | HR | 40 | $ - 0 | |
| G-54-1 | Pipe Handrail - Guiderail, Aluminum | LF | 25 | $ - 0 | |
| G-54-2 | Pedestrian / Bicycle, Railing, Aluminum Only, 42" Picket Rail | LF | 25 | $ - 0 | |
| G-54-3 | Pedestrian / Bicycle, Railing, Aluminum Only, 42" Type 1 | LF | 25 | $ - 0 | |
| G-54-4 | Pipe Handrail, Aluminum | LF | 25 | $ - 0 | |
| G-55-1 | Bollard, 4 Inch | EA | 15 | $ - 0 | |
| G-55-2 | Bollard, 6 Inch | EA | 15 | $ - 0 | |
| G-56-A-1 | Concrete Curb , Type A | LF | 0 -50 | $ - 0 | |
| G-56-A-2 | Concrete Curb , Type A | LF | 51 - 100+ | $ - 0 | |
| G-56-B-1 | Concrete Curb, Type B | LF | 0 - 50 | $ - 0 | |
| G-56-B-2 | Concrete Curb, Type B | LF | 51 - 100+ | $ - 0 | |
| G-56-D-1 | Concrete Curb, Type D | LF | 0 - 50 | $ - 0 | |
| G-56-D-2 | Concrete Curb, Type D | LF | 51 - 100+ | $ - 0 | |
| G-56-E-1 | Concrete Curb Type E | LF | 0 - 50 | $ - 0 | |
| G-56-E-2 | Concrete Curb Type E | LF | 51 - 100+ | $ - 0 | |
| G-56-F-1 | Concrete Curb Type F | LF | 0 - 50 | $ - 0 | |
| G-56-F-2 | Concrete Curb Type F | LF | 51 - 100+ | $ - 0 | |
| G-56-RA-1 | Concrete Curb, Type RA | LF | 0 - 50 | $ - 0 | |
| G-56-RA-2 | Concrete Curb, Type RA | LF | 51 - 100+ | $ - 0 | |
| G-56-DR-1 | Concrete Valley/Drop Curb & Gutter | LF | 0 - 50 | $ - 0 | |
| G-56-DR-2 | Concrete Valley/Drop Curb & Gutter | LF | 51 - 100+ | $ - 0 | |
| G-57 | Concrete Valley/Drop Curb & Gutter Remove | ||||
| & Replace | LF | 250 | $ - 0 | ||
| G-58-1 | 4 inch concrete (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-2 | 4 inch concrete (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-3 | 4 inch concrete (4000 psi /with fiber) | SY | 0 - 50 | $ - 0 | |
| G-58-4 | 4 inch concrete (4000 psi /with fiber) | SY | 51 - 250+ | $ - 0 | |
| G-58-5 | 6 inch concrete with fiber reinforced (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-6 | 6 inch concrete with fiber reinforced (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-7 | 6 inch concrete with fiber reinforced (4000 psi / with fiber) | SY | 0 - 50 | $ - 0 | |
| G-58-8 | 6 inch concrete with fiber reinforced (4000 psi / with fiber) | SY | 51 - 250+ | $ - 0 | |
| G-58-9 | 8 inch concrete with fiber and/or rebar (engineers design dictates, 4000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-10 | 8 inch concrete with fiber and/or rebar (engineers design dictates, 4000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-11 | 4 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-12 | 4 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-13 | 6 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 0 - 50 | $ - 0 | |
| G-58-14 | 6 inch Concrete - 3' x 5' Pattern w/ salt rock finish (3000 psi) | SY | 51 - 250+ | $ - 0 | |
| G-58-15 | Concrete Edge Beam | LF | 250 | $ - 0 | |
| G-58-16 | Miscellaneous Concrete | CY | 250 | $ - 0 | |
| G-59 | Patterned/Textured Pavement, Vehicular Areas for Crosswalk | SY | 500 | $ - 0 | |
| G-61-1 | Brick Paver Bands (furnish and install) | LF | 500 | $ - 0 | |
| G-61-2 | Architectural Brick (traffic rated, Furnish and install) | SY | 500 | $ - 0 | |
| G-61-3 | Concrete Curb Ramp (CR - A ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-4 | Concrete Curb Ramp (CR - B ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-5 | Concrete Curb Ramp (CR - C ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-6 | Concrete Curb Ramp (CR - D ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-7 | Concrete Curb Ramp (CR - E ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-8 | Concrete Curb Ramp (CR - F ) with Detectable Warning Surface | EA | 10 | $ - 0 | |
| G-61-9 | Concrete Curb Ramp (CR - G ) with Detectable Warning Surface | EA | 1 | $ - 0 | |
| G-61-10 | Concrete Curb Ramp (CR - L ) with Detectable Warning Surface | EA | 20 | $ - 0 | |
| G-62 | Detectable Warnings on Walking Surfaces (Retrofit) | SF | 520 | $ - 0 | |
| G-63-1 | Roof Drain Assembly, conduit | EA | 10 | $ - 0 | |
| G-63-2 | Roof Drain Assembly, Polylok | EA | 1 | $ - 0 | |
| G-66 | RIP RAP | CY | 20 | $ - 0 | |
| G-67 | Concrete Rubble 2' Thick | SY | 35 | $ - 0 | |
| G-79-1 | Seed and Mulch | SY | 1 -500 | $ - 0 | |
| G-79-2 | Seed and Mulch | SY | 500 -1000+ | $ - 0 | |
| G-80-1 | Sod - St. Augustine | SY | 1 -250 | $ - 0 | |
| G-80-2 | Sod - St. Augustine | SY | 251 -1000+ | $ - 0 | |
| G-80-3 | Sod – Bahia | SY | 1 -250 | $ - 0 | |
| G-80-4 | Sod – Bahia | SY | 251 - 1000+ | $ - 0 | |
| G-88-1 | Inductive Loop Detector Type A w/Homerun | EA | 10 | $ - 0 | |
| G-88-2 | Inductive Loop Detector Type B w/Homerun | EA | 10 | $ - 0 | |
| G-88-3 | Inductive Loop Detector Type F w/Homerun | EA | 10 | $ - 0 | |
| G-89 | Traffic Control Sign Assembly | EA | 10 | $ - 0 | |
| G-90 | Traffic Control Sign Assembly Removal & Relocation | EA | 20 | $ - 0 | |
| G-91-1 | Raised Retro-Reflective Pavement Markers & Bituminous Adhesive | EA | 0 -50 | $ - 0 | |
| G-91-2 | Raised Retro-Reflective Pavement Markers & Bituminous Adhesive | EA | 50 -250+ | $ - 0 | |
| G-92-1 | Standard Wheel Stops | EA | 1 | $ - 0 | |
| G-92-2 | Standard Wheel Stops (Remove and Reinstall) | EA | 1 | $ - 0 | |
| G-93-1 | Painted Pavement Markings, Standard, White, Solid, 6" | LF | 0 - 25 | $ - 0 | |
| G-93-2 | Painted Pavement Markings, Standard, White, Solid, 6" | LF | 26 - 100+ | $ - 0 | |
| G-93-3 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 0 - 25 | $ - 0 | |
| G-93-4 | Painted Pavement Markings, Standard, White, Solid, 24" | LF | 26 - 50+ | $ - 0 | |
| G-93-5 | Painted Pavement Markings, Standard, White , Solid, 12" | LF | 0 -25 | $ - 0 | |
| G-93-6 | Painted Pavement Markings, Standard, White , Solid, 12" | LF | 26 -50+ | $ - 0 | |
| G-93-7 | Temporary Skip Stripe 6" Wide 10-30- Yellow or White (gross) | GLF | 1 -250 | $ - 0 | |
| G-93-8 | Temporary Skip Stripe 6" Wide 10-30- Yellow or White (gross) | GLF | 251 - 1000+ | $ - 0 | |
| G-93-9 | Painted Pavement Markings, Standard, White, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 0-25 | $ - 0 | |
| G-93-10 | Painted Pavement Markings, Standard, White, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 26 - 50+ | $ - 0 | |
| G-93-11 | Painted Pavement Markings, Standard, Solid 6" Double Yellow Stripe | LF | 1 - 250 | $ - 0 | |
| G-93-12 | Painted Pavement Markings, Standard, Solid 6" Double Yellow Stripe | LF | 250 - 1000+ | $ - 0 | |
| G-93-13 | Painted Pavement Markings, Standard, Solid 6" Yellow Stripe | LF | 0 -100 | $ - 0 | |
| G-93-14 | Painted Pavement Markings, Standard, Solid 6" Yellow Stripe | LF | 101 - 1000+ | $ - 0 | |
| G-93-15 | Painted Pavement Markings, Standard, Solid 18" Stripe | LF | 0 -25 | $ - 0 | |
| G-93-16 | Painted Pavement Markings, Standard, Solid 18" Stripe | LF | 26 - 75+ | $ - 0 | |
| G-93-17 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2'- 4' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-18 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2'- 4' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-93-19 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-20 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-93-21 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2 - 2' Dotted, Extension, 12" | GLF | 0 - 20 | $ - 0 | |
| G-93-22 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 2 - 2' Dotted, Extension, 12" | GLF | 21 - 50+ | $ - 0 | |
| G-93-23 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 3'- 9', Dotted, Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-93-24 | Painted Pavement Markings, Standard, Yellow, Dotted/Guideline, 3'- 9', Dotted, Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-1 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 6" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-2 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 6" Stripe | LF | 26 - 100+ | $ - 0 | |
| G-94-3 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 12" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-4 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 12" Stripe | LF | 26 - 100+ | $ - 0 | |
| G-94-5 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 24" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-6 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, 24" Stripe | LF | 26 - 50+ | $ - 0 | |
| G-94-7 | Thermoplastic Solid 6" Skip Stripe 10' x 30' Yellow or White (Gross) | GLF | 1 -250 | $ - 0 | |
| G-94-8 | Thermoplastic Solid 6" Skip Stripe 10' x 30' Yellow or White (Gross) | GLF | 251 - 1000+ | $ - 0 | |
| G-94-9 | Thermoplastic Traffic Stripes and Markings, Standard, White, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-10 | Thermoplastic Traffic Stripes and Markings, Standard, White, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-11 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 6" Double Yellow Stripe | LF | 1 -250 | $ - 0 | |
| G-94-12 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 6" Double Yellow Stripe | LF | 251 - 1000+ | $ - 0 | |
| G-94-13 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 18" Stripe | LF | 0 - 25 | $ - 0 | |
| G-94-14 | Thermoplastic Traffic Stripes and Markings, Standard, Solid, 18" Stripe | LF | 26 - 75+ | $ - 0 | |
| G-94-15 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 4' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-16 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 4' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-17 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 2' Gap Extension, 12" | GLF | 0 - 20 | $ - 0 | |
| G-94-18 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline /2'- 2' Gap Extension, 12" | GLF | 21 - 50+ | $ - 0 | |
| G-94-19 | Thermoplastic Traffic Stripes and Markings, Yellow, Solid, 6" | LF | 0 - 100 | $ - 0 | |
| G-94-20 | Thermoplastic Traffic Stripes and Markings, Yellow, Solid, 6" | LF | 100 - 1000+ | $ - 0 | |
| G-94-21 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-22 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/6-10 Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-94-23 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/3'-9' Gap Extension, 6" | GLF | 0 - 20 | $ - 0 | |
| G-94-24 | Thermoplastic Traffic Stripes and Markings, Standard, Yellow, Dotted/Guideline/3'-9' Gap Extension, 6" | GLF | 21 - 50+ | $ - 0 | |
| G-95-1 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "STOP" | EA | 1 | $ - 0 | |
| G-95-2 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message " STOP AHEAD " | EA | 1 | $ - 0 | |
| G-95-3 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Arrow | EA | 10 | $ - 0 | |
| G-95-4 | Thermoplastic Traffic Stripes and Markings, Standard, White, Yield Line Symbol | EA | 15 | $ - 0 | |
| G-95-5 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "SCHOOL" | EA | 1 | $ - 0 | |
| G-95-6 | Thermoplastic Traffic Stripes and Markings, White, Message “R & R” Crossing | EA | 1 | $ - 0 | |
| G-95-7 | Thermoplastic Traffic Stripes and Markings, Standard , White, Message “ Bus “ | EA | 1 | $ - 0 | |
| G-95-8 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "HANDICAP" | EA | 1 | $ - 0 | |
| G-95-9 | Thermoplastic Traffic Stripes and Markings, Standard, White, Solid, Message "Bike symbol" | EA | 1 | $ - 0 | |
| G-96-1 | Painted Pavement Markings, Standard, White, Pavement Message "Stop Ahead" | EA | 1 | $ - 0 | |
| G-96-2 | Painted Pavement Markings, Standard, White, Pavement Message "Stop" | EA | 1 | $ - 0 | |
| G-96-3 | Painted Pavement Markings, Standard, White, White Direction Arrow | EA | 1 | $ - 0 | |
| G-96-4 | Painted Pavement Markings, Standard, White, Yield Line Symbol | EA | 1 | $ - 0 | |
| G-96-5 | Painted Pavement Markings, Standard, Pavement Message "School" | EA | 1 | $ - 0 | |
| G-96-6 | Painted Pavement Markings, Standard, White, “R & R” Crossing | EA | 2 | $ - 0 | |
| G-96-7 | Painted Pavement Markings, Standard, Yellow, Island Nose | LF | 15 | $ - 0 | |
| G-96-8 | Remove Stripe / Pavement / Message (Grind or Waterblast) | SF | 100 | $ - 0 | |
| G-96-9 | Painted Pavement Markings, Standard, Pavement Message "BUS" | EA | 1 | $ - 0 | |
| G-96-10 | Painted Pavement Markings, Standard, White, Pavement Message "Handicap" | EA | 1 | $ - 0 | |
| G-96-11 | Painted Pavement Markings, Standard, White, Pavement Message "Bike Symbol" | EA | 1 | $ - 0 | |
| G-99-1 | Speed Humps | EA | 6 | $ - 0 | |
| G-99-2 | Remove & Reinstall Speed Hump | EA | 6 | $ - 0 | |
| G-100-1 | 1" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-2 | 2" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-3 | 3" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-4 | 4" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-100-5 | 6" SCDH 40 PVC, Conduit, Furnish & Install | LF | 1 | $ - 0 | |
| G-101-1 | Directional Bore - 1" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-2 | Directional Bore - 2" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-3 | Directional Bore - 3" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-4 | Directional Bore - 4" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-5 | Directional Bore - 6" PVC PIPE | LF | 1 | $ - 0 | |
| G-101-6 | Directional Bore - 2" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-7 | Directional Bore - 4" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-8 | Directional Bore - 6" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-9 | Directional Bore - 8" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-10 | Directional Bore - 10 " HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-11 | Directional Bore - 12" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-12 | Directional Bore - 14" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-13 | Directional Bore - 16" HDPE PIPE | LF | 1 | $ - 0 | |
| G-101-14 | Directional Bore - 18" HDPE PIPE | LF | 1 | $ - 0 | |
| G-102-1 | Traffic Separator Concrete -TYPE I, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-2 | Traffic Separator Concrete -TYPE I, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-3 | Traffic Separator Concrete - TYPE I, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-4 | Traffic Separator Concrete - TYPE II, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-5 | Traffic Separator Concrete - TYPE II, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-6 | Traffic Separator Concrete - TYPE II, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-7 | Traffic Separator Concrete - TYPE IV, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-8 | Traffic Separator Concrete - TYPE IV, 6' WIDE | LF | 1 | $ - 0 | |
| G-102-9 | Traffic Separator Concrete - TYPE IV, 8.5' WIDE | LF | 1 | $ - 0 | |
| G-102-10 | Traffic Separator Concrete - TYPE V, 4' WIDE | LF | 1 | $ - 0 | |
| G-102-11 | Traffic Separator Concrete - TYPE V, 6' WIDE | LF | 1 | $ - 0 | |
| G-103 | Decorative Stamp installed in concrete finish (City provides stamp) | EA | 100 | $ - 0 | |
| G-104-1 | Joint Sealer for Pavement and Structures: | ||||
| Hot Pour Crack Sealing | GAL | 1-250 | $ - 0 | ||
| G-104-2 | Joint Sealer for Pavement and Structures: | ||||
| Hot Pour Crack Sealing | GAL | 251 - 1000+ | $ - 0 | ||
| S-04-1 | Remove Existing 22" Ring & Cover & | ||||
| Replace W/24" Hinged R/C (Labor Only) | EA | 80 | $ - 0 | ||
| S-04-2 | Remove Existing 32" Ring & Cover & | ||||
| Replace W/32" Hinged R/C (Labor Only) | EA | 30 | $ - 0 | ||
| W-20-1 | Adjust Valve Box to Grade (Traffic rated metal riser ring) | EA | 25 | $ - 0 | |
| W-20-2 | Adjust Valve Box to Grade | EA | 25 | $ - 0 | |
| W-20-3 | Adjust Meter Box to Grade | EA | 25 | $ - 0 |
image1.png
File details come from the government source that posted it. Updated .