About this file

This is an Amendment to Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Program Contracting Activity Central for project 620A4-22-700, the EHRM Infrastructure Upgrades Construction at Castle Point VA Medical Center in Wappinger Falls, New York.

The amendment extends the bid due date from July 29, 2026 to August 4, 2026 at 1:00 PM EDT. The solicitation is for a lump sum Base Bid (Line Item 0001) that consolidates all project work into a single price covering eight work categories: EHRM Infrastructure Upgrades, General Construction, Electrical Work, Mechanical Work, Telecommunications Work, Structural Work, Site and Civil Work, and Environmental Remediation Work. The contractor must complete the entire project no later than 730 calendar days after receiving the Notice to Proceed. The amendment updates the price schedule to include all tasks in the Base Bid Line Item and posts the majority of Requests for Information (RFI) responses; approximately 35 additional Control RFIs are pending and will be posted when available. Bidders must submit pricing in whole dollar values without cents and provide their Unique Entity Identifier associated with SAM.gov on Standard Form 1442. Award will be made on the Grand Total (Line Item 0001 - Base Bid). Failure to acknowledge receipt of this amendment prior to the specified date and time may result in rejection of the offer.

View the file

Other files

File Type Posted
Amendment 4 - 36C77626B0025 0004.pdf PDF
PRE-BID _RFI_185_ 26.07.16.pdf PDF
7-30-2026 - RFIs - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
Online Bid Opening Meeting Info.docx DOCX document
7-21-2026 - RFI TRACKING SHEET - SOLICITATION 36C77626R0065 - Castle Point.xlsx XLSX spreadsheet
Amendment 2 - 36C77626B0025 0002.pdf PDF
Site visit sign-in sheet - Castle Point EHRM.pdf PDF
Amendment 1 - 36C77626B0025 0001.pdf PDF
Attachment 1 - SPECS - 260311 100pc CD2 R2 SPECS Combined 620A4 22 700.pdf PDF
Attachment 11 - DWGS Combined 3 of 5 620A4 22 700.pdf PDF
Attachment 12 - DWGS Combined 4 of 5 620A4 22 700.pdf PDF
Attachment 20 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 21 - Site visit instructions.pdf PDF
Attachment 22 - RFI TRACKING SHEET - SOLICITATION 36C77626B0025 - Castle Point.xlsx XLSX spreadsheet
Attachment 4 - Appendices EnviroSurvey 620A4-22-700.pdf PDF
Attachment 6 - Appendices Mech Variance Req 620A4-22-700.pdf PDF
Attachment 8 - Appendices UTL Locate 620A4-22-700.pdf PDF
Attachment 9 - DWGS Combined 1 of 5 620A4 22 700.pdf PDF
Attachment 10 - DWGS Combined 2 of 5 620A4 22 700.pdf PDF
Attachment 15 - V-SURV-SUAS-SHEET 2.pdf PDF
Attachment 18 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 19 - Wage rates Dutchess Co NY 5-18-2026.pdf PDF
Attachment 5 - Appendices Geotech -620A4-22-700.pdf PDF
Attachment 7 - Appendices TR Master List 620A4-22-700.pdf PDF
Attachment 16 - V-SURV-SUAS-SHEET 3.pdf PDF
Attachment 17 - V-SURV-SUAS-SHEET 4.pdf PDF
IFB - 36C77626B0025.pdf PDF
Attachment 2 - BOD - 251107 100pc CD2 BOD 620A4 22 700r1.pdf PDF
Attachment 3 - Appendices ArchVarianceReq-620A4-22-700.pdf PDF
Attachment 13 - DWGS Combined 5 of 5 620A4 22 700.pdf PDF
Attachment 14 - V-SURV-SUAS-SHEET 1.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0003 07-21-2026

620A4-22-700

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

36C77626B0025

06-03-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-04-2026 1PM EDT

See CONTINUATION Page

Proj. 620A4-22-700 EHRM Infrastructure Upgrades Construction Castle Point VA Medical Center; Wappinger Falls NY

The purpose of this amendment is to provide the following:

1. Extend the Bid Due Date from 7-29 to August 4, 2026

2. Update the price schedule which now contains all tasks in Base Bid Line Item 0001.

3. Post the majority of RFI's with answers

We are currently working on getting answers to an additional approx 35 Control RFI's and will post when available.

Bid due date may change as needed.

Bridget May

Contracting Officer

VA-VHA-RPOC-2023-0037

CONTINUATION PAGE

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

Line item 0001 Base Bid is to provide Line Items I through VIII as listed in Attachment 1 - SPECS - 260311 100pc CD2 R2 SPECS Combined 620A4 22 700, 01 00 00, 1.3 Statement of Bid Items. The requirements for each item are listed below. The contractor shall complete the entire project no later than 730 calendar days after the contractor receives the NOTICE TO PROCEED.

ITEM I, EHRM INFRASTRUCTURE UPGRADES Work includes all general, safety, and management requirements depicted in the contract documents.

ITEM II, GENERAL CONSTRUCTION: Work includes general constructions, alterations, and selective demolition depicted in the contract documents.

ITEM III, ELECTRICAL WORK: Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project depicted in the contract documents.

ITEM IV, MECHANICAL WORK: Work includes all labor, material, equipment, and supervision to perform the required mechanical construction work on this project depicted in the contract documents.

ITEM V, TELECOMMUNICATIONS WORK: Work includes all labor, material, equipment, and supervision to perform the required telecommunications construction work on this project depicted in the contract documents.

ITEM VI, STRUCTURAL WORK: Work includes all labor, material, equipment, and supervision to perform the required structural construction work on this project depicted in the contract documents.

ITEM VII, SITE AND CIVIL WORK: Work includes all labor, material, equipment, and supervision to perform the required site and civil construction work on this project depicted in the contract documents.

ITEM VIII, ENVIRONMENTAL WORK: Work includes all labor, material, equipment, and supervision to perform the required environmental remediation work on this project depicted in the contract documents.

GRAND TOTAL __________________

NOTICE

1. Line Item 0001 (Base) contains all the work for this project.

2. Bidders must provide a lump sum price for Line Item 0001 (Base Bid). Failure to do so may render their bid nonresponsive.

3. Award will be made on the Grand Total (Line Item 0001 - Base Bid).

4. Pricing must be submitted in whole dollar values. Do NOT include pricing in cents.

5. Contractor is required to fill in their Unique Entity Identifier associated with SAM.gov in Block

No. 14 on Standard Form (SF) 1442.

See attached document: 7-21-2026 - RFI TRACKING SHEET - SOLICITATION

36C77626R0065 - Castle Point.

End of Document