IFB_252615_Addendum_9_with_Attachments.pdf

PDF 8 MB Posted

Attached to
Transfer Station and Reclaimed Water Distribution Pump Station At the Sanford North Water Reclamation Facility
Solicitation number
IFB 25/26-15
Issued by
Florida

About this file

This is Addendum #9 to IFB 25/26-15 issued by the City of Sanford, Florida Purchasing Division on August 28, 2026, addressing modifications to the Transfer Station and Reclaimed Water Distribution Pump Station at the Sanford North Water Reclamation Facility. The addendum supersedes verbal instructions and incorporates revised specifications, contract drawings, and responses to seven bidder questions into the solicitation. The addendum maintains the original bid due date of Thursday, September 10, 2026 at 2:00 p.m. Local Time. Revised contract drawings are provided for sheets E-03, E-04, E-05, E-06, E-07, E-09, E-09A, E-12, E-14, E-16, E-17, E-18, E-20, E-22, E-23, E-24, E-27, E-28, and I-08, along with revised specification section 16375 for Active Harmonic Filters. Key clarifications include confirmation that duct bank raceways BB through JJ are new installations, specification of minimum 2-inch conduit size for existing raceways receiving new fiber optic cabling, removal of junction boxes with rerouting of existing fiber through existing conduit, and relocation of control equipment mounting locations on building exteriors. The addendum also adds new sections 1.18 (Demolition) and 1.19 (Disposition of Removed Materials and Equipment) to specification section 16050, clarifying removal procedures for electrical work associated with equipment marked for removal and establishing requirements for reuse, salvage, and disposal of materials.

The addendum includes complete specification section 16375 for Active Harmonic Filters, establishing performance requirements for mitigation of nonlinear loads with minimum 3 percent impedance, limiting total harmonic distortion voltage (THD(v)) to not more than 5 percent, and achieving displacement power factor correction to 0.95 lagging or better. Acceptable manufacturers include Schneider Electric Square D PowerLogic AccuSine PCS+ for 3-phase mitigation and AccuSine PCSn for neutral current compensation applications, rated at 480V with 200A output capacity. The specification mandates manufacturer qualifications including ISO 9001 certification and minimum 10 years of satisfactory service in similar applications, installer qualifications requiring minimum 5 years of experience with similar equipment, and comprehensive submittals including harmonic analysis reports, factory acceptance testing reports, and functional demonstration testing reports. Warranty requirements specify 12 months from commissioning or 18 months from shipment, whichever is earlier, with a required 2-year service plan including dedicated customer success management, priority remote and on-site expert support within 100 miles of the service location, continuous monitoring and alarming, and online training at no additional cost to the Owner.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUR-F-212 Rev. 11/2016

City of Sanford | Finance Department | Purchasing Division 300 N. Park Avenue Suite 236, Sanford, Florida 32771

Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov ADDENDUM #9

IFB 25/26-15 Transfer Station and Reclaimed Water

Distribution Pump Station At the Sanford North Water Reclamation Facility

DATE: August 28, 2026

TO: All Bidders/Proposers

FROM: Marisol Ordonez

City of Sanford Purchasing Division

SUBJECT: IFB 25/26-15 Transfer Station and Reclaimed Water Distribution Pump Station

At the Sanford North Water Reclamation Facility | ADDENDUM #9

This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or answers to questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal and/or other instructions given to any bidder/proposer qualified to respond pursuant to the requirements set forth in the solicitation document.

This Addendum consists of a total of 5 pages plus the following attached items:

A. Acknowledgement of Receipt of Addendum No. 8 Form – Total of 1 Page B. Revised Specifications:

16375 C. Revised Contract Drawings:

E-03, E-04, E-05, E-06, E-07, E-09, E-09A, E-12, E-14, E-16, E-17, E-18, E-20, E-22, E-23, E-24, E- 27, E-28 and I-08

I. DUE DATE

This Addendum does not change the solicitation due date. As such, the solicitation response is due no later than Thursday, September 10, 2026 at 2:00PM Local Time.

II. QUESTIONS AND ANSWERS (Q&A)

The City has received the following question(s) concerning the solicitation:

Q1. Sheet E-03 – Please clarify the following: - For Duct Bank BB, is concrete cutting and restoration required along the south side of North Electrical Building No. 1? This work is not indicated on the drawings. -Please confirm that all raceways shown between North Electrical Building No. 1, FPP-N7, and PCP-N3 are existing, as indicated. Note N#1 on the conduit to FPP-N7 appears to suggest concrete cutting and restoration would be required, implying a new installation.

a.) Sheet E-04 – Please clarify the following: -Please provide a detail specifying the required pull box size, type, rating, and any other applicable requirements for the power and fiber conduit associated with Duct Bank FF.

mailto:purchasing@sanfordfl.gov b.) Duct Bank Details -Please confirm that all raceways shown in Duct Bank Details BB, CC, DD, EE, FF, GG, HH, II, and JJ are new raceways.

c.) Please clarify the minimum conduit size required for all existing raceways that will receive new fiber optic cabling.

d.) Sheet E-22, Please clarify the intent of Note No. 3 located above the FPL transformer.

e.) Sheet E-22, Please provide a panel schedule for Panel L-S6B.

A1. Concrete cutting and restoration work for Section BB is required along the south side of the building. See revised Sheet E-03 issued under this addendum.

Cutting and restoration work for Section AA has been removed on Sheet E-04, re-issued under Addendum No. 3 a.) See revised sheet E-28 issued under this addendum for pullbox details.

b.) Yes. These are new raceways.

c.) 2 inch. Refer to sheet E-09A issued under this Addendum for clarification.

d.) The continuation of the underground line for FPL primary conduits to the FPL in-line service pole are shown on Sheet E-05.

e.) Panel schedule provided on revised sheet E-27 issued under this Addendum.

Q2. Please provide revised section 00410, as well as revised sheet C-5, listed in Addendum 6. They were not included with the addendum.

A2. This has been corrected.

Q3. Please provide details and specs for 200A Active Filters No. S6A and No. S6B as no information on them is provided and vendors are not quoting these items as a result.

A3. See spec section 16375 (Active Harmonic Filter) issued under this addendum.

Q4. Drawing E-01, plan symbols for CONTROL PULLBOX and POWER PULLBOX say "SEE

DETAIL" . I could not find a detail for the CONTROL PULLBOX or the POWER PULLBOX.

Please provide.

A4. See revised sheet E-28 issued under this addendum for pullbox details.

Q5. Drawing E-29 , detail 1 shows "NEMA 4X 316 SS TERMINATION CABINET" next to the

DISCONNECT. Drawing E-07 shows "JB" next to the DISCONNECT. Is this to be a "TERMINATION CABINET" or a "JUNCTION BOX"? Please provide detail.

A5. This is a junction box. See revised Detail#1, Sheet E-29 issued under this addendum.

Q6. Addendum #3 A7-" No new pumps are being provided" . Drawing E-07 shows darkened symbol for 125 hp motor at HS1. Drawing E-24 shows darkened symbol for 75 hp motor at HS1. Is replacing the pump motor at HS1 part of the scope of this contract? If so which size motor is required?

A6. No new pumps or motors are being provided.

Q7. a.) Can you clarify how the existing raceways are intended to be terminated into the new junction boxes mounted on the exterior of each building? Are the existing fiber raceways required to be rerouted and reworked into the new junction boxes as shown on Sheets E-12, E-14, E-15, E-16, E-17, and E-20?

b.) Can you clarify the scope of work for FPP-N7? It is shown as new on Sheet E-09A. Is this equipment existing or new? If new, please provide the exact installation location and details.

c.) Can you confirm that the duct bank JJ entry location into the Office Building shown on Sheet E-04 is correct? Is the intent to route raceways through the Office Building and connect to the Control Junction Box located on the exterior of the building as shown on Sheet E-20? If so, please provide the ceiling type within the Office Building.

d.) Can you confirm that the duct bank CC entry location into the Operations Building shown on

Sheet E-04 is correct? Is the intent to route raceways through the Operations Building and connect to NIP-OPS as shown on Sheet E-21? If so, please provide the ceiling type within the Operations Building. 5. On Sheet E-09A, please provide the locations of OWS-S1 and OWS-S2 within the Office Building. These devices do not appear to be shown on Sheet E- 20.

e.) Can you confirm that the duct bank DD entry location into SEB1 shown on Sheet E-04 is correct? Is the intent to route raceways through SEB1 and connect to FPP-S1A located on the exterior of the building as shown on Sheet E-19? If so, please provide the ceiling type within

SEB1.

f.) Can you clarify the scope of work for FPP-S1B? It is shown as new on Sheet E-09A. Is this equipment existing or new? If new, please provide installation details. Is this equipment intended to be mounted on an equipment rack?

g.) Please provide the locations of the future Actiflow PLC, Master Lift Station, and Headworks.

A7. a.) Junction boxes removed. See revised drawings issued under this Addendum. New fiber to be run and pulled through existing conduit.

b.) FPP-N7 location is shown on Sheet E-03 and specified under specification section 13360.

c.) Control junction box added to north side on Sheet E-20 for duct bank JJ section.

d.) Route raceways exposed on east side of building and connect to NIP-OPS. OWS-S1 and

OWS-S2 are to be located on the existing control room desks and connected to the existing Cat6 wall jacks. See revised Sheets E-04 and E-20 issued under this Addendum.

e.) Route exposed raceways on the east side of SEB1.

f.) New Fiber patch panel to be rack mounted as shown on revised E-04 issued under this addendum. See specification section 13360 for requirements.

g.) Empty conduit not required. The locations of these items are to be determined at a later date. See revised E-09A issued under this addendum.

III. CHANGES, ADDITIONS AND/OR CLARIFICATIONS

1. Delete the following from specification section 16217 (ATS), 2.01, B:

ATS enclosures shall be 72 inches Deep, NEMA 1 Construction.

Insert the following in its place:

ATS enclosure maximum dimensions shall be 20 inches Deep by 34 inches wide by 72 inches high, NEMA 1 Construction.

2. Insert new specification section 16375 (Active Harmonic Filter) issued under this addendum.

3. Insert the following into specification section 16050:

1.18 DEMOLITION

A. Remove all electrical work associated with equipment shown to be removed (TBR) except those portions indicated to remain or be reused. Remove all unused exposed conduit and wiring back to point of concealment.

Remove unused wiring in concealed conduits back to source (or nearest point of usage). Electrical work to be removed corresponds to the associated mechanical equipment to be removed.

B. Where electrical systems pass through the demolition areas to serve other portions of the premises, they shall remain or shall be suitably relocated and the system restored to normal operation. Coordinate outages in systems with the Owner. Where duration of proposed outage cannot be allowed by the Owner, provide temporary connections as required to maintain service.

C. All removals and relocations of existing installations cannot be completely detailed on the Drawings. Survey the site before submitting bid proposal.

D. Continuous service is required on all circuits and outlets affected by these changes, except where the Owner will permit outage for a specific time. Obtain Owner's written consent before removing any circuit from continuous service.

E. Where required to disconnect and/or remove any part of an existing circuit, reconnect that circuit to reestablish service in the remaining portion.

F. Remove exposed conduits, wireways, outlet boxes, pull boxes and hangers made obsolete by the alternations, unless specifically designated to remain. Exposed conduits shall be removed back to point of concealment, where they shall be cut and threaded for a cap. A threaded cap shall then be installed. Conduits may be removed back to first coupling if within 3-inches of point of concealment. Cut back in traffic areas to the floor level and patch.

At the Sanford North Water Reclamation Facility

G. Repair and patch all walls to “Like new” condition and paint to match existing wall color.

1.19 DISPOSITION OF REMOVED MATERIALS AND EQUIPMENT

A. In general, it is intended that all materials and equipment indicated to be removed and disposed of by the CONTRACTOR shall, upon removal, become the CONTRACTOR's property and shall be disposed of off the site by the CONTRACTOR, unless otherwise directed by the Owner.

B. Reuse of wire will not be permitted. An exception is the reuse or relocation when wire is part of an existing lighting branch circuit and reuse or relocation is specifically designated and can be accomplished without removing and re-pulling the wire.

C. All reusable and salvageable disconnect switches, starters, control devices, control panels and instruments, receptacles, light fixtures, etc. shall be sorted and returned to the Owner.

D. All electrical equipment to be salvaged shall be removed and shall be moved by the CONTRACTOR to a location on the site for storage as directed by the Owner.

E. Delete the following Contract Drawings:

E-03, E-04, E-05, E-06, E-07, E-09, E-09A, E-12, E-14, E-16, E-17, E-18, E-20, E-22, E-23, E-24, E-27, E-28 and I-08 Insert the following revised Contract Drawings in their place:

E-03, E-04, E-05, E-06, E-07, E-09, E-09A, E-12, E-14, E-16, E-17, E-18, E-20, E-22, E-23, E-24, E-27, E-28 and I-08

IV. SIGN-IN SHEET

NA

Respondents must acknowledge receipt of this Addendum by signing this form below and returning it to the Procurement Division prior to the hour and date specified for receipt of bids/proposals or by including this Addendum with your submittal. Failure to comply may result in disqualification of your response.

Acknowledgment is hereby made of Addendum #9 to IFB 25/26-15 Transfer Station and Reclaimed Water Distribution Pump Station At the Sanford North Water Reclamation Facility

Name of Firm/Company Contact Email

Street Address City, State, Zip Code

Telephone Number Fax Number

Authorized Person Printed Name Authorized Person Title

Authorized Person Signature Date of Signature

Transfer Station and Reclaimed ACTIVE HARMONIC FILTER

Water Distribution Pump Station

16375-1

ECTION 16375

ACTIVE HARMONIC FILTERS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Active harmonic filters (AHF) as shown on E-07 of the Electrical Drawings

1.02 RELATED REQUIREMENTS

A. Section 16107 – Switchboards

B. Section 16370 - VFDs

1.03 ABBREVIATIONS AND ACRONYMS

A. AHF: Active harmonic filter.

B. EMC: Electromagnetic compatibility.

C. EPMS: Electrical power management system.

D. HMI: Human machine interface.

E. IGBT: Insulated gate bipolar transistor.

1.04 REFERENCE STANDARDS

A. ANSI Z535.4 - American National Standard for Product Safety Signs and Labels;

2023.

B. ASCE 7 - Minimum Design Loads and Associated Criteria for Buildings and Other Structures; Most Recent Edition Cited by Referring Code or Reference Standard.

C. ICC (IBC) - International Building Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

D. ICC-ES AC156 - Acceptance Criteria for Seismic Certification by Shake-Table Testing of Nonstructural Components; 2010, with Editorial Revision (2020).

E. IEC 60529 - Degrees of Protection Provided by Enclosures (IP Code); 1989 (Corrigendum 2019).

F. IEEE 519 - IEEE Standard for Harmonic Control in Electric Power Systems;

2022.

G. ISO 9001 - Quality Management Systems — Requirements; 2015, with Amendment (2024).

16375-2

H. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

I. NFPA 70E - Standard for Electrical Safety in the Workplace; 2024.

1.05 ADMINISTRATIVE REQUIREMENTS

A. Coordinate work with VFD supplier and CONTRACTOR to provide harmonic mitigation for nonlinear and switching electrical equipment to be installed.

1.06 SUBMITTALS

A. Shop drawings shall be submitted In accordance with specification section 16050, 1.11.

B. Provide sufficient information to determine compliance with Contract Documents.

Identify submittal data with specific equipment tags and/or service descriptions to which they pertain. Identify specific model numbers, options, and features of equipment proposed.

C. Indicate deviations from Contract Documents with reference to corresponding drawing or specification number and written justification for deviation.

D. Product Data: Provide manufacturer's standard catalog pages and data sheets for active harmonic filters, components, and accessories.

1. Include assembly rated input KVA and output KVA, topology, converter/inverter type, percent efficiency, operating characteristics, and electrical characteristics.

2. Include maximum Btu (kJ) heat release data and ambient cooling requirements.

E. Harmonic Analysis Report: Provide project-specific calculations and manufacturer's statement of compliance with IEEE 519, based on detailed electrical power system characteristics supplied by CONTRACTOR.

F. Factory acceptance testing report.

G. Include certification, signed by the CONTRACTOR, that equipment and associated system have been installed, configured, and tested in accordance with manufacturer’s recommendations, conforms to requirements of Contract Documents, and is ready for operation.

H. Functional Demonstration Testing Report: Document test results, including assumptions, conditions, allowances, and corrections made.

I. Manufacturer's qualification statement.

J. Installer's qualification statement.

K. Operation and Maintenance Data:

16375-3

1. Provide detailed information on system operation, equipment programming and setup, replacement parts, and recommended maintenance procedures and intervals.

a. Provide contact information for parts stocking location closest to Owner.

b. Identify critical spare parts associated with long lead times and/or those critical to unit operation.

c. Identify maintenance spare parts required to regularly perform scheduled equipment maintenance including, but not limited to, consumable parts required to be exchanged during scheduled maintenance periods.

L. Statement of standard warranty and extended warranty options/costs.

M. Maintenance Materials: Furnish the following for Owner's use in maintenance of project:

1. Spare Parts: For each type and size of unit installed.

a. Provide minimum spare parts recommended by manufacturer.

b. Package and mark spare parts for long-term storage. Provide separate anti-static containers for printed circuit boards.

2. Tools: Manufacturer-specific special tools required to install, remove, test, and maintain active harmonic filter components.

a. Equipment Configuration Software: Provide PC-based or mobile device application; provide of each different communication interface cable required to connect computer/device configuration and programming.

b. Equipment Configuration Files: For future upload into replaced/repaired components, in media format acceptable by Owner.

1.07 QUALITY ASSURANCE

A. Comply with the following:

1. NFPA 70.

2. Requirements of local authorities having jurisdiction.

3. Applicable local codes.

16375-4

B. Manufacturer Qualifications:

1. Firm engaged in manufacture of specified products of types and sizes required, and whose products have been in satisfactory use in similar service for minimum of 10 years.

2. Certified in accordance with ISO 9001 with applicable quality assurance system regularly reviewed and audited by third-party registrar. Develop and control manufacturing, inspection, and testing procedures under guidelines of quality assurance system.

3. Service, repair, and technical support services available 24 hours per day, 7 days per week from manufacturer or their representative.

C. Installer Qualifications: Firm with minimum 5 years experience with active harmonic filters of similar type and scope[; approved by manufacturer's representative].

D. Product Listing Organization Qualifications: Organization recognized by OSHA as Nationally Recognized Testing Laboratory (NRTL) and acceptable to authorities having jurisdiction.

1.08 DELIVERY, STORAGE, AND HANDLING

A. Prior to delivery to project site, verify suitable storage space is available to store materials in well-ventilated area protected from weather, moisture, soiling, extreme temperatures, humidity, and corrosive atmospheres.

B. Protect materials during delivery and storage and maintain within manufacturer's written storage requirements. At minimum, store indoors in clean, dry space with uniform temperature to prevent condensation and protect electronics from potential damage from electrical and magnetic energy.

C. Deliver materials to project site in supplier's or manufacturer's original wrappings and containers, labeled with supplier's or manufacturer's name, material or product brand name, and equipment tag number or service name as identified in Contract Documents.

D. Inspect products and report concealed damage or violation of delivery, storage, and handling requirements to Engineer.

1.09 FIELD CONDITIONS

A. Maintain field conditions within manufacturer's required service conditions during and after installation.

1.10 WARRANTY

A. Manufacturer Warranty: Provide manufacturer warranty for defects in material and workmanship for 12 months from date of commissioning or 18 months from date of shipment, whichever comes first. Complete forms in Owner's name and register with manufacturer.

16375-5

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Schneider Electric; Square D PowerLogic AccuSine PCS+ (3-phase mitigation), Eaton or approved equal.

B. Source Limitations: Furnish products produced by same manufacturer as other electrical distribution equipment for this project.

2.02 ACTIVE HARMONIC FILTERS

A. Basis of Design: Schneider Electric; Square D PowerLogic AccuSine PCS+ (3-phase mitigation).

1. Harmonic mitigation performance calculations were based on these products for AHF sizes indicated for mitigation of nonlinear loads with minimum 3 percent impedance. Increase size of AHFs as required to meet specified harmonic mitigation performance requirements.

B. Description: Power electronic device consisting of insulated gate bipolar transistor (IGBT) power semiconductors that switch into AC lines to modulate output to mitigate detrimental harmonic current, correct displaced reactive current (leading or lagging), and balance current (negative sequence current) for power source.

C. System Performance Requirements:

2. Provide the following performance using basis of design sizing calculation method for nonlinear loads, each with minimum impedance of 3 percent.

a. Limit THD(v) to not more than 5 percent as contributed by loads at each AHF location. Use THD(v) setpoint to optimize AHF performance and maintain 5 percent setpoint.

b. Size AHF such that THD (i) meets IEEE 519 current distortion limits for systems rated 208 V through 600 V.

c. Displacement Power Factor (PF): Corrected to 0.95 lagging or better at each AHF location.

1) Displacement PF never to go leading due to AHF performance or design.

2) Provide AHF setpoint entry to maintain objective.

3) Provide optimized displacement correction that will not attempt to overcorrect PF closer to unity than setpoint or cross over unity for leading PF.

3. For AHFs with 3-phase mitigation, provide negative sequence current correction to source current imbalance not more than 2 percent phase-to-

16375-6 phase after correction. For AHFs with neutral current compensation and 3-phase mitigation, provide zero sequence current correction in addition to negative sequence.

4. Service Conditions:

a. Operating Ambient Temperature Range:

1) Floor Standing Units: From 32 degrees F (0 degrees C) to 104 degrees F (40 degrees C) maximum.

2) Wall-Mounted Units Rated 300 A: From 32 degrees F (0 degrees C) to 104 degrees F (40 degrees C) maximum.

3) Support temperature derating up to 134 degrees F (50 degrees C) maximum ambient temperature; derate to meet environmental conditions of installed location.

b. Maximum Altitude: Up to 3,300 feet (1000 m) without derating.

c. Humidity: Up to 95 percent, noncondensing.

D. Active Harmonic Filters with 3-Phase Mitigation; AccuSine PCS+:

1. Input Voltage Range:

a. 480 V: Plus 10 percent, minus 15 percent.

2. Heat Losses:

a. 480 V: Not more than 3 percent of unit kVAR rating.

3. Current Output Ratings:

a. 480 V: 200A.

4. AC Supply Frequency: 60 Hz, plus/minus 3 Hz.

5. Floor Standing Units: Provide door-interlocked circuit breaker rated at 200 kAIC up to 480 VAC.

E. Active Harmonic Filters with Neutral Current Compensation and 3-Phase Mitigation; AccuSine PCSn:

1. Input Voltage Range: 480V, plus 10 percent, minus 15 percent.

2. Heat Losses: 780 V: Not more than 3 percent of unit kVAR rating.

3. AC Supply Frequency: 60 Hz, plus/minus 3 Hz.

4. Provide UL class T fuses rated 200 kAIC from 208 V to 415 V.

5. Parallel Capability: Up to 12 units of any size combination.

16375-7

F. General Requirements:

1. Provide three-level converter design to optimize performance and minimize heat losses.

2. Provide conformal coating for printed circuit boards.

3. Provide phase rotation insensitivity; detect phase rotation and align output accordingly.

4. AHFs that shut off nonlinear loads (e.g., variable frequency motor controllers) when AHF has faulted are not acceptable.

5. Floor-Standing Units: Provide incoming bus bar terminations for both top and bottom entry; capable of landing minimum of two cables per phase.

6. Safety Features:

a. Provide dead front safety feature upon opening enclosure door on floor-standing units, with extreme measures required to bypass; to perform service, lock out upstream feeder breaker before opening enclosure door.

b. Connect incoming power to input circuit breaker within power cable entry plenum with no access to incoming cabling once cable installation is complete and plenum covers are reinstalled.

7. Provide energy saving feature to stop unit when load goes below selected setpoint (10 percent factory setting) and turn on at higher setpoint (15% factory setting).

8. Provide service port in front cover of each unit chassis (IP00); with power disconnected, USB connection from laptop computer can examine past performance and review parameter setpoints and event log for commissioning or service.

9. Monitor total current of loads under review utilizing two CTs mounted on supply AC lines for 3-phase loads. Provide three CTs if phase-to-neutral loads are connected (four-wire system).

a. Analyze content of supply current for harmonics from 2nd to 51st order and determine reactive current content representing displacement power factor and current balancing.

1) Inject cancellation for every harmonic from 2nd to 51st order; AHFs that inject fewer harmonic orders are not acceptable.

2) Nonlinear Loads: Provide input line reactors rated 3 percent or higher impedance (inductance).

16375-8

3) Optimized Power Factor Correction: Selectable feature designed to prevent correction when system PF is better (closer to unity) than programmed PF set point; AHFs that reduce system PF to attain reduced set point are not acceptable.

b. Operation Modes: Field-selectable as harmonic filter, reactive current correction, or supply current balancing, or any combination of these three; AHFs that do not support these three modes are not acceptable.

10. Provide current balancing of AC supply for harmonic and reactive currents regardless of actual load distribution per phase.

11. Provide up to 30 seconds of logic ride-through if power is lossed.

12. Provide current limiting function to protect IGBTs.

a. When current limit level is attained on any harmonic order, display message indicating output capacity is operating at maximum capacity.

b. Continue operation indefinitely at reduced level without trip or unit degradation.

13. Provide automatic restart capability upon power loss return and fault resets.

a. Fault Trip Limit: Provide positive shut down with notification after five restarts within 5-minute period; stop output current production and lock out restart until fault is manually cleared

14. Incorporate overtemperature output roll back to reduce total output current and power component heating to maintain maximum current correction at elevated temperatures within electrical system.

a. Monitor incoming air temperature and invoke hard trip of unit at 124 degrees F (51 degrees C).

b. Cooling Architecture: Mount heat sinks in separate plenum with separate cooling arrangement; do not mix clean and dry air intake for PCB’s with air for heat sinks.

15. Provide compatibility with surge protective devices, EMC filters, SCR (thyristor) snubber circuits, and switched mode power supplies.

G. Operator Interface:

1. Provide door-mounted human machine interface (HMI) with touch screen control, rated IEC 60529, IP65, dust tight, and liquid resistant.

2. Provide run/stop control from every screen.

16375-9

3. Provide oscilloscope feature to display specific parameters.

a. Support monitoring of three sets of data at once, with up to twenty selectable predefined parameters for each curve.

b. Display performance trend curves for load total RMS current, load RMS harmonic current per phase, AHF harmonic current output per phase, AC mains voltage per phase, THDi, TDD, load RMS reactive current, and AHF RMS reactive current output.

c. Provide bar graphs for display of mains and load harmonic current amplitudes per harmonic order.

d. Provide select internal curves for diagnostic and performance checks.

4. Display operating and setup parameters and event/fault messages in plain English; AHFs that use cryptic codes or symbols are not acceptable.

a. Display mains voltage and CT current.

b. Support parameter adjustment with password protection.

c. Record and display event log with time and date stamp for minimum of 100 events; clear event log with stop function or power-off.

5. Provide external communications via RJ45 connectors.

a. Modbus TCP/IP Support: Remote run/stop and display of operating parameters, set up parameters, and diagnostic functions.

6. Provide safety feature to lock out other forms of control during service and commissioning.

a. After 15 minutes of non-use, clear lockout, and revert control functions to full functionality and remote control capability.

7. Display flashing warning screen in event of fault.

8. Download parameters to USB memory device to permit remote diagnostic evaluations and save unit set up parameters.

9. Provide on-board commissioning guide with automatic detection features.

a. Automatically check for proper AC line phase rotation; no specific phase rotation is required.

b. Automatically test for CT phase rotation and polarity. If installation is incorrect, rotate and reorient CT’s through logic calculation. If

16375-10 proper alignment cannot be achieved, provide fault warning and operation lockout.

c. Automatically calibrate CT for optimum harmonic cancellation performance.

d. Perform at full capacity for period of 15 minutes to validate components meet temperature performance requirements in installed location.

e. If on-board commissioning is not reconciled, lock out function until commissioning agent corrects, verifies, and clears each test.

H. Enclosures:

1. Include provisions for locking disconnects in off position. Provisions for additional padlocking with approved lockout/tag-out device to be supplied by Owner.

2. Free-Standing Enclosure bolted to the wall: IEC 60529, IP31 or IP54 with provisions for top and bottom entry of cables.

I. Markings and Labeling:

1. Provide identification and warning labels/nameplates exterior to equipment resistant to weather, UV, and intended installation environment.

2. Provide engraved nameplates identifying project-specific equipment tag and service description.

3. Provide warning labels/nameplates complying with ANSI Z535.4 at access locations to advise personnel of possible hazards in accordance with listing, NFPA 70, NFPA 70E, and other applicable standards.

J. Current Transformers:

1. Provide split core type current transformers as indicated on drawings.

2. Primary Current Rating: Select according to circuit full load current rating.

3. Current Transformer Ratio: As indicated on drawings.

4. Secondary Current Rating: 1 A or 5 A.

5. Frequency Rating: 50-60 Hz.

6. Accuracy: Class 1, minimum.

16375-11

7. Provide factory-tested native software compatibility, including the following:

a. Capability for pre-engineered, interactive graphical display screens to view and analyze real-time device data.

1) Per-phase total currents (source, load, and output).

2) Per-phase fundamental currents (source, load, and output).

3) Per-phase harmonics currents (load and output).

4) Fundamental Powers: kW, kVAR, kVA (source and load).

5) Voltages (phase-to-phase and average).

6) Total harmonic distortion (THD) currents per phase (source and load).

7) Total harmonic distortion (THD) voltages line-to-line.

8) Voltage harmonics line-to-line for odd-ordered harmonics (1st through 15th).

9) Per-phase current harmonics for odd-ordered harmonics (1st through 15th).

10) Device alarms (temperature alarms, trip signals, failure alarms, and misconfiguration alarms).

11) Device diagnostic data (configuration values, lifetime operating values, system capacity values).

b. Pre-mapping of registers to standard measurement names without need for additional configuration or internal device registers.

c. Automatic collection and logging of device data by EPMS software without additional configuration.

1) Per-phase total currents (source, load, and output).

2) Per-phase fundamental currents (source, load, and output).

3) Per-phase harmonics currents (load and output).

4) Voltage (line-to-line average).

5) Total harmonic distortion (THD) currents per phase (source, load).

6) Total harmonic distortion (THD) voltages line-to-line.

16375-12

7) Displacement power factor (source and load).

d. Capability for EPMS software to download recorded waveforms.

2.03 SOURCE QUALITY CONTROL

A. Factory Acceptance Testing (FAT):

1. Prior to shipment, original equipment manufacturer to fully test performance at full current and voltage while functioning as harmonic correction device at their manufacturing facility.

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine equipment exterior and interior for damage, including but not limited to, structure, moisture, and mildew.

B. Examine for conditions detrimental to completion of work.

3.02 INSTALLATION

A. Install equipment in accordance with manufacturer’s written instructions.

B. Unless otherwise indicated, install and anchor active harmonic filters on raised concrete pad 4 inches high.

3.03 FIELD QUALITY CONTROL

A. Manufacturer Services: Provide services of manufacturer's field representative to perform functional testing, commissioning, and first parameter adjusting.

1. Include necessary material, equipment, labor, and technical supervision.

2. Replace damaged or malfunctioning equipment and report discrepancies or installation issues.

3.04 CLOSEOUT ACTIVITIES

A. Functional Demonstration Testing: Demonstrate proper operation of active harmonic filters and associated systems to Owner's designated representative and the Engineer, observing and documenting compliance with Contract Documents.

B. Training:

1. Train Owner's personnel on operation and maintenance of system.

a. Accommodate minimum of 8 attendees.

b. Provide not less than 1 session with two hours of classroom and 3 hours of hands-on training.

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-03

EN

LA

R G

ED

N

O R

TH

S

IT

E

PL

A

N

/1

7/

AD

D

EN

D

U M

N O

.3

/1

1/

AD

D

EN

D

U M

N O

.5

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

N

S

IT

E

PL

AN

.d w g, /2

7/

:0 1:

P

M , f de la o

SPRINKLER

SPRINKLER

SPRINKLER

SPRINKLER

TO

B

TO

B

TO

E

TOB

TOB

.4 7'

49.00'

.4

7'

49.00'

EXISTING SANITARY SEWER MH

TOP RIM ELEV = 10.09

N INV (8" PVC) ELEV = 6.04

NW INV (8" PVC) ELEV = 5.73

W INV (8" PVC) ELEV = 4.13

SW INV (8" PVC) ELEV = 3.97

SE INV (12" PVC) ELEV = 1.96

ASPHALT PAVEMENT

30.1'

.6

5.8'

7.

2'

5.7'

.3

30.3'

.0

.6

50.7'

.7

50.7'

.4

21.4'

.4

21.3'

OHU

OHU

OHU OHU OHU OHU OHU OHU

O H

U O

H U

O H

U O

H U

O H

U O

H U

O H

U O

H U

O H

U

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

ODOR

CONTROL

STRUCTURE

FLOW

FLOW

3" RWM

24" RAW

18" RAW

4" W

TR

6"

W

TR

4" W

TR

3" RWM

₂

/1

7/

AD

D

EN

D

U M

N O

.3

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-04

EN

LA

R G

ED

S

O U

TH

S

IT

E

PL

A

N

/1

1/

AD

D

EN

D

U M

N O

.5

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

S

SI

TE

P

LA

N .d w g, /2

7/

:0 2:

P

M , f de

/1

7/

AD

D

EN

D

U M

N O

.3

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-05

EN

LA

R G

ED

W

ES

T

SI

TE

P

LA

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

W

S

IT

E

PL

AN

.d w g, /2

7/

:0 2:

P

M , f de

7/

AD

D

EN

D

U M

N O

.3

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-06

C O

N D

U

IT

S

EC

TI

O

N S

/1

1/

AD

D

EN

D

U M

N O

.5

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

CO

N D

UI

T

SE

CT

.d w g, /2 7/

:0

2:

P M

, f de

7/

/1

1/

AD

D

EN

D

U M

N O

.3

AD

D

EN

D

U M

N O

.5

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-07

SI

N

G

LE

L

IN

E D

IA

G

R A

M

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

SW

BD

S

W

BD

S

LD

.d w g, /2

7/

:0 2:

P

M , f de

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-09

C O

N

TR

O L

R

IS

ER

D

IA

G

R A

M

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

RI

SE

R

D

IA

GR

AM

.d w g, /2 7/

:0

2:

P M

, f de

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-09A

N

ET

W O

R K

R

IS

ER

D

IA

G

R A

M

/1

1/

AD

D

EN

D

U M

N O

.5

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -0

9A N

ET

W

O

RK

R

IS

ER

D

IA

.d w g, /2

7/

:2 6:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-12

N O

R

TH

E

LE

C

TR

IC

A

L B

U

IL

D

IN

G N

O .1

EL

EC

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

N

E

LE

C

BL

D G

N O

.1 P

LA

N

.d w g, /2 7/

:2

7:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-14

B

IO

SO

LI

D S

M A

N A

G

EM

EN

T

FA

C

IL

IT

Y B

U

IL

D

IN

G (S

EB

2)

E

LE

C

TR

IC

A

L

PL

A N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

BI

O F

AC

E

LE

C

PL

AN

.d w g, /2 7/

:3

6:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-15

SO

U

TH

E

LE

C

TR

IC

A L

B U

IL

D

IN

G

N O

.5 (S

EB

5)

D

EW

A

TE

R

IN

G

B U

IL

D

IN

G

EL

EC

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

SE

B5

D

EW

TR

B

LD

G

EL

EC

P

LA

N .d w g, /2

7/

:1 9:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-16

SO

U

TH

E

LE

C

TR

IC

A L

B U

IL

D

IN

G

N O

.4 (S

EB

4)

TR

U C

K L

O A

D

IN

G B

U

IL

D

IN

G

EL

EC

TR

IC

A

L

PL

A N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

SE

B4

T

RU

CK

B

LD

G

EL

EC

P

LA

N .d w g, /2

7/

:1 9:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-17

SO

U

TH

E

LE

C

TR

IC

A L

B U

IL

D

IN

G

N O

.3 (S

EB

3)

E

LE

C

TR

IC

A

L

PL

A N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

S

EL

EC

B

LD

G

PO

W

ER

P

LA

N .d w g, /2

7/

:1 9:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

/1

1/

AD

D

EN

D

U M

N O

.5

E-18

SO

U

TH

E

LE

C

TR

IC

A L

B U

IL

D

IN

G

N O

.7 (S

EB

7)

M

A

ST

ER

P

U M

P

ST

A

TI

O N

EL

EC

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

SE

B7

M

PS

B

LD

G

EL

EC

P

LA

N

.d w g, /2 7/

:0

2:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-19

SO

U

TH

E

LE

C

TR

IC

A L

B U

IL

D

IN

G

N O

.1 (S

EB

1)

B

EL

T

FI

LT

ER

P

R

ES

S B

U

IL

D

IN

G E

LE

C

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -1

SE

B1

B

EL

T

FI

LT

ER

E

LE

C

PL

AN

.d w g, /2

7/

:0 3:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

/1

1/

AD

D

EN

D

U M

N O

.5

E-20

O

FF

IC

E

B U

IL

D

IN

G

S

ER

VE

R

R O

O M

EL

EC

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

O

FF

IC

E

BL

D G

SE

RV

R O

O M

E

LE

C

PL

AN

.d w g, /2

7/

:0 3:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

/1

7/

AD

D

EN

D

U M

N O

.3

E-22

R

EC

LA

IM

E

LE

C

TR

IC

A

L B

U

IL

D

IN

G

PO

W

ER

P

LA

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

RC

LM

E

LE

C

BL

D

G

PW

R

PL

AN

.d w g, /2

7/

:0 3:

P

M , f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-23

R

EC

LA

IM

E

LE

C

TR

IC

A

L B

U

IL

D

IN

G

LI

G H

TI

N

G

G R

O U

N D

IN

G

P

LA

N S

/1

7/

AD

D

EN

D

U M

N O

.3

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

RC

LM

E

LE

C

BL

D

G

LT

G

G N

D P

LA

N

.d w g, /2 7/

:0

3:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-24

H

IG

H S

ER

VI

C E

PU

M

P

ST

A

TI

O N

EL

EC

TR

IC

A L

PL

A

N

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

H

SP

S

EL

EC

P

LA

N .d w g, /2

7/

:0 3:

P

M , f de

/1

7/

AD

D

EN

D

U M

N O

.3

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-27

LI

G

H

TI

N G

F

IX

TU

R

E

SC

H

ED

U

LE

D

ET

A

IL

S

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

LT

G D

TL

S.

dw g, /2

7/

:0 3:

P

M , f de

7/

AD

D

EN

D

U M

N O

.3

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-28

PA

N

EL

S

C H

ED

U

LE

S

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

PN

L

SC

H D

.d w g, /2 7/

:0

3:

P M

, f de

CPH, Inc.

Plans Prepared By:

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

E-29

EL

EC

TR

IC

A L

D

ET

A

IL

S-

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\E -2

EL

EC

D

TL

S-

1.

dw g, /2 7/

:0

3:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

I-05

FI

B

ER

O

PT

IC

N

ET

W O

R K

O

VE

R

VI

EW

/1

1/

AD

D

EN

D

U M

N O

.5

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\I-

F

IB

ER

N

TW

K

D

IA

.d w g, /2 7/

:0

3:

P M

, f de

State of Florida Licenses:

Engineer No. 3215

Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298

D at e N o.

R ev is io n www.cphcorp.com A Full Service

A & E Firm

123456

C

THIS SHEET NOT VALID FOR

CONSTRUCTION WITHOUT

COMPLETE SET OF PLANS.

Sheet No.

Drawn:

Designed:

Checked:

Job No.:

Date:

100% SUBMITTAL

06/23/2026

SEB

KRG

SEB

S06208

SA

N

FO

R

D N

O R

TH

R

EC

LA

IM

ED

TR

A

N

SF

ER

P

U M

P/

EF

FL

U

EN

T

TR

A

N

SF

ER

P

U M

P

ST

A

TI

O N

P

LC

IM

PR

O

VE

M

EN

TS

ST

EP

H

EN

E . B

AI

LE

Y, P

.E

I-08

PC

P

D

IS

TR

IB

U

TI

O N

D

IA

G R

A M

/2

7/

AD

D

EN

D

U M

N O

.8

X:

\A ct iv e Pr oj ec ts \C

PH

\S an fo rd \S an fo rd N or th

R ec la im a nd

P

LC

Im p\

._A dd en du m

\D w gs

\I-

P

CP

D

IS

T D

IA

.d w g, /2

7/

:0 3:

P

M , f de

16375-13

c. Training Reference: Use submitted operations and maintenance manuals Provide manuals and documentation for each participant.

d. Instructor: Factory-trained manufacturer's representative.

e. Location: Project site.

2. Provide sufficient time and detail in each session to cover the following at minimum:

a. Operation theory.

b. Key operations.

c. Cooling system requirements.

d. Operator interfaces.

e. Printed circuit board maintenance and replacement.

f. Power device maintenance and replacement.

g. Preventative maintenance routines.

3.05 MAINTENANCE

A. Provide to Owner, at no extra cost, separate contract for service plan for 2 years from date of Substantial Completion including, but not limited to, dedicated customer success management team, priority remote and on-site (within 100 miles (160 km) of service location) expert support, discounted service rates, continuous monitoring and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .