Past_Performance_Survey_Cover_Letter.pdf

PDF 29 KB Posted

Attached to
Construct New Aircraft Rinse Rack Federal contract opportunity
Solicitation number
HSCG86-13-R-CWRR01
Issued by
Department of Homeland Security US Coast Guard

About this file

Past Performance Survey Cover Letter

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Aircraft Rinse Rack, newest first.
File Type Posted
Amd_0006.pdf PDF
Amd_0005.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2C.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2B.pdf PDF
Amd_0004.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2A.pdf PDF
Amd_0004_-_Sketch_4M12A.pdf PDF
Amd_0003_-_32_31_13_Chain_Link_Fence_Specification.pdf PDF
Amd_0003_-_Sketch_3D.pdf PDF
Amd_0003_-_Wage_Decision_No._HI140001_01.03.2014_HI1.pdf PDF
Amd_0003_-_Diversion_Valve_Specification.pdf PDF
Amd_0003.pdf PDF
Amd_0002.pdf PDF
Amd_0001.pdf PDF
Amd_0001_-_Soil_Log_Data.pdf PDF
Amd_0001_-_2013-12-13_RFI-01_SKETCH_1A 1B 1C 2 3A 3B 3C 3D 4A 4B 5A 5B 5C.pdf PDF
Amd_0001_-_RRackHaulBarr.pdf PDF
Amd_0001_-_Attachment_1.pdf PDF
Drawings_Sheets_1-11.pdf PDF
Drawings_Sheet_54-63.pdf PDF
Drawings_Sheet_44-53.pdf PDF
Wage_Decision_No._HI130001_11.15.13_HI1.pdf PDF
Drawings_Sheets_23-33.pdf PDF
HSCG86-13-R-CWRR01_-_Solicitation.pdf PDF
Drawings_Sheets_12-22.pdf PDF
Drawings_Sheets_34-43.pdf PDF
Specifications.pdf PDF
DD2626_-_Performance_Evaluation_(Construction).pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GOVERNMENT

PAST PERFORMANCE SURVEY

Solicitation Number: HSCG86-13-R-CWRR01: Construct Clear Water Aircraft Rinse Rack

Name of firm to be evaluated: ______________________________

The above contractor has identified you or your (Agency) company as a reference for past performance information for the above referenced solicitation.

Please take a few minutes to complete the attached form DD2626, evaluating the contractor’s performance under your contract(s). It is requested that the individual(s) responsible for the administrative (post-award) oversight of the project respond to this questionnaire. Please supplement your answers with comments that may be useful to the U.S. Government in assessing the contractor's past performance. Handwritten responses are sufficient. Once completed, this evaluation will be considered source selection sensitive in accordance with FAR part 3.104.

Please submit your evaluations DIRECTLY TO THE CONTRACTING OFFICER at Tammy.K.Kao@uscg.mil no later than 2pm Hawaii Standard Time on December 30, 2013.

Thank you for your assistance in this past performance evaluation process!

Tammy K. Kao Contracting Officer U.S. Coast Guard, CEU Honolulu Phone: (808) 535-3474 Email: Tammy.K.Kao@uscg.mil

The following definitions are applicable rating levels for the contractor’s performance.

(O) Outstanding

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

(A) Above Average

Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

(S) Satisfactory

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

(M) Marginal

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

(U) Unsatisfactory

Performance does not meet significant contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

File details come from the government source that posted it. Updated .