CALL 0007-01 Atch 1-1 PWS (Revised)MOTCO 24 Oct 2014
View the file
Other files for this federal contract opportunity
Show all 50
Stevedoring and Related Terminal Services (S&RTS) Master Solicitation (CONUS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1-1 Call 0007-01
Stevedoring & Related Terminal Services
Performance Work Statement
For
Military Operations Terminal Concord – US Army 834th Transportation Battalion
The following State of California locations: Military Ocean Terminal Concord (MOTCO), the Port of Oakland, the
Naval Station Ventura County (Port Hueneme), the Tenth Avenue Terminal & the National City Terminal, San
Diego, plus Naval Air Station North Island, Coronado
24 Oct 2014
Stevedoring & Related Transportation Services Performance Work Statement
TABLE OF CONTENTS
Section Section Topic Page
1.0 Background & Scope 2
2.0 Security 2
3.0 Safety 5
4.0 Contract Administration 5
5.0 Contractor General Requirements 6
6.0 Terminal Specific Requirements 9
Contractor Performance Requirements 21
Appendix A Regulations, Publications, & Forms 22
Appendix B Glossary of Terms 25
Appendix C List of Acronyms & Abbreviations 42
1.0 BACKGROUND & SCOPE
1.1 Background-Military Surface Deployment and Distribution Command (SDDC), headquartered at Scott
AFB, IL is a major U.S. Army Command and a vital component of the U.S. Transportation Command. Since its establishment in 1965, SDDC has played a vital role in our nation’s defense by providing support to every war, major contingency, training exercise and humanitarian relief operation where our military forces have been deployed.
1.2 Scope-Stevedoring and Related Terminal Services
1.2.1. The Contractor shall provide stevedoring and related terminal services and management services in connection with the receipt, processing, and/or loading/discharging of cargo via all conveyances as designated by the Contracting Officer or Contracting Officer’s Representative (COR). The Contractor shall provide sufficient qualified labor, gear and equipment and materials to satisfy the scope of this contract, and make every effort to rectify any shortfall, for which the Contractor will be paid at the applicable commodity or man-hour rates as designated in Section B – Schedule of Services in this contract as requested by the COR.
1.3 Ground Rules and Constraints
1. 3.1 Persons Excluded from the Premises-The Contractor shall not allow a person that has been banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to terminal operations.
1.3.2 Persons with Restricted Duties-The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter those areas.
2.0 SECURITY
2.1 The overall performance classification of this PWS is Unclassified.
2.2 Security Related to Personnel-If the Government notifies the Contractor that the employment or the continued employment of any Contractor employee is prejudicial to the interests or endangers the security of the
United States of America, the Contractor shall make any changes necessary in the appointment(s).
2.3 Personnel working IAW this PWS who do not require IA administrative privileges/ system monitoring capability, but do require access to Non-Secure Internet Protocol Router Network (NIPRNET) applications, must successfully complete a National Agency Check with Inquiries (NACI). Favorable NACI investigation results must be posted in the Joint Personnel Adjudication System (JPAS) before a contractor is allowed access to the NIPRNET.
2.4. Personnel not requiring a NACI investigation, but require access to the port as a union labor employee of the Stevedoring contractor are required to obtain a Transportation Workers Identification Card (TWIC). TWIC cards are individually issued from TWIC processing centers in port areas IAW mandatory dates provided from the
United States Coast Guard Captain of the Port.
Contractor personnel working the MOTCO ammunition port may be subject to additional personnel clearance actions, to include clearing through an individual screening inspection point before entering the terminal. The government may also run a National Criminal Identification Check also beyond the standard set for the TWIC Card.
2.5 Once the contract is awarded, names of the contractor employees needing a CAC to specifically access and use Government automated systems i.e. Cargo and Billing System (CAB) as required by the Government, will be submitted to SDDC for vetting through JPAS to ensure investigative and clearance requirements have been obtained before the start date of the contract. This will be completed prior to the Contracting Officer’s Representative (COR)
/ Trusted Agent (TA) submission of contractor employees’ names for the Common Access Card(s) (CAC) in the
DoD Trusted Associate Sponsorship System (TASS). If a contractor’s employee does not have the appropriate investigative or security clearance requirement the contractor’s employee will be denied the ability to work in support of this PWS and will not be loaded into the TASS. Contractor employees will be loaded in TASS and will have an expiration date on their CAC for the initial contract period. Upon approval of each option period a new
CAC will be issued with new dates for the subsequent option period only.
2. 6 The contractor shall ensure the roles/privileges assigned to contractor employees on the Government computing platforms are limited to the roles/privileges essential to that individual’s performance of his/her assignments. These roles/privileges can be limited or revoked by the Government for any reason.
2.7 If the Government notifies the contractor that the employment or the continued employment of any contractor employee is prejudicial to the interests or endangers the security of the United States of America, that person shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The company receiving award of this task order shall make any changes necessary in the appointment(s).
2.8 Requirement for Contractor Information Assurance (IA) Report
The Contractor shall provide an Information Assurance Report to describe their environment that safeguards DOD non-public information resident on or transiting the contractor's unclassified information systems from unauthorized access and disclosure. Protection measures applied should consider the risks (i.e. consequences and their probability) of loss, misuse, unauthorized access, or modification of information. The report shall address the SANS
(Sys Admin, Audit, Network, Security) Institute's Twenty Critical Security Controls for Effective Cyber Defense:
Consensus Audit Guidelines (http://www.sans.org/critical-security-controls) and be provided in accordance with the attached template at Attachment 1 to the PWS. The contractor is encouraged to provide additional information above and beyond what is outlined in the SANS guidelines to enhance the government’s understanding of their information security posture. The report will be updated 30 days prior to exercise of an option period, if applicable.
2.8.1 Cyber Security Incidents
2.8.1.1 Reporting Requirements
The contractor shall report to the following two Government organizations as soon as possible upon discovery of any suspected cyber intrusion events that affect DOD information resident on or transiting the contractor's unclassified information systems.
1. USTRANSCOM Cyber Operations Center (CyOC)
E-mail: transcom.scott.tcj3.mbx.cyoc@mail.mil
Commercial Phone: 618-220-4222 mailto:transcom.scott.tcj3.mbx.cyoc@mail.mil
2. USTRANSCOM Deployment and Distribution Operation Center (DDOC)
E-mail: transcom.scott.tcj3.mbx.ddoc-chief@mail.mil
Commercial Phone: 618-220-7700
Initial report shall be provided even if some details are not yet available, with follow-on detailed reporting within 72 hours. Reportable cyber intrusion events include the following:
1. A cyber intrusion event appearing to be an advanced persistent threat
2. A cyber intrusion event involving data exfiltration or manipulation or other loss of any DOD information resident on or transiting the contractor's, or its subcontractors', unclassified information systems
3. Intrusion activities that allow unauthorized access to an unclassified information system on which DOD information is resident or transiting
Definition of advanced persistent threat: An extremely proficient, patient, determined, and capable adversary, including two or more of such adversaries working together.
2.8.1.2 Incident Report Content
The incident report shall include, at a minimum, the following information:
1. Applicable dates (date of suspected compromise and date of discovery)
2. Threat methodology (all known resources used such as Internet Protocol (IP) addresses, domain names, copies malware, etc.)
3. An account of what actions the threat(s) may have taken on the victim system/network and what information may have been accessed
4. A description of the roles and functions of the threat-accessed system
5. An initial list of potentially impacted government programs and each program’s classification
6. What information may have been exfiltrated that may impact government programs
7. A list of all employees and subcontracted employees who work or have worked with the victim system/network
8. A point of contact to coordinate damage assessment activities
2.8.1.3 Incident Report Submission
The contractor will submit unclassified network cyber incident reports to the USTRANSCOM Technical
Information Analysis Center (TIAC) and USTRANSCOM designated government personnel via encrypted email or another mutually agreed upon secure communications method. Copies of malware require special handling and pre-coordination must be accomplished prior to submission.
3.0 SAFETY
The Contractor must comply with applicable international, federal, state, local, installation and SDDC
Transportation Battalion safety and fire regulations. The Contactor must establish and maintain an effective and comprehensive safety program. The Contractor will support the SDDC battalion's Emergency Disaster Plan. The
Contractor must acquire, maintain, and require the use of safety equipment, personal protective equipment and devices necessary to protect employees on the installation, port, and on the vessel. The Contractor is responsible for enforcement and monitoring of applicable international, federal, state, local installation safety and fire regulations.
Deviations or failure to comply with applicable safety rules may be documented by any government worker and reported to the COR for formal advisement and corrections to the Contractor lead or designated safety representative. Discrepancies will be logged within the defined quality performance process.
3.1 Safety-Driver Training- Qualified Driver
3.1.1 The Government will make available driver training for Government vehicles and related processes/procedures and the Contractor shall coordinate with local labor to attend the Government provided mailto:transcom.scott.tcj3.mbx.ddoc-chief@mail.mil training so that sufficient pools of operators are available to operate Government vehicles, within a port as required.
Government vehicles may include, but is not limited to, all classes of Trucks, Stryker vehicles, Heavy Equipment
Transporters (HETS), Mine Resistant Ambush Protective (MRAP) vehicles and Armored Tracked vehicles. Labor shall participate and Contractor shall be compensated at man-hour rates.
3.1.2 The Government at times may have field service representatives or vendor training onsite for new models entered into the Army inventory. The Contractor shall coordinate with the COR for approval to have cargo operators attend this available training. The Contractor shall be compensated at Man-Hour rates contained in the
Schedule B for the time his labor attends training.
3.1.3 The Contractor shall ensure that personnel operating Government Vehicles possess a valid civilian driver's license issued by a State, District of Columbia, or U.S. possession. For OCONUS contracts, personnel will have a valid license as required for operating vehicles in that country or region.
3.1.4 The Contractor will develop and implement a sustainment training program. This will be accomplished for each option year. Sustainment training is periodic driver training conducted to maintain a high level of driver skill proficiency and to prevent drivers from acquiring poor driving habits. The Contractor shall be compensated at Man-
Hour rates contained in the Schedule B for the time his labor attends training. The Contractor shall submit actual invoices for costs associated with this training, and proof of the sustainment training, to the COR for the Contracting
Officer and COR approval before any payment is authorized. Proof of sustainment training shall also be kept by the
Contractor.
3.1.5 The Contractor will establish a remedial training program for drivers or operators who have had driver at-fault accidents or traffic violations, misused equipment, or otherwise demonstrated a need for additional training on military vehicles or equipment. The COR may identify individuals that need remedial training. This training will be directed towards identifying and correcting individual weaknesses. Remedial training will be conducted at no cost to the government.
3.1.6 All Contractor personnel who operate U.S. Government or Contractor furnished vehicles laden with hazardous material, to include munitions, shall possess a Pacific Maritime Association - approved operators’ license with the General Safety Training HAZMAT endorsement.
3.1.6.1. All Contractor personnel who operate U.S. Government or Contractor furnished vehicles laden with Class 1 munitions or Explosives, shall possess a Pacific Maritime Association approved operators’ card with AMMO endorsement.
3.1.6.2. The Contractor shall provide a qualified point of contact for HAZMAT handling.
3.1.6.3. Ammunition and Explosives laden material handling equipment (MHE) or vehicles will not be used during any operator training at any time.
3.1.6.4. All newly licensed Contractor personnel who operate U.S. Government or Contractor furnished vehicles laden with Class 1 munitions or Explosives shall have had sufficient operating experience prior to being dispatched to MOTCO such that they can perform their duties safely, competently and efficiently, with a confidence that reflects adequate mastery of their equipment, vehicle or crane. The government reserves the right to challenge the sub-standard performance of any contractor operator that causes safety-related concerns for the mission and direct the contractor arrange immediate personnel replacement of, or to halt further activity until corrective measures are in place which minimizes or avoids further performance concerns.
3.1.7 The Contractor shall provide the COR with a list of names each day for those drivers who are assigned to handle specialized vehicles, HAZMAT, or ammunition laden cargo per operation. The list will include a statement from the Contractor verifying that the individuals performing these driving functions comply with AR 600-55. The
Government reserves the right to stop contractor personnel at any time to verify their qualifications against the approved list of personnel scheduled to perform these functions. Personnel found to be in non-compliance will be removed from the handling of this cargo and the incident will be reported to the Contracting Officer and will be submitted in the monthly performance report.
3.2 Safety Briefings - The Contractor shall conduct and document safety briefings for all workers at each shift change and must brief new workers as any new labor is added. The safety briefings conducted and documented by the contractor, as it relates to the type of operation (e.g. truck, rail, vessel, yard, crane, etc.), at minimum must meet
OSHA regulatory guidance and include the following basic information:
*Overall General Safety Requirements
Work tasks to be performed
Responsibilities - who reports unsafe conditions and to whom
Injury and property damage reporting procedures
Required PPE for personnel on the terminal
Designated smoking areas
Emergency procedures - phone numbers, evacuation routes/procedures, rally locations, accountability
Location of emergency equipment - fire extinguishers, PFDs
Weather/temperature conditions
Communication - signals, flagman duties, radios, no cell phones etc.
Walking/Tripping Hazards
Pedestrian and traffic movement
Gangway Safety
Person in water - prevention, recovery and survival
*Traffic Safety
Driver distractions
Use of Seat Belts
Pier specific vehicle procedures - lights, keys, mirrors etc.
Speed limits - pier, yard, railcar and vessel
Parking locations
Traffic Flow
Use of ground guides when moving (ramp/backing/stow)
Rail crossings
*Task/terminal Specific (as applicable)
Terminal and yard configurations, distinctive characteristics
Safe equipment operation - MHE, vehicles (verify trained/certified/licensed)
Safe explosives handling procedures - (verify trained/certified/licensed)
Safe Rail operations - 3 step protection, right of way
Ladder Safety
Use of fall protection
Safe lashing procedures
Unusual loads
3.2.1 The Government will conduct supplemental safety briefings when necessary, and per local Commanders’ guidance, during which time the labor will be on standby detention time. The Government safety briefing will include information as prescribed in 3.2 based on the type of operation, and any other necessary terminal or
Command related safety information.
3.3 Operation of Equipment- Equipment operated by the Contractor for use during operations on any S&RTS
Terminal must be maintained and operated IAW applicable Federal / State laws and regulations, OSHA, Army, port, and terminal regulations, directives, instructions and pamphlets. Damage to cargo or injury related to the use of non-compliant equipment or improper use of equipment will result in immediate non-use of that Contractor's equipment until the Contractor takes corrective action. The Contractor must notify the COR when equipment is made compliant.
3.4 The Contractor shall immediately notify the COR of any incident of dropped cargo, accident or incident which results in damage to cargo or property, release of HAZMAT, injury or death to personnel during or arising from performance under this contract.
3.4.1 In all instances where a reportable accident (that meets the minimum criteria IAW DA PAM 385-40 for ground Class A-D accidents) or incident occurs, the Contractor shall submit a full written report to the COR within
24 hours utilizing the U.S. Army Abbreviated Ground Accident Report (AGAR) (DA Form 285-AB-R). The
Contractor shall assist the Government during any investigation of an accident or serious incident. Accidents that do not meet the minimum criteria will be reported to the COR IAW Terminal Section 6 requirements.
3.4.1.1. The contractor shall submit documentation to the COR explaining qualification and task training for each contract employee involved in the incident/accident.
3.4.1.2. The contractor shall submit all maintenance records for contractor supplied equipment involved in the incident/accident.
3.4.2. The Contractor shall assist the Government during any investigation of an accident or serious incident.
3.4.2.1. After an accident or serious incident occurs, the Contractor will secure the location, preserve critical evidence and allow government personnel access to the location, evidence and contractor employed witnesses.
Operations will not resume until cleared with the COR.
4.0 CONTRACT ADMINISTRATION
4.1 Detention, Minimum Time, Differentials
4.1.1 Detention and minimum time, computed to the nearest 6 minute multiple, are payable to the contractor, in lieu of commodity or extra labor (XL) rates specified elsewhere in this contract, at the applicable man-hour rates, subject to the following:
4.1.2 When detention occurs during a commodity operation, the Contractor shall absorb each detention of eighteen (18) minutes or less. The government shall pay the Contractor at detention rates for persons or gangs, including clerks and equipment operators (drivers) for each detention in excess of eighteen minutes including the first eighteen minutes thereof, per the informal US West Coast PMA – ILWU agreement.
4.1.2.1 Detention shall not be authorized for any part of a gang that is not required on commodity operations or when certain classes of labor on commodity operations are required to stand by because of another class of labor performing a commodity operation. For example, commodity vessel load is inclusive of loading and lashing cargo.
Gangs conducting the load & lash are inclusive of each other under one commodity rate; therefore, drivers or lashers during the process of load and lash may be waiting for the other to perform or complete their job. Neither party will be placed on detention while the other is performing commodity work.
4.1.3 Whenever detention occurs prior to or during extra labor operations, the Government shall pay the
Contractor on a detention rate basis for the time of each detention. In the event part of a gang is required to perform an extra labor operation, the balance of the gang standing by shall be paid for at detention rates. In the event certain classes of labor are required to standby because of another class of labor performing an extra labor operation, such certain classes of labor shall be paid at detention rates.
4.1.4 In accordance with applicable collective bargaining agreements, minimum time shall be payable to the
Contractor when work fails to materialize or when work is completed prior to the minimum time and shall not be payable (i) for checkers working in conjunction with longshoremen until completion of the longshoreman commodity activity; and (ii) for any part of a gang not required on a commodity activity. For example, rail unload operation is inclusive of unlash and unload of cargo under one commodity rate. Lashers finish the unlash portion are still on commodity until the drivers are complete with unload and stage to point of rest. During rail load, after drivers complete the load, they remain on commodity until lashers have completed all lashing. While one portion of the gang is on commodity, all are listed as commodity.
4.1.5 The Contractor must obtain pre approval to work overtime; only when authorized by the COR.
4.2 Contract Labor Reporting-The contractor shall provide as requested by the COR a daily time keeper personnel log book for verification of labor services provided for the day’s operations to use for reconciliation. The breakout will include total quantity by class of service.
4.3 Contractor Manpower Reporting Requirements
4.3.1 CONTRACTOR MANPOWER REPORT (CMR). The contractor shall report ALL contractor labor hours
(including subcontractor labor hours) required for performance of services provided under this contract for Military
Surface Deployment and Distribution Command via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://cmra.army.mil/.
4.3.2 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the
FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under Help Resources on the right side of the login page.
4.4 Training and Contingency Operations- The Government reserves the right to conduct training and contingency operations for Department of Defense personnel during a scheduled or contingency load or discharge for any vessel operation and related terminal operations. The Contracting Officer or COR will advise the Contractor when such training or contingency operation is scheduled; such notification will be provided to the Contractor as soon as it is known but NLT 48 hours prior to training, contingency or special operation mission. During these training/special operation events, the Contractor shall provide, when requested by the COR, sufficient qualified labor to support DoD personnel during these operations. Such labor, to include operators, flagmen, lashers, mechanic or headers when requested, will be compensated at the man-hour rates established in Section B – Schedule of Rates.
5.0 CONTRACTOR GENERAL REQUIREMENTS)
5.1 General duties and requirements of the Contractor are defined within this section. Duties and requirements specific to the particular terminal(s) within the scope of this contact are further defined in Section 6.0 -Terminal
Specific Requirements.
5.2 Contractor services will cover the full spectrum of ocean terminal operations to include discharge and load of vessels, vessel stage/call forward areas including designated areas/facilities for washing and/or fumigation.
Vessels anticipated are Large Medium Speed Roll On/Roll Off (LMSR), Fast Sealift Ships (FSS), MARAD/Ready
Reserve Fleet (RRF), Military Sealift Command (MSC) Controlled or Charted Vessels, Maritime Prepositioned
Ships, Cape Class Vessels, Barges, U.S. Army and Navy vessels, car carrier vessels, combined container/Ro-Ro vessels as well as other vessel types and classes. The Contractor must be capable of handling multiple and simultaneous vessel, operations at each terminal as described in this contract’s Area of Responsibility (AOR).
Contractor will handle various classes of supply to include Ammunition, Hazardous Material, sensitive, controlled, and general DoD cargo.
5.3 The Contractor will inspect for damage and discrepancies and immediately report these items to the COR.
The contractor shall report any damage caused by the contractor, to cargo or vessel, immediately to the COR.
5.4 The Contractor shall communicate to the COR any labor shortfalls immediately, and make every effort to rectify the shortfall.
5.5 The Contractor shall provide a dedicated manager to serve as a single point of contact for interface with the government during all daily operations; this includes management presence at away ports during terminal operations as described in Section 6.1 Area of Responsibility.
https://cmra.army.mil/
5.6 The Contractor shall provide a single point of contact on-site for each operation for each shift to the COR.
This individual must have decision-making authority and shall act as the central point of contact. During vessel operations, the Contractor must have stevedore oversight for all gang activity onboard vessels and in staging yards.
If any delay of operation is as a result of stevedore absence on deck or in the staging yard; the delay will be at the
Contractor’s expense.
5.7 The Contractor shall participate in daily operations meetings and shall participate in other meetings regarding vessel load or unload as required. The Contractor shall order labor, material, and equipment based upon agreement with the COR.
5.8 The Contractor shall compare Government reports to Contractor documents and identify discrepancies and recommend reconciliations to the COR.
5.9 The Contractor shall provide a certified point of contact for HAZMAT cargo handling IAW CFR49 Part
172.704(d)
5.10 The Contractor shall acquire and maintain access, and submit man-hour input, to the Cargo & Billing
System (CAB), or its future replacement system, for labor operations within seven (7) days following the billing activity.
5.11 The Contractor shall establish a Quality Control Inspection Plan (QCIP) which will emphasize quality control over all contract requirements. The Quality Control Inspection Plan will contain a Quality Control Inspection
Checklist (QCIC) which, at a minimum, will contain all elements of the Performance Requirements Summary
(PRS).
5.12 Out of Pocket (OOP) Expenses - As related to the support of transportation and cargo and terminal operations, upon the request and approval of the COR, the Contractor shall provide specialized equipment
(examples: floating crane, scissor lifts, generators, light sets, etc.) and supplies reimbursed by the Government at actual costs. Vendor receipt must be provided for reimbursement. Types of supplies include, but not limited to, lumber, placards, straps, shackles, tie wire, clips, fuel for military cargo and GFE (other than commodity operation) and banding material. The Contractor will also provide 3rd party services related to the support of transportation and terminal operations such as port-a-lets used in the operational area and crane orders for extra labor operations .
5.13 Stevedoring and Related Terminal Services (Import)
5.13.1 The Contractor will prepare the vessel for discharge to include the unlashing and physical removal of cargo from the vessel. Inclusive of the vessel discharge commodity rate, the Contractor shall discharge and document cargo (to include capturing linked, nested, and secondary items) of inbound cargo IAW with the agreed upon
Discharge Plan and stage in accordance with the agreed upon Staging Plan (e.g. by type and destination) within time frame established at the cargo meeting between the Contractor and the Contracting Officer’s Representative (COR).
The Contractor shall handle multiple classes of cargo including sensitive, classified, HAZMAT cargo and Reefers in accordance with discharge and stage plan and IAW current applicable regulations. Any changes must be approved through the COR.
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of discharge of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition. The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows; discharge hours may or may not be continuous:
VESSEL TYPE DISCHARGEWORK HOURS
FSS (using shipboard crane) 56
FSS (using port crane) 48
BREAKBULK 72
LMSR (NON-PREPO) 72
RORO 48
CONTAINER SHIP* 48
MPS 72
MPS/MAERSK 96
5.13.2 The Contractor shall conduct a reconciliation/validation of the cargo discharged.
5.13.3 The Contractor shall return vessel lashing gear to its proper place (lashing bins and wall racks) and will clean contractor debris prior to vessel departure.
5.14 Stevedoring and Related Terminal Services (Export)
5.14.1 The Contractor shall load cargo on the vessel from its place of rest to point of stow aboard vessel in accordance with the approved vessel pre-stow plan furnished by the Government and within the time frame established at cargo meeting between the Contractor and the COR. The Contractor shall handle all multiple classes of cargo including sensitive, classified, HAZMAT and Reefer Cargo IAW the pre-stow plan. The contractor shall secure cargo IAW SDDC TEA Reference 55-22, Marine Lifting and Lashing. The Contractor shall coordinate all vessel activity with the COR, the vessel master/chief mate, and when applicable with the Military Sealift Command
(MSC) representative. The Contractor shall receive and review expected cargo list and pre-stow plan for accuracy and efficiency of vessel operations and report discrepancies, issues or concerns to the COR.
At the operations meeting held prior to the start of each vessel operation, the COR will confirm with the Contractor the mutually agreed upon timeframe for the safe and efficient completion of loading of the vessel. Vessel operation completion timeframes will be determined based on such factors as cargo volume, stow factors, RDD, cargo mix and vessel type being worked.
The Contractor will not be held accountable for delays in vessel operations resulting from circumstances not within the control or responsibility of the Contractor. Factors known to affect productivity may include: weather; reserve augmentation; vessel condition and cargo condition.
The chart below contains estimated vessel timelines for completion of discharge of fully loaded vessels as follows;
discharge hours may or may not be continuous:
VESSEL TYPE LOAD WORK HOURS
FSS (using shipboard crane) 72
FSS (using port crane) 60
BREAKBULK 96
LMSR (NON-PREPO) 96
RORO 48
CONTAINER SHIP* 48
MPS 96
MPS/MAERSK 120
* Container ship shall be defined as an ocean cargo container-carrying ship specifically built with cargo holds having cell vertical guides on the fore and aft bulkheads that match to both sides of the specific length of the containers being loaded. i.e. Holds which have had their 20’ cell guides stripped out (from one or both ends of the cell) shall not be considered to be defined as a container ship for loading TEU ocean cargo containers.
Loading TEUs into an FEU cell guide of a ships’ hold shall therefore also not be considered as meeting the definition of a container ship in the above tables.
5.14.2 The Contractor shall provide documentation using load list and scanner/ PDA that reflects the correct stow location, pay, nested, linked, secondary loads(as requested) and condition of the loaded cargo.
5.14.3 For vessel load and vessel discharge the Government will:
-Provide command and control as Single Port Operator/Manager for SDDC Operations.
-Identify specialized, unique military equipment requiring special handling and coordinate for handling this equipment as required.
-Maintain log book/record of events/time for all operations.
-Provide reports to the Contractor as specified within this contract.
-Compare contractor furnished reports with the Government reports, identify further discrepancies and reconcile them with the Contractor.
-Identify the COR to oversee contract operations.
-Provide a qualified point of contact for HAZMAT.
-Provide ICODES pre-stow plans as specified within this contract NLT 48 hours for review with a revised copy provided NLT 24 hours prior to operation.
-Utilize GATES or system of record to document movement of cargo.
-Provide scanners (PDA), tally sheets or Military Shipping Label (MSL) as applicable to the Contractor.
-Process contractor activity pay into GATES or system of record NLT 48 hours after receipt of documentation;
delays to GATES processing may occur due to frustrated cargo records.
-As applicable to type of operations, provide a discharge report; manifest; cargo load list; GATES on hand report;
pre-stow plan for vessel load; staging requirements; and when provided, a final stow plan for vessel discharge, to the Contractor
-Assist to resolve cargo discrepancies such as overages, shortages and Hazardous Material (HAZMAT) documentation.
-Provide input on special handling requirements to include staging of HAZMAT; sensitive; classified cargo and
Refrigerated containers.
-Provide training on scanners (PDA) and Government Documentation System(s), when applicable.
6.0 TERMINAL SPECIFIC REQUIREMENTS (IMPORT/ EXPORT)
6.0.1 Introduction
The US Army 834 th
Transportation BN serves as the Strategic Port Manager for military surface cargo movements, to include fielding, sustainment, deployment and re-deployment operations through select major commercial and/or military ports in California.
The unit also serves as the Strategic Port Manager for the Department of Defense, TRANSCOM major munitions ports on the US West Coast.
The 834 th
Trans BN utilizes a commercial S&RTS contractor to periodically carry out its mission at select major commercial and/or military ports in California, to include Oakland, Port Hueneme and San Diego, as well as for performing munitions-handling cargo operations at MOTCO.
The 834 th
Transportation BN is the port operator for MOTCO, conducting military general cargo and A, A&E vessel load and discharge trans-shipments. The unit also serves as the Strategic Port Manager for military deployment and re-deployment operations at select major commercial and/or military ports in California, to include Oakland, Port
Hueneme and San Diego.
6.0.2 Hours of Operation
MOTCO
The normal hours of operation for MOTCO/Oakland are as follows: 0800 – 1630 hrs for the day shift; 1900 – 0400 hrs for swing shift and 0300 – 0800 hrs hoot-owl, (a hoot-owl shift in these ports relieves the swing shift one hour earlier than if no hoot-owl shift came on).
Oakland, Port Hueneme, San Diego
The normal hours of operation for Oakland, Port Hueneme and San Diego are as follows: 0800 – 1700 hrs 1 st (day) shift; 1800 – 0300 hrs, 2 nd
(swing) shift, 0300 – 0800 hrs, 3 rd
(hoot-owl) shift
6.1 Terminal-Specific Background – Routine Commercial Port Operations
The 834 may rely on the S&RTS contractor’s assistance to provide or obtain adequate port terminal facilities in commercial ports.
a. The contractor will be required to have ready access to a facility at the commercial ports of Oakland and
San Diego. This facility will be the primary terminal for vessel operations. At a minimum, the facility requirements should accommodate military cargo volumes of 135,000 sq. ft of rolling stock, 80 TEUs, and provide 1250 ft of functional dockside space with no less than 35’ Mean Lower Low Water draft. Also, the contractor will provide the government with approximately 2500 sq. ft of temporary, fully functional office space to perform the government’s mission functions.
b. Office equipment, such as furniture, telephones, and commercial telephone services, and other material as will be required to maintain the Contractor’s operation. At MOTCO only, the contractor s’ communication services will be ordered and paid for by the contractor and placed in a location designated by the DOIM by the commercial service provider. If the MOTCO MPOE is moved in the future for any reason, the contractor will be financially responsible for moving those services to the new MOTCO MPOE, utilizing the DOIMs’ recommended vendor.
c. Wire cables, turnbuckles, shackles, clips, lumber, dunnage, chocking, and blocking materials may be required in the performance of the services hereunder. All supplies purchased by the contractor with prior approval of the COR will become property of the Government. The Government shall reimburse the contractor for such materials/supplies as an out-of-pocket cost. These materials will be used in performance of work under this contract and are obtained for and on behalf of the Government, who shall be the owner thereof at the time of acquisition. Serviceable material/supplies recovered from down-loading ships or unstuffed TEUs will be reused. Dunnage and lashing materials, furnished by contractor will be of grade, quality, size, and dimensions suitable for the intended use and meeting international regulatory requirements. The Contractor shall deliver these materials to shipside or other designated location(s), as required. When the contractor furnishes any materials from their own stock, they shall submit a signed certification listing such materials with itemized costs. The COR’s certification, indicating prior approval of the quantity and prices will be presented with the invoice for reimbursement, otherwise reimbursement will not be made.
d. [Note: A fully functional office shall be securable and within one-quarter mile of government cargo and the dock. As a minimum, it must have ventilation, controllable heating, at least eight (8) 110-volt outlets, sufficient lighting for reading and writing, five (5) work tables (banquet style), or the equivalent height of counter space, twelve (12) chairs with back support, and access to functional restrooms.]
6.2 SCOPE OF VESSEL OPERATIONS
6.2.1 The contractor shall provide Stevedoring and Related Terminal Services for the movement of military cargo, to include containerized cargo, conventional break-bulk cargo or, containerized and/or break-bulk A,A&E
(MOTCO only, except for limited quantities of small arms ammunition treated as general cargo), military vehicle rolling stock (wheeled and tracked), and equipment through designated California ports in support of the national/strategic military interests of the United States of America. MOTCO anticipates an average of 2.5 A,A&E vessel events for full load/discharge (per year), in addition to possible “Call Forward” A,A&E cargo movement exercise, for which the scheduling is subject to the needs of the government. Movements at the commercial ports have previously been in support of small (9 or fewer ships) contingency deployments and re-deployments, lasting less than 2 months duration. San Diego can anticipate .5 vessel event movements per year. Oakland can anticipate
.5 vessel event movements per year. Port Hueneme is expected to have 8 vessel event movements per year.
The contractor also may, during contingency operations be required to support in-stream cargo operations at any of the designated ports.
6.2.2 The contractor also may, during contingency operations be required to support in-stream cargo operations at any of the designated ports.
6.2.3 The Contractor shall order labor based upon agreement with Contracting Officer’s Representative (COR).
The contractor shall also provide qualified personnel to perform S&RTS in support of government water terminal cargo transfer operations. Specific additional post-training dispatches are required for contractor TMHE/V operators at MOTCO. By nature of MOTCO’s mission, the port is not to be used as TMHE/V training/orientation location for any licensed but inexperienced contractor operators. The contractor shall ensure any contractor
TMHE/V operator has successfully performed their dispatched operator duties in previous on-the-job assignments before being dispatched to MOTCO. Additionally, any gantry crane or ship’s gear signalmen must be actually gantry crane licensed operators to work as a signalman at MOTCO. The contractor must maintain current records of qualifications and training completed. These records must be made available upon request from the COR.
6.2.4 The Contractor shall communicate to the COR any labor/equipment shortfalls and make every effort to rectify shortfalls.
6.3 Contingency Operations at Commercial Ports
If contractor facilities at any of these commercial ports do not accommodate a port-specific military deployment terminal requirement, the contractor shall, upon approval of the ACO, arrange for additional space. This is usually
750,000 sq ft accessible, contiguous flat surface staging, free of dirt with suitable drainage and 1250’ of berthing with minimum 35’ depth alongside at MLLW per vessel operation and other such within-port temporary terminal facilities with the port authority. The contractor may also be tasked to obtain temporary administrative facilities such as double-wide office suitable trailers, equipment and services for the government’s terminal mission administrative functions within the temporary facility. Contractor will be reimbursed for any prior-approved out-of-pocket costs directly related to providing any such additional-facility assistance for the government.
6.4 Locations: Types of Cargo
This contract covers the handling of DoD sponsored export and import general military cargo through the military terminal at Port Hueneme, as well as routine or contingency military movements through the commercial ports of
Oakland and San Diego, California. Both general military & A,A&E cargo may move through MOTCO.
6.5 Scope of Terminal(s) and Operations (MOTCO)
a. At MOTCO, most munitions shipments will predominately be containerized in 20’ TEUs w/8 ½’ height and mostly received on COFC rail cars. Two commercial rail carriers deliver rail cargo to MOTCO, using separate terminal interchange gates. A single commercial rail carrier services Port Hueneme and San
Diego. Truck trailer cargo is received, discharged, then sorted and staged per the following criteria:
segregated by the assigned Controlled Inventory Item Code (CIIC) if applicable, then by Destination
Consignee (if a multi-POD load-out), then by Hazard Class, Division and Compatibility Group. All TEUs are then usually sorted by gross weight groupings (e.g. < 10K, <25 K & >25 K).
b. The Contractor shall load and secure cargo on outbound (port clearance) conveyances (rail and truck trailer) in accordance with industry and SDDC standards.
c. Truck deliveries also routinely bring TEU containerized B/B occasionally; less than 8% cargo to MOTCO.
After clearing Pass & ID, trucks normally report to a terminal location determined by the COR to await further instructions for movement to discharge or loading. Truck movements generally account for 21 % of all cargo movements into/out of MOTCO.
d. MOTCOs’ intra-terminal rail track system at MOTCO (38 miles of track) is very extensive. Railcar staging consists of two significant rail staging yards, four rail-to-trailer transfer areas, and two rail-to-container transfer facilities. Container on Flat Car (COFC) rail movements account for 85% of all munitions movements into/out of MOTCO. Every effort is made to work the terminal efficiently. However, operational delays of up to 25 minutes per sequence can result from shifting strings of railcars and road-movement restrictions as locomotives pass through multiple unguarded intra-terminal railroad crossings and switch-backs to exchange empty for loaded railcars. The Contractor shall raise and position corner pockets within COFC rail cars to accept TEUs, reporting any non-operational TEU locking pins or hooks the COR or designated COR representative. The Contractor shall be responsible for the proper loading and securing of TEUs onto container –on-flatcars railcars, to include ensuring when available all four locking corner pins are properly and fully locked onto the bottom ISO container corner fittings. Any contractor labor needed for follow-on corrections of post-load-up identified rail loading deficiencies will be performed at no additional expense to the government.
e. Carpentry Service; the contractor shall fabricate and install blocking and bracing, and coopering and other similar services as directed by the COR and IAW munition regulations.
6.6 Break bulk (B/B) munitions
Occasionally, MOTCO will receive Break bulk (B/B) A, A&E. These are usually truck deliveries. to be either held on terminal in the delivery conveyance, directly un-loaded for vessel up-load, or directly transferred into TEUs, or possibly to another temporary holding location designated by the COR. Terminal-owned rail boxcars are occasionally used for temporary on-terminal secure holding. The S&RTS contractor will not be tasked to manage, move or control, monitor NEW or report on munitions-laden boxcars or rail cars in the terminal once they have been pulled out of any sited contractor work area. The contractor us expected to manage “grounded” munitions, or A<
A&E staged on, but not pulled from within any CoRA-sited, COR-designated B/B-holding areas.
6.7 Port Missions
6.7.1 MOTCO
Import A, A&E cargo is discharged from the vessel and moved from the pier to the COR designated cargo staging areas, unless a direct-to-rail load-up is feasible. Cargo is cleared from the terminal by truck and/or railcar. Should
B/B import munitions be received, anything that cannot be expeditiously uploaded into a truck-trailer or truck dromedary that same day will be temporarily secured at a location designated by the COR, or possibly into on-terminal rail boxcars. The terminal also receives and trans-loads export A, A&E as well as occasionally moving other military general cargo as a small, partial or full military contingency deployment or re-deployment. At
MOTCO, the government reserves the right to bring in skilled military crane operators to operate the vessel or port gantry cranes.
6.7.2 Oakland
Provide service at the contractor’s facility for the SDDC-sponsored Universal Services Contract vessel, or for a small movement or a small, partial or full military contingency deployment or re-deployment.
6.7.3 San Diego
Provide service at the contractor’s facility, or at a temporary terminal arranged from within the existing commercial terminals for military use and/or at a military base (e.g. Naval Station Coronado) to support a small or partial contingency deployment or re-deployment.
6.7.4 Port Hueneme
Provide service at the contractor’s facility for the Universal Services Contract vessel, or for a small movement or a small, partial or full military contingency deployment or re-deployment.
6.8 Operations at Commercial Ports
6.8.1 Port of Oakland Operations
The Port of Oakland’s 7
Street complex is the principle commercial terminal within San Francisco Bay and serves as the main container port for Northern California, handling approximately 6% of the nation’s container vessel activity. Minimal amounts of Defense Transportation System (DTS) cargo will move thru Oakland. Small movements or full contingency operations may occur at Oakland during the contract period. The contractor must be prepared to establish terminal operations in Oakland.
6.8.2 Port of San Diego Operations
The Port of San Diego is a moderately sized commercial port. However, with its proximity to major military installations, San Diego is a designated and often-used deployment port for various military units tasked under certain DoD plans and post 9/11 deployment/ re-deployment moves. The contractor must be prepared to establish terminal operations at any port facility in San Diego. Further, as some military cargo may be better accommodated through a terminal next to an airfield, the contractor may also be tasked to load or discharge such cargo from vessels docked at military facilities. This will require special security arrangements in advance to clear in, control and transport longshoremen into North Island and to confine them to the immediate work-site for the duration of any mission there.
6.9 Terminal-Specific Background – Other Military Port Operations
6.9.1 Port Hueneme Operations
a. The Naval Station Ventura County (NSVC), referred…