This is a Pre-Construction Survey Report for Asbestos-Containing Materials (ACM) and Lead-Based Paints (LBP) prepared by Quality Environmental Solutions & Technologies, Inc. (QuES&T) for Spees Design Build at the VA Hudson Valley Health Care Castle Point Campus in Wappingers Falls, New York. The survey was conducted across 17 buildings (Buildings 1, 6, 7, 8, 9, 13, 15E, 16, 17, 18, 19, 20, 21, 35, 44, 88, and 111) in support of a Data Center Project and EHRM Infrastructure Upgrades construction initiative. The inspection occurred from August 31 to September 7, 2023, and September 22, 2023, with sampling and analysis performed by certified NYSDOL asbestos inspectors using Polarized Light Microscopy (PLM), PLM-NOB, and Quantitative Transmission Electron Microscopy (QTEM) methods.

The survey identified asbestos-containing materials in nine buildings, with the most prevalent findings in Buildings 7, 8, 9, 16, 17, 18, 19, and 20. Identified ACM includes rough coat plaster (1.1–2.3% chrysotile) on walls and ceilings, joint compound on sheetrock (1.1–1.3% chrysotile), floor tiles (2.1–2.3% chrysotile), and spray-on fireproofing with vermiculite (Buildings 16 and 20). Lead-based paint testing via X-Ray Fluorescence (XRF) identified LBP on various surfaces across Buildings 1, 6, 7, 8, 9, 17, 18, 19, 35, and 44, ranging from 1.3 to 20.1 mg/sq. cm on wood frames, cove base molding, plaster, and concrete. The report recommends that all identified ACM be removed by a licensed asbestos abatement contractor before construction activities commence, in compliance with Title 12 NYCRR Part 56, EPA NESHAP standards, and OSHA regulations. Additionally, workers performing disturbance of any lead-containing surfaces require monitoring and adherence to 29 CFR 1926.62 occupational exposure protocols.

View the file

Other files

File Type Posted
Amendment 4 - 36C77626B0025 0004.pdf PDF
PRE-BID _RFI_185_ 26.07.16.pdf PDF
Online Bid Opening Meeting Info.docx DOCX document
7-30-2026 - RFIs - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
7-21-2026 - RFI TRACKING SHEET - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
Amendment 3 - 36C77626B0025 0003.pdf PDF
Amendment 2 - 36C77626B0025 0002.pdf PDF
Site visit sign-in sheet - Castle Point EHRM.pdf PDF
Amendment 1 - 36C77626B0025 0001.pdf PDF
Attachment 6 - Appendices Mech Variance Req 620A4-22-700.pdf PDF
Attachment 8 - Appendices UTL Locate 620A4-22-700.pdf PDF
Attachment 9 - DWGS Combined 1 of 5 620A4 22 700.pdf PDF
Attachment 10 - DWGS Combined 2 of 5 620A4 22 700.pdf PDF
Attachment 15 - V-SURV-SUAS-SHEET 2.pdf PDF
Attachment 18 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 19 - Wage rates Dutchess Co NY 5-18-2026.pdf PDF
Attachment 1 - SPECS - 260311 100pc CD2 R2 SPECS Combined 620A4 22 700.pdf PDF
Attachment 11 - DWGS Combined 3 of 5 620A4 22 700.pdf PDF
Attachment 12 - DWGS Combined 4 of 5 620A4 22 700.pdf PDF
Attachment 20 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 21 - Site visit instructions.pdf PDF
Attachment 22 - RFI TRACKING SHEET - SOLICITATION 36C77626B0025 - Castle Point.xlsx XLSX spreadsheet
IFB - 36C77626B0025.pdf PDF
Attachment 2 - BOD - 251107 100pc CD2 BOD 620A4 22 700r1.pdf PDF
Attachment 3 - Appendices ArchVarianceReq-620A4-22-700.pdf PDF
Attachment 13 - DWGS Combined 5 of 5 620A4 22 700.pdf PDF
Attachment 14 - V-SURV-SUAS-SHEET 1.pdf PDF
Attachment 5 - Appendices Geotech -620A4-22-700.pdf PDF
Attachment 7 - Appendices TR Master List 620A4-22-700.pdf PDF
Attachment 16 - V-SURV-SUAS-SHEET 3.pdf PDF
Attachment 17 - V-SURV-SUAS-SHEET 4.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QuES&T Quality Environmental Solutions & Technologies, Inc.

1376 Route 9, Wappingers Falls, NY 12590 Phone (845) 298-6031 Fax (845) 298-6251

NYS MWBD MBE Cert # 49952-2006 NYSUCP DBE Certified NJUCP DBE Certified www.Qualityenv.com

PRE-CONSTRUCTION SURVEY REPORT

FOR

ASBESTOS-CONTAINING MATERIALS (ACM)

LEAD-BASED PAINTS (LBP)

Prepared for:

SPEES DESIGN BUILD

23830 Pacific Highway S, Suite 203

Kent, WA 98032 at

Veteran’s Affairs Hudson Valley Health Care

Castle Point Campus Buildings’

1, 6, 7, 8, 9, 13, 15E, 16, 17, 18, 19, 20, 21, 35, 44, 88, 111.

41 Castle Point Road

Wappingers Falls, NY 12590

QuES&T Project #23-5590 http://www.qualityenv.com/

December 7, 2023

SPEES DESIGN BUILD

23830 Pacific Highway S, Suite 203

Kent, WA 98032

ATTN: Jonathan Greb

Via E-mail: jonG@speesdb.com

Re: Veteran’s Affairs Hudson Valley Health Care

Castle Point Campus

Multiple Buildings’

Pre-Construction Asbestos & Lead

QuES&T Project #23-5590

Dear Mr. Greb, Attached is the Pre-Construction Inspection Report for Asbestos-containing Materials (ACM) & Lead-

Based Paints (LBP) identified throughout areas included within the above-referenced location(s) by

Quality Environmental Solutions & Technologies, Inc. (QuES&T). The inspection included visual assessment of the location in question, and representative sampling, as required, in compliance with the requirements of all applicable federal, state, and local regulations.

The attached report summarizes the inspection protocol and inspection results for your review. QuES&T believes this report accurately reflects the material condition existing in the functional spaces at the time of our inspection.

Should you wish to discuss this matter further or require additional information concerning this submittal, please contact us at (845) 298-6031. QuES&T appreciates the opportunity to assist Spees Design Build in the environmental services area.

Sincerely, Shannon D. Talsma

Field & Technical Services

NYS/AHERA Inspector/Project Monitor Cert. #AH 23-61PEC-SHAB

NYS Mold Assessor Cert. #23-6O1D6-SHMO

Niton-Certified XRF Technician mailto:jonG@speesdb.com

TABLE OF CONTENTS

EXECUTIVE SUMMARY Page 1 - 5

1.0 INTRODUCTON Page 5

2.0 ASBESTOS SURVEY Page 6 - 9

2.1 Inspection Summary

2.2 Sample Collection & Analytical Procedures

2.3 Identified Asbestos-containing Materials (ACM)

3.0 LEAD-BASED PAINT SURVEY Page 9 - 11

3.1 Inspection Summary

3.2 Identified Lead-based Paints (LBP)

4.0 RECOMMENDATIONS Page 11 - 12

4.1 Asbestos

4.2 Lead

5.0 DISCLAIMERS Page 13

Table I Identified Asbestos-containing Materials (ACM) Page 7 - 9

Table II Identified Lead-based Paints (LBP) Page 10 - 11

Appendix A Sample Location Drawings & Asbestos Sample Results

Appendix B Asbestos Drawings

Appendix C Lead Based Paint XRF Analytical Data

Appendix D Laboratory, Company & Personnel Licenses & Certifications

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

EXECUTIVE SUMMARY

Quality Environmental Solutions & Technologies, Inc. (QuES&T) was retained by Spees Design Build to conduct a Pre-Construction Survey for the presence of Asbestos-containing Materials (ACM) & Lead-based Paints (LBP) in support of the Data Center Project, located at the VA Hudson Valley Health Care, Castle Point Campus, 41 Castle Point Road, Wappingers Falls, NY 12590.

The survey included a visual inspection/assessment for suspect hazardous material(s), as detailed above, which are likely to be affected by planned demolition/renovations/construction activities. Inspection and sampling was limited to areas/materials slated for demolition/renovation/construction.

The survey was conducted by QuES&T personnel on August 31st – September 7th, 2023 and September

22nd, 2023. Asbestos & Lead inspections and/or sampling was conducted by NYSDOL Asbestos

Inspector(s) Shannon D. Talsma (AH# 23-61PEC-SHAB). The lead survey was conducted by Niton-

Certified XRF Technician Shannon D. Talsma utilizing X-Ray Fluorescence Technology (XRF).

ASBESTOS

Laboratory analysis and/or existing sampling data indicated the following materials as Asbestos-containing Materials (greater than 1% asbestos) (Refer to Table I & Appendix A for details and locations)

Building #1

**No Asbestos-containing Materials (ACM) identified upon PLM & QTEM/PLM analysis.**

Building #6

Building #7

Second Floor, Room #209, Wall, Partition, On Pyro Bar Brick, Rough Coat Plaster: 1.1% Chrysotile

Second Floor, Room #209, Wall, Partition, On Pyro Bar Brick, Rough Coat Plaster: 1.2% Chrysotile

Third Floor, Room #317, Ceiling, Above Suspended Ceiling, Rough Coat Plaster: 1.1% Chrysotile

Third Floor, Room #317, Ceiling, Above Suspended Ceiling, Rough Coat Plaster: 1.2% Chrysotile

Building #8

First Floor, Room #108A, Above Suspend Ceiling, Ceiling, Rough Coat Plaster: 1.1% Chrysotile

First Floor, Room #108A, Wall, Partition, Behind Sheetrock, Rough Coat Plaster: 1.1% Chrysotile

First Floor, Room #108A, Wall, Partition, Behind Sheetrock, Rough Coat Plaster: 1.1% Chrysotile

Building #9

First Floor, Room #119, Wall, Partition, On Sheetrock, Joint Compound: 1.2% Chrysotile

First Floor, Room #119, Wall, Partition, On Sheetrock, Joint Compound: 1.1% Chrysotile

Second Floor, Room #211, Wall, Partition, On Sheetrock, Joint Compound: 1.2% Chrysotile

Second Floor, Room #211, Wall, Partition, On Sheetrock, Joint Compound: 1.3% Chrysotile

Third Floor, Room #309, Wall, Partition, On Sheetrock, Joint Compound: 1.2% Chrysotile

Third Floor, Room #309, Wall, Partition, On Sheetrock, Joint Compound: 1.1% Chrysotile

Third Floor, Room #309, Wall, Partition, On Sheetrock, Joint Compound: 1.1% Chrysotile

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Building #9 contd.

First Floor, Room #119, Wall, On Pyro Bar Brick, Rough Coat Plaster: 1.4% Chrysotile

First Floor, Room #119, Wall, On Pyro Bar Brick, Rough Coat Plaster: 1.3% Chrysotile

First Floor, Room #119, Above Suspended Ceiling, Ceiling, Rough Coat

Plaster: 1.2% Chrysotile

Second Floor, Room #211, Wall, On Pyro Bar Brick, Rough Coat Plaster: 1.2% Chrysotile

Second Floor, Room #211, Above Suspended Ceiling, On Cementitious Deck, Rough Coat Plaster: 1.1% Chrysotile

Second Floor, Room #211, Wall, Partition, On Pyro Bar Brick, Rough Coat

Plaster: 1.2% Chrysotile

Third Floor, Room #309, Above Suspended Ceiling, Ceiling, Rough Coat

Plaster: 1.2% Chrysotile

Building #13

Building #15E

Building #16

Basement, Room #F-008, Above Suspended Ceiling, On Metal Deck: *Vermiculite*

Building #17

Second Floor, Room #G-203, Wall, Perimeter, Rough Coat Plaster: 2.0% Chrysotile

Second Floor, Room #G-203, Wall, Perimeter, Rough Coat Plaster: 2.0% Chrysotile

Second Floor, Room #G-203, Wall, Perimeter, Rough Coat Plaster: 1.2% Chrysotile

First Floor, Room #G-107, Floor, Under Carpet Tile, 9” x 9” Floor Tile: 2.1% Chrysotile

First Floor, Room #G-107, Floor, Under Carpet Tile, 9” x 9” Floor Tile: 2.3% Chrysotile

Building #18

Basement, Room #39, Wall, Partition, Rough Coat Plaster: 1.3% Chrysotile

Basement, Room #39, Wall, Partition, Rough Coat Plaster: 1.3% Chrysotile

Second Floor, Room #D-124, Above Suspended Ceiling, Ceiling, Rough

Coat Plaster: 1.3% Chrysotile

Second Floor, Room #D-124, Above Suspended Ceiling, Ceiling, Rough

Coat Plaster: 1.3% Chrysotile

Third Floor, Room #314-C, Above Suspended Ceiling, Ceiling, Rough

Coat Plaster: 1.3% Chrysotile

Third Floor, Room #314-C, Above Suspended Ceiling, Ceiling, Rough

Coat Plaster: 1.3% Chrysotile

Third Floor, Room #314-C, Above Suspended Ceiling, Ceiling, Rough

Coat Plaster: 1.3% Chrysotile

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Building #19

First Floor, Room #C-104, Wall, Partition, Rough Coat Plaster: 1.1% Chrysotile

First Floor, Room #C-104, Wall, Partition, Rough Coat Plaster: 1.2% Chrysotile

First Floor, Room #C-104, Above Suspended Ceiling, Ceiling, On

Concrete, Rough Coat Plaster: 1.3% Chrysotile

Second Floor, Room #C-208, Above Suspended Ceiling, Ceiling, Rough Coat Plaster: 1.5% Chrysotile

Second Floor, Room #C-208, Wall, Partition, Rough Coat Plaster: 1.1% Chrysotile

Building #20

Second Floor, Room #B-205B, Above Suspended Ceiling, On

Metal Beam: *Vermiculite*

Second Floor, Room #B-205B, Above Suspended Ceiling, On

Metal Beam: *Vermiculite*

Second Floor, Room #B-205B, Above Suspended Ceiling, On

Metal Beam: *Vermiculite*

First Floor, Room #B-122, Above Suspended Ceiling, On

Metal Beam: *Vermiculite*

First Floor, Room #B-122, Above Suspended Ceiling, On

Metal Beam: *Vermiculite*

Building #21

Building #35

Building #44

Building #88

Building #111

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

LEAD

Based on review of the data generated by the Niton XLp-300A XRF Spectrum Analyzer, the following surfaces within the scope of work were identified as lead-based as defined by HUD/EPA (equal to or in excess of 1.0 milligram per square centimeter) (Refer to Table II & Appendix B for details):

Interior’s

Basement, Foundation, Wall, Brick & Mortar, White 2.5 mg/sq. cm

Basement, Foundation, Wall, Brick & Mortar, White 4.2 mg/sq. cm

Basement, Foundation, Wall, Brick & Mortar, White 2.9 mg/sq. cm

Basement, Foundation, Wall, Brick & Mortar, White 4.5 mg/sq. cm

Building #6, Garage #8

Main Level, Door, Frame, Wood, White 2.7 mg/sq. cm

Third Floor, Room #319, Window, Frame, Wood, White 14.3 mg/sq. cm

Third Floor, Room #319, Wall, Cove Base Molding, Wood, White 19.8 mg/sq. cm

Third Floor, Room #319, Door, Frame, Wood, White 13.0 mg/sq. cm

Second Floor, Room #209, Window, Frame, Wood, White 12.4 mg/sq. cm

Second Floor, Room #209, Door, Frame, Wood, White 10.1 mg/sq. cm

First Floor, Room #115, Wall, Cove Base Molding, Wood, Gray 20.1 mg/sq. cm

First Floor, Room #115, Window, Sill, Wood, White 5.1 mg/sq. cm

First Floor, Room 108A, Window, Frame, Wood, White 8.8 mg/sq. cm

Building #9

Third Floor, Room #309, Window, Frame, Wood, Tan 11.0 mg/sq. cm

Third Floor, Room #309, Window, Sill, Wood, Tan 5.7 mg/sq. cm

First Floor, Room #G-107, Ceiling, Plaster, Tan 7.4 mg/sq. cm

First Floor, Room #G-107, Above Suspended Ceiling, Wall, Plaster, Tan 2.6 mg/sq. cm

First Floor, Room #G-107, Above Suspended Ceiling, Wall, Plaster, White 2.4 mg/sq.cm

Third Floor, Room #D-314C, Wall, Upper, Plaster, White 1.9 mg/sq. cm

Third Floor, Room #D-314C, Ceiling, Plaster, Tan 4.1 mg/sq. cm

Second Floor, Room #D-214, Ceiling, Plaster, Tan 4.6 mg/sq. cm

Basement, Room #39, Wall, Plaster, White 4.0 mg/sq. cm

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Second Floor, Room #208-C, Ceiling, Plaster, Green 3.2 mg/sq. cm

First Floor, Room #35-003, Step, Concrete, Yellow 1.3 mg/sq. cm

First Floor, Room #44-101, Wall, Plaster, Tan 2.0 mg/sq. cm

It should be noted that several components tested did in fact contain minimal lead-levels below the EPA threshold level of 1.0 mg/sq. cm for classification as Lead-Based Paint (LBP) and are considered lead-containing coatings by the OSHA Regulation, “Lead Exposure in Construction” (29 CFR 1926.62).

OSHA does not recognize a minimum limit for lead concentrations in paint for the purposes of disturbance. Monitoring of workers performing demolition/cleaning/disturbance of painted surfaces shall be completed to document personnel occupational exposure. Items containing any amount of lead concentration are considered lead-containing coatings per 29 CFR 1926.62, OSHA Lead Exposure in

Construction.

1.0 INTRODUCTION:

Quality Environmental Solutions & Technologies, Inc. (QuES&T) performed a Pre-Construction Survey for the presence of Asbestos-containing Materials (ACM) & Lead-based Paint (LBP) in conformance with the requirements of all applicable federal, state, and local regulations. The survey included a visual inspection/assessment, and representative sampling of suspect hazardous materials, as required, throughout accessible interior and exterior locations to be affected by future renovations of Multiple

Buildings throughout the VA Campus.

Certified QuES&T personnel, Shannon D. Talsma conducted field inspection(s) on August 31st –

September 7th, 2023 and September 22nd, 2023. The inspection scope was established based on review of work scope drawings. Results and findings from previous surveys conducted by QuES&T were not utilized in this inspection.

QuES&T established functional spaces based either on physical barriers (i.e. walls, doors, etc.) or homogeneity of material. Within each functional space identified, a visual inspection was performed using reasonable care and judgment, to identify and assess location, quantity, friability, and/or condition, as applicable, of all accessible installed building materials observed at the affected portion of the building/structure.

Limited localized demolition of building surfaces was performed, as part of this survey, to access concealed surfaces. No disassembly of installed equipment was conducted as part of this inspection. ACM and/or LBP, concealed within structural components and equipment interiors or that is accessible only through extensive mechanical or structural demolition may not have been identified as part of this survey.

Homogenous material types were established based on appearance, color, and texture. The findings presented in this report are based upon reasonably available information and observed site conditions at the time the assessment was performed. The findings and conclusions of this report are not meant to be indicative of future conditions at the site and does not warrant against conditions that were not evident from visual observations or historical information obtained from others.

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

2.0 ASBESTOS SURVEY:

2.1 INSPECTION SUMMARY

QuES&T performed a Pre-Construction Survey, in conformance with Title 12 NYCRR Part 56-5.1, for

Spees Design Build in support of the Construction Project at VA Hudson Valley Health Care, Castle

Point Campus, 41 Castle Point Road, Wappingers Falls, NY 12590. The survey included a visual inspection / assessment for Presumed Asbestos-containing Materials (PACM) and suspect miscellaneous

Asbestos-containing Materials (ACM) throughout accessible interior and exterior locations to be affected by future renovations, as detailed above. No previous sampling data were utilized in this inspection.

Limited localized demolition of building surfaces was performed, as part of this survey, to access concealed surfaces. No disassembly of installed equipment was conducted as part of this inspection. ACM concealed within structural components and equipment interiors or that is accessible only through extensive mechanical or structural demolition may not have been identified as part of this survey. When any construction activity, such as demolition, remodeling, renovation, or repair work, reveals PACM or suspect miscellaneous ACM that has not been identified, as part of this survey, all construction activities shall cease in the affected area.

The survey included both visual inspection of accessible spaces and representative sampling of suspect building materials for ACM. Samples collected were analyzed by a laboratory approved under the New

York State Department of Health Environmental Laboratory Approval Program (NYSDOH ELAP).

Samples were analyzed in the laboratory by Polarized Light Microscopy (PLM), Polarized Light

Microscopy-NOB (PLM-NOB) and/or Quantitative Transmission Electron Microscopy (QTEM), as required. Sample collection and laboratory analysis were conducted in compliance with the requirements of Title 12 NYCRR Part 56-5.1, 29 CFR 1926.1101 and standard EPA & OSHA accepted methods.

Samples consisting of multiple layers were separated and analyzed independently in the laboratory.

2.2 SAMPLE COLLECTION & ANALYTIAL PROCEDURES

Representative bulk sampling was performed on suspect building materials for laboratory analysis using

PLM, PLM-NOB, and/or QTEM. The following is a summary of installed building materials sampled:

• Wall Materials – Brick, Mortar, Joint Compound, Sheetrock, Plaster, Mortar, Brick, Concrete, Pyro Bar Brick, Cove Base Molding, Mastic, Ceramic Wall Tile, Grout, Cementitious Block.

• Ceiling Materials – Ceiling Tile, Glue Dabs.

• Flooring Materials – Carpet Mastic, Cementitious Slab, Floor Tile, Mastic, Tar Paper Vapor

Barrier, Leveler, Linoleum Sheet Flooring, Peel and Stick Floor Tile, Ceramic Floor Tile, Grout, Mudset.

• Thermal System Insulation Materials (TSI) – Pipe Insulation.

• Miscellaneous Materials – Spray On Fireproofing, Anti Sweat Tar.

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Certified QuES&T personnel (Appendix C), Mr. Shannon D. Talsma (Cert. #AH 23-61PEC-SHAB) performed visual assessments throughout interior and exterior construction areas. A total of five hundred-thirteen (513) samples/layers of installed and accessible suspect building materials were analyzed by a laboratory approved under the NYSDOH ELAP. Two hundred forty-two (242) samples/layers were analyzed using Polarized Light Microscopy (PLM) for friable materials; one hundred fifty (150) samples/layers were analyzed using Polarized Light Microscopy (PLM-NOB) for non-friable organically bound materials; and one hundred twenty-four (124) samples/layers were analyzed by Confirmatory-

QTEM following negative-determinations using PLM-NOB protocols.

2.3 IDENTIFIED ASBESTOS-CONTAINING MATERIALS (ACM)

TABLE I: IDENTIFIED ACM

VA Hudson Valley Health Care

Castle Point Campus

Multiple Buildings

41 Castle Point Road

Wappingers Falls, NY 12590

(CONSTRUCTION AREAS)

(Refer to Appendix A for details)

KEY: ACM = Materials containing greater than 1% of asbestos;

LF = Linear Feet; SF = Square Feet; PACM = Presumed Asbestos-containing Materials;

Friable = ACM capable of being released into air, and which can be crumbled, pulverized, powdered, crushed, or exposed by hand-pressure.

Location Material Approximate

Quantity Friable? Condition

(INTERIORS)

**No Asbestos-containing Materials identified upon PLM & QTEM/PLM analysis.**

Building #6

Second Floor, Room #209, Wall, Plaster 800 SF Yes Good

Partition, On Pyro Bar Brick, Rough Coat

Third Floor, Room #317, Ceiling, Plaster 800 SF Yes Good

Above Suspended Ceiling, Rough

Coat

First Floor, Room #108A, Above Plaster 800 SF Yes Good

Suspended Ceiling, Ceiling, Rough

Coat

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Location Material Approximate

Quantity Friable? Condition

Building #9

First Floor, Room #119, Wall, Joint Compound 400 SF Yes Good

Partition, On Sheetrock

Second Floor, Room #211, Wall, Joint Compound 400 SF Yes Good

Partition, On Sheetrock

Third Floor, Room #309, Wall, Joint Compound 400 SF Yes Good

Partition, On Sheetrock

Building #13

Building #15E

Building #16

Basement, Room #F-008, Wall, Spray On Fireproofing 400 SF Yes Good

Perimeter, Above Suspended, Ceiling, On Metal Deck

Second Floor, Room #G-203, Wall, Plaster 1,000 SF Yes Good

Perimeter, Rough Coat

First Floor, Room #G-107, Floor, Floor Tile 600 SF No Good

Under Carpet Tile, 9” x 9”

Basement, Room #39, Wall, Plaster 800 SF Yes Good

Partition, Rough Coat

Second Floor, Room #D-124, Above Plaster 800 SF Yes Good

Suspended Ceiling, Ceiling, Rough

Coat

Third Floor, Room #314-C, Plaster 800 SF Yes Good

Above Suspended Ceiling, Ceiling, Rough Coat

First Floor, Room #C-104, Wall, Plaster 800 SF Yes Good

Partition, Rough Coat

Second Foor, Room #C-208, Plaster 800 SF Yes Good

Above Suspended Ceiling, Ceiling, Rough Coat

Building #20

Second Floor, #B-205B, Above Spray On Fireproofing 200 SF Yes Good

Suspended Ceiling, On Metal *Vermiculite*

Beam

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Location Material Approximate

Quantity Friable? Condition

First Floor, #B-122, Above Spray On Fireproofing 200 SF Yes Good

Suspended Ceiling, On Metal *Vermiculite*

Beam

Building #21

Building #88

Building #111

3.0 LEAD SURVEY:

3.1 INSPECTION SUMMARY

QuES&T conducted a Limited Pre-Construction Lead Survey, utilizing X-Ray Fluorescence Technology

(XRF), throughout specific interior and exterior areas of the VA Hudson Valley Health Care, Castle Point

Campus, Building #1, located at 41 Castle Point Road, Wappingers Falls, NY 12590 in support of the

Spees Design Build Construction Project. The survey was limited to specific accessible, representative building components & immovable objects, potentially affected by scheduled renovation/construction activities.

Niton-certified XRF Technician(s) Shannon D. Talsma of QuES&T, collected a total of one hundred seventy-four (174) samples (including calibrations) on August 31st – September 7th, 2023 and September

22nd, 2023.

3.2 IDENTIFIED LEAD-BASED PAINT(S) (LBP)

Based on review of the data generated by the Niton XLp-300A XRF Spectrum Analyzer, the following surfaces tested were identified as lead-based as defined by HUD/EPA (equal to or in excess of 1.0 milligram per square centimeter):

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

TABLE II: IDENTIFIED LEAD-BASED PAINT

VA Hudson Valley Health Care

Castle Point Campus

Multiple Buildings

41 Castle Point Road

Wappingers Falls, NY 12590

(CONSTRUCTION AREAS)

Location

LBP

Component Substrate Color LBP Condition Approximate Quantity

Building #1, Basement Wall Brick & Mortar White Intact 2000 SF

Building #6, Garage #8, Main Level Door, Frame Wood White Fair 10 SF

Building #7, Third Floor, Room #319 Window, Frame Wood White Intact 6 SF

Building #7, Third Floor, Room #319

Cove Base

Molding Wood White Intact 10 SF

Building #7, Third Floor, Room #319 Door, Frame Wood White Intact 6 SF

Building #7, Second

Floor, Room #209 Window, Frame Wood White Intact 6 SF

Building #7, Second

Floor, Room #209 Door, Frame Wood White Intact 6 SF

Building #7, First Floor, Room #115

Wall, Cove Base

Molding Wood Gray Intact 10 SF

Building #7, First Floor, Room #115 Window, Sill Wood White Intact 2 SF

Building #8, First Floor, Room #108A Window, Frame Wood White Intact 6 SF

Building #9, Third Floor, Room #309 Window, Frame Wood Tan Intact 6 SF

Building #9, Third Floor, Room #309 Window, Sill Wood Tan Intact 2 SF

Building #17, First Floor, Room #G-107 Ceiling Plaster Tan Fair 400 SF

Building #17, First Floor, Room #G-107

Above

Suspended

Ceiling, Wall

Plaster Tan Fair 800 SF

Building #17, Room #G-

Above

Suspended

Ceiling, Wall

Plaster White Intact 800 SF

Building #18, Third

Floor, Room #D-314C Wall, Upper Plaster White Intact 800 SF

Building #18, Third

Floor, Room #D-314C Ceiling Plaster Tan Intact 400 SF

Building #18, Second

Floor, Room #D-214 Ceiling Plaster Tan Fair 400 SF

Building #18, Basement, Room #39 Wall Plaster White Intact 800 SF

Building #19, Second

Floor, Room #208-C Ceiling Plaster Green Fair 400 SF

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Location

LBP

Component Substrate Color LBP Condition Approximate Quantity

Building #35, Room

#35-003 Step Concrete Yellow Intact 4 SF

Building #44, First Floor, Room #44-101 Wall Plaster Tan Intact 400 SF

It should be noted that several components tested did in fact contain minimal lead-levels below the EPA threshold level of 1.0 mg/sq. cm for classification as Lead-Based Paint (LBP) and are considered lead-containing coatings by the OSHA Regulation, “Lead Exposure in Construction” (29 CFR 1926.62).

OSHA does not recognize a minimum limit for lead concentrations in paint for the purposes of disturbance. Monitoring of workers performing demolition/cleaning/disturbance of painted surfaces shall be completed to document personnel occupational exposure. Items containing any amount of lead

4.0 RECOMMENDATIONS:

4.1 ASBESTOS

All construction personnel as well as individuals who have access to locations where asbestos containing materials (ACM) exists should be informed of its presence and the proper work practices in these areas.

Conspicuous labeling of all ACM is suggested to ensure personnel is adequately informed. Personnel should be informed not to rest, lean or store material or equipment on or near these surfaces and not to cut, saw, drill, sand or disturb ACM. All removal, disturbance, and repair of ACM should be performed in compliance with Title 12 NYCRR Part 56 by persons properly trained to handle ACM. Facility custodial and maintenance personnel should receive training commensurate with their work activities; as defined in

29 CFR 1910.1001.

As specified in Title 12 NYCRR Part 56-5.1 (h) and (i), "If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains ACM, PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material, which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth in this Part. All ACM, PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material impacted by the demolition, renovation, remodeling, or repair project shall be removed as per this Part, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner’s agent prior to the completion of the asbestos abatement in accordance with the notification requirements of this Part…All building/structure owners and asbestos abatement contractors on a demolition, renovation, remodeling, or repair project, which includes work covered by this part, shall inform all trades on the work site about

PACM, ACM, asbestos material and suspect miscellaneous ACM…Bids may be advertised and contracts awarded for demolition, remodeling, renovation, or repair work, but no work on the current intermediate portion of the project shall commence on the demolition, renovation, remodeling or repair work by any owner or agent prior to completion of all necessary asbestos abatement work for the current intermediate portion of the entire project, in conformance with all standards set forth in this Part.”

Prior to conducting demolition or construction work at the building, all ACM affected/impacted by such activities shall be removed utilizing a licensed asbestos abatement contractor and NYSDOL/EPA/NYC certified personnel prior to construction/demolition activities. All work conducted should be in accordance with all legal requirements, including but not limited to U.S. Environmental Protection

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

Agency (EPA) National Emissions Standards for Hazardous Air Pollutants (NESHAP) [40 CFR Part 61], New York State Industrial Code Rule 56 Asbestos Regulations (ICR 56) and Chapter 1 of Title 15 of the

Rules of the City of New York Regulations, as applicable. Advance notification of the asbestos project to the USEPA, NYSDOL, and NYCDEP may be required.

All suspect building materials not sampled during this survey should be considered ACM until these materials are sampled and analyzed for ACM in the laboratory. Concealed ACM: In addition to the

ACMs identified at the site, there is a possibility that concealed ACM may exist at the subject facility. As such, if any concealed suspect ACM is encountered during future construction related activities, the work should immediately stop. Prior to resuming the work, the suspect ACM should either be 1) Sampled by an appropriately certified asbestos professional and submitted to an Approved NYSDOH ELAP laboratory for asbestos analysis or 2) Presumed to be ACM (PACM) and removed by a licensed asbestos abatement contractor for disposal in accordance with all applicable regulations.

4.2 LEAD

In addition to any identified Lead-based Paints (LBP), several components tested did in fact contain minimal lead-levels below the EPA threshold level of 1.0 mg/sq. cm for classification as LBP and are considered lead-containing coatings by the OSHA Regulation, “Lead Exposure in Construction” (29 CFR

1926.62). OSHA does not recognize a minimum limit for lead concentrations in paint for the purposes of disturbance. Monitoring of workers performing demolition/cleaning/disturbance of painted surfaces shall be completed to document personnel occupational exposure. Items containing any amount of lead

Activities involving the disturbance of LBP in homes, child-occupied facilities, and/or pre-schools built before 1978 must follow the requirements outlined by EPA regulations (40 CFR 745).

In areas where demolition and/or renovations are to occur and lead is present, the demolition debris waste stream should be further analyzed during segregation for compliance with EPA regulations to ensure proper disposal. TCLP testing can be performed prior to waste segregation, but results may not be indicative of the actual waste streams produced during demolition.

Pre-Construction Environmental Survey SPEES DESIGN BUILD

QuES&T Project #23-5590 @VA Hudson Valley Health Care, Multiple Buildings

ENVIRONMENTAL CONSULTING & TRAINING

5.0 DISCLAIMERS

The findings presented in this report are based upon reasonably available information and observed site conditions at the time the assessment was performed. Conditions may have changed since that time and the findings and conclusions of this report are not meant to be indicative of future conditions at the Site.

This report does not warrant against conditions that were not evident from visual observations or historical information obtained, or conditions that could only be determined by physical sampling or other intrusive investigation techniques that are outside the proposed scope of work.

It should be noted that the information contained within this report is based solely upon site observations and the results of laboratory analysis for samples collected by QuES&T. These observations and results are time dependent, subject to changing site conditions and revisions to Federal, State and Local regulations. QuES&T warrants that these findings have been promulgated after being prepared in general accordance with generally accepted practices in the abatement industries. QuES&T also recognizes that inspection laboratory data is not usually sufficient to make all abatement and management decisions.

Due to the potential for concealed Asbestos-containing Materials (ACM) or other regulated materials, this report should not be construed to represent all ACM or regulated materials within the site(s). All quantities of ACM or other regulated materials identified, and all dimensions listed within this report are approximate and should be verified On-site.

This inspection report is not intended to be used as the sole basis for soliciting pricing for regulated materials abatement. An abatement plan, specification, drawing and/or Variances should be developed to identify scope, timing, phasing, and remediation means & methods for any asbestos project. The Linear and/or Square Footages (LF / SF) listed within this Report are only approximates. Abatement

Contractor(s) are required to visit the building(s) in order to take actual field measurements within each listed location.

Appendix A:

SAMPLE LOCATION DRAWINGS &

ASBESTOS SAMPLE RESULTS

Quality Environmental Solutions & Technologies, Inc.

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 00G

LOBBY 101 & RM 102

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 1 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

Sample Location (ACM)

02, 0401, 03

07, 08, 09

No Asbestos-containing Materials (ACM) identified uponPLM & QTEM/PLM analysis

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/26/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 01

GARAGE #8

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building #6 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/26/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 01

ROOM 115

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 7 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location

01, 03, 05, 07

02, 04, 06

09, 12

10, 13

16, 21

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 02

ROOM 209

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 7 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

17, 23, 27

18, 22, 26

28, 29

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-03

Issued For:

Asbestos Survey

Version #

LEVEL 03

ROOM 317

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 7 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

19, 24

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM 05B

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 8 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

B05

15, 17

16, 1820 19

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM 108A

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 8 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

108A

0102, 04

03, 05

07, 09

08, 10

06, 11

23, 25

24, 26

27 28

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/25/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM 119

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 9 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

01, 08

10, 20, 11, 21, 12, 17

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 2

ROOM 211

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 9 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location

14, 15, 18, 22

26, 28, 32

27, 29, 33

13, 23

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-03

Issued For:

Asbestos Survey

Version #

LEVEL 3

ROOM 309A

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 9 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

309A

01, 09

0316, 19

39 34, 35

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM 01

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building #13 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

01 02, 04

03, 05

06, 08, 10, 12

07, 09, 11, 13

No Asbestos-containing Materials (ACM) identified uponPLM & QTEM/PLM analysis

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM 011A

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 15E 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

011A

02, 04

03, 05

07, 10

06, 09

08, 11

12, 14, 13, 15, No Asbestos-containing Materials (ACM) identified uponPLM & QTEM/PLM analysis

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM F-008

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 16 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

F-008

01, 05

02, 04

06, 07, 15, 16

08, 19, 10, 12, 14

21, 22

09, 11, 13

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM G-014

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 17 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

G - 014

09, 13

10, 14

11, 15

32, 44

33, 45

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM 107

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 17 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

06, 16

12, 17

30, 34, 36

31, 35, 37

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 2

ROOM G203

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 17 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

02, 04

03, 05

08, 19

20, 22, 24, 28, 21, 23, 25, 29, 42, 43

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-00

Issued For:

Asbestos Survey

Version #

LEVEL 00

ROOM 39

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 18 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location

04, 09 05, 10

11, 18

12, 19

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM 115

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 18 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

Room 115

01, 07

03, 08

41, 43, 45, 47

42, 44, 46, 48

51, 52

57, 58

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 3

ROOM 314C

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 18 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

314C

16, 17, 23, 24

26, 28, 32, 34, 36, 38

15, 22

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM C104

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 19 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

C104

02, 07

13, 14

15, 16

01, 06, 12

03, 08

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 2

ROOM 208

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 19 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

04, 09 05, 10, 11

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 1

ROOM 122

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 20 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Location (Non-ACM)

01, 06

11, 12 17, 18

13, 15

14, 16

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-01

Issued For:

Asbestos Survey

Version #

LEVEL 01

ROOM 142A

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 21 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement. An abatement plan, specification, drawing and/or variances should be developed to identify scope, timing, phasing and remediation means & methods for any asbestos project.

SAMPLE LOCATION KEY

Sample Locations

08, 09, 10

13, 15, 16, 17, 18, 20

01, 06, 23, 142A

1376 Route 9 Wappingers Falls, NY 12590

Phone: (845) 298- 6031 Fax: (845) 298-6251

Prepared By:

DS

QuES&T Project #:

23-5590

Date:

9/19/2023

SL-02

Issued For:

Asbestos Survey

Version #

LEVEL 02

ROOM A-203

SAMPLE LOCATIONS

Spees Design Build 23830 Pacific Highway S, Suite 203, Kent, WA 98032

Building 21 41 Castle Point Road, Wappingers Falls, NY 12590

Project Manager:

LJH

CLIENT

PROJECT LOCATION

**Drawing Not to Scale** This Drawing is not intended to be used as the sole basis for soliciting pricing for asbestos abatement.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .