Attachment 3 - Appendices ArchVarianceReq-620A4-22-700.pdf

PDF 7 MB Posted

Attached to
Z2DA--FY26 EHRM 620A4-22-700 EHRM Infrastructure Upgrades Construction Castle Point VA Medical Center; Wappinger Falls NY
Solicitation number
IFB-36C77626B0025
Issued by

About this file

This document is Appendix A: Request for Variance from the Infrastructure Standards for Telecommunications Spaces v4.0, a form template used by the U.S. Department of Veterans Affairs Office of Information and Technology to request deviations from published telecommunications infrastructure standards.

The variance request form captures essential project information including requestor contact details, organizational representation, specific site and building locations, and a detailed description of the variance being sought. The applicant must identify the applicable standards section, explain the problem statement demonstrating that all alternatives have been exhausted, provide required technical details and drawings (such as diamond analyses, floor plans, equipment schematics, and one-line drawings), and propose an alternate method that maintains safety and reliability objectives. The form requires documentation of the plan to bring the project into compliance, timeline for compliance, funding plan, and designation of whether the variance is temporary or permanent. Requests for EHRM (Healthcare Engineering) variances are submitted through the EHRM HEFP SEP Network Infrastructure Project Station Inquiry tool, while all other requests are sent to OIT Data Center and Infrastructure Engineering (DCIE) at VAITESEDatacenterEngineering2@va.gov. The document defines a variance as an allowable deviation from specific requirements where a proposed alternate method provides equal or higher safety, reliability, redundancy, and sustainability objectives, or alternatively, a temporary variance may be granted during emergency circumstances with an actionable compliance plan. DCIE serves as the Authority Having Jurisdiction and allows a minimum of two weeks for processing; the return email from DCIE constitutes proof of the final decision. Variance determinations must be retained on file for future design reviews, budget planning, and infrastructure upgrade initiatives.

View the file

Other files

File Type Posted
Amendment 4 - 36C77626B0025 0004.pdf PDF
PRE-BID _RFI_185_ 26.07.16.pdf PDF
Online Bid Opening Meeting Info.docx DOCX document
7-30-2026 - RFIs - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
7-21-2026 - RFI TRACKING SHEET - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
Amendment 3 - 36C77626B0025 0003.pdf PDF
Amendment 2 - 36C77626B0025 0002.pdf PDF
Site visit sign-in sheet - Castle Point EHRM.pdf PDF
Amendment 1 - 36C77626B0025 0001.pdf PDF
Attachment 4 - Appendices EnviroSurvey 620A4-22-700.pdf PDF
Attachment 6 - Appendices Mech Variance Req 620A4-22-700.pdf PDF
Attachment 8 - Appendices UTL Locate 620A4-22-700.pdf PDF
Attachment 9 - DWGS Combined 1 of 5 620A4 22 700.pdf PDF
Attachment 10 - DWGS Combined 2 of 5 620A4 22 700.pdf PDF
Attachment 15 - V-SURV-SUAS-SHEET 2.pdf PDF
Attachment 18 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 19 - Wage rates Dutchess Co NY 5-18-2026.pdf PDF
Attachment 1 - SPECS - 260311 100pc CD2 R2 SPECS Combined 620A4 22 700.pdf PDF
Attachment 11 - DWGS Combined 3 of 5 620A4 22 700.pdf PDF
Attachment 12 - DWGS Combined 4 of 5 620A4 22 700.pdf PDF
Attachment 20 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 21 - Site visit instructions.pdf PDF
Attachment 22 - RFI TRACKING SHEET - SOLICITATION 36C77626B0025 - Castle Point.xlsx XLSX spreadsheet
IFB - 36C77626B0025.pdf PDF
Attachment 2 - BOD - 251107 100pc CD2 BOD 620A4 22 700r1.pdf PDF
Attachment 13 - DWGS Combined 5 of 5 620A4 22 700.pdf PDF
Attachment 14 - V-SURV-SUAS-SHEET 1.pdf PDF
Attachment 5 - Appendices Geotech -620A4-22-700.pdf PDF
Attachment 7 - Appendices TR Master List 620A4-22-700.pdf PDF
Attachment 16 - V-SURV-SUAS-SHEET 3.pdf PDF
Attachment 17 - V-SURV-SUAS-SHEET 4.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF INFORMATION AND TECHNOLOGY

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-1

Appendix A: Request for Variance Infrastructure Standards for Telecommunications Spaces v4.0 Request Date:

Government POC:

Org Represented:

Email Address:

Contact Phone:

Site, Building #, Room, Mission of the Facility Where Requested (also note admin vs medical specific use):

Variance Requested:

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-2

Standards Section Title, Number, and Page:

Standards Section Text:

Problem Statement (explain how site/ project exhausted all possibilities to meet standards and why it cannot be achieved due to cost, schedule, architectural constraints, etc.):

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-3

Required Detail on Page A-4:

• Missing detail may delay or prevent processing.

• Details vary depending on the nature of the request (see items 1-6 below).

Note: If there are multiple buildings or multiple floors with identical room or building floorplans and designs, then you may use a single request and drawing for that floorplan. Annotate each building and room number that is accurately represented by the drawings.

1. Telecommunications Room (TR) or Other Space Architecture (Size)

a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)

b. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).

c. Other potential locations considered as trade-offs but were deemed unworkable

d. Attach both the building drawing to see the macro view, architecture, and distances and the TR or other space drawing to see the footprint and other spec requirements.

2. Telecommunications Room (TR) or Other Space Architecture (Location):

a. Number of racks and total data drops (WAOs) versus the total number expected to be active (requiring patching to switches, typically approximately 50%)

b. Cable distances to WAO

c. Dimensions of the space, not just square footage. The footprint needs to be understood (primarily with 3 ft clearance around racks on all sides).

d. Other locations considered as trade-offs but were deemed unworkable

e. Attach:

i. Diamond analysis

ii. Building drawing to see the macro view, architecture, horizontal and vertical distances between other TRs and telecommunications spaces, and distances to adjacent water or RFI sources

iii. TR or space drawing to see the footprint and other spec requirements

3. Cabling and Outside Plant: Attach campus drawing to see the macro view, paths, and distances between other telecommunications spaces.

4. Power: Attach schematics of all equipment and connections.

5. HVAC: Attach drawings and specs of all equipment.

6. Other: Attach specs of all equipment and drawings of telecommunications spaces.

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-4

Enter Required Detail:

Proposed Alternate Method:

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-5

Plan to Bring Project into Compliance:

Timeline to Bring Project into Compliance:

Funding Plan to Complete:

Choose Temporary or Permanent:

Coordinating Instructions:

• Before requesting, review to see if a solution has already been provided for the subject:

o VHA HEFP EHRM - Guidance Documents from Solution Delivery (sharepoint.com) o VHA HEFP EHRM - Design Alerts (sharepoint.com)

• EHRM Variances are requested through EHRM HEFP SEP Network Infrastructure Project Station Inquiry (SI Tool): Healthcare Engineering - Home (sharepoint.com)

• Submit an EHRM HEFP SEP Network Infrastructure Project Station Inquiry - Job Aid.pdf.

• Send all other requests to: OIT Data Center and Infrastructure Engineering (DCIE)

VAITESEDatacenterEngineering2@va.gov.

• Subject line: Include Station/Site Name_VISN XX_Project No_ EHRM (if applicable)_High-

Level Project Description_Variance Request_(Nature of Request).

• Example: Bronx NY_VISN 10_10-369_EHRM_Remodel MCR_Variance Request_(Power).

Submitter must digitally sign the email under the Options heading in Outlook.

Attach all required diagrams, one-line drawings, photos, manufacturer’s brochures, and/or other supplemental information to support your application.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FGuidance%2520Documents%2520From%2520Solution%2520Delivery%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lcT9tw%2BHFyo8LpmWh%2FsT0n4TvJLoks%2BRSFm66mI9%2Br8%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FForms%2FAllItems.aspx%3Fid%3D%252Fsites%252FVHAOCAMESEHRM%252FVHA%2520Site%2520Assessment%2520Resources%252FDesign%2520Alerts%26viewid%3Dd14511ba-8bd6-461a-9a61-472a9277303c&data=05%7C01%7C%7C5a0f973c5dff4b93ba4908db35dcd060%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638162994720459281%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BCvivBylsfmsW7qHV6PL%2FlMmcnyC%2F%2FTBoZMjQf33zKY%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdvagov.sharepoint.com%2Fsites%2FVHA10NA5E%2FSitePages%2FHome.aspx&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=FsHkJdoy0Y3gEjFfbRyZ%2BOlRTKDr0eloHLK5%2Be4rAWk%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/ap/b-59584e83/?url=https%3A%2F%2Fdvagov.sharepoint.com%2F%3Ab%3A%2Fr%2Fsites%2FVHAOCAMESEHRM%2FVHA%2520Site%2520Assessment%2520Resources%2FHow%2520To%2527s%2FHow%2520to%2520Submit%2520an%2520EHRM%2520HEFP%2520SEP%2520Network%2520Infrastructure%2520Project%2520Station%2520Inquiry%2520-%2520Job%2520Aid.pdf%3Fcsf%3D1%26web%3D1%26e%3DwcSGpo&data=05%7C01%7C%7C3b0075283a774a38decb08dae9c8a27d%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638079345164482103%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YEK1vV034ueOTV2znaNwpqw0rTDEGqv2A66coiESBQk%3D&reserved=0 mailto:VAITESEDatacenterEngineering2@va.go

INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES| A-6

What is a variance?

A variance is an allowable deviation from specific requirements of a published standard where a proposed alternate method of installation or operation will provide equal or higher safety, reliability, redundancy, and sustainability objectives. Alternately, under emergency time-sensitive circumstances a temporary variance may be granted without meeting the criteria above with an actionable plan to bring the project into compliance within a reasonable time frame. They should be submitted only as a last resort after the project and site have exhausted all other alternatives to meet specifications.

What will a variance not do?

A variance will not avoid compliance with the intention of a standard section or rule. A variance is not a method to recover from an installation or design error. A variance will not be granted if the alternate method would reduce the safety or effectiveness of the installation or equipment.

What does a variance cover?

If the variance is granted, it shall be limited to the particular site and installation covered in the application and will NOT be considered as a precedent for other installations.

Who may apply for a variance?

Those responsible for compliance with the standards may apply for a variance.

Who grants a variance?

A variance is granted only by DCIE upon written request through the approved process for submission, tracking, and processing. New variance requests embedded in project designs are not actionable for approval. They still need to go through the process.

How is a variance approved?

DCIE will approve, deny, or ask for clarification from their respective mailboxes. Allow a minimum of two weeks for processing. The return email from the DCIE organizational address is proof of the final decision of the Authority Having Jurisdiction (AHJ).

What are the disposition requirements of the determination?

A record of the variance determination email and any supporting attachments should remain with the project and be attached for context to all future design review or variance requests for the site. Retain the determination on file for the site for use in budgeting and initiating projects to upgrade the infrastructure to minimum ISTS specifications at the next technical refresh.:

B

A

C D

180 SF

MECHANICAL ROOM

224 SF

TOILET

91 SF

RECEPTION

016A

132 SF

OFFICE

016B

332 SF

PHLEBOTOMY

WAITING

ROOM

175 SF

LABORATORY

016C

61 SF

TOILET

016D

244 SF

PHLEBOTOMY

206 SF

TRAIGE WAITING ROOM

91 SF

OFFICE

E030

137 SF

OFFICE

E031

544 SF

H.A.S.

CHECK-IN

E033

99 SF

MECHANICAL ROOM

E036B1

47 SF

HAC

E037

208 SF

WOMEN'S TOILET

E038

320 SF

CORRIDOR

94 SF

EXAM ROOM

009E

100 SF

EXAM ROOM

009F

100 SF

EXAM ROOM

009G

44 SF

NURSE STATION 3

44 SF

NURSE STATION 4

147 SF

ENTRY

164 SF

OFFICE

009H

134 SF

STAFF LOUNGE

71 SF

ELEVATOR

580 SF

CORRIDOR 5

43 SF

STORAGE 01

E033B

16 SF

STORAGE

183 SF

BLOOD BANK

95 SF

OFFICE

71 SF

ISOLATION

032A

18 SF

FLOUR. CL

032B

491 SF

MICRO BIOLOGY

176 SF

STAFF LOCKER ROOM

046 (044)

249 SF

CONFERENCE ROOM

042D (046)

116 SF

OFFICE

042A

320 SF

CORRIDOR 10

119 SF

ASSOLATE PATH.

042B

125 SF

ADMIN SUPPORT

170 SF

LAB CHIEF

042C

289 SF

CORRIDOR 7

808 SF

HISTOLOGY

039 (038)

236 SF

STORAGE

035(038A)

157 SF

RECEIVING

(MORGUE)

41 SF

COLD ROOM

277 SF

RECEIVING

(MORGUE)

LOADING BAY

167 SF

CORRIDOR 8

112 SF

OEF/OIF/OND

OFFICE

E032

71 SF

ELEVATOR

580 SF

CORRIDOR 5

63 SF

WOMEN'S

WAITING

ROOM

E036A

111 SF

SUPERVISOR

OFFICE

E033A

MORGUE

COOLERS

1572 SF

CHEMISTRY/

HEMOTOLOGY

COAGUZATION

112 SF

VESTIBULE

E010

A

B

T

C

D

E

F G

H

I

K L

M

N

O

P

Q

S

R

UV

WY X

DD

EE

GG

FF

CC

Z

AA

BB

J

59 SF

SCHED.

H-046C

64 SF

TOILET

H-046B

147 SF

AGENT CASHIER

H-042

46 SF

TOILET

H-046A

55 SF

TOILET

VACANT

H-045

78 SF

TOILET

H-043

1040 SF

EMPLOYEE FITNESS

AND WELLNESS CENTER

H-047

302 SF

EDUCATION

OFFICE

H-047A

140 SF

ADL

KITCHEN

H-046G

153 SF

SPLINT RM.

H-046F

174 SF

VENDING AREA

H-026A

265 SF

STARBUCKS

H-025

143 SF

SWING SPACE

H-040

123 SF

STORAGE

H-041

88 SF

ELECTRICAL

ROOM

H-051

224 SF

ELECTRICAL

ROOM

H-051A

135 SF

OFFICE

H-052

150 SF

ELEVATOR

MECHANICAL

ROOM

H-053

46 SF

E.M.S. CLOSET

H-050101 SF

DATA-TELE CLOSET

H-049

143 SF

OFFICE

H-048

219 SF

ELEVATOR LOBBY

CB-01

252 SF

MULTI-PURPOSE ROOM

H022A

605 SF

MECHANICAL

EQUIPMENT ROOM

H-247DD

82 SF

OXYGEN STORAGE

H-001

1237 SF

CORRIDOR

CB-02

1417 SF

MECHANICAL EQUIPMENT ROOM

H-032

51 SF

CANTEEN PASSAGE

CB-05

261 SF

VESTIBULE 01

CB-03A

1311 SF

RETAIL STORE

H-035

803 SF

RETAIL STORAGE

H-033

127 SF

OFFICE

H-034

79 SF

OFFICE

H-034A

164 SF

FEMALE LOCKER ROOM

H-029

39 SF

H-031C

60 SF

ELEC. CLO.

H-030

126 SF

MALE LOCKER ROOM

H-028

512 SF

KITCHEN

H-031

368 SF

FOOD STORAGE

H-031A

241 SF

DISHWASHING

H-031B

766 SF

FOOD SERVICE

H-027

1444 SF

MAIN LOBBY

CB-03

505 SF

CORRIDOR

CB-06

274 SF

SERVICE LOBBY

CB-04

2192 SF

DINING

H-026

ELEVATOR

ELEVATOR

156 SF

OFFICE

H-024B

129 SF

OFFICE

H-024A

171 SF

OFFICE SUPPORT

H-024

134 SF

OFFICE

H-024C

339 SF

SWING OFFICE

H-024D

13 SF

TELE. CL.

H-044

204 SF

CENTER

STAIR HALL

1770 SF

OCCUPATIONAL THERAPY

112 SF

CHIEF OFFICE

046I

57 SF

LEAD

OFFICE

046H

129 SF

REHAB ENTRY

142 SF

KT OFFICE

H-046E

403 SF

OT OFFICES

H-046D

160 SF

PT

STORAGE

H-046D1

480 SF

PT OFFICE

H-046J

614 SF

PHYSICAL THERAPHY CLINIC

H-046486 SF

CONFERENCE AREA

435 SF

OT AREA

85 SF

SOILED

UTILITY ROOM

H012N

190 SF

EXAM / CVT

ROOM

H012M

76 SF

OBSERVATION

ROOM

H012L

60 SF

ISOLATION

ROOM

H012K

117 SF

Room

H012J

107 SF

EXAM ROOM

H212I

107 SF

EXAM ROOM

H012H

105 SF

GENERAL

ISOLATION

H012G

76 SF

GIP CLEAN

SUPPLY STORAGE

H012F

95 SF

NURSE

TRIAGE

H012E

128 SF

FEMALE EXAM

OBSERVATION

H012D

59 SF

PATIENT

TOILET

H012D1

109 SF

OBSERVATION

ROOM

H012C

63 SF

PATIENT

TOILET

H012B1

114 SF

OBSERVATION

ROOM

H012B

48 SF

CLEAN

LINEN

H014

45 SF

TOILET

H008A

110 SF

OFFICE

H003

117 SF

MECHANICAL ROOM

H002

896 SF

CORRIDOR

H021

802 SF

MULTIPURPOSE ROOM

H008

769 SF

MULTIPURPOSE ROOM

H020

196 SF

TRAVEL ROOM

H022

CORRIDOR

52 SF

TOILET

H020A

46 SF

CLEAN

UTILITY

H010

80 SF

OFFICE

H013

67 SF

MED. ROOM

H012A

62 SF

PAT. TOILET

H011

199 SF

NURSE

STATION

H0120

1458 SF

URGENT CARE CLINIC

H012

171 SF

VESTIBULE

H023

AMBULANCE BAY

1292 SF

URGENT CARE LOBBY

E036

419 SF

ARGANT CARE WAITING ROOM

E036A1

INFO

174 SF

CORRIDOR

E033C

127 SF

TRAVEL

E033C2

213 SF

CORRIDOR

108 SF

ELIGIBILITY OFFICE

E034

237 SF

MENS TOILET

E039

127 SF

CONFERENCE ROOM

H015

48 SF

STAFF TOILET

H016

216 SF

CORRIDOR

338 SF

WAITING

E010

112 SF

RECEPTION

E013

68 SF

WORKROOM

E013A

91 SF

OFFICE

E016

146 SF

SPEECH THERAPY

E017

246 SF

VESTIBULAR EXAM

E018

349 SF

AUDIOMETRIC ROOM 1

E019

416 SF

AUDIOMETRIC ROOM 2

E020

402 SF

AUDIOMETRIC ROOM 3

E023

349 SF

AUDIOMETRIC ROOM 4

E024

937 SF

PASSAGEWAY

E012

56 SF

STAFF TOILET

E025

125 SF

CLINIC ROOM

E026

246 SF

BREAKROOM / CONFERENCE ROOM

E027

207 SF

LAB

E028

81 SF

ELEC. ROOM

E011

103 SF

COMPRESSOR ROOM

019A

92 SF

STORAGE

019B

97 SF

STAIR HALL

23 SF

STORAGE

E021

18 SF

STORAGE

E020A

21 SF

STORAGE

E023A

248 SF

TR

011A

1.1'

15.8

Y'.5

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:2 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

E

A

R

S D

B .r v t

15EA-400

BUILDING 15E & 15H - LEVEL 00 - FLOOR PLAN

15E & 15H

EM BS

95% DESIGN DEVELOPMENT

02/24/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/16" = 1'-0"

LEVEL 00 - FLOOR PLAN

KEY PLAN

PROJECT

NORTH

0' 8' 16' 32'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Polygon

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR 011A

1. VA APPROVED TR 011A (248 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: UTILIZE EXISTING TR SPACE; EXPANSION INTO

PROGRAMMING SPACE (RM E-011A).

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

SantiagoSapero Line

A

C D

190 SF

OFFICE

129A

88 SF

OFFICE

422 SF

ACUPUNCTURE CLINIC

94 SF

CORRIDOR 03

187 SF

OFFICE

212 SF

STAIR HALL

91 SF

STORAGE

130B

403 SF

SPINAL CORD

INJURY CLINIC

205 SF

EMG

123B

S

F

W A

IT

IN

G R

O O

M

188 SF

OFFICE

123A

284 SF

CONFERENCE ROOM

267 SF

SERVICE CHIEF

524 SF

PROSTHETICS LAB.

624 SF

CORRIDOR 02

459 SF

OFFICES

197 SF

STAIR HALL 1

418 SF

CORRIDOR 01

49 SF

OFFICE

84 SF

TOILET

S F

E .M

.S

C L

O S

E T

75 SF

ELEVATOR

61 SF

DATA CLOSET

187 SF

PSAS MANAGEMENT ANALYST OFFICE

25 SF

ELECTRICAL

CLOSET

205 SF

PROSTHETICS STORAGE 1

114A

137 SF

PROSTHETICS STORAGE 02

114B

S

F

P R

O S

T H

E T

IC

S

S T

O R

A G

E

434 SF

WHEELCHAIR REPAIR

200 SF

PROSTHETICS CLINIC

145 SF

112A

S F

W H

E E

L C

H A

IR

R

E P

A

IR

354 SF

AUDIOLOGY LAB

733 SF

CORRIDOR 04

196 SF

WAITING ROOM

106A

171 SF

RECEPTIONIST

261 SF

AUDIO ROOM

104 SF

OFFICE

107B

192 SF

AUDIO. AID LAB

115 SF

OFFICE 03

107A

214 SF

AUDIOLOGY TREATMENT

198 SF

AUDIOLOGY TREATMENT

192 SF

AUDIOLOGY TREATMENT

126 SF

OFFICE

135 SF

CORRIDOR 05

106 SF

OFFICE

102A

106 SF

SERVICE CHIEF

102B176 SF

STAFF CONF.

100 SF

OFFICE

205 SF

STAIR HALL

182 SF

VESTIBULE 01

100B

972 SF

MECHANICAL PENTHOUSE

13 SF

126A

A

B

T

C D

E

F G

H

I

K L

M N

O P

Q

S

R

WEE

GG

FF

J

346 SF

BATHROOM

H-142

16 SF

STORAGE

H-109

1173 SF

DAYROOM

H-129

364 SF

2 BEDROOM

H-130

44 SF

W/C STORAGE

H-131

27 SF

TOILET

H-130A

71 SF

BATHROOM

H-132A

5 SF

H-132B

276 SF

2 BEDROOM

H-132

277 SF

2 BEDROOM

H-133

25 SF

STORAGE

H-134

301 SF

2 BEDROOM

H-135

325 SF

2 BEDROOM

H-136

71 SF

BATHROOM

H-135A

71 SF

BATHROOM

H-133A

71 SF

BATHROOM

H-138A

37 SF

TOILET

H-138A

69 SF

ELECTRICAL CLOSET

H-137

114 SF

DATA CLOSET

H-139

534 SF

4 BEDROOM

H-138

268 SF

LOUNGE

H-100

236 SF

ELEVATOR LOBBY

C1-01

385 SF

CORRIDOR

C1-02

95 SF

CLEAN LINEN

H-101

705 SF

MECH. EQUIP. ROOM

H-103

13 SF

STORAGE

H-140

102 SF

EQUIP STORAGE

H-102

30 SF

E.M.S. CLOSET

H-141

98 SF

SOILED UTILITY

H-104

119 SF

OFFICE

H-106

199 SF

CENTER STAIR HALL

-52 SF

TOILET

H-105A

42 SF

SHOWER

H-114B

110 SF

TOILET

H-114A

161 SF

FEMALE LOCKERS

H-114

55 SF

SHOWER

H-115

32 SF

TOILET

H-115B

55 SF

MALE LOCKERS

H-115A

228 SF

STAFF LOUNGE

H-113 274 SF

CONFERENCE ROOM

H-105

7 SF

H-105B

7 SF

H-107B

276 SF

2 BEDROOM

H-107

54 SF

TOILET

H-107A

1017 SF

CORRIDOR

C1-02

54 SF

TOILET

H-108

144 SF

EXAM ROOM

H-106A

54 SF

NUTRITION ROOM

H-110

65 SF

MED. ROOM

H-112

137 SF

CORRIDOR

C1-04

118 SF

OFFICE

H-111

175 SF

CORRIDOR

H-C1-06

498 SF

NURSE STATION

C1-08

41 SF

W/C STORAGE

H-127

25 SF

TOILET

H-128A

277 SF

2 BEDROOM

H-126

70 SF

BATHROOM

H-126A277 SF

2 BEDROOM

H-125

5 SF

H-126B

363 SF

2 BEDROOM

H-128

202 SF

CLEAN UTILITY

H-143

1478 SF

CORRIDOR

C1-05

191 SF

STAIR HALL 2

98 SF

CLEAN UTIL. STORAGE

H-116

227 SF

STORAGE

H-146

25 SF

ALCOVE

308 SF

2 BEDROOM

H-117

28 SF

TOILET

H-117A

58 SF

ELECTRIC CLOSET

H-118

70 SF

BATHROOM

H-119A

277 SF

2 BEDROOM

H-119

275 SF

2 BEDROOM

H-120

71 SF

BATHROOM

H-120A

6 SF

H-120B

310 SF

2 BEDROOM

H-123

71 SF

BATHROOM

H-123A

308 SF

2 BEDROOM

H-124

71 SF

BATHROOM

H-124A

70 SF

BATHROOM

H-125A

88 SF

ELEVATOR 01

96 SF

ELEVATOR 02

27 SF

STORAGE

H-122

27 SF

STORAGE

H-124B

204 SF

2-BEDROOM

H-117B

6 SF

125B

6 SF

133B

834 SF

CORRIDOR

C1-07

7 SF

119B

103 SF

TR TOWER

H-140

50 SF

AUDIO BOOTH 01

130FFF

93 SF

TOILET

130A

1.1'

15.8

Y'.5

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:2 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

E

A

R

S D

B .r v t

15EA-401

BUILDING 15E & 15H - LEVEL 01 - FLOOR PLAN

15E & 15H

EM BS

95% DESIGN DEVELOPMENT

02/24/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/16" = 1'-0"

LEVEL 01 - FLOOR PLAN

KEY PLAN

PROJECT

NORTH

0' 8' 16' 32'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR TOWER H-140

1. VA APPROVED TR TOWER H-140 (100 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: SPACE BELOW APPEARS TO BE MORE FEASIBLE

FOR TOWER PLACEMENT BASED OFF EXISTING

INFRASTRUCTURE.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

A

C D

366 SF

NURSE STATION

252 SF

TWO BEDROOM

200 SF

EAST STAIR HALL

63 SF

BATHROOM

202A

314 SF

TWO BEDROOM

61 SF

BATHROOM

205A

62 SF

BATHROOM

203A

313 SF

TWO BEDROOM

64 SF

BATHROOM

204A

65 SF

BATHROOM

206A

288 SF

TWO BEDROOM

322 SF

STORAGE

309 SF

TWO BEDROOM

237 SF

ONE

BEDROOM

58 SF

BATHROOM

209A

58 SF

BATHROOM

207A

63 SF

BATHROOM

210A

61 SF

BATHROOM

208A

361 SF

TWO BEDROOM

235 SF

ONE

BEDROOM

197 SF

SUPPLY ROOM

179 SF

OFFICE

137 SF

CORRIDOR 4

84 SF

STORAGE

50 SF

E.M.S.

CLOSET

144 SF

OFFICE

25 SF

ELEC. CLO.

179 SF

SOILED LINEN

71 SF

TELE. CLOSET

39 SF

TOILET

106 SF

NOURISHMENT CENTER

961 SF

CORRIDOR 3

388 SF

CORRIDOR 1

80 SF

BATHROOM

225A

91 SF

CLEAN LINEN

223A

196 SF

CENTER STAIR HALL

287 SF

TWO BEDROOM

63 SF

FILE ROOM

193 SF

STAFF LOUNGE

35 SF

TOILET

224A

101 SF

MEDICATION

ROOM

683 SF

CORRIDOR 2

303 SF

TWO BEDROOM

322 SF

TWO BEDROOM

269 SF

TWO BEDROOM

70 SF

BATHROOM

227A70 SF

BATHROOM

229A

79 SF

BATHROOM

230A

85 SF

BATHROOM

228A

332 SF

TWO BEDROOM

238 SF

ISOLATION ROOM

232A

57 SF

BATHROOM

232B

79 SF

CLEAN STATION

126 SF

CONFERENCE ROOM

57 SF

BATHROOM

233B

87 SF

CLEAN STATION

243 SF

ISOLATION ROOM

233A

214 SF

WEST STAIR HALL

75 SF

ELEVATOR

A

B

T

C D

E

F G

H I

K L

M

N O

P

Q

S

R

DDEEGG FF

J

117 SF

ONCOLOGY EXAM

H-212

110 SF

ONCOLOGY EXAM

H-211

213 SF

CORRIDOR

C2-05

104 SF

ONCOLOGY EXAM

H-214

121 SF

ONCOLOGY EXAM

H-213

408 SF

CHEMO TREATMENT ROOM

H-215B

11 SF

STORAGE

H-215A

77 SF

PATIENT TOILET

H-215B1

107 SF

ONCOLOGY EXAM

H-209

93 SF

ONCOLOGY EXAM

H-210

187 SF

STAIR HALL "B"

H-207

462 SF

CORRIDOR

H-C2-04

59 SF

ONCOLOGY EXAM

H-216

202 SF

CHEMO NURSE STATION

H-215

142 SF

PRIVATE TREATMENT

H-215D

99 SF

CHEMO PREP

H-215C

103 SF

CLINIC EXAM

H-221

104 SF

CLINIC EXAM

H-220

89 SF

CLINIC EXAM

H-219

94 SF

ONCOLOGY EXAM

H-217

21 SF

STORAGE

H-218

339 SF

CONFERENCE ROOM

58 SF

WOMENS TOILET

129 SF

CLINIC EXAM

H-230

53 SF

MENS TOILET

9 SF

ELEC. CLOSET

H-208

218 SF

CORRIDOR

C2-06

113 SF

CLINIC EXAM

H-222

120 SF

CLINIC EXAM

147 SF

CLINIC EXAM

H-224

219 SF

SPECIAL CLINIC RECEPTION

84 SF

CLINIC EXAM

93 SF

CLINIC EXAM

97 SF

CLINIC EXAM

93 SF

CLINIC EXAM

129 SF

CLINIC EXAM

H-231

103 SF

CLINIC EXAM

140 SF

CLINIC EXAM

344 SF

CORRIDOR

C2-07

314 SF

CORRIDOR

C2-08

131 SF

CLINIC EXAM

134 SF

CLINIC EXAM

291 SF

STAFF LOUNGE

251E

51 SF

WOMENS TOILET

52 SF

MENS TOILET

223 SF

BULK STORAGE ROOM

251F

44 SF

STORAGE

99 SF

CLINIC EXAM

2192 SF

OPTI-FILL 2 AREA

246D

129 SF

PRESCRIPTION RECEPTION

89 SF

ADMIN OFFICE

189 SF

STAIR HALL"A"

773 SF

MECHANICAL ROOM

385 SF

CORRIDOR

C2-02

551 SF

PRESCRIPTION AREA

246B

54 SF

COM. CLOSET

62 SF

ELECTRICAL CLOSET

339 SF

ROLLING SHELF STORAGE

246C

170 SF

SECURED DISPENSING

249A

151 SF

PRESCRIPTION VAULT

96 SF

I.V. ROOM A

250C

109 SF

FREEZER & SUPPLIES

250B

118 SF

ANTE ROOM

250A

103 SF

I.V. ROOM B

250D

284 SF

OPEN SPACE

251A

166 SF

RECEPTIONIST

155 SF

ADMIN. OFFICE

251D

126 SF

ADMIN. OFFICE

251C

67 SF

ADMIN. OFFICE

251B

722 SF

ELEVATOR LOBBY

C2-01

88 SF

ELEVATOR

96 SF

ELEVATOR

1023 SF

MEDICAL CORRIDOR

C2-03B

711 SF

MEDICAL LOBBY

C2-03A

80 SF

WOMENS TOILET

49 SF

E.M.S. CLOSET

73 SF

MENS TOILET

342 SF

WINDOW CHECK

246A

180 SF

PATIENT EDUCATION

91 SF

RECEIVING STAGING

103 SF

TR TOWER

H-255

1.1'

15.8

Y'.5

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:2 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

E

A

R

S D

B .r v t

15EA-402

BUILDING 15E & 15H - LEVEL 02 - FLOOR PLAN

15E & 15H

EM BS

95% DESIGN DEVELOPMENT

02/24/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/16" = 1'-0"

LEVEL 02 - FLOOR PLAN

KEY PLAN

PROJECT

NORTH

0' 8' 16' 32'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR TOWER H-225

1. VA APPROVED TR TOWER H-225(100 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: SPACE BELOW APPEARS TO BE MORE FEASIBLE

FOR TOWER PLACEMENT BASED OFF EXISTING

INFRASTRUCTURE.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

A

C D

ELEVATOR

109 SF

OPTOMETRY

304A

117 SF

OPTOMETRY

102 SF

OPTOMETRY

200 SF

STAIR HALL 03

148 SF

OPTOMETRY

82 SF

VISUAL FIELD TEST

126 SF

OFFICE

204 SF

OPTOMETRY

49 SF

BATHROOM

306A

28 SF

TOILET

308A

30 SF

TOILET

307A

389 SF

WAITING ROOM

393 SF

DOCTOR'S OFFICE

220 SF

CORRIDOR 05

179 SF

RECEPTION

206 SF

PODIATRY

52 SF

KITCHENETTE

310E

183 SF

PATIENT TOILET

108 SF

STORAGE

312A

38 SF

TOILET

310D

248 SF

PULMONARY REST EXAM RM.

168 SF

STAFF LOUNGE

253 SF

STORAGE

312B

116 SF

STORAGE

90 SF

STORAGE

314A

747 SF

CORRIDOR 04

413 SF

CORRIDOR 01

32 SF

ELEC. CLO.

317183 SF

PULMONARY

RESP EXAM RM.

72 SF

TELE CLOSET

76 SF

OFFICE

58 SF

SUPPLY

44 SF

E.M.S.

CLOSET

111 SF

OFFICE

322A

91 SF

SOCIAL WORKER

OFFICE

197 SF

STAIR HALL 01

384 SF

CHEMO THERAPHY

384 SF

WAITING ROOM

374 SF

EXAM ROOM

229 SF

CHECK-IN

142 SF

STAFF LOUNGE

327A

29 SF

TOILET

329A

28 SF

TOILET

327B

28 SF

TOILET

326A

28 SF

TOILET

328C

142 SF

EXAM ROOM 2

328B

133 SF

EXAM ROOM 1

328A

86 SF

GASTRO CLINIC

83 SF

ONCOLOGY

131 SF

EXAM ROOM 2

329C

138 SF

EXAM ROOM 1

329B

536 SF

CORRIDOR 02

211 SF

STAIR HALL 02

214 SF

PULMONARY EXAM

196 SF

CORRIDOR 03

198 SF

ORTHOPEDICS

58 SF

BATHROOM

334A

115 SF

NURSE OFFICE

115 SF

EXAM ROOM

66 SF

BATHROOM

333A

210 SF

NEUROLOGY

28 SF

TOILET

325A

28 SF

TOILET

324A

21 SF

ALCOVE

310F

67 SF

OFFICE

310A

56 SF

OFFICE

310C

73 SF

SUPPLY ROOM

310B

A

B

T

C D

E

F G

H I

K

L

M

N O

P

Q

S

R

WEEGG FF

J

315 SF

STORAGE

H-300

88 SF

ELEVATOR 01

96 SF

ELEVATOR 02

602 SF

ELEVATOR LOBBY

C3-01

105 SF

TR TOWER

H-301

228 SF

NURSING STAFF

1.1'

15.8

Y'.5

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:3 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

E

A

R

S D

B .r v t

15EA-403

BUILDING 15E & 15H - LEVEL 03 - FLOOR PLAN

15E & 15H

EM BS

95% DESIGN DEVELOPMENT

02/24/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/16" = 1'-0"

LEVEL 03 - FLOOR PLAN

KEY PLAN

PROJECT

NORTH

0' 8' 16' 32'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR TOWER H-301

1. VA APPROVED TR TOWER H-301 (100 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: SPACE BELOW APPEARS TO BE MORE FEASIBLE

FOR TOWER PLACEMENT BASED OFF EXISTING

INFRASTRUCTURE.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

A

C D

1249 SF

PENTHOUSE

87 SF

STAIR HALL 1

154 SF

ELEVATOR

MECH. ROOM

A

B

36 35

T

C D

E

F G

H I

K

L

M N

O P

Q

S

R

UV

WYX

DD

EE

GG

FF

CC

Z

AA

BB

J

1/4" / 1'-0"

/4

1.1'

15.8

Y'.5

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:3 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

E

A

R

S D

B .r v t

15EA-404

BUILDING 15E & 15H - LEVEL 04 - FLOOR PLAN

15E & 15H

EM BS

95% DESIGN DEVELOPMENT

02/24/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/16" = 1'-0"

LEVEL 04 - FLOOR PLAN

PROJECT

NORTH

KEY PLAN

0' 8' 16' 32'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Text Box

EXISTING TR

SantiagoSapero Text Box

BLDG 15E & 15H - LEVEL 04

1. PENTHOUSE CURRENTLY HAS NO PROGRAMMING NEEDS;

ANY PROGRAMMING NEEDS WILL BE MET FROM TR TOWER

T-3 ON LEVEL 03.

SHOWN AREA

PROJECT

NORTH

A

2 3 4 5 6 7 8 9 10 11

B

C

D

E

F

G

H

I

J

462 SF

CONTROL

ROOM

005A

62 SF

STORAGE

ROOM

005B

126 SF

WAITING

ROOM

81 SF

ECHO

READING

003B

179 SF

OFFICE

23 SF

CLOSET

001A

178 SF

CORRIDOR

1309 SF

CORRIDOR

297 SF

CONFERENCE

ROOM

212 SF

OFFICE

126 SF

TOILET

002A

47 SF

VESTIBULE

177 SF

STORAGE

007A

54 SF

STORAGE

007B

85 SF

STORAGE

29 SF

CORRIDOR

154 SF

TR

125 SF

STORAGE

008A

225 SF

COOLER 03

259 SF

COOLER 04

131 SF

COOLER 02

114 SF

COOLER 01

125 420 SF

CORRIDOR

228 SF

DRY FOOD

STORAGE

273 SF

DRY FOOD

STORAGE

233 SF

COOLER 5

159 SF

MECHANICAL

ROOM

132 SF

PROSTHESIS

STORAGE

176 SF

CART WASH

44 SF

MECH. ROOM

77 SF

SCALE ROOM

76 SF

FIRE ALARM

113 SF

STAIR HALL

32 SF

CORRIDOR

621 SF

CORRIDOR

- 132 SF

OPERATORY

010L

118 SF

OPERATORY

010K

124 SF

OPERATORY

010F

96 SF

OFFICE

010C

60 SF

OPERATORY

130 SF

CORRIDOR

63 SF

OPERATORY

66 SF

CORRIDOR

64 SF

OPERATORY

107 SF

OPERATORY

166 SF

WAITING

ROOM

137 SF

RECEPTION

010A

143 SF

OFFICE

010B

67 SF

X-RAY 01

5-255

92 SF

X-RAY

010D

67 SF

X-RAY 02

319 SF

CORRIDOR

79 SF

LOUNGE

010G

149 SF

ORAL

SURGERY

010H

100 SF

CORRIDOR

55 SF

STERALIZATION

58 SF

STORAGE

ROOM

30 SF

STORAGE

010J

103 SF

OFFICE

022A

90 SF

MECHANICAL

ROOM

651 SF

DENTAL LAB.

214 SF

STEAM

ROOM

020A

64 SF

FILM

STORAGE

012A

68 SF

COMPUTER

012B

116 SF

TRANSFER

ROOM

37 SF

TOILET 02

163 SF

HOLDIGN

AREA

37 SF

TOILET 01

54 SF

EMS CLOSET

226 SF

CONTROL

ROOM

202 SF

READING

ROOM

016D

335 SF

EQUIPMENT

ROOM

3 SF

166 SF

CONTROL

ROOM

397 SF

C.A.T. SCAN

58 SF

STORAGE

012C

221 SF

E.K.G.

003A

477 SF

CORRIDOR

622 SF

MRI SUITE

86 SF

CORRIDOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:3

:4 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

16A-400

BUILDING 16 - LEVEL 00 - FLOOR PLAN

EM KB

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

KEY PLAN

1/8" = 1'-0"

LEVEL 00 - FLOOR PLAN

0' 4' 8' 16'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR 008

1. VA APPROVED TR 008 (154 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

A

C O

N N

C

O R

R

ID

O R

T

O B

L D

G

2 3 4 5 6 7 8 9 10 11

B

C

D

E

F

G

H

I

J

550 SF

TR

F-100

208 SF

OFFICE

101A

165 SF

COOLER

2728 SF

KITCHEN

73 SF

OFFICE

126 SF

COOLER

150 SF

OFFICE

103A

52 SF

STORAGE

CLOSET

103B

162 SF

LOCKER

ROOM

107D

112 SF

OFFICE

107C

120 SF

OFFICE

107B

179 SF

STORAGE

108A334 SF

STORAGE

103C

395 SF

GROUP

OFFICE

107A

2163 SF

DINING

ROOM

921 SF

DISHWASHING

ROOM

713 SF

DIRECTOR'S

CONFERENCE

ROOM

60 SF

STORAGE

CLOSET

108A

48 SF

STORAGE

CLOSET

108B

448 SF

GROUP

OFFICE

270 SF

MCCR

BILLING

OFFICE

193 SF

TELEPHONE

OPERATOR

42 SF

TOILET

004A

155 SF

TOILET

24 SF

TELEPHONE

108C

49 SF

STORAGE

CLOSET

103C

142 SF

STAIR HALL

43 SF

FREIGHT

ELEVATOR

ROOF

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:3

:4 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

16A-401

BUILDING 16 - LEVEL 01 - FLOOR PLAN

EM KB

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

KEY PLAN

0' 4' 8' 16'

PROJECT

NORTH

1/8" = 1'-0"

LEVEL 01 - FLOOR PLAN

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR 100

1. VA APPROVED TR 100 (550 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM FACTOR

REQUIREMENT OF A 10'x10' FOOTPRINT.

4. ROOM IS EXISTING DEMARCATION ROOM; RACKS WILL BE

PLACED IN EXISTING ROOM SERVING TELECOM NEEDS FOR

THIS FLOOR AND LIMITED PROGRAMMING NEEDS ON 2ND

AND 3RD FLOORS.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

ROOF

ROOF

RADIATOR RADIATOR RADIATOR

RADIATOR RADIATOR RADIATOR

2 3 4 5 6 7 8 9 10 11

B

C

D

E

F

G

H

I

J

478 SF

CORRIDOR

327 SF

ULTRASOUND

85 SF

X-RAY FILES

117 SF

OFFICE

206A

72 SF

OFFICE

206B

159 SF

RECEPTION

237 SF

WAITING

ROOM

922 SF

DISHWASHING

ROOM

BELOW

170 SF

STORAGE

ROOM

2727 SF

KITCHEN

BELOW

2163 SF

DINING

ROOM

BELOW

178 SF

CORRIDOR

486 SF

CORRIDOR

25 SF

CLOSET

19 SF

CLOSET

299 SF

VASCULAR

LAB.

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:3

:4 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

16A-402

BUILDING 16 - LEVEL 02 - FLOOR PLAN

EM KB

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

KEY PLAN

0' 4' 8' 16'

PROJECT

NORTH

1/8" = 1'-0"

LEVEL 02 - FLOOR PLAN

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Text Box

EXISTING TR

SantiagoSapero Text Box

BLDG 16 - LEVEL 02

1. LIMITED PROGRAMMING NEEDS ON THIS FLOOR WILL BE

SERVICED FROM TR 100 ON LEVEL 01.

RADIATORRADIATOR

RADIATORRADIATOR

RADIATOR

RADIATOR RADIATOR

ROOF

ROOF

2 3 4 5 6 7 8 9 10 11

B

C

D

E

F

G

H

I

J

522 SF

CORRIDOR

202 SF

OFFICE

229 SF

OFFICE

123 SF

OFFICE

109 SF

WAITING

ROOM

86 SF

OFFICE

121 SF

SURGERY

PREP.

50 SF

TOILET

329 SF

SURGERY

PREP.

3153 SF

MECHANICAL

PENTHOUSE

159 SF

CORRIDOR

752 SF

CORRIDOR

506 SF

CORRIDOR

62 SF

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:3

:4 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

16A-403

BUILDING 16 - LEVEL 03 - FLOOR PLAN

EM KB

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

KEY PLAN

1/8" = 1'-0"

LEVEL 03 - FLOOR PLAN

0' 4' 8' 16'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Text Box

EXISTING TR

SantiagoSapero Text Box

BLDG 16 - LEVEL 03

1. LIMITED PROGRAMMING NEEDS ON THIS FLOOR WILL BE

SERVICED FROM TR 100 ON LEVEL 01.

B C D E F G H

228 SF

STORAGE

258 SF

STORAGE

44 SF

STAIR HALL

38 SF

MECHANICAL

ROOM

70 SF

SERVICE

TANK ROOM

309 SF

EQUIPMENT

STORAGE

008A

164 SF

TRANSFORMER

ROOM

008D

211 SF

CORRIDOR

177 SF

OFFICE

008C

286 SF

OFFICE

008B

191 SF

MECHANICAL

RM.

176 SF

MECHANICAL

RM.

88 SF

WHEELCHAIR

REPAIR

G-014

86 SF

WHEELCHAIR

REPAIR

G-014B

217 SF

EMS SUPPLY

135 SF

CORRIDOR

469 SF

CORRIDOR

45 SF

STORAGE

68 SF

ELEVATOR

142 SF

WHEELCHAIR

REPAIR

G-014A

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:5 p m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

17A-400

BUILDING 17 - LEVEL 00G - FLOOR PLAN

EM BS

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

3/16" = 1'-0"

LEVEL 00G - FLOOR PLAN

KEY PLAN

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR G-014

1. VA APPROVED TR G-014 (88 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA

REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR MEETS THE VA STANDARD MINIMUM FORM

FACTOR REQUIREMENTS OF A 10'X10' FOOTPRINT.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Snapshot

SantiagoSapero Area Measurement 100 sf

B C D E F G H

224 SF

DIRECTOR

4 SF

CL

105A

191 SF

CORRIDOR

100C48 SF

TOILET

105B

192 SF

CHIEF OF

STAFF

132 SF

PUBLIC

RELATIONS

175 SF

ASSOC.

DIRECTOR

43 SF

TOILET

53 SF

TOILET

14 SF

E.M.S.

CLOSET

301 SF

NURSING

SERVICE

200 SF

OFFICE

112A

110 SF

OFFICE

124 SF

CORRIDOR

17 SF

CLOSET

109A

192 SF

ADMIN.

SUPPORT

3 SF

108A

110 SF

OFFICE

166 SF

OFFICE

111 SF

TR

40 SF

VESTIBULE

627 SF

LOBBY

100A

123 SF

STAIR HALL

141 SF

CORRIDOR

265 SF

ADMIN.

SUPPORT

5 SF

CL.

014A

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:5 p m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

17A-401

BUILDING 17 - LEVEL 01 - FLOOR PLAN

EM BS

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

3/16" = 1'-0"

LEVEL 01 - FLOOR PLAN

KEY PLAN

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Polygon

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR 107

1. VA APPROVED TR 107 (111 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR DOES NOT MEET THE VA STANDARD MINIMUM FORM

FACTOR REQUIREMENTS OF A 10'X10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: TR IN RM 112A

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

B C D E F G H

166 SF

OFFICE

225A

123 SF

STAFF

LOUNGE

37 SF

CONTROL

ROOM

225A

130 SF

OFFICE

89 SF

CORRIDOR

107 SF

OFFICE

70 SF

IMAGING

ROOM

213A

147 SF

OFFICE

90 SF

ELECTRICAL

ROOM

109 SF

WAITING

ROOM

123 SF

STAIR HALL

39 SF

TOILET

20 SF

CONTROL

ROOM

205A

149 SF

X-RAY

39 SF

CONTROL

ROOM

201A

253 SF

X-RAY

22 SF

TOILET

201B

151 SF

CORRIDOR

233 SF

WORK

STATION

280 SF

CORRIDOR

111 SF

FILE ROOM

227 SF

FILE ROOM

26 SF

CONTROL

ROOM

204A

246 SF

X-RAY

20 SF

FOYER

23 SF

TOILET

70 SF

ELEVATOR

184 SF

PREP ROOM

204A

123 SF

TR

G-203

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:5 p m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

17A-402

BUILDING 17 - LEVEL 02 - FLOOR PLAN

EM BS

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

3/16" = 1'-0"

LEVEL 02 - FLOOR PLAN

KEY PLAN

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Rectangle

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR G-203

1. VA APPROVED TR G-203 (123 SQFT).

2. TR MEETS THE VA STANDARD FLOOR AREA REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF 100 SQFT.

3. TR DOES NOT MEET THE VA STANDARD MINIMUM FORM

FACTOR REQUIREMENTS OF A 10'X10' FOOTPRINT.

4. SINGLE DIAMOND IS FOR SCALE REFERENCE.

5. OPTION 1: TR IN FILE ROOM

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

B C D E F G H

136 SF

STERILIZER

ROOM

333 SF

OPERATING

ROOM

42 SF

AUTOCLAVE

ROOM

56 SF

315A

51 SF

SCRUB

ROOM

121 SF

CORRIDOR

337 SF

CORRIDOR

392 SF

OPERATING

ROOM 1

112 SF

STERILE

SUPPLY

STORAGE

89 SF

STAIR HALL

46 SF

HOUSEKEEPING

CLOSET

330 SF

RECOVERY

ROOM

29 SF

ROOF

ACCESS

37 SF

O.R.

SUPPLIES

58 SF

MEN'S

LOCKER

ROOM

303A

18 SF

TOILET

303B

20 SF

SHOWER

303C

158 SF

CORRIDOR

90 SF

SUPPLIES

43 SF

FEMALE

LOCKERS

306A

32 SF

SHOWER

306C

26 SF

FEMALE

LOCKERS

20 SF

DIRTY

PUMPS

STORAGE

152 SF

STAFF

LOUNGE

302A

69 SF

OFFICE

302B

302 SF

WORK SHOP

115 SF

RECOVERY

ROOM

301A

46 SF

MENS

LOCKER

70 SF

ELEVATOR

33 SF

TOILET

306B

39 SF

STORAGE

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:5 p m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

17A-403

BUILDING 17 - LEVEL 03 - FLOOR PLAN

EM BS

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

3/16" = 1'-0"

LEVEL 03 - FLOOR PLAN

KEY PLAN

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Text Box

EXISTING TR

SantiagoSapero Text Box

BLDG 17 - LEVEL 03

1. CURRENT SPACE IS STORAGE FOR LOGISTICS; VERY LIMITED PROGRAMMING. VARIANCE WILL BE PURSUED TO SERVICE

FLOOR FROM TR G-203 ON LEVEL 02.

B C D E F G H

65 SF

MECH RM 04

375 SF

MECH. ROOM

215 SF

ELEVATOR

MACHINE

ROOM

ROOF

18" DIAMETER VENTILATOR18" DIAMETER VENTILATOR

SKYLIGHT OVER STAIR HALL

13"x13"

FLUE VENT

ROOF

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:2

:0 p m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

17A-404

BUILDING 17 PENTHOUSE - FLOOR PLAN

EM BS

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

3/16" = 1'-0"

PENTHOUSE - FLOOR PLAN

KEY PLAN

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Text Box

EXISTING TR

SantiagoSapero Text Box

BLDG 17 - PENTHOUSE

1. CURRENT SPACE IS STORAGE FOR LOGISTICS; VERY LIMITED PROGRAMMING. VARIANCE WILL BE PURSUED TO SERVICE

FLOOR FROM TR G-203 ON LEVEL 02.

A B D E G H I J K L M N

C

105 SF

STAIR HALL 3

001G

75 SF

ELEVATOR

D.214C

192 SF

ULTRASOUND

001A

173 SF

BONE

DENSITOMERY

001B

128 SF

TOUCHDOWN

SPACE

001C

72 SF

CLEAN

UTILITY

001D

186 SF

ULTRASOUND

001E

66 SF

TOILET

001E.1

62 SF

TOILET

001F.1

185 SF

ULTRASOUND

001F

188 SF

MECHANICAL

ROOM

229 SF

TOILET

ROOM

35 SF

STORAGE

001N.1

105 SF

OFFICE A

001N.1

113 SF

OFFICE B

001J

138 SF

OFFICE C

001I

144 SF

ELECTRICAL

ROOM

001H

63 SF

TOILET

324 SF

RADIOLOGY

001M

140 SF

SOILED

UTILITY

001L

56 SF

TOILET

001K.1

68 SF

STAFF

TOILET

001N.1

334 SF

R/F ROOM

001K.1

165 SF

EQUIPMENT

STORAGE

001N.3

51 SF

STORAGE

001H.1

275 SF

EMERGENCY

POWER

ELECTRICAL

ROOM

344 SF

WORK AREA

001N

132 SF

RECEPTION

001N.5

83 SF

SCOPE

DECON

512 SF

DECONTAMINATION

76 SF

CART AUTO.

WASH

131 SF

SCOPE

PROCESS

50 SF

ANTE ROOM

100 SF

ANTE ROOM

33 SF

H.A.C.

64 SF

FEMALE

LOCKER

54 SF

FEMALE

BATH

66 SF

MALE

LOCKER

16 59 SF

MALE BATH

919 SF

CLEAN

PREPARATION

62 SF

STERILIZERS

701 SF

STERILE /

NON-STERILE

61 SF

ANTE ROOM

100 SF

CLEAN

STORAGE

74 SF

FEMALE

LOCKER

113 SF

ANTE ROOM

54 SF

TR

61 SF

FEMALE

TOILET

50 SF

MALE TOILET

71 SF

MALE BATH.

36 SF

H.A.C.

99 SF

TECH.

OFFICE

108 SF

CHIEF

OFFICE

94 SF

ELECTRICAL

DISTRIBUTION

219 SF

LOCKER

ROOM

73 SF

74 SF

CENTER

STAIR HALL

81 SF

VESTIBULE

008A

97 SF

VESTIBULE

172 SF

CORRIDOR 1

300 SF

CORRIDOR 2

407 SF

ENTRY

F

SHOWN AREA

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

/0 /2

:5

:2 a m

B

IM

/6

A

-2

-7

V

A H

V E

H R

M i n fr a s tr u c tu re u p g ra d e s

C a s tl e

P o in t/ V

A C

P

A R

S

D B

.r v t

18A-400

BUILDING 18 - LEVEL 00 - FLOOR PLAN

EM CO

95% DESIGN DEVELOPMENT

09/13/2024

620A4-22-700EHRM INFRASTRUCTURE

UPGRADES - CASTLE POINT

VA HUDSON VALLEY MEDICAL CENTER

41 CASTLE POINT ROAD WAPPINGERS FALLS, NY 12590

1/8" = 1'-0"

LEVEL 00 - FLOOR PLAN

KEY PLAN

PROJECT

NORTH

0' 4' 8' 16'

Revisions: Date:

TYPE OF BUILDING : HEALTHCARE

LEGENDS

- EXISTING ORIGINAL TR

- VA PROPOSED TR LOCATION

- A/E PROPOSED TR LOCATION

- VA DISAPPROVED TR LOCATION

- VA APPROVED TR LOCATION

GENERAL NOTES

1. ALL DIAMONDS ARE 80 METERS FROM

CENTER

JG/SGSJG/MA JG/SGS

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Line

SantiagoSapero Polygon

SantiagoSapero Text Box

VA APPROVED TR LOCATION

SantiagoSapero Text Box

TR 39

1. VA APPROVED TR 39 (54 SQFT).

2. TR DOES NOT MEET THE VA STANDARD FLOOR AREA

REQUIREMENTS FOR EXISTING HEALTHCARE BUILDINGS OF

100 SQFT.

3. TR DOES NOT MEET THE VA STANDARD MINIMUM FORM

FACTOR REQUIREMENTS OF A 10'X10' FOOTPRINT.

4. EXISTING TR TO BE EXPANDED IN AN EFFORT TO SUPPORT

NEW SPS FROM EXISTING LOCATION IN ORDER TO PREVENT

DISRUPTION TO NEW HARDLID CEILING.

SantiagoSapero Line

SantiagoSapero PolyLine

SantiagoSapero Line

153 SF

EXAM ROOM

134 SF

EXAM ROOM

174 SF

SOCIAL

WORKER

OFFICE

138 SF

NUTRITION

CLINIC

106 SF

SUPPLY

CLOSET

107 SF

OFFICE

98 SF

ANTE

CORRIDOR

74 SF

TOILET

215 SF

STAIR HALL

188 SF

EXAM ROOM

160 SF

OFFICE

196 SF

OFFICE

239 SF

EXAM ROOM

186 SF

EXAM ROOM

155 SF

EXAM ROOM

152 SF

EXAM ROOM

129 SF

OFFICE

88 SF

OFFICE

69 SF

ANTE

CORRIDOR

124 SF

OFFICE

143 SF

OFFICE

72 SF

OFFICE

132 SF

OFFICE

56 SF

TOILET

144A

46 SF

BATHROOM

148A

73 SF

TOILET

199 SF

STAIR HALL

128 SF

OFFICE

152 SF

EXAM ROOM

155 SF

SOCIAL

WORKER

OFFICE

123 SF

OFFICE

120 SF

PROVIDER

156 SF

EXAM ROOM

104 SF

STORAGE

ROOM

72 SF

STOCK

ROOM

99 SF

PROVIDER

71 SF

TOILET

75 SF

PATIENT

EDUCATION

41 SF

TELEPHONE

CLOSET

48 SF

SPRINKLER

CLOSET

29 SF

TOILET

51 SF

E.M.S.

CLOSET

105 SF

OFFICE

148 SF

OFFICE

162 SF

OFFICE

102 SF

TOILET

155 SF

EXAM ROOM

154 SF

EXAM ROOM

244 SF

STAFF

LOUNGE

87 SF

OFFICE

100 SF

OFFICE

91 SF

OFFICE

12…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .