Amd_0006.pdf

PDF 151 KB Posted

Attached to
Construct New Aircraft Rinse Rack Federal contract opportunity
Solicitation number
HSCG86-13-R-CWRR01
Issued by
Department of Homeland Security US Coast Guard

About this file

Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Aircraft Rinse Rack, newest first.
File Type Posted
Amd_0005.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2C.pdf PDF
Amd_0004_-_Sketch_4M12A.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2B.pdf PDF
Amd_0004.pdf PDF
Amd_0004_-_H0454C03-Sketch_R2A.pdf PDF
Amd_0003_-_Wage_Decision_No._HI140001_01.03.2014_HI1.pdf PDF
Amd_0003_-_Diversion_Valve_Specification.pdf PDF
Amd_0003_-_32_31_13_Chain_Link_Fence_Specification.pdf PDF
Amd_0003_-_Sketch_3D.pdf PDF
Amd_0003.pdf PDF
Amd_0002.pdf PDF
Amd_0001.pdf PDF
Amd_0001_-_2013-12-13_RFI-01_SKETCH_1A 1B 1C 2 3A 3B 3C 3D 4A 4B 5A 5B 5C.pdf PDF
Amd_0001_-_RRackHaulBarr.pdf PDF
Amd_0001_-_Attachment_1.pdf PDF
Amd_0001_-_Soil_Log_Data.pdf PDF
Drawings_Sheets_1-11.pdf PDF
Drawings_Sheet_54-63.pdf PDF
Drawings_Sheets_34-43.pdf PDF
Specifications.pdf PDF
DD2626_-_Performance_Evaluation_(Construction).pdf PDF
Past_Performance_Survey_Cover_Letter.pdf PDF
Drawings_Sheet_44-53.pdf PDF
Wage_Decision_No._HI130001_11.15.13_HI1.pdf PDF
Drawings_Sheets_23-33.pdf PDF
HSCG86-13-R-CWRR01_-_Solicitation.pdf PDF
Drawings_Sheets_12-22.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

0006 1/30/2014 2413863CWRR01 4343175

Contracting Officer United States Coast Guard Civil Engineerg Unit Honolulu 300 Ala Moana Blvd., Rm 8-134 Honolulu, HI 96850

HSCG86-13-R-CWRR01

Nov 30, 2013

A. This amendment is issued to incorporate the attached RFI Question & Answers into this request for proposals HSCG86-13-R-CWRR01 for the Construction of a New Aircraft Rinse Rack.

B. The date set for receipt of proposals remains 2:00 p.m. HST on 2/3/14.

C. All other terms and conditions remain unchanged.

TAMMY K. KAO

Request for Information‐(Response)

Amendment 0006

CLEAR WATER RINSE RACK, USCG AIR STATION BARBERS POINT, KAPOLEI, HAWAII

86. Can you give one manufacture’s name for the DIVERSION VALVE called out in ADDENDUM #3?

Response: One diversion valve manufacturer is C.I.Agent StormWater Solutions. However, we will accept any diversion valve that meets our specifications. And it remains the contractor’s responsibility to ensure that any diversion valve (from C.I.Agent or any other manufacturer) provided meets our specifications.

Other Changes:

87. In the Diversion Valve Specification, the “Local Technical Support” paragraph is hereby deleted, and the following statement is added, “There shall be at least one local Hawaii company that is capable of providing instruction, routine maintenance and emergency maintenance service on all system components.”

88. In the Diversion Valve Specification, the following requirement is hereby added, “A sensor is required to divert the water back to the processing equipment if rinse rack operations commence during rainy conditions. The sensor shall also divert the rain water back to the retention pond when rinse rack operations cease. This is to allow for rinse rack operations to proceed even during rainy conditions.”

NOTE: This is expected to be the final amendment. The proposal due date remains February 3, 2014 at 2:00pm Hawaii Time.

***THE DEADLINE FOR SUBMISSION OF RFI’S HAS PASSED. NO FURTHER RFI’S

SHOULD BE SUBMITTED. PLEASE FINALIZE YOUR PROPOSALS FOR

SUBMISSION***