This is a Comprehensive Environmental Review Process (CERP) documentation file submitted to the Illinois Department of Natural Resources (IDNR) for an electric vehicle charger installation project at Illinois Beach State Park in Lake County, Township 46N, Range 12E, Section 27 (with an alternative site at Section 35). The project proposes installation of six EV chargers at the South Unit Main Beach parking lot, with an alternative location at the Hotel parking lot contingent upon completion of CDB Ballroom/Hotel Improvements and Pool construction. The base bid specifies six DC Fast Chargers rated at 250kW or more utilizing a 1,000 kVa transformer and load management system, while the alternate bid offers six Level 2 EVSE units at 80A minimum per unit with two connections per charger to serve 12 parking spaces. Associated work includes trenching for service lines in conduit at a minimum depth of two feet, electrical panel connection and meter installation, concrete slab work for charging pedestals, and site restoration in the Concession Building area and along designated parking spaces. The proposed project start date is Summer 2026, with CERP approval documentation signed on December 19, 2025.
Funding for this project is sourced through IDNR Capital allocation and supported by a USDOT CFI Community Discretionary Grant. The project is not located within a Federal Aid Project boundary. Environmental reviews have been conducted covering threatened and endangered species, natural areas and nature preserves, wetlands, and cultural resources, with all reviews marked as approved or approved with restrictions by CERP Program Manager Justin Dillard. The file includes site photographs and a site plan depicting the proposed primary location at the Concession/Camp Store Main Parking Lot and alternative location at the Hotel South End Parking Lot, demonstrating project visibility and accessibility from multiple vantage points within the park.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois Department of Natural Resources CERP code:
(Provided by CERP staff.)
COMPREHENSIVE ENVIRONMENTAL REVIEW PROCESS
Regional (or previous) CERP code: Project title: EV Charger Installation Site name: Illinois Beach State Park Contact person: County: Lake Township: 46N
Proposed start date: Summer 2026 Phone:
Range: 12E Section: 27, (alt 35)
Project Description:
This project proposes installation of 6 EV chargers at the South Unit Main Beach parking lot under the auspices of a special grant to IDNR, with an alternative site at the Hotel parking lot.
The work will consist of the following:
• Location: Concession/Camp store parking lot area (Main Parking Lot)
a. Alternative location is Hotel parking lot, with final hookup pending CDB Ballroom/Hotel
Improvements/Pool construction
• Chargers:
a. Base Bid: 6 DC Fast Chargers (250kW or more) using a 1,000 kVa transformer and load management system
b. Alternate Bid: 6 Level 2 EVSE (80A Minimum per EVSE) with 2 connections per charger to serve 12 parking spaces (2 80A EVSE with 1 connection and circuit sharing permissible in lieu of 1 EVSE with 2 connections)
• Electrical Work:
a. Trenching Service line, in conduit, min 2’ depth, xx LF
b. Electrical Panel connection and meter
• Concrete work for slab required under charging pedestals.
• Site restoration between service panel in Concession Building, west side of building conduit run, and conduit along parking spaces, where trenching has occurred no Number, size, species:
Is work area in a Federal Aid Project boundary? Yes or No No Federal Aid type: USDOT CFI Community Discretionary Grant
Funding source: IDNR Capital— X 962 Heavy Equipment— Force Account— Other State, Local, or Private agency— Federal Agency— Federal Program—
Approval by Site Superintendent (for all NON-CAPITAL projects, e.g., heavy equipment, force account, leases, r-o-w, etc.)
Signature, Site Superintendent: Date: 12-19-25
CERP Staff Only
REVIEWS PERFORMED
Approved Approved w/ Restrictions Comments
Threatened & Endangered Species Natural Areas/Nature Preserves
Wetlands
Cultural Resources
Other (contaminants, wildlife, federal nexus, etc.)
Justin Dillard, CERP Program Manager 217–557-6723 Date
Future New Pool Location
Concession/Camp Store Location
Main Parking Lot, South Unit
Alternative: Hotel Location
El ec
Concession/Camp Store Site Plan
NORTH
Concession/Camp Store Location (Main Parking Lot) View Northeast from Proposed EV Parking
Concession/Camp Store Location (Main
View Northwest to Proposed EV Parking
Concession/Camp Store Location (Main
View North to Proposed EV Parking
EV Parking Concession/ Camp Store
Beach Campground (Beyond)
Main Parking Lot
ADA ADA
Alt. Hotel Location (South End Parking Lot) View East to Proposed EV Parking
Alt. Hotel Location (South End Parking Lot) View North to Proposed EV Parking
Hotel Pool (Beyond)
Hotel Bed Tower
Hotel Lobby and Conference
View North to Proposed EV Parking
View South to Proposed EV Parking
Township: 46N; Range: 12E; Section: 27, 35
WORK AREAS
Alternative site