About this file
This is Addendum No. 5 issued by the City of Sanford, Florida Purchasing Division on August 11, 2026, for Invitation for Bids (IFB) 25/26-15 regarding the Transfer Station and Reclaimed Water Distribution Pump Station at the Sanford North Water Reclamation Facility. The addendum revises the solicitation due date to Thursday, August 20, 2026, at 2:00 p.m. Local Time. The project encompasses construction of electrical infrastructure, process instrumentation and control systems (PICS), HVAC systems, roofing replacement, asphalt paving, concrete work, and site preparation. Key revisions include corrections to drawing numbering and specifications, clarification that pole-mounted lighting fixtures are not required on this project, confirmation that existing conduits will be used for new fiber installations rather than requiring new 2-inch conduits, and technical corrections to the single line diagram renaming ATS2 to ATS-S6B. The addendum also extends the question deadline to August 6, 2026, at 2:00 p.m. and addresses ten substantive bidder questions regarding conduit sizing, electrical panel specifications, and clarifications on ductbank sections. Three additional System Control Suppliers—ITG Technologies, Southern Flow, and General Control Systems—are added to the approved vendors list. The specification sections for the List of Drawings (00015) and Proposal/Bid Form (00410) are revised, with the Bid Form now providing clearer definitions of work items including Mobilization and General Conditions, Demobilization and Closeout, Pre-Construction Video, Site Work, Electrical Building, and Process Instrumentation and Control System components. Revised contract drawings for sheets G-02, E-03, E-04, E-06, E-07, E-09A, E-18, E-20, E-21, I-05, and I-07 are incorporated, with a new sheet E-09A added as the Network Riser Diagram.
Bidders are required to acknowledge receipt of this addendum and all previous addenda (Addendum No. 4 acknowledgment form is included) prior to bid submission or risk disqualification. The schedule of values in the bid form presents work organized into lump-sum line items covering mobilization and general conditions, demobilization and record drawings, pre-construction video, site work activities, electrical building construction, and furnish-and-install pricing for electrical systems and process instrumentation and control systems. No information regarding set-asides, incumbents, or specific funding sources is detailed in this addendum. Pricing is structured as lump-sum bid items with quantities of one for each line item, requiring bidders to provide comprehensive unit pricing that encompasses all materials, labor, equipment, transportation, overhead, and profit for complete project delivery within 365 calendar days of Notice to Proceed.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUR-F-212 Rev. 11/2016
City of Sanford | Finance Department | Purchasing Division 300 N. Park Avenue Suite 236, Sanford, Florida 32771
Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov
ADDENDUM
#5 IFB 25/26-15 Transfer Station and Reclaimed Water
Distribution Pump Station
At the Sanford North Water Reclamation Facility
DATE: August 11, 2026
TO: All Bidders/Proposers
FROM: Maria A. Green
SUBJECT:
City of Sanford Purchasing Division
IFB 25/26-15 Transfer Station and Reclaimed Water Distribution Pump
Station At the Sanford North Water Reclamation Facility | ADDENDUM #5
This addendum is issued to provide additional information, clarification, corrections, additions, deletions and/or answers to questions concerning the above referenced solicitation. All information provided in this addendum is incorporated into the solicitation document as set forth therein. All other parts of the solicitation have been maintained as originally distributed. This addendum supersedes any verbal and/or other instructions given to any bidder/proposer qualified to respond pursuant to the requirements set forth in the solicitation document.
This Addendum consists of a total of 3 pages plus the following attached items:
A. Acknowledgement of Receipt of Addendum No. 4 Form – Total of 1 Page
B. Revised Specifications:
00015 and 00410
C. Revised Contract Drawings:
G-02, E-03, E-04, E-06, E-07, E-09A, E-18, E-20, E-21, I-05 and I-07.
I. DUE DATE
This Addendum does change the solicitation due date. As such, the solicitation response is due no later than Thursday, August 20, 2026 at 2:00PM Local Time.
II. QUESTIONS AND ANSWERS (Q&A)
The City has received the following question(s) concerning the solicitation:
Q1. The List of Drawings in the Project Manual and on the INDEX of Sheets is missing “E-21
EXISTING OPERATIONS BUILDING SCADA ROOM PLAN”. Drawings E-21 thru E-30 look to be numbered incorrectly on the list. The last drawing “ELECTRICAL DETAILS-3” I believe should be E-31.
A1. Drawings and Specifications updated.
Q2. LIGHTING FIXTURE SCHEDULE includes TYPES A,B (Pole Mounted Fixtures) and TYPE -
EXIT. I did not find any of these indicated on the ELECTRICAL drawings. Are any of these fixtures required in this contract?
A2. Pole mounted lighting fixtures are not required on this project. Detail removed.
mailto:purchasing@sanfordfl.gov
300 N. Park Avenue Suite 236, Sanford, Florida 32771
Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov
ADDENDUM
#5 IFB 25/26-15 Transfer Station and Reclaimed Water
Distribution Pump Station
At the Sanford North Water Reclamation Facility
Q3. There are several unanswered questions that are impacting our vendors and subs from quoting the project. Since Addendum 3 has not yet been issued, please consider extending the bid date with this Addendum to allow for adequate time for these vendors.
A3. Bid date to be extended to August 20th at 2:00 PM.
Q4. It appears that addendum 3 has not answered all of the submitted question. Will a 4th addendum be addressing the rest? Also, please confirm that the new question deadline is 8/6 at 2:00pm.
A4. Question deadline is August 6th at 2:00 PM.
Q5. Please furnish the manufacturer and model of existing panels L1, LT, L-1A and/or circuit breakers to be installed in them per sheet E-12 Note 3, Sheet E-14 Note 4, Sheet E-18 Note 2 respectively.
A5. Eaton Type PRL1A.
Q6. Please provide conduit size and wiring requirements for conduit runs shown on sheets E-13 through E-21.
A6. See revised drawings issued under Addendum No. 4.
Q7. Addendum #3, Drawing E-03 has a new NOTE 4 pointing to the ductbank between existing
PMH-2/CMH-2 and existing PMH-3/CMH-3 which states "EXISTING CONDUITS TO BE
USED FOR NEW FIBER." This same ductbank is also labelled with A-A. Drawing E-06
DUCTBANK CONDUIT SECTION shows new 2" conduit with FIBER. Question: does the contractor need to provide a new 2" conduit in this ductbank?
A7. No. Existing conduit to be used.
Q8. The single line diagram on sheet E-07 shows a connection between the GCP and ATS Control
Module of ATS-S6A. It also shows a connection, with the same conduit and wire requirements, between the GCP and "ATS2". Please confirm if this connection should be between the GCP and the ATS Control Module of ATS-S6B, or please furnish the location of "ATS2". Thank you
A8. Yes, ATS2 should be renamed to ATS-S6B. See revised drawing attached issued under this addendum.
Q9. Sheet E-06, revised by Addendum 3, now shows 2 new ductbank sections: "I I" and "J J". Sheet
E-04, revised by Addendum 3, now shows ductbank sections "J J" being used, but identifies two different ones as "C C". Please confirm of section "C C" between section "J J" and Operations building on sheet E-04 is meant to be section "I I" or if section "C C" is meant to be used two times. Thank you.
A9. Sections JJ and CC are to be used between the Operations building and the control room.
Direct buried Fiber conduits will be required from NIP-S per section JJ, fiber conduits to be concrete encase under roads per Section CC.
Q10. Can General Control Systems please be added to the list of approved System Control Suppliers
(SCS)? GCS meet the qualifications outlined in Section 13300.
A10. Yes. See revisions to specifications issued under this addendum.
300 N. Park Avenue Suite 236, Sanford, Florida 32771
Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov
ADDENDUM
#5 IFB 25/26-15 Transfer Station and Reclaimed Water
Distribution Pump Station
At the Sanford North Water Reclamation Facility
Q11. There doesn't appear to be a written description of what is to be included in each bid item on the bid form. Can you please provide a measurement and payment spec section that will describe each item? i.e. - what is the difference between "Earthwork" and "Sitework"? Also, what is defined as
"Equipment" that we are to provide purchase and installation pricing for?
A11. Bid form updated.
III. CHANGES, ADDITIONS AND/OR CLARIFICATIONS
1. Specification 00015, “List of Drawings”, Remove and replace with attached Revision Section
00015.
2. Specification 00410, “Proposal (Bid Form)”, Remove and replace with attached Revision Section
00410.
3. Insert the following into specification section 13300, 1.01, C., 1:
f. ITG Technologies
g. Southern Flow
h. General Control Systems
4. Delete the following Contract Drawings:
G-02, E-03, E-04, E-06, E-07, E-18, E-20, E-21, I-05 and I-07.
5. Insert the following Revised Contract Drawings in their place:
G-02, E-03, E-04, E-06, E-07, E-18, E-20, E-21, I-05 and I-07.
6. Insert new sheet E-09A as part of this addendum.
IV. SIGN-IN SHEET
NA
300 N. Park Avenue Suite 236, Sanford, Florida 32771
Phone: 407-688-5028 or 5030 | Fax: 407-688-5021 | Email: purchasing@sanfordfl.gov
ADDENDUM
#5 IFB 25/26-15 Transfer Station and Reclaimed Water
Distribution Pump Station
At the Sanford North Water Reclamation Facility
Respondents must acknowledge receipt of this Addendum by signing this form below and returning it to the
Procurement Division prior to the hour and date specified for receipt of bids/proposals or by including this
Addendum with your submittal. Failure to comply may result in disqualification of your response.
Acknowledgment is hereby made of Addendum #5 to IFB 25/26-15 Transfer Station and Reclaimed
Water Distribution Pump Station At the Sanford North Water Reclamation Facility
Name of Firm/Company Contact Email
Street Address City, State, Zip Code
Telephone Number Fax Number
Authorized Person Printed Name Authorized Person Title
Authorized Person Signature Date of Signature
Sanford North WRF Reclaimed Electrical System Improvements LIST OF DRAWINGS
00015-1
SECTION 00015
LIST OF DRAWINGS
SHEET NO. DESCRIPTION
G1 Cover Sheet
G2 Index of Sheets, General Notes, and Vicinity Map
G3 Signature
V1 Survey Boundary
C1 Existing Site Conditions
C2 SWPPP
C3 Details and Notes
C4 Site Plan
C5 Site Dimension and Grading Plan
C7 Civil Details 1
C8 Civil Details 2
E-01 Electrical Notes, Symbols & Abbreviation
E-02 Overall Site Plan
E-03 Enlarged North Site Plan
E-04 Enlarged South Site Plan
E-05 Enlarged West Site Plan
E-06 Conduit Sections
E-07 Single Line Diagram
E-08 Load Tabulations
E-09 Control Riser Diagram
E-09A Network Riser Diagram
E-10 Solid State Starter Elementary Diagram
E-11 VFD Elementary Diagram
E-12 North Electrical Building No.1 Electrical Plan
E-13 Existing Disc Filters Electrical Plan
E-14 Existing Biosolids Management Facility Electrical Plan
E-15 Existing Dewatering Building Electrical Plan
E-16 Existing Truck Loading Building Electrical Plan
E-17 South Electrical Building Electrical Plan
E-18 Existing Master Pump Station Building Electrical Plan
E-19 Existing Belt Filter Press Building Electrical Plan
E-20 Office Building Server Room Electrical Plan
E-21 Existing Operations Building Scada Room Plan
E-22 Reclaim Electrical Building Power Plan
E-23 Reclaim Electrical Building Light and Grounding Plan
E-24 High Service Pump Station Electrical Plan
E-25 Transfer Pump Station Electrical Plan
E-26 Ground Storage Tank Electrical Plan
E-27 Lighting Fixture Schedule and Detail
E-28 Panel Schedules
Sanford North WRF Reclaimed Electrical System Improvements LIST OF DRAWINGS
00015-2
E-29 Electrical Details – 1
E-30 Electrical Details – 2
E-31 Electrical Details – 3
I-01 Instrumentation Notes, Symbols and Abbreviations
I-02 Process & Instrumentation Diagram - Master Lift Station
I-03 Process & Instrumentation Diagram - Transfer Pump Station
I-04 Process & Instrumentation Diagram - Effluent
I-05 Fiber Optic Network Overview
I-06 Network Diagram – North
I-07 Network Diagram – South
I-08 PCP Distribution Diagram
I-09 Master Lift Station Back-up Control Panel Elementary Design
I-10 Transfer and Reclaim Pump Back-up Control Panel Elementary Design
I-11 Instrumentation Details
A001 Sheet Index and Drawing Convention
A002 General Information and Abbreviations
A010 Code Summary, Calculations & Life Safety Plan
A031 Partition Types & Notes
A101 Architectural Floor Plan Electrical Building
A201 Exterior Elevation Electrical Building
A301 Building Sections Electrical Building
A500 Door Schedule & Details
A521 Details
S001 Structural General Notes
S100 Foundation Plan and Roof Framing Plan
S101 Foundation Typical Details
H2-11 First Floor Ductwork Plan
END OF SECTION
Transfer Station and Reclaimed Water Distribution Pump Station PROPOSAL (BID FORM)
NAME OF BIDDER:
00410-1
SECTION 00410
PROPOSAL (BID FORM)
PART 1 GENERAL
1.01 Description
The following Bid, for the (1) , is hereby made to (2) , hereafter called the Owner. This Bid is submitted by (3)
(1) Name of Project as shown in the Invitation for Bids
(2) Owner
(3) Name, address, and telephone number of Bidder
1.02 The Undersigned:
A. Acknowledges receipt of:
1. Project Manual and Drawings identified within the Project Manual.
2. Addenda: Number Dated Number Dated Number Dated Number Dated
Number Dated Number Dated
B. Has examined the site and all Bidding Documents and understands that in submitting his Bid, he waives all right to plead any misunderstanding regarding the same.
C. Agrees:
1. To hold this Bid open for 90 calendar days after the bid opening date.
2. To accept the provisions of the Instructions to Bidders regarding disposition of Bid Security.
3. To enter into and execute a contract with the Owner, if awarded on the basis of this Bid, and to furnish a Performance Bond and a Labor and Material Payment Bond in accordance with the Instructions to Bidders.
4. To accomplish the work in accordance with the Contract Documents.
00410-2
5. To begin Work after the issuance of a Notice to Proceed, unless otherwise provided, and substantially complete the Work within 365 calendar days of the date of the Notice to Proceed.
6. To accept the provisions of the Agreement as to liquidated damages in the event of failure to complete the work on time.
1.03 Lump Sum Price
The undersigned will construct this Project for the Base Bid Lump Sum Price of $ Dollars ($ ).
1.04 Schedule of Values
The Bidder hereby indicates the following total units and total prices which represent all materials, labor, equipment, transportation, performance of all operations relative to construction of the Project, overhead, and costs of all kinds and profit to complete the work items in accordance with the Project Manual, plans, and permits. Work for which there is not a listed item below shall be considered incidental to the Contract and no additional compensation will be allowed.
Item Description UNIT QTY Total Price
Mobilization, Bonds, Insurance, and General Conditions
1.1 Mobilization, Bonds, Insurance, and General Conditions
LS 1
Demobilization, Record Drawings and Closeout
2.1 Demobilization, Record Drawings and Closeout LS 1
3 Pre-Construction Video
3.1 Pre-Construction Video LS 1
4 Site Work
4.1 Erosion & Sedimentation Control (including silt fence)
LS 1
4.3 Clearing and Grubbing LS 1
4.5 Importing Fill LS 1
4.7 Dewatering LS 1
4.8 Grading LS 1
4.9 Sod LS 1
4.11 FDOT Concrete Gravity Wall with Handrail LS 1
4.13 Concrete Pad at FPL Transformer and Pump Station repairs
LS 1
4.14 Concrete Sidewalk (4" thick) LS 1
4.15 Asphalt Mill and Resurface LS 1
4.16 16" Reclaimed Watermain Concrete Encasement LS 1
NAME OF BIDDER:
00410-3
14 Electrical Building
14.1 Furnish & Install Electrical Building LS 1
14.2
Furnish & Install HVAC for Electrical Building (Concrete Slab, Masonry, Truss System, Roofing, Doors, Ceiling, Insulation, Weatherproofing, Finishes, etc.)
LS 1
15 Electrical, Process and Instrumentation
15.1
Furnish & Install Electrical (Electrical Gear, Panelboards, Automatic Transfer Switches, VFDs, Soft Starters Conduit/Wire, lighting, grounding, lightning protection and all misc electrical appurtenances)
LS 1
15.2
Furnish & Install Process Instrumentation & Control System (PICS). PLC hardware, Field Instruments, Control Panels, Control Panel Modifications, SCADA, Fiber Optic System and programming as described in division 13 specifications and instrumentation drawings.
LS 1
1.05 Miscellaneous Requirements and Affirmations
A. Proposals (Bids) must be on the Bid Form.
B. The Bidder acknowledges the receipt, execution, and return of the following forms and required information with the Bid (the Bidder is to fill out the far right column in the below Table):
Section Form / Information Submitted by Bidder with Bid (Y/N)
00410 Proposal (Bid Form) Including Completed Schedule of Values and Acknowledgment of All Issued Addenda
--- Acknowledge of Receipt of Addendum (Form Issued by the City with each issued Addendum
--- Bid Security in Accordance with the Instructions to Bidder
--- Bidder Completed W-9 Form
--- Bidder Officer Signatory Authorization Information
00430 Trench Safety Form
00432 Non Collusion Affidavit
00434 Conflict of Interest Affidavit
00436 Florida Statutes on Public Entity Crimes Affidavit
00438 Compliance With the Public Records Law Affidavit
NAME OF BIDDER:
00410-4
Section Form / Information Submitted by Bidder with Bid (Y/N)
00440 Bidder Information and Affidavit
00450 Certification Of Non-Segregated Facilities Form
00452 Disputes Disclosure Form
00454 Drug Free Workplace Form
00455 Certification Regarding Non-Scrutinized Companies
00456 Unauthorized (Illegal) Alien Workers Affidavit
00458 E-Verify Compliance Form
00460 Americans With Disabilities Act Affidavit
00462 Equal Employment Opportunity Certification
00463 Certification Regarding Debarment
00465 Schedule of Proposed Subcontractors
00525 Criminal Background Check Requirements and Affidavit
00618 City of Sanford Insurance Requirements and Affidavit
--- Copies of Licenses Issued by the State of Florida Dept. of Business and Professional Regulation Construction Industry Licensing Board
--- Material price quotes used in the Bid for any pay item(s) for which the Contractor anticipates a rapid material price change between the date of the Bid and when the material is anticipated to be ordered
1.06 RESPECTFULLY SUBMITTED, signed and sealed this day of
Name of Bidder
By (Signature) Date
Printed Name and Title
Business Address
00410-5
(CORPORATE SEAL)
City State Zip Code
Telephone No. Facsimile No.
E-Mail Address
ATTEST:
By (Signature) Date
Printed Name and Title
END OF SECTION
North Water Reclamation Facility City of Sanford
INDEX OF SHEETS, GENERAL NOTES,
AND LOCATION MAP
JOB# S06208DATE: 1/2026
GENERAL PROVISIONS
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL MAKE A PRE-CONSTRUCTION VIDEO (DVD FORMAT) ALONG THE PROPOSED ROUTE IN ACCORDANCE WITH THE SPECIFICATIONS. IN PARTICULAR, THE VIDEO SHALL DOCUMENT THE CONDITION OF EXISTING DRIVEWAYS, BUILDINGS, STRUCTURES, MAILBOXES, SIGNS, FENCES, AND LANDSCAPING ALONG
PROPOSED CONSTRUCTION AREAS.
2. THE CONTRACTOR SHALL RECOGNIZE AND ABIDE BY ALL OSHA EXCAVATION SAFETY STANDARDS, INCLUDING THE FLORIDA TRENCH SAFETY ACT (FS 553.60-553.64). ANY MATERIAL, CONSTRUCTION METHODS, OR MATERIAL COST TO
COMPLY WITH THESE LAWS SHALL BE INCIDENTAL TO THE CONTRACT.
3. ALL CONSTRUCTION PROJECTS 1 OR MORE ACRES IN SIZE THAT DISCHARGE TO OFFSITE AREAS ARE REQUIRED TO COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR STORMWATER DISCHARGE FROM SMALL AND LARGE CONSTRUCTION ACTIVITIES. IN ORDER TO MEET NPDES REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR PREPARING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IMPLEMENTING, INSPECTING, MAINTAINING, AND REPORTING ON ALL ELEMENTS OF THE SWPPP, COMPLETING AND SUBMITTING THE REQUIRED NOTICE OF INTENT (NOI) AND NOTICE OF TERMINATION (NOT) FORMS AS THE OPERATOR, AND PAYING ALL ASSOCIATED FEES. FOR PROJECTS LESS THAN 1 ACRE IN SIZE THAT ARE NOT REQUIRED TO COMPLY WITH THE NPDES GENERAL PERMIT, THE CONTRACTOR IS STILL RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO AND DURING CONSTRUCTION
IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
4. UNLESS OTHERWISE NOTED ON THE PLANS, THE CONTRACTOR SHALL USE THE GEOMETRY PROVIDED ON THE CONSTRUCTION PLANS. BENCHMARK INFORMATION SHALL BE PROVIDED TO THE CONTRACTOR BY THE OWNER OR OWNER'S SURVEYOR. ANY DISCREPANCIES BETWEEN FIELD MEASUREMENTS AND CONSTRUCTION PLAN INFORMATION
SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY.
5. BASE SURVEY INFORMATION INCLUDING BUT NOT LIMITED TO ELEVATIONS, EASEMENTS, RIGHTS OF WAY, AND OTHER TOPOGRAPHIC INFORMATION HAS BEEN PREPARED BY OTHER PROFESSIONALS. CPH, INC. ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION.
6. THIS SET OF PLANS MAY CONTAIN DRAWINGS PREPARED BY OTHER PROFESSIONALS, WHICH CONTAIN THE NAME, ADDRESS, AND LOGO OF THE PROFESSIONAL. CPH CONSULTING, INC. IS NOT RESPONSIBLE FOR DRAWINGS PREPARED
BY OTHER PROFESSIONALS.
7. SUBMIT ELECTRONIC COPIES (PDF FORMAT) OF EACH SHOP DRAWING AND PRODUCT DATA TO THE ENGINEER FOR APPROVAL PRIOR TO ORDERING THE MATERIALS REQUIRED FOR CONSTRUCTION. PRIOR TO SUBMISSION, THE CONTRACTOR SHALL THOROUGHLY CHECK SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES FOR COMPLETENESS AND FOR COMPLIANCE WITH THE CONSTRUCTION PLANS AND SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS AND SHALL COORDINATE THE SHOP DRAWINGS WITH THE REQUIREMENTS FOR OTHER RELATED WORK. THE CONTRACTOR'S RESPONSIBILITY FOR ERRORS AND OMISSIONS IN SUBMITTALS IS NOT RELIEVED BY THE ENGINEER'S REVIEW OF SUBMITTALS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING AT THE TIME OF SUBMISSION, OF
DEVIATIONS IN SUBMITTALS FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
8. PROTECT BENCHMARKS, PROPERTY CORNERS, AND OTHER SURVEY MONUMENTS FROM DAMAGE OR DISPLACEMENT. IF MARKER NEEDS TO BE REMOVED IT SHALL BE REFERENCED BY LICENSED LAND SURVEYOR AND REPLACED, AS
NECESSARY, BY SAME.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL QUALITY CONTROL TESTING. AS A MINIMUM, TESTING SHALL INCLUDE A) PIPING AND STRUCTURAL EXCAVATION, BEDDING AND BACKFILL MATERIALS AND DENSITY TESTS; B) DETERMINATION OF COMPACTIVE EFFORT NEEDED FOR COMPLIANCE WITH THE DENSITY REQUIREMENTS; C) PORTLAND CEMENT CONCRETE AND ASPHALT PAVING QUALITY CONTROL TESTING INCLUDING DESIGN MIX REVIEW, MATERIALS, FIELD SLUMP AND AIR
CONTENT, AND FIELD AND LAB CURED STRENGTH SAMPLES AND TESTING.
10. IN ADDITION TO QUALITY CONTROL TESTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED TESTING OR APPROVALS FOR ANY WORK (OR ANY PART THEREOF) IF LAWS OR REGULATIONS OF ANY PUBLIC BODY HAVING JURISDICTION SPECIFICALLY REQUIRE TESTING, INSPECTIONS OR APPROVAL. THE CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION THEREWITH AND SHALL FURNISH THE OWNER AND ENGINEER THE REQUIRED CERTIFICATES OF
INSPECTION, TESTING OR APPROVAL.
11. ANY DESIGN OR TESTING LABORATORY UTILIZED BY THE CONTRACTOR SHALL BE AN INDEPENDENT LABORATORY ACCEPTABLE TO THE OWNER AND THE ENGINEER, APPROVED IN WRITING, AND COMPLYING WITH THE LATEST EDITION OF THE "RECOMMENDED REQUIREMENTS FOR INDEPENDENT LABORATORY QUALIFICATION", PUBLISHED BY THE
AMERICAN COUNCIL OF INDEPENDENT LABORATORIES.
12. TESTING RESULTS SHALL BE PROVIDED TO THE OWNER/OPERATOR AND THE ENGINEER. ALL TEST RESULTS SHALL BE
PROVIDED (PASSING AND FAILING) ON A REGULAR AND IMMEDIATE BASIS.
13. THE ENTIRE PROJECT SITE SHALL BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK. CLEAN ALL INSTALLED PIPELINES, STRUCTURES, SIDEWALKS, PAVED AREAS, ACCUMULATED SILT IN PONDS, PLUS ALL ADJACENT AREAS AFFECTED BY CONSTRUCTION, AS DIRECTED BY THE OWNER OR JURISDICTIONAL AGENCY. EQUIPMENT TO
CLEAN THESE SURFACES SHALL BE SUBJECT TO APPROVAL BY THE OWNER.
UTILITY GENERAL NOTES
1. THE UTILITY DATA SHOWN ON THESE PLANS WAS LOCATED BY THE RESPECTIVE UTILITY, OR IS BASED ON UTILITY DRAWINGS, MAPS, OR FIELD
RECONNAISSANCE.
2. THE LOCATION, MATERIAL TYPE, AND SIZE OF ALL EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATIONS OF THESE UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING AN UNDERGROUND UTILITY, WHETHER SHOWN ON THE PLANS OR LOCATED BY THE UTILITY COMPANY. ANY UTILITIES, WHETHER SHOWN ON THESE PLANS OR NOT, THAT INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE CLOSELY COORDINATED WITH THE ENGINEER AND THE RESPECTIVE UTILITY COMPANY FOR RELOCATION OR PROPER
INSTRUCTION.
3. FLORIDA LAW (F.S. 556) UNDERGROUND FACILITY DAMAGE PREVENTION AND SAFETY ACT MANDATES THAT EXCAVATORS/CONTRACTORS SHALL CONTACT SUNSHINE 811 (FKA: SUNSHINE STATE ONE CALL OF FLORIDA BY CALLING 800-432-4770 OR
811 AT LEAST 2 FULL BUSINESS DAYS PRIOR TO BEGINNING ANY EXCAVATION OR DEMOLITION TO ALLOW MEMBER OPERATORS AN OPPORTUNITY TO IDENTIFY AND MARK THEIR UNDERGROUND FACILITIES AND APPROPRIATELY RESPOND TO THE POSITIVE RESPONSES SYSTEM
4. THE FOLLOWING UTILITIES HAVE PREVIOUSLY INDICATED THAT THEY MAY HAVE FACILITIES IN THE VICINITY OF THE CONSTRUCTION AREA
5. THE CONTRACTOR SHALL KEEP LOCATE TICKETS UP TO DATE AT ALL TIMES.
6. THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH EACH UTILITY AND ALL COSTS ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE NECESSARY RELOCATIONS OR OTHER
CONSTRUCTION RELATED MATTERS WITH EACH UTILITY.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN IN SERVICE ALL EXISTING PIPING ENCOUNTERED DURING CONSTRUCTION UNLESS OTHERWISE INDICATED IN THE DRAWINGS. ANY PIPING WHICH CAN BE REMOVED DURING CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY THE CONTRACTOR WITH THE PERMISSION OF THE OWNER AND THE ENGINEER.
8. THE CONTRACTOR SHALL FIELD LOCATE ALL WATER AND SEWER SERVICES AND LATERALS WITHIN THE PROPOSED CONSTRUCTION AREA PRIOR TO CONSTRUCTION AND ADJUST THE PROPOSED CONSTRUCTION AS NEEDED TO ACCOMMODATE THESE EXISTING LINES.
9. TYPICAL DETAILS AND PROPOSED CONSTRUCTION AS SHOWN ILLUSTRATE THE ENGINEER'S INTENT AND ARE NOT PRESENTED AS A SOLUTION TO ALL CONSTRUCTION PROBLEMS ENCOUNTERED IN THE FIELD. THE CONTRACTOR MAY ALTER THE PROPOSED CONSTRUCTION TO SUIT FIELD CONDITIONS, PROVIDED IT COMPLIES WITH THE PROJECT SPECIFICATIONS AND APPROVAL IS RECEIVED FROM THE ENGINEER. WHERE SUCH PROPOSED REVISIONS DEVIATE FROM THE FDEP CONSTRUCTION PERMIT, THEN SUCH REVISIONS WILL ALSO REQUIRE APPROVAL FROM FDEP.
10. FOR EACH RESPECTIVE PIPELINE CONSTRUCTION REQUIRED, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DEPTH, SIZE, MATERIAL TYPE, AND ALIGNMENT OF ALL EXISTING PIPES, CABLES, ETC. TO BE CROSSED OR CONNECTED TO. IF THE CONTRACTOR DEEMS NECESSARY (A) A CHANGE IN ALIGNMENT OR DEPTH, OR THE NEED FOR ADDITIONAL FITTINGS, BENDS, OR COUPLINGS, WHICH REPRESENT A DEPARTURE FROM THE CONTRACT DRAWING, OR (B) A NEED FOR RELOCATION OF EXISTING UTILITIES, THEN DETAILS OF SUCH DEPARTURES, RELOCATIONS, OR ADDITIONAL FITTINGS, INCLUDING CHANGES IN RELATED PORTIONS OF THE PROJECT AND THE REASONS THEREFORE, SHALL BE SUBMITTED WITH SHOP DRAWINGS. APPROVED DEPARTURES FOR THE CONTRACTOR'S CONVENIENCE SHALL BE MADE AT NO ADDITIONAL COST TO THE
OWNER.
11. THE CONTRACTOR SHALL PROVIDE AT HIS OWN EXPENSE ALL NECESSARY TEST PUMPING EQUIPMENT, WATER, WATER METERS, PRESSURE GAUGES, AND OTHER EQUIPMENT, MATERIAL AND FACILITIES REQUIRED FOR ALL HYDROSTATIC, LEAKAGE, AND PRESSURE TESTING. THE CONTRACTOR SHALL CONTACT THE ENGINEER AND THE OWNER IN WRITTEN FORM, AT LEAST TWO BUSINESS DAYS IN ADVANCE OF PROPOSED TESTING. THE CONTRACTOR SHALL PERFORM SATISFACTORY PRETESTING PRIOR TO NOTIFICATION.
CHARTER COMMUNICATIONS
3767 ALL AMERICAN BLVD
ORLANDO, FL 32810
ATTN: RAMON NUNEZ
407-215-5870
CENTURYLINK
1025 ELDORADO BLVD
BROOMFIELD, CO. 80021
877-366-8344X2
AT&T
6628 LAKESIDE ROAD
WEST PALM BEACH, FL 33411
ATTN: DINO FARRUGGIO
561-683-2729
J:\S06208\Civil\DWG\_Current_Plan_Set\S06208 G2 - INDEX OF SHEETS.dwg Aug 07, 2026 - 1:17pm sholmes
Location Map 1" = 1000'
"THIS IS TO CERTIFY THAT THE DESIGN REFLECTED IN
THE PLANS AND SPECIFICATIONS REPRESENT SOUND
ENGINEERING PRINCIPLES AND IS CONSISTENT WITH
THE APPLICABLE REQUIREMENTS OF THE FLORIDA
ADMINISTRATIVE CODE"
Detail and Section Identification
DETAIL NUMBER
DRAWING NUMBER
ON WHICH DETAIL
IS DRAWN
DRAWING NUMBER
ON WHICH DETAIL
IS TAKEN
DETAIL SECTION
LETTER
DRAWING NUMBER
ON WHICH SECTION
IS DRAWN
DRAWING NUMBER
ON WHICH SECTION
IS TAKEN
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Standard Abbreviations AL. or ALUM.
ASPH.
Ba.V.
BLDG.
BM
BT
B.F.V.
CIP or CI
CONC.
CONST.
CONT.
CMU
C.V.
DIA.
DIP or DI
DOT
DR. or DW.
ED
ESM'T
EF
EFF.
ELEC.
ELEV. or EL.
EQUIP.
EXIST.
EXP.
EXT.
EW
FD
FLEX.
FLG.
FM
GALV.
GM
GPM
GS
GSP
G.V.
HB
HORIZ.
HP
HWL
ID
INF.
I.P.
INV.
MANF.
MATL.
NG
NTS
NWL
OC
OH. E.
PE
PL.
PP
PROP.
PT
P.V.
PVC
PVMT.
R
RCP
RED.
REINF.
REQ’D
RT.
RWM
R/W
SAN
SPEC.
STA.
SQ.
SS
STN. STL.
SWD
SW (S/W).
T
TBM
TOF
TRANS.
TYP.
UE
UG
UT
VCP
VERT.
W.L.
WM
Aluminum Asphalt Ball Valve Building Bench Mark Buried Telephone
Butterfly Valve
Cast Iron Pipe Concrete Construction Continued Concrete Masonry Unit Check Valve
Diameter Ductile Iron Pipe Dept. Of Transportation Drive Or Driveway
Equipment Drain Easement Each Face Effluent Electrical Elevation Equipment Existing Expansion Extended Each Way Floor Drain
Flexible Flanged Force Main Galvanized Gas Main Gallons Per Minute Galvanized Steel Galvanized Steel Pipe Gate Valve Hose Bibb Horizontal Horsepower High Water Level Identification
Influent Iron Pipe Invert
Manufacturer Material
Natural Grade
Not To Scale Normal Water Level On Center
Overhead Electric Plain End Plate Power Pole Proposed Pressure Treated Plug Valve Polyvinyl Chloride Pavement
Radius
Reinforced Concrete Pipe Reducer Reinforced Required
Right Reclaimed Water Main Right-of-way Sanitary
Specification Station Square Stainless Steel Stainless Steel Side Water Depth Sidewalk
Telephone Cable Temporary Benchmark Top Of Floor Transformer Typical Underground Electric Underground Underground Telephone Vitrified Clay Pipe
Vertical
Water Line
Water Main
F.E. Fire Extinguisher
W.F. Water Fountain
I.D. Inside Diameter
CFS Cubic Feet Per Second
C.Y. Cubic Yards
EA Each
FDOT Florida Department of Transportation
F.F. Finish Floor
L.F. Linear Feet
MG Million Gallons MGD Million Gallons Per Day
NPW Non-potable Water
OD Outside Diameter
PW Potable Water
RAS Return Activated Sludge
Reuse Reuse Water
S.F. Square Feet
S.Y. Square Yards
VAC. Vacuum
WAS Waste Activated Sludge
MAX. Maximum MATL. Material
BTS Biological Treatment System NIC Not in Contract
N
ROCCO RICHARD NASSO II, P.E.
FLORIDA REG. # 64727
Index of Sheets
G1 COVER SHEET
G2 INDEX OF SHEETS, GENERAL NOTES
AND LOCATION MAP
G3 SIGNATURE SHEET
V1 BOUNDARY SURVEY
C1 EXISTING SITE CONDITIONS
C2 SWPPP
C3 DETAILS AND NOTES
C4 SITE PLAN
C5 SITE DIMENSION AND GRADING PLAN
C6 NOT USED
C7 CIVIL DETAILS
C8 CIVIL DETAILS
E-01 ELECTRICAL NOTES,SYMBOLS
AND ABBREVIATIONS
E-02 OVERALL SITE PLAN
E-03 ENLARGED NORTH SITE PLAN
E-04 ENLARGED SOUTH SITE PLAN
E-05 ENLARGED WEST SITE PLAN
E-06 CONDUIT SECTION
E-07 SINGLE LINE DIAGRAM
E-08 LOAD TABULATIONS
E-09 CONTROL RISER DIAGRAM
E-09A NETWORK RISER DIAGRAM
CITY OF SANFORD
TRANSFER STATION AND
RECLAIMED WATER DISTRIBUTION
PUMP STATION
AT THE
SANFORD NORTH WATER RECLAMATION FACILITY
A Full Service A & E Firm
500 West Fulton Street Sanford, FL 32771 Ph: 407.322.6841
C www.cphcorp.com
Plans Prepared By:
CPH CONSULTING, LLC
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect No. AA26000926 Landscape No. LC000298
E-10 ELEMENTARY DIAGRAM
E-11 ELEMENTARY DIAGRAM-2
E-12 NORTH ELECTRICAL BUILDING ELECTRICAL PLAN
E-13 EXISTING DISC FILTERS ELECTRICAL PLAN
E-14 EXISTING BIOSOLIDS MANAGEMENT FACILITY ELECTRICAL PLAN
E-15 EXISTING DEWATERING BUILDING ELECTRICAL PLAN
E-16 EXISTING TRUCK LOADING BUILDING ELECTRICAL PLAN
E-17 SOUTH ELECTRICAL BUILDING ELECTRICAL PLAN
E-18 EXISTING MASTER PUMP STATION BUILDING ELECTRICAL PLAN
E-19 EXISTING BELT FILTER PRESS BUILDING ELECTRICAL PLAN
E-20 OFFICE BUILDING ELECTRICAL PLAN
E-21 EXISTING OPERATIONS BUILDING SCADA ROOM PLAN
E-22 RECLAIM ELECTRICAL BUILDING POWER PLAN
E-23 RECLAIM ELECTRICAL BUILDING LIGHT AND GROUNDING PLAN
E-24 HIGH SERVICE PUMP STATION ELECTRICAL PLAN
E-25 TRANSFER PUMP STATION ELECTRICAL PLAN
E-26 GROUND STORAGE TANKS ELECTRICAL PLAN
E-27 LIGHTING FIXTURE SCHEDULE & DETAILS
E-28 PANEL SCHEDULES
E-29 ELECTRICAL DETAILS-1
E-30 ELECTRICAL DETAILS-2
E-31 ELECTRICAL DETAILS-3
I-01 INSTRUMENTATION NOTES, SYMBOLS AND ABBREVIATIONS
I-02 PROCESS & INSTRUMENTATION DIAGRAM-
MASTER LIFT STATION
I-03 PROCESS & INSTRUMENTATION DIAGRAM -TRANSFER PUMP STATION
I-04 PROCESS & INSTRUMENTATION DIAGRAM - EFFLUENT
I-05 FIBER OPTIC NETWORK OVERVIEW
I-06 NETWORK DIAGRAM - NORTH
I-07 NETWORK DIAGRAM - SOUTH
I-08 PCP DISTRIBUTION DIAGRAM
I-09 MASTER LIFT STATION BACK-UP CONTROL PANEL
ELEMENTARY DESIGN
I-10 TRANSFER AND RECLAIM PUMP BACK-UP CONTROL
PANEL ELEMENTARY DESIGN
I-11 INSTRUMENTATION DETAILS
CITY OF SANFORD UTILITIES
300 N PARK AVE
SANFORD, FL 32771
ATTN: RICHARD BLAKE
407-688-5101
FLORIDA POWER & LIGHT
386-586-6403
FLORIDA PUBLIC UTILITIES CO.
405 S HWY 17/92
DEBARY, FL 32713
ATTN: JOEL BRAY
386-586-6403
SEMINOLE COUNTY TRAFFIC ENGINEERING
140 BUSH LOOP
SANFORD. FL 32773
ATTN: JOHN BROWN
407-665-5644
A001 SHEET INDEX AND DRAWING CONVENTIONS
A002 GENERAL INFORMATION AND ABBREVIATIONS
A010 CODE SUMMARY, CALCULATIONS & LIFE SAFETY PLAN
A031 PARTITION TYPES & NOTES
STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
GENERAL INFORMATION
S100 FOUNDATION PLAN AND ROOF FRAMING PLAN
ARCHITECTURE
A101 ARCHITECTURAL FLOOR PLAN ELECTRICAL BLDG
A201 EXTERIOR ELEVATION ELECTRICAL BLDG
A301 BUILDING SECTIONS ELECTRICAL BLDG
A500 DOOR SCHEDULE & DETAILS
A521 DETAILS
HVAC
S101 FOUNDATION TYPICAL DETAILS
H2-11 FIRST FLOOR DUCTWORK PLAN
G2
B
ID
D O
C U
M
EN
TS
EBOX
EBOX
ELEC
ELEC
ELEC
ELEC
ELEC
CO
CO
CO
EJB
EJB
EJB
EJB
CO
CO CO
WV
CO
CO
CO
CO
EOEJB
WV
WV
WV
WV
9.4
9.5
9.5
9.6
9.4
9.4
CO
S
.21
.21
.20
.20
.1911 .1711
.19
.17
.7310 .23
.24
.24
.23
.20
.21
.21
.21
.20
.16
.20
.22
.22
.24
.25
.23
.48
.20
EBOX
EBOX
ELEC
ELEC
ELEC
ELEC
ELEC
CO
CO
CO
EJB
EJB
EJB
EJB
CO
CO CO
WV
CO
CO
CO
CO
EOEJB
WV
WV
WV
WV
9.4
9.5
9.5
9.6
9.4
9.4
CO
S
.21
.21
.20
.20
.1911 .1711
.19
.17
.7310 .23
.24
.24
.23
.20
.21
.21
.21
.20
.16
.20
.22
.22
.24
.25
.23
.48
.20
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
E-03
EN
LA
R G
ED
N
O R
TH
S
IT
E
PL
A
N
/1
7/
AD
D
EN
D
U M
N O
.3
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -0
N
S
IT
E
PL
AN
.d w g, /6
/2
4:
:4
PM
, s lo go fa tu
D W
G To
P D
F.
pc
SPRINKLER
SPRINKLER
SPRINKLER
SPRINKLER
TO
B
TO
B
TO
E
TOB
TOB32
.4
7'
49.00'
.4
7'
49.00'
EXISTING SANITARY SEWER MH
TOP RIM ELEV = 10.09
N INV (8" PVC) ELEV = 6.04
NW INV (8" PVC) ELEV = 5.73
W INV (8" PVC) ELEV = 4.13
SW INV (8" PVC) ELEV = 3.97
SE INV (12" PVC) ELEV = 1.96
ASPHALT PAVEMENT
30.1'
.6
5.8'
7.
2'
5.7'
.3
30.3'
.0
.6
50.7'
.7
50.7'
.4
21.4'
.4
21.3'
UNKUNK
OHU
OHU
UNK
UNK
UNK
OHU OHU OHU OHU OHU OHU
O H
U O
H U
O H
U O
H U
O H
U O
H U
O H
U O
H U
O H
U
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
OHU
8.0
8.8
9.0
9.1
9.6
9.5
9.
8.9
.41
.25
.95
ODOR
CONTROL
STRUCTURE
FLOW
FLOW
3" RWM
24" RAW
18" RAW
4" W
TR
6"
W
TR
4" W
TR
3" R
WM
₂
/1
7/
AD
D
EN
D
U M
N O
.3
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
E-04
EN
LA
R G
ED
S
O U
TH
S
IT
E
PL
A
N
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -0
S
SI
TE
P
LA
N .d w g, /6
/2
4:
:1
PM
, s lo go fa tu
D W
G To
P D
F.
/1
7/
AD
D
EN
D
U M
N O
.3
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
E-06
C O
N D
U
IT
S
EC
TI
O
N S
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -0
CO
N D
UI
T
SE
CT
.d w g, /6 /2
4:
:3
PM
, s lo go fa tu
D
W G
To P
D F.
/1
7/
/0
6/
AD
D
EN
D
U M
N O
.3
AD
D
EN
D
U M
N O
.4
CPH, Inc.
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
E-07
SI
N
G
LE
L
IN
E D
IA
G
R A
M
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -0
SW
BD
S
W
BD
S
LD
.d w g, /6
/2
5:
:1
PM
, f de la o
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
E-09A
N
ET
W O
R K
R
IS
ER
D
IA
G
R A
M
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -0
9A N
ET
W
O
RK
R
IS
ER
D
IA
.d w g, /6
/2
4:
:5
PM
, s lo go fa tu
D W
G To
P D
F.
Plans Prepared By:
State of Florida Licenses:
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
/0
6/
AD
D
EN
D
U M
N O
.4
E-18
SO
U
TH
E
LE
C
TR
IC
A L
B U
IL
D
IN
G
N O
.7 (S
EB
7)
M
A
ST
ER
P
U M
P
ST
A
TI
O N
EL
EC
TR
IC
A L
PL
A
N
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -1
SE
B7
M
PS
B
LD
G
EL
EC
P
LA
N
.d w g, /6 /2
4:
:1
PM
, s lo go fa tu
D
W G
To P
D F.
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
/0
6/
AD
D
EN
D
U M
N O
.4
E-20
O
FF
IC
E
B U
IL
D
IN
G
S
ER
VE
R
R O
O M
EL
EC
TR
IC
A L
PL
A
N
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -2
O
FF
IC
E
BL
D G
SE
RV
R O
O M
E
LE
C
PL
AN
.d w g, /6
/2
4:
:4
PM
, s lo go fa tu
D W
G To
P D
F.
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
/0
6/
AD
D
EN
D
U M
N O
.4
E-21
EX
IS
TI
N
G O
PE
R
A
TI
O N
S B
U
IL
D
IN
G
SC
A D
A R
O O
M E
LE
C
TR
IC
A L
PL
A
N
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\E -2
O
PS
B
LD
G
SC
AD
A
RO
O M
E
LE
C
PL
AN
.d w g, /6
/2
4:
:5
PM
, s lo go fa tu
D W
G To
P D
F.
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
I-05
FI
B
ER
O
PT
IC
N
ET
W O
R K
O
VE
R
VI
EW
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\I-
F
IB
ER
N
TW
K
D
IA
.d w g, /6 /2
4:
:0
PM
, s lo go fa tu
D
W G
To P
D F.
Engineer No. 3215
Surveyor No. LB7143 Architect. No. AA26000926 Landscape No. LC000298
D at e N o.
R ev is io n www.cphcorp.com A Full Service
A & E Firm
123456
C
THIS SHEET NOT VALID FOR
CONSTRUCTION WITHOUT
COMPLETE SET OF PLANS.
Sheet No.
Drawn:
Designed:
Checked:
Job No.:
Date:
100% SUBMITTAL
06/23/2026
SEB
KRG
SEB
S06208
SA
N
FO
R
D N
O R
TH
R
EC
LA
IM
ED
TR
A
N
SF
ER
P
U M
P/
EF
FL
U
EN
T
TR
A
N
SF
ER
P
U M
P
ST
A
TI
O N
P
LC
IM
PR
O
VE
M
EN
TS
ST
EP
H
EN
E . B
AI
LE
Y, P
.E
I-07
N
ET
W O
R K
D
IA
G R
A M
SO
U
TH
/0
6/
AD
D
EN
D
U M
N O
.4
X:
\A ct iv e Pr oj ec ts \C
PH
\S an fo rd \S an fo rd N or th
R ec la im a nd
P
LC
Im p\
._A dd en du m
\D w gs
\I-
N
TW
K D
IA
S
O
UT
H .d w g, /6
/2
4:
:1
PM
, s lo go fa tu
D W
G To
P D
F.
File details come from the government source that posted it. Updated .