This is a Bid Tab Form for the City of Sanford, Florida's Invitation for Bid (IFB 25/26-15) for modifications to the Transfer Station and Reclaimed Water Distribution Pump Station at the Sanford North Water Reclamation Facility. The project encompasses construction of a new electrical building, modifications to electrical systems and control panels, upgrade of Process Instrumentation and Control Systems (PICS) with replacement of obsolete PLC hardware, roofing replacement, mechanical and electrical work, site preparation including asphalt paving and concrete work, and concrete encasement of an existing reclaimed water main. The bid form itemizes work across major categories including mobilization and demobilization (2 lump-sum items), pre-construction video documentation (1 item), site work tasks including erosion control, clearing, grading, concrete work, and asphalt operations (11 items), electrical building construction and HVAC (2 items), and electrical and instrumentation systems (2 items). Sealed bids are due August 13, 2026 at 2:00 p.m. Local Time, with a non-mandatory pre-bid meeting and site visit scheduled for July 28, 2026 at 10:00 a.m. at 1201 West Seminole Boulevard, Sanford, Florida. The contract term is 365 calendar days from Notice to Proceed.
The engineer's estimate for this project is $6.3 million on a lump-sum contract basis. Two allowances are included in the bid: Building Permit Fee ($15,000) and FPL Service Fee ($75,000). Bid security of 5% of the maximum bid price is required along with Performance and Labor and Material Payment Bonds. Bidders must hold valid Florida contractor licenses with at least three years of prime contractor experience on comparable projects, and the Control System Engineer must hold a Florida Professional Engineer license with ten years of controls engineering experience. The System Control Supplier must be selected from approved vendors: Rocha Controls, Inframark, Revere Controls, or TESCO Controls. Liquidated damages are assessed at $3,498 per day for failure to meet substantial completion. The City reserves the right to negotiate with the lowest responsive and responsible bidder if the bid exceeds available funding. Bidders must submit non-collusion affidavits, conflict of interest statements, drug-free workplace certifications, E-Verify compliance forms, audited financial statements from the preceding 12 months, equipment lists, and material price quotes. Minority and Women-Owned Business Enterprises (M/WBEs) are encouraged to participate. All bid documents and addenda (three total, with Addendum 3 posted July 23, 2026) must be acknowledged by bidders.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tab
| City of Sanford |
| Transfer Station and Reclaimed Water Distribution Pump Station |
| BID TAB FORM |
| Item | Description | UNIT | QTY | Total Price |
| 1 | Mobilization, Bonds, Insurance, and General Conditions | |||
| 1.1 | Mobilization, Bonds, Insurance, and General Conditions | LS | 1 | |
| 2 | Demobilization, Record Drawings and Closeout | |||
| 2.1 | Demobilization, Record Drawings and Closeout | LS | 1 | |
| 3 | Pre-Construction Video | |||
| 3.1 | Pre-Construction Video | LS | 1 | |
| 4 | Site Work | |||
| 4.1 | Erosion & Sedimentation Control (including silt fence) | LS | 1 | |
| 4.3 | Clearing and Grubbing | LS | 1 | |
| 4.5 | Importing Fill | LS | 1 | |
| 4.7 | Dewatering | LS | 1 | |
| 4.8 | Grading | LS | 1 | |
| 4.9 | Sod | LS | 1 | |
| 4.11 | FDOT Concrete Gravity Wall with Handrail | LS | 1 | |
| 4.13 | Concrete Pad at FPL Transformer and Pump Station repairs | LS | 1 | |
| 4.14 | Concrete Sidewalk (4" thick) | LS | 1 | |
| 4.15 | Asphalt Mill and Resurface | LS | 1 | |
| 4.16 | 16" Reclaimed Watermain Concrete Encasement | LS | 1 | |
| 14 | Electrical Building | |||
| 14.1 | Furnish & Install Electrical Building (Concrete Slab, Masonry, Truss System, Roofing, Doors, Ceiling, Insulation, Weatherproofing, Finishes, etc.) | LS | 1 | |
| 14.2 | Furnish & Install HVAC for Electrical Building | LS | 1 | |
| 15 | Electrical, Process and Instrumentation | |||
| 15.1 | Furnish & Install Electrical (Electrical Gear, Panelboards, Automatic Transfer Switches, VFDs, Soft Starters Conduit/Wire, lighting, grounding, lightning protection and all misc electrical appurtenances) | LS | 1 | |
| 15.2 | Furnish & Install Process Instrumentation & Control System (PICS). PLC hardware, Field Instruments, Control Panels, Control Panel Modifications, SCADA, Fiber Optic System and programming as described in Division 13 specifications and instrumentation drawings. | LS | 1 | |
| Allowance | ||||
| 1 | Building Permit Fee | ALLOWANCE | 1 | $ 15,000 |
| 2 | FPL Service Fee | ALLOWANCE | 1 | $ 75,000 |
| Base Bid Subtotal Construction | ||||
| Base plus Allowance Bid Total | ERROR:#REF! |