Q# Reference

Section Reference Paragraph

Question Government Response

1 PWS 2.1.3 a) How was the threshold for impact events selected? Suitable thresholds very wide between vendors due to different device specifications and mounting locations.

The Government's requirement for impact events was determined based on market research.

2 PWS 2.1.3 c) What are the acceptable methods for tamper detection?

In accordance with (IAW) RFQ Attachment 1 - PWS Rail ITV paragraph 2.1.3, the Government requires a device or additional sensors that are able to detect a tampering event. The Government is not dictating the exact method for tamper detection;

however, examples are provided in RFQ Attachment 1 - PWS Rail ITV paragraph 2.1.3(c).

3 PWS 2.1.3 c) How is the DoD planning to react to tampering events?

The Government will monitor events to meet operational requirements. Event history will be provided to authorities, if required, for relation to investigations such as rail car pilferage. In the event of tampering, the rail car and device(s) will be inspected at next destination and tag replaced as necessary, IAW RFQ Attachment 1 - PWS Rail ITV .

4 PWS 2.2.4

Is battery life remaining required for devices with solar recharging?

Yes. IAW RFQ Attachment 1 - PWS Rail ITV paragraph 2.2.4., this is a requirement for ITV devices.

5 PWS 2.2.5

MIL-STD 464A seems superseded, should this be MIL-STD 464D?

Yes, MIL-STD 464D is the correct version the base regulation. This regulation reference has been updated in the following RFQ documents:

1.) RFQ v Amend 01 2.) RFQ PWS Attachment 1 - PWS Rail ITV v Amend 01 3.) RFQ Attachment 6 - Techncial Worksheet v Amend 01

6 PWS 2.2.8 Does the DoD have any size requirements for the label?

The Government does not have a specific size requirement. The label will need to fit on the proposed RMD or within proximity. The size of the RMD could also vary.

7 PWS 2.2.8 Does the DoD have a template or a standard for this label?

There is not a template. IAW RFQ Attachment 1- PWS Rail ITV paragraph 2.2.8, "A label shall be placed onto the RMD or within proximity to identify the RMD as being property of the “United States (U.S.) GOVERNMENT" and containing sensitive monitoring instruments. The label shall contain a “WARNING” in large red letters with a description of handling requirements to ensure the RMD is not damaged during loading or unloading operations at installations by MHE, such as forklifts. The Contractor’s proposed warning label shall be approved by the Contracting Officer Representative (COR) before production and affixing to DODX rail cars".

8 PWS 4.1

Does the globally unique tag identifier need to follow a specific standard?

No.

9 PWS 4.1 Is a unique identifier generated by the vendor acceptable?

Yes.

10 PWS

7.2 Coverage Gap Duration

Does the DoD know if all their yards and routes have LTE-M coverage?

It is the responsibility of the Prime Contractor to ensure "[the ITV device has] broad access to data networks, enabling coverage at military installations and ports across the country. Cellular devices shall utilize the industry’s globally recognized mobile phone standards, minimally Global System for Mobile Communication (GSM) coverage such as LTE/4G, with fallback to alternative standards (e.g., 3G and 2G), as required to interoperate on the provider’s cellular networks within CONUS. Satellite devices shall provide no less than equivalent coverage as provided by the Iridium satellite constellation. Hybrid devices must meet both cellular and satellite requirements above. Satellite and hybrid devices are not required to utilize the Enhanced Mobile Satellite Services (EMSS) Gateway. All devices shall be capable of storing data when not able to connect to a network and be capable of sending data when reconnection occurs" IAW RFQ Attachment 1 - PWS Rail ITV paragraph 4.5.

11 PWS

7.2 Coverage Gap Duration

Does the DoD have a general idea of their current utilization? If so, what is the DoD’s estimate?

The Government does not currently monitor cellular utilization.

Rail car utilization, as defined in the answer to question 15, averaged 55- 60%.

However,this can vary significantly depending on operational requirements.

12 PWS 2.1.2

Does the Government have a reporting interval change process or will the vendor be expected to provide the change process?

IAW RFQ Attachment 1 - PWS Rail ITV paragraph 2.1.2., "the Government may change data reporting intervals as required by missions." The Government will coordinate with the Prime Contractor to define the process for changing data reporting intervals as required in the PWS.

13 PWS 4.4 Are there any data storage location requirements?

IAW RFQ Attachment 1 - PWS Rail ITV paragraph 4.4, the "Contractor shall retain rail car data, either online or in offline storage, for the length of the contract. At the end of the contract, the Contractor shall provide the Government the data in a mutually agreed to format that will allow use of the data without the Contractor’s system within 30 days."

Data requirements must also meet the provision and clause requirements as listed in the RFQ such as DFARS 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls and DFARS 252.204-7020, NIST SP 800-171 DoD Assessment Requirements.

14 PWS 4.3.2 What is meant by “queried through running reports”?

IAW RFQ Attachment 1 - PWS Rail ITV paragraph 4.3.2., the Government shall have the ability to produce a report(s) by querying historical data for each and all assets.

15 PWS 4.3.2 What is “utilization” defined as (moving vs stationary)? Utilization is the time that a rail car is loaded with cargo.

16 RFQ 2.h.(2) Does my SAM registration cover all the Reps/Certs required for this bid?

In accordance with (IAW) FAR 4.1102(a), Representations and Certifications shall be submitted online using https://www.sam.gov where available OR may be submitted with your contract documentation.

Additionally, see 2.h.(2) of the RFQ for a list of provisions that must be included with your quote if they are not in your SAM record.

Further, The contractor shall complete the actions required in the RFQ Information and General Compliance Worksheet (RFQ Attachment 5) and submit a copy of the completed worksheet.

File details come from the government source that posted it. Updated .