QA_for_MOTCO_6_-_13.pdf
PDF 105 KB Posted
- Attached to
- Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) Federal contract opportunity
- Solicitation number
- HTC711-14-R-R003
View the file
Other files for this federal contract opportunity
Show all 50
Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for
HTC711-14-R-R003 Call 0007
Stevedoring and Related Terminal Services (S&RTS)
MOTCO Solicitation
Questions 6 - 13
QUESTION # 6: PWS Section 3.1.1 states labor will be trained to operate Government vehicles at man hour rates. I request confirmation that the man hours required for this training are included in the Pricing Schedule Hours quantity.
ANSWER: No, this is a non-routine cost and it was not included in the
Pricing schedule hours.
QUESTION # 7: PWS Section 3.2 indicates safety briefing is required at shift change. Is this reimbursed at detention, or commodity?
Also, Government may conduct supplemental safety briefings when labor is on standby/detention. Is this subject to section 4.1.2 detention absorbed?
ANSWER 1: Detention Time
ANSWER 2: If the Government supplements to the stevedore’s safety briefing exceed 12 minutes, then it would be charged as detention time.
QUESTION # 8: PWS Section 4.1.3 is not subject to detention absorbed period referenced in 4.1.2 (4.1.2 is detention during commodity, while 4.1.3 is detention during XL)?
ANSWER: Yes, Commodity detention is subject to the PMA time protocols that, after 12 minutes, computed in 6 minute intervals, detention could be charged to the government. Extra
Labor has no detention.
QUESTION # 9: PWS Section 4.1.4 In the case of Guarantee for labor prior to operations
(say a 1300 start and FM or clerical get 8-1 or 8-2), is guarantee before operations payable as minimum time ?
ANSWER No, In accordance with PMA, this is covered as lap hours (for designated positions, e.g. Supercargo, Walking Boss) in the PMA labor rate structure.
QUESTION #10: PWS Section 4.1.5 Does contractor need to get COR authorization for guaranteed OT for clerical/FM.
ANSWER: No, this is accepted up front as an integral part of the labor rate structure.
QUESTION #11: PWS Section 5.14.3(o) Is training on scanners and government documentation does at contractors or government cost?
ANSWER: Government cost.
QUESTION #12: PWS Section 6.4(f) Are carpentry services provided at man hour rates plus out of pocket?
ANSWER: All carpenter work is Man hour; all materials they consume is paid out-of-pocket.
QUESTION #13: PWS Section 6.7.2 (l) are Terex at MOTCO fueled by Contractor or Government?
ANSWER: Government fuels TEREXs.
WILLIAM FUGATE
Contracting Officer
File details come from the government source that posted it. Updated .