This document is a set of electrical one-line diagrams and schedules for the EHRM Infrastructure Upgrades project at VA Hudson Valley Medical Center, Castle Point, New York. The drawings are prepared by SPEES Design Build (23830 Pacific Highway S., Suite 300, Kent, WA 98032) as the Architect/Engineer of Record and are issued at 100% Construction Documents level dated November 7, 2025. The diagrams detail the electrical distribution systems for Buildings 19, 20, and 21, showing interconnections between the main distribution panels, substations, transformers, automatic transfer switches (ATS-19-1 and ATS-19-2), feeder circuits, and branch circuit panelboards at 208V, 3-phase service. Key electrical components include multiple panelboards rated from 50A to 800A frames with various breaker manufacturers (SIEMENS, GE, Square D, Cutler-Hammer, Federal Pacific) and feeder conductors ranging from 2 AWG to 500 kcmil copper. The project incorporates digital power meters (DPM) and surge protective devices (SPD) integrated into the facility BMS system, with complete raceways, cabling, and integration required to provide fully functional systems.
The contractor is responsible for field verification of existing conditions, submission of shutdown and temporary power plans 30 days prior to implementation, provision of circuit breakers with AIC ratings equal to or greater than the highest fault current indicated on panelboard schedules, and updating all panel circuit directories to reflect changes. Key notes and revision details (ASI 001 dated 07/16/2026) address utilization of existing panelboard enclosures as splice boxes with ID placard relabeling, provision of junction boxes and insulated taps to intercept and extend existing feeders, utilization of spare breakers for added loads, and re-termination of existing circuits to replacement panelboards. The electrical schedules document existing circuit configurations in grey text and revised circuits in black text, with references to associated equipment load schedules for overall panel load calculations. The drawings encompass multiple feeder routes, cable identifications, and detailed circuit-level information across three building complexes within the facility infrastructure upgrade scope.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E N
ATS-19-1
Manufacturer RUSSELECTRIC Type RTB
CBL-6501 to 1901
50.0 ft 1 per phase 500 AWG/kcmil
TO BLDG. 20
"SHEET 000EP601"
CBL-XF6 to 1902
100.0 ft 1 per phase 500 AWG/kcmil
6501 Emergency Main
208.0 V
TO ATS-19-2,
SEE SHEET 019EP602
BLDG 65
CBL-0221
1 per phase
500 AWG/kcmil
CBL-0259
100.0 ft 1 per phase
2 AWG/kcmil
6502 Service Panel
208.0 V
CBL-0222
200.0 ft 1 per phase
500 AWG/kcmil
CBL-0225
200.0 ft 1 per phase
500 AWG/kcmil
CBL-0236
200.0 ft 1 per phase
3/0 AWG/kcmil
19 Elevator
Rated HP 20.0 hp Rated kVA 20.1 kVA X"d 0.1692 pu X/R 10.0004
1903 19-PP-EL
208.0 V
1903-2 Rec Bldg
SIEMENS
QJ
Frame/Rating: 225.0 A
Sensor/Trip: 225.0 A
CBL-0246
50.0 ft 1 per phase 3/0 AWG/kcmil
1903-3 Spare
SIEMENS
QJ
Frame/Rating: 150.0 A
Sensor/Trip: 125.0 A
1903-4 Spare
SIEMENS
QJ
Frame/Rating: 150.0 A
Sensor/Trip 100.0 A
CBL-1907-1
50.0 ft 1 per phase
2 AWG/kcmil
1928 PP-20-1
208.0 V
1907 Bldg 20 1st
208.0 V
CBL-1907-2
50.0 ft 1 per phase
4/0 AWG/kcmil
BaseVoltage 208 V RatedAmps 55.7 A
1903-1 PP-20-T
SIEMENS
QJ
Frame/Rating: 225.0 A
Sensor/Trip: 225.0 A
CBL-0245
50.0 ft 1 per phase 4/0 AWG/kcmil
SEE SHEET 111EP601
CBL-0228
100.0 ft 1 per phase
4/0 AWG/kcmil
1906 B-C NEW PANEL
208.0 V
1901-7 Bldg 20 1st Floor
SIEMENS
FJ
Frame/Rating: 175.0 A
Sensor/Trip: 150.0 A
CBL-0232
100.0 ft 1 per phase
1/0 AWG/kcmil
1929 20-PB
208.0 V
CBL-0233
50.0 ft 1 per phase
2 AWG/kcmil
1928-1 LP-20-1
CUTLER-HAMMER
BAB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
CBL-0230
50.0 ft 1 per phase
2 AWG/kcmil
1958 LP-20-1
208.0 V
CBL-0258
200.0 ft 1 per phase
2 AWG/kcmil
1912 19-LP-EM
208.0 V
CBL-0257
200.0 ft 1 per phase
4 AWG/kcmil
1911 20-B1-150
208.0 V
CBL-0255
100.0 ft 1 per phase
1/0 AWG/kcmil
1910 PP-20-2
208.0 V
CBL-0252
100.0 ft 1 per phase
2 AWG/kcmil
1909 BC Elevator
208.0 V
3P SPACE
(X4)
CBL-0253
25.0 ft 1 per phase
2 AWG/kcmil
CBL-0264
25.0 ft 1 per phase
2 AWG/kcmil
1909-3
CUTLER-HAMMER
GHB
Frame/Rating: 60.0 A
Sensor/Trip: 60.0 A
1901-2
CUTLER-HAMMER
HQP
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1901-3 PP-EL
SIEMENS
JJ
Frame/Rating: 400.0 A
Sensor/Trip: 400.0 A
1901-4 EDP-21
SIEMENS
JJ
Frame/Rating: 400.0 A
Sensor/Trip: 350.0 A
1901-5 Bldg 19 1st Floor
SIEMENS
FJ
Frame/Rating: 225.0 A
Sensor/Trip: 200.0 A
1901-6 B-C NEW PANEL
SIEMENS
FJ
Frame/Rating: 225.0 A
Sensor/Trip: 200.0 A
1929-1 20-PP
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1959-1 MAIN
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
CBL-0234
50.0 ft 1 per phase
2 AWG/kcmil
1929-2 20-P1
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1960-1 MAIN
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
CBL-0235
50.0 ft 1 per phase
2 AWG/kcmil
1929-3 20-P2
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1961-1 MAIN
GE
THHQB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1901-8 Bldg 21 PANEL
SIEMENS
FJ
Frame/Rating: 175.0 A
Sensor/Trip: 150.0 A
1901-9 BC Elevator
SIEMENS
EE
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1909-1 Main
SQUARE D
QO
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1909-2 Main
SQUARE D
QO
Frame/Rating: 80.0 A
Sensor/Trip: 80.0 A
1901-10 Bldg 20 2nd Floor
SIEMENS
EE
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1901-11 Bldg 21 Elev
SIEMENS
EE
Frame/Rating: 100.0 A
Sensor/Trip: 60.0 A
1901-12 LP-EM
SIEMENS
EE
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
CBL-0256
10.0 ft 1 per phase
1/0 AWG/kcmil
1935 LP-20-2
208.0 V
1901-1
CUTLER-HAMMER
BAB
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
CBL-0572
50.0 ft 1 per phase
2 AWG/kcmil
1936-1
SQUARE D
QO
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1936 Pavilion
208.0 V
1922 PP-EL
208.0 V
1922-1 C-105
SQUARE D
Q1 (Obs.)
Frame/Rating: 100.0 A Sensor/Trip: 100.0 A
CBL-0249
50.0 ft 1 per phase
4/0 AWG/kcmil
1947 C-105
208.0 V
1959 20-PP
208.0 V
1960 20-P1
208.0 V
1961 20-P2
208.0 V
1908-1
SQUARE D
Q2 Frame/Rating: 225.0 A Sensor/Trip: 225.0 A
225AF/100AT
3P
PANELBOARD
"019-C-208A"
225AF/100AT
208/120V
3PH, 4W
PANELBOARD
"019-C-104A"
225AF/100AT
208/120V
3PH, 4W
SPD SPD
225AF/100AT
3P
PANELBOARD
"019-DP-TRA"
208/120V 225A
3PH, 4W
1905-1-C001
GE
TE
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0227
50.0 ft 1 per phase 4/0 AWG/kcmil
1905-2-C001
GE
TE
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1957 LP2C
208.0 V
CBL-0226
50.0 ft 1 per phase 1/0 AWG/kcmil
1905 Bldg 19 1st
208.0 V
1908-2 21-LP2
SQUARE D
QB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0237
50.0 ft 1 per phase 1 AWG/kcmil
1930 LP2
208.0 V
1908-3 21-LP1
SQUARE D
QB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0238
50.0 ft 1 per phase 1 AWG/kcmil
1931 LP1
208.0 V
1908-4 21-WATER HEATER
SQUARE D
QO
Frame/Rating: 50.0 A Sensor/Trip 50.0 A
CBL-0239
50.0 ft 1 per phase 4 AWG/kcmil
1932 EP-1/2
208.0 V
1908-5 21-LB
SQUARE D
QO-VH
Frame/Rating: 150.0 A Sensor/Trip 150.0 A
CBL-0240
50.0 ft 1 per phase 1/0 AWG/kcmil
1933 21-LB
208.0 V
1908-6 21-PM PANEL A003
SQUARE D
QO
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0241
50.0 ft 1 per phase 2 AWG/kcmil
1934 PM PANEL A 003
208.0 V
1933-1 21-L1
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0250
50.0 ft 1 per phase 1/0 AWG/kcmil
1962 21-L1
208.0 V
1962-1 21-L11
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1933-2 21-L2
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0251
50.0 ft 1 per phase 1/0 AWG/kcmil
1963 21-L2
208.0 V
1963-1 21-L22
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1908 ED- 21
208.0 V
1924 EDP/21
208V, 800A, 3PH, 4W
100A/3P
CONDENSING
UNIT
"019-CU-01-C-104/
C-208"
36A FLA
208V 1PH
019-P-08
019-P-03019-P-02
225AF/200AT
3P
200A 3P
PANELBOARD
"020-B-205BA"
225AF / 125AT
208/120V
3PH, 4W
SPD
020-P-02
PANELBOARD
"020-B-122A"
225AF / 100AT
208/120V
3PH, 4W
SPD
020-P-01
020-P-06
60A/3P
CONDENSING
UNIT
"020-CU-01-B-122/
B-205B"
25.6 FLA
208V, 3PH
225AF/100AT
3P
PANELBOARD
"021-203A"
225AF / 100AT
208/120V
3PH, 4W
PANELBOARD
"021-142A"
225AF / 100AT
208/120V
3PH, 4W
SPD SPD
225AF/
100AT
3P
100A/2P
CONDENSING UNIT
"021-CU-01-142/203"
36A FLA
208V 1PH
021-P-05
021-P-02021-P-01
225AF/200AT
3P
100A 3P
100A 3P
30A 3P
SPD
100A 3P
PANELBOARD "1904 EDP/21"
225A, 208/120V, 3PH, 4W
CBL-0560
50.0 ft 1 per phase 8 AWG/kcmil
1950 EP-B-1
208.0 V
CBL-0561
50.0 ft 1 per phase 6 AWG/kcmil
1951 ATT LIGHTS 1
208.0 V
CBL-0562
50.0 ft 1 per phase 6 AWG/kcmil
1952 LIGHTS 2
208.0 V
6501-2 ATS-19-1
FEDERAL PACIFIC
NJL
Frame/Rating: 400.0 A Sensor/Trip 400.0 A
65 Gen
6501-1 Main
FEDERAL PACIFIC
NM
Frame/Rating: 800.0 A Sensor/Trip 800.0 A
6501-3 ATS-19-2
GE
TJK
Frame/Rating: 400.0 A Sensor/Trip 400.0 A
RatedSize 313.000 kVA Base kVA 313.0 kVA Rated PF 0.800 Lead X"d 0.1500 pu X/R Pos 20.0000
G
1901-1 Tunnel Main ATS #1
SIEMENS-ALLIS
KM
Frame/Rating: 800.0 A Sensor/Trip 800.0 A
1927-1 LP-19-2
CUTLER HAMMER
BAB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1956 LP-19-2
208.0 V
CBL-0566
50.0 ft 1 per phase 2 AWG/kcmil
1927-2 LP2C
CUTLER HAMMER
BAB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1957 LP2C
208.0 V
CBL-0567
50.0 ft 1 per phase 2 AWG/kcmil
019-P-04
1926-1
SQUARE D
QO
Frame/Rating: 100.0 A
Sensor/Trip: 100.0 A
1906 19LP
208.0 V
1927 PP-19-2
208.0 V
TYP.
019-P-01
DOUBLE THROW
SWITCH
400A, BLDG 20,
RM B-003A
1 per phase
500 AWG/KCMIL
1 per phase
500 AWG/KCMIL
MAIN DIST. PANEL -
BLDG 20, RM B-003A
4 4
PULLBOX
BLDG 20, RM B-001
30A 3P
SPD DPM
225AF/200AT
3P
JUNCTION BOX
"JB-21-EDP/21"
JUNCTION BOX
"JB-1904-EDP/21"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/1
/2
:0
:5
A
M
B
IM
/6
A
-2
-7
V
A H
V E
H R
M i n fr a s tr u c tu re u p g ra d e s
C a s tl e
P o in t/ V
A C
A S
T L
E P
O
IN
T
G E
N E
R A
L S
H E
E T
S .r v t
019EP601
BLDG 19, 20, AND 21 - ONE-LINE DIAGRAM -
REVISED - PART 1 OF 2
SHM/LRL RTS/JNV
100% CONSTRUCTION
DOCUMENTS
11/07/2025
620A4-22-700EHRM INFRASTRUCTURE
UPGRADES - CASTLE POINT
VA HUDSON VALLEY MEDICAL CENTER
41 CASTLE POINT ROAD, WAPPINGERS FALLS, NY 12590
GENERAL NOTES
KEY NOTES
- NTS
1 BLDG 19, 20, AND 21 - ONE-LINE DIAGRAM - REVISED - PART 1 OF 2
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,
AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR
TO IMPLEMENTATION.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
4. NOT ALL ONE-LINE DIAGRAM SHEETS MAY HAVE WORK SHOWN; ALL ONE-LINE
DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
5. ALL PROVIDED DIGITAL POWER METERS (DPM) SHALL BE INTEGERATED INTO
FACILITY BMS SYSTEM; PROVIDE ALL REQUIRED RACEWAYS, CABLING, AND
INTEGRATION TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL PROVIDE CIRCUIT BREAKERS WITH AIC RATING EQUAL TO OR
GREATER THAN HIGHEST FAULT CURRENT RATING INDICATED ON ASSOCIATED
PANELBOARD SCHEDULE AND ONE-LINE DIAGRAM.
Revisions: Date:
UTILIZE EXISTING PANELBOARD "1904 EDP/21" ENCLOSURE AS SPLICE BOX AND
PROVIDE ID PLACARD RELABELING AS "JB-1904-EDP/21". PROVIDE INSULATED TAPS TO
EXTEND EXISTING CONDUIT AND WIRE TO REPLACEMENT PANELBOARD "1904 EDP/21"
AS INDICATED.
REFERENCE ASSOCIATED PANELBOARD SCHEDULE FOR ADDITIONAL CIRCUITING
INFORMATION.
PROVIDE JUNCTION BOX AND INSULATED TAPS TO INTERCEPT AND EXTEND EXISTING
PANELBOARD "1905 BLDG 19 1ST" SOURCE FEEDER TO PANELBOARD "19-DP-TRA" AS
INDICATED. SIZE JUNCTION BOX AND TAPS PER NEC. CONTRACTOR SHALL FIELD
COORDINATE JUNCTION BOX INSTALLATION LOCATION AS REQUIRED.
UTILIZE EXISTING SPARE BREAKER FOR ADDED LOAD. PROVIDE SPLICE BOX,
INSULATED TAPS, RACEWAY, AND CONDUCTOR AS REQUIRED TO TERMINATE CONDUIT
AND WIRE TAG TO EQUIPMENT. SIZE SPLICE BOX AND TAPS PER NEC. CONTRACTOR
SHALL FIELD COORDINATE SPLICE BOX INSTALLATION LOCATION AS REQUIRED.
REFERENCE ASSOCIATED BUILDING 020 PANEL SCHEDULES FOR ADDITIONAL
INFORMATION.
EXISTING PANELBOARD REFED AS SHOWN. REFERENCE EXISTING ONE-LINE DIAGRAM
FOR ADDITIONAL INFORMATION.
ADDITIONAL LOAD HAS BEEN ADDED TO FEEDER. REFERENCE CONTINUED ONE-LINE
DIAGRAM AS INDICATED ON DRAWING AND ASSOCIATED PANEL SCHEDULE FOR
ADDITIONAL LOADING INFORMATION.
EXTEND RACEWAY AND CONDUCTORS AS REQUIRED TO RE-TERMINATE EXISTING
CIRCUITS TO REPLACEMENT PANELBOARD. PERFORM THIS FOR ALL EXISTING
CIRCUITS.
PROVIDE INSULATED TAP WITHIN JUNCTION BOX "JB-21-EDP/213" TO INTERCEPT AND
EXTEND CIRCUIT AS INDICATED.
UTILIZE EXISTING SPARE BREAKER FOR ADDED LOAD. PROVIDE SPLICE BOX, INSULATED
TAPS, RACEWAY, AND CONDUCTOR AS REQUIRED TO TERMINATE FEEDER TO EQUIPMENT.
SIZE SPLICE BOX AND TAPS PER NEC. CONTRACTOR SHALL FIELD COORDINATE SPLICE
BOX INSTALLATION LOCATION AS REQUIRED. REFERENCE ASSOCIATED BUILDING 020
PANEL SCHEDULES FOR ADDITIONAL INFORMATION.
ASI 001 07/16/2026
6501-3 ATS-19-2
GE
TJK
Frame/Rating: 400.0 A Sensor/Trip 400.0 A
E N
ATS-19-2
Manufacturer RUSSELECTRIC Type RTB
CBL-6501 to 1902
50.0 ft 1 per phase 500 AWG/kcmil
1902-1 Main
GE
TKMA
Frame/Rating: 800.0 A Sensor/Trip 800.0 A
1902 20DE
208V, 800A, 3PH, 4W
1902-2 20-LE-20
GE
TFJ
Frame/Rating: 225.0 A
Sensor/Trip 225.0 A
CBL-0260
100.0 ft 1 per phase
4/0 AWG/kcmil
1913-1 20LE-1
GE
THED
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0573
50.0 ft 1 per phase
2 AWG/kcmil
1937 20LE-1
208.0 V
1913-2 20LE-2
GE
THED
Frame/Rating: 100.0 A Sensor/Trip 90.0 A
CBL-0574
50.0 ft 1 per phase
2 AWG/kcmil
1938 20LE-2
208.0 V
1913 LE-20
208.0 V
1913-3 20LE-P
GE
TFJ
Frame/Rating: 110.0 A Sensor/Trip 100.0 A
CBL-0575
50.0 ft 1 per phase
4/0 AWG/kcmil
1939 20LE-P
208.0 V
1902-3 "19"
GE
TFJ
Frame/Rating: 225.0 A
Sensor/Trip 225.0 A
CBL-0261
100.0 ft 1 per phase
4/0 AWG/kcmil
1902-4 Compressor 20
GE
THED
Frame/Rating: 50.0 A
Sensor/Trip 20.0 A
CBL-0262
50.0 ft 1 per phase
8 AWG/kcmil
1915 Compressor 20
208.0 V
1902-5 P1
GE
THED
Frame/Rating: 50.0 A
Sensor/Trip 15.0 A
CBL-0263
50.0 ft 1 per phase
8 AWG/kcmil
1916 P1
208.0 V
1902-6 USECO
FEDERAL PACIFIC
HEJ
Frame/Rating: 225.0 A
Sensor/Trip 200.0 A
CBL-0264
100.0 ft 1 per phase
2/0 AWG/kcmil
1917 20-USECO
208.0 V
1902-7 subpanel#2
FEDERAL PACIFIC
NE
Frame/Rating: 100.0 A
Sensor/Trip 70.0 A
CBL-0265
50.0 ft 1 per phase
2 AWG/kcmil
1918 19-PP-EL2
208.0 V
1902-8 B-002
GE
THED
Frame/Rating: 100.0 A
Sensor/Trip 100.0 A
CBL-0266
100.0 ft 1 per phase
2 AWG/kcmil
1902-9 Compressor 19
GE
THED
Frame/Rating: 50.0 A
Sensor/Trip 20.0 A
CBL-0267
50.0 ft 1 per phase
10 AWG/kcmil
1920 Compressor 19
208.0 V
1902-10 Elevator
FEDERAL PACIFIC
HEJ
Frame/Rating: 225.0 A
Sensor/Trip 200.0 A
CBL-0275
100.0 ft 1 per phase
3/0 AWG/kcmil
19 Elev Fuse
BUSSMANN
FRN-R
Frame/Rating: 175.0 A Sensor/Trip 175.0 A
19 Elev
Rated HP 20.0 hp Rated kVA 20.1 kVA X"d 0.1692 pu X/R 10.0004
1914 19-B-1-2
208.0 V
1914-1 19LE-B
GE
THED
Frame/Rating: 100.0 A
Sensor/Trip 100.0 A
1914-2 19LE-1
GE
THED
Frame/Rating: 100.0 A
Sensor/Trip 100.0 A
CBL-0577
50.0 ft 1 per phase 2 AWG/kcmil
1941 LE-B
208.0 V
1914-3 19LE-2
GE
THED
Frame/Rating: 100.0 A
Sensor/Trip 100.0 A
CBL-0578
50.0 ft 1 per phase 2 AWG/kcmil
1942 LE-2
208.0 V
1918-1
SQUARE D
QO
Frame/Rating: 40.0 A Sensor/Trip 40.0 A
CBL-0579
50.0 ft 1 per phase
8 AWG/kcmil
1943 B-002 (1)
208.0 V
1918 B-002
208.0 V
1918-2
SQUARE D
QO
Frame/Rating: 80.0 A Sensor/Trip 80.0 A
CBL-0580
50.0 ft 1 per phase
8 AWG/kcmil
1944 B-002 (2)
208.0 V
1945-1
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1945 L1
208.0 V
1946-1
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1946 L2
208.0 V
BaseVoltage 208 V RatedAmps 55.7 A
CBL-0268
50.0 ft 1 per phase 2 AWG/kcmil
CBL-0269
50.0 ft 1 per phase 2 AWG/kcmil
1921-1 20-L1a
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
1902-11 New E Pnl Bldg 20
GE
THED
Frame/Rating: 150.0 A
Sensor/Trip 150.0 A
CBL-0280
100.0 ft 1 per phase
1/0 AWG/kcmil
CBL-XF6 to 1902
100.0 ft 1 per phase 500 AWG/kcmil
1921 20-LB
208.0 V
1921-2 20-L2a
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
TO 6501 Emergency Main
SEE SHEET 019EP601
3P SPACES
(X2)
TO BLDG. 20
"SHEET 000EP601"
S
P
XF LP-1
15.0 kVA Pri 480 V Sec 208 V Z = 2.7789 %
X/R 0.8667
TO FEEDER #2, XF-7
Sheet 000EP601
CBL-XF7 to 2001
100.0 ft 3 per phase
500 AWG/kcmil
2001-1 Main
FEDERAL PACIFIC
NP
Frame/Rating: 2000.0 A
Sensor/Trip 2000.0 A
ISC: 15040A
2001 Bldg 20 Main
208.V, 1600A, 3PH, 4W
2001-2 Spare
FEDERAL PACIFIC
NJL
Frame/Rating: 400.0 A Sensor/Trip 400.0 A
2001-3 19DH
FEDERAL PACIFIC
NJL
Frame/Rating: 400.0 A
Sensor/Trip 400.0 A
ISC: 15040A
CBL-0211
100.0 ft
1 per phase 500 AWG/kcmil
2001-4 20LH-1
GE
THQD
Frame/Rating: 225.0 A
Sensor/Trip 225.0 A
ISC: 15040A
CBL-0212
100.0 ft 1 per phase
4/0 AWG/kcmil
2001-5 PP1
GE
THQD
Frame/Rating: 225.0 A
Sensor/Trip 200.0 A
ISC: 15040A
CBL-0213
100.0 ft 1 per phase
4/0 AWG/kcmil
2001-6 20LH-2
GE
THQD
Frame/Rating: 225.0 A
Sensor/Trip 225.0 A
ISC: 15040A
CBL-0214
100.0 ft 1 per phase
4/0 AWG/kcmil
2001-7 20LHP
GE
THED
Frame/Rating: 100.0 A
Sensor/Trip 100.0 A
ISC: 15040A
CBL-0215
100.0 ft 1 per phase 2 AWG/kcmil
2001-8 Spare
GE
THED
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
2004 20LH-1
208.0 V
2005 PP-1
208.0 V
2006 20LH-2
208.0 V
2007 20LN-P
208.0 V
3P SPACE
(X4)
2101-1 UNKNOWN LOAD
CUTLER-HAMMER
HLB
Frame/Rating: 225.0 A Sensor/Trip 225.0 A
2101-2 New Water Tower
CUTLER-HAMMER
HLB
Frame/Rating: 225.0 A Sensor/Trip 100.0 A
CBL-0270
50.0 ft 1 per phase 2 AWG/kcmil
2102-1 MAIN
CUTLER-HAMMER
BR
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
2102 New Water Tower
208.0 V
2101-3 Elev#2
CUTLER-HAMMER
HLB
Frame/Rating: 225.0 A Sensor/Trip 200.0 A
CBL-0276
50.0 ft 1 per phase 2/0 AWG/kcmil
21 Elev Fuse
BUSSMANN
FRN-R
Frame/Rating: 175.0 A Sensor/Trip 175.0 A
21 Elevator
Rated HP 40.0 hp Rated kVA 40.1 kVA X"d 0.1692 pu X/R 10.0004 BaseVoltage 208 V RatedAmps 111.3 A
2103-1 21-PP
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0272
50.0 ft 1 per phase
2 AWG/kcmil
2104-1 21-PP
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
2105 21-PP
208.0 V
2103-2 21-P1
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0273
50.0 ft 1 per phase
2 AWG/kcmil
2106-1 21-P1
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
2106 21-P1
208.0 V
2103-3 21-P2
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
CBL-0274
50.0 ft 1 per phase
2 AWG/kcmil
2107-1 21P2
GE
THHQB
Frame/Rating: 100.0 A Sensor/Trip 100.0 A
2107 21-P2
208.0 V
2103 Panel PP
208.0 V
2101-4 Panel PP
CHALLENGER
CK
Frame/Rating: 250.0 A Sensor/Trip 225.0 A
CBL-0271
50.0 ft 1 per phase
4/0 AWG/kcmil
2101-5 UNKNOWN LOAD
CUTLER-HAMMER
HLB
Frame/Rating: 400.0 A Sensor/Trip 400.0 A
CBL-XF7 to 2101
50.0 ft 4 per phase
500 AWG/kcmil 2101 Bldg 21 Main
208V, 1200A, 3PH, 4W
2101-6 Washer&Dryer 2nd Floor
CUTLER-HAMMER
HLB
Frame/Rating: 225.0 A Sensor/Trip 225.0 A
CBL-0581
50.0 ft 1 per phase
2 AWG/kcmil
2104 Washer& Dryer 2nd Floor
208.0 V
UNKNOWN
LOAD
UNKNOWN
LOAD
Isc: 17908 A Isc: 17908 A Isc: 17908 A Isc: 17908 A
Isc: 11604 A Isc: 11604 A Isc: 11604 A
S
P
XF LP-1
15.0 kVA Pri 480 V Sec 208 V Z = 2.7789 % X/R 0.8667
20A 3P
20A 3P
PANELBOARD
"19-DH"
208/120V 400A
3PH, 4W
CBL-0277
50.0 ft 1 per phase 4/0 AWG/kcmil
CBL-0278
50.0 ft 1 per phase 4/0 AWG/kcmil
CBL-0279
50.0 ft 1 per phase 4/0 AWG/kcmil
2008 19-LH-1
208.0 V
2009 19-LH-2
208.0 V
2010 19-LH-P
208.0 V
TYP.
019-P-07019-P-06
020-P-04 020-P-05
TYP.
400AF / 400AT
3P
100A 3P
225A 3P
225A 3P
NEMA L21-30R
30A, 208V
LOCKING
TR 020-B-122
SIDE B
P-TR-2B
NEMA L21-30R
30A, 208V
LOCKING
TR 020-B-205B
SIDE B
P-TR-2B
NEMA L21-20R
20A, 208V
LOCKING
TR 019-C-104
SIDE B
P-TR-1B
DISCONNECT
"DISC-019-C-104"
30A/3P
NEMA L21-20R
20A, 208V
LOCKING
TR 019-C-208
SIDE B
DISCONNECT
"DISC-019-C-208"
30A/3P
P-TR-1B
SPD
30A 3P
225AF / 100AT
3P
30A 3P
NEMA L21-20R
20A, 208V
LOCKING
TR 021-142
SIDE B
NEMA L21-20R
20A, 208V
LOCKING
P-TR-1B
TR 021-203
SIDE B
021-P-03 021-P-04
30A 3P
20A 3P
20A 3P
3P SPACE
(X2)
PANELBOARD "20-DP-TRB"
225A, 208/120V, 3PH, 4W
DISCONNECT
"DISC-020-B-122"
30A/3P
DISCONNECT
"DISC-021-142"
30A/3P
DISCONNECT
"DISC-021-203"
30A/3P
CBL-0576
50.0 ft 1 per phase 2 AWG/kcmil
1940 LE-B
208.0 V
DPM
019-P-05
020-P-03
DISCONNECT
"DISC-020-B-205B"
30A/3P
P-TR-1B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/1
/2
:0
:1
A
M
B
IM
/6
A
-2
-7
V
A H
V E
H R
M i n fr a s tr u c tu re u p g ra d e s
C a s tl e
P o in t/ V
A C
A S
T L
E P
O
IN
T
G E
N E
R A
L S
H E
E T
S .r v t
019EP602
BLDG 19, 20, AND 21 - ONE-LINE DIAGRAM -
REVISED - PART 2 OF 2
SHM/LRL RTS/JNV
100% CONSTRUCTION
DOCUMENTS
11/07/2025
620A4-22-700EHRM INFRASTRUCTURE
UPGRADES - CASTLE POINT
VA HUDSON VALLEY MEDICAL CENTER
41 CASTLE POINT ROAD, WAPPINGERS FALLS, NY 12590
GENERAL NOTES
KEY NOTES
- NTS
1 BLDG 19, 20, AND 21 - ONE-LINE DIAGRAM - REVISED - PART 2 OF 2
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLANS,
AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR
TO IMPLEMENTATION.
3. SHORT CIRCUIT CALCULATIONS BASED ON VA PROVIDED AS-BUILTS.
4. NOT ALL ONE-LINE DIAGRAM SHEETS MAY HAVE WORK SHOWN; ALL ONE-LINE
DRAWINGS HAVE BEEN INCLUDED IN THIS DRAWING SET FOR REFERENCE
PURPOSES.
5. ALL PROVIDED DIGITAL POWER METERS (DPM) SHALL BE INTEGERATED INTO
FACILITY BMS SYSTEM; PROVIDE ALL REQUIRED RACEWAYS, CABLING, AND
INTEGRATION TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL SYSTEM.
6. CONTRACTOR SHALL PROVIDE CIRCUIT BREAKERS WITH AIC RATING EQUAL TO OR
GREATER THAN HIGHEST FAULT CURRENT RATING INDICATED ON ASSOCIATED
PANELBOARD SCHEDULE AND ONE-LINE DIAGRAM.
Revisions: Date:
PROVIDE JUNCTION BOX AND INSULATED TAPS TO EXTEND EXISTING CONDUIT AND
WIRE TO REPLACEMENT PANELBOARD AS INDICATED. SIZE JUNCTION BOX PER NEC.
CONTRACTOR SHALL FIELD COORDINATE JUNCTION BOX INSTALLATION LOCATION AS
REQUIRED.
REFERENCE ASSOCIATED PANELBOARD SCHEDULE FOR ADDITIONAL INFORMATION.
UTILIZE EXISTING SPARE BREAKER FOR ADDED LOAD. PROVIDE SPLICE BOX,
INSULATED TAPS, RACEWAY, AND CONDUCTOR AS REQUIRED TO TERMINATE CONDUIT
AND WIRE TAG TO EQUIPMENT. SIZE SPLICE BOX AND TAPS PER NEC. CONTRACTOR
SHALL FIELD COORDINATE SPLICE BOX INSTALLATION LOCATION AS REQUIRED.
REFERENCE ASSOCIATED BUILDING 020 PANEL SCHEDULES FOR ADDITIONAL
INFORMATION.
RE-TERMINATE EXISTING FEEDER CONDUCTORS TO REPLACEMENT PANEL AS
REQUIRED. PERFORM THIS FOR ALL EXISTING CIRCUITS.
UTILIZE EXISTING SPARE BREAKER FOR ADDED LOAD. PROVIDE SPLICE BOX, INSULATED
TAPS, RACEWAY, AND CONDUCTOR AS REQUIRED TO TERMINATE FEEDER TO
EQUIPMENT. SIZE SPLICE BOX AND TAPS PER NEC. CONTRACTOR SHALL FIELD
COORDINATE SPLICE BOX INSTALLATION LOCATION AS REQUIRED. REFERENCE
ASSOCIATED BUILDING 020 PANEL SCHEDULES FOR ADDITIONAL
INFORMATION.
07/16/2026ASI 001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/1
/2
:1
:2
A
M
B
IM
/6
A
-2
-7
V
A H
V E
H R
M i n fr a s tr u c tu re u p g ra d e s
C a s tl e
P o in t/ V
A C
A S
T L
E P
O
IN
T
G E
N E
R A
L S
H E
E T
S .r v t
019EP701
ELECTRICAL SCHEDULES
SHM/LRL RTS/JNV
100% CONSTRUCTION
DOCUMENTS
11/07/2025
620A4-22-700EHRM INFRASTRUCTURE
UPGRADES - CASTLE POINT
VA HUDSON VALLEY MEDICAL CENTER
41 CASTLE POINT ROAD, WAPPINGERS FALLS, NY 12590
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE ASSOCIATED EQUIPMENT LOAD
SCHEDULE FOR OVERALL PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING PANELBOARD RATINGS, CIRCUITS,
AND LOADS. BLACK TEXT INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/1
/2
:1
:5
A
M
B
IM
/6
A
-2
-7
V
A H
V E
H R
M i n fr a s tr u c tu re u p g ra d e s
C a s tl e
P o in t/ V
A C
A S
T L
E P
O
IN
T
G E
N E
R A
L S
H E
E T
S .r v t
020EP701
ELECTRICAL SCHEDULES
SHM/LRL RTS/JNV
100% CONSTRUCTION
DOCUMENTS
11/07/2025
620A4-22-700EHRM INFRASTRUCTURE
UPGRADES - CASTLE POINT
VA HUDSON VALLEY MEDICAL CENTER
41 CASTLE POINT ROAD, WAPPINGERS FALLS, NY 12590
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE ASSOCIATED EQUIPMENT LOAD
SCHEDULE FOR OVERALL PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING PANELBOARD RATINGS, CIRCUITS,
AND LOADS. BLACK TEXT INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/1
/2
:1
:3
A
M
B
IM
/6
A
-2
-7
V
A H
V E
H R
M i n fr a s tr u c tu re u p g ra d e s
C a s tl e
P o in t/ V
A C
A S
T L
E P
O
IN
T
G E
N E
R A
L S
H E
E T
S .r v t
021EP701
ELECTRICAL SCHEDULES
SHM/LRL RTS/JNV
100% CONSTRUCTION
DOCUMENTS
11/07/2025
620A4-22-700EHRM INFRASTRUCTURE
UPGRADES - CASTLE POINT
VA HUDSON VALLEY MEDICAL CENTER
41 CASTLE POINT ROAD, WAPPINGERS FALLS, NY 12590
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT DIRECTORIES TO INDICATE IN ANY
AND ALL CHANGES; ALL REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE ASSOCIATED EQUIPMENT LOAD
SCHEDULE FOR OVERALL PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE PROTECTIVE DEVICES (SPD) ARE
INTEGRAL TO ELECTRICAL DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING PANELBOARD RATINGS, CIRCUITS,
AND LOADS. BLACK TEXT INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Revisions: Date:
| 019EP602 |
| 019EP701 |
| 020EP701 |
| 021EP701 |