DRAFT__Atch 5 - CSDR Plan.WBS UEWR-CD BIT v7 12.1 chg 03.06.12.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Upgraded Early Warning Radar (UEWR) & Cobra Dane (CD) Ballistic Missile Defense System (BMDS) Integration & Test (BIT)
Solicitation number
HQ0147-11-R-0006
Issued by

About this file

Draft CSDR Plan

View the file

Other files

File Type Posted
Master Cross Reference Question.pdf PDF
Revised 2 Sec_J_Atch_8_-_Sect_L_-_for_final_RFP_05-24-12.pdf PDF
RFP HQ0147-11-R-0006 Amendment 0003.pdf PDF
Revised 2 Sec_J_Atch_9_-_Sect_M_-_for_final_RFP_05-24-12.pdf PDF
Round 3 RFP Clarifications 05 24 12.pdf PDF
THIS POSTING IS FOR RFP AMENDMENT 0003.pdf PDF
Revised_Sec_L_-_Exhibit_B1_-_B7_UEWR-Test_Pricing_Exhibits_with_Labor_Cats_05-24-12.xlsx XLSX spreadsheet
INSTRUCTIONS FOR AMENDMENT 0002.pdf PDF
RFP HQ0147-11-R-0006 Amendment 0002.pdf PDF
Revised Sec_L_-_Exhibit_B8_UEWR_CD__Test_BOE_Sum_05.17.12.xlsx XLSX spreadsheet
Revised Sec_J_Atch_2_-_IDIQ_SOW_UEWR_05.17.12.pdf PDF
RFP HQ0147-11-R-0006 Amendment 0001.pdf PDF
Revised Sec L Atch L-3 Past Performance Information Form 05.17.12.doc DOC document
Revised Task_Order_0001_SOW_05.17.12.pdf PDF
Revised Sec_J_Atch_9_-_Sect_M_-_for_final_RFP_05.17.12.pdf PDF
THIS POSTING IS FOR RFP AMENDMENT.pdf PDF
Revised Sec_L_-_Exhibit_B1_-_B7_UEWR-Test_Pricing_Exhibits_with_Labor_Cats_05.17.12.xlsx XLSX spreadsheet
Revised Sec_J_Atch_8_-_Sect_L_-_for_final_RFP_05-17-12.pdf PDF
RFP Q S Part 2 v4 05 17 12.pdf PDF
INSTRUCTIONS FOR OFFERORS.pdf PDF
R1 Clarification.xlsx XLSX spreadsheet
Sec L Atch L-4b Past Performance Questionnaire 04.25.12.docx DOCX document
Sec L Atch L-6 Client Authorization Letter 04.25.12.doc DOC document
Sec J Atch 5 - CSDR Plan.WBS UEWR-CD BIT 04.25.12.xlsx XLSX spreadsheet
Sec J Atch 2 - IDIQ SOW UEWR 04.25.12.doc DOC document
Sec L - Exhibit_B8_UEWR_CD__Test_BOE_Sum 04.25.12.xlsx XLSX spreadsheet
Sec J Atch 6 - Acronym List 04.25.12.docx DOCX document
Sec J Atch 4 - UEWR_CD BIT GFP List 04.25.12.xlsx XLSX spreadsheet
RFP Cover Letter 05.01.12.pdf PDF
Sec L Atch L-8 Pre-Award Survey of Acct Sys Checklist Modified SF 1408 04.25.12.doc DOC document
Sec L Atch L-5 Subcontractor Consent Letter 04.25.12.doc DOC document
Sec L Atch L-7 Proposal Master Cross Ref Matrix UEWR-CD BIT 04.25.12.xlsx XLSX spreadsheet
Sec J Atch 7 - MDA OCI Policy Memo No. 04.25.12.pdf PDF
Sec L Atch L-2 Past Performance Reference List Worksheet 04.25.12.xlsx XLSX spreadsheet
Sec J Atch 9 - Sect M - for final RFP 04.25.12.docx DOCX document
Sec L - Exhibit B1 - B7 UEWR-Test Pricing Exhibits with Labor Cats 04.25.12.xlsx XLSX spreadsheet
Sec J Atch 3 - Labor Categories 04.25.12.xlsx XLSX spreadsheet
.Task_Order_0001_SOW 04.25.12.docx DOCX document
Sec L Atch L-3 Past Performance Information Form 04.25.12.doc DOC document
Sec L Atch L-1 H09 OCI Analysis-Disclosure Form 04.25.12.doc DOC document
Final RFP HQ0147-11-R-0006.pdf PDF
Sec J Atch 1 - DD-254 HQ0147-11-R-0006 04.25.12.pdf PDF
Sec J Exhibit A-UEWR_CD BIT CDRLs 04.25.12.pdf PDF
Sec J Atch 8 - Sect L - for final RFP 04-25-12.docx DOCX document
Sec L Atch L-4a Past Performance Cover Letter 04.25.12.docx DOCX document
FBO R5 UEWR.CD BIT QAs 04 27 12.pdf PDF
R5 Q As_04.27.12.pdf PDF
FBO R4 UEWR.CD BIT QAs 04 09 12.pdf PDF
R4 Q As_04.10.12.pdf PDF
FBO R3 Q As UEWR CD BIT 03 09 12.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (CSDR Plan)

COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM (MDAP)1b. PRIME MISSION PRODUCT1c. MILESTONE2. MIL-HDBK-881 APPENDIX USED
UEWR-CD BITAC: LRIP
BC: PRODUCTION
3. SUBMISSION TYPE4. CURRENT SUBMISSION DATE (YYYYMMDD)5. LAST APPROVED PLAN DATE (YYYYMMDD)
XINITIALCHANGE20120207
6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code)6b. TELEPHONE NUMBER (Include Area Code)6c. FAX NUMBER (Include Area Code)6d. E-MAIL ADDRESS
James Waterbury

Bldg. 5222, Martin Road Redstone Arsenal, AL 35898 256-450-4777 James.Waterbury@mda.mil

7. PLAN TYPE8. PREPARING ORGANIZATION9. APPROVED PLAN NUMBER
PROGRAMXPRIMEMDA/DOC
CONTRACTSUB
10. WBS ELEMENT CODE11.
WBS REPORTING ELEMENTS12a.

CONTRACTOR

NAME12b.
CONTRACT NUMBER13. REPORTS REQUIRED (X if applicable)
a.
PROGRAMb.
CONTRACTa. CWBSb. DD 1921c. DD 1921-1d. DD 1921-2e. SRDR
DICTIONARY(CDSR)(FCHR)(PCR)FORMATS
TContractXX
T.01Task Order #1XX
T.01.AProgram Management & Infrastructure (PM&I)XX
T.01.A.01Program ManagementXX
T.01.A.01.aIntegrated Process and Product ManagementXX
T.01.A.01.bKick-off MeetingXX
T.01.A.01.cBusiness OperationsXX
T.01.A.01.dProgram ControlXX
T.01.A.01.eIntegrated Master ScheduleXX
T.01.A.01.fProgram Management Review & Technical Interchange MeetingXX
T.01.A.01.gContract ManagementXX
T.01.A.01.hProgram OperationXX
T.01.A.01.iRisk ManagementXX
T.01.A.02TrainingXX
T.01.A.03Long Term AgreementsXX
T.01.A.04DelaysXX
T.01.A.05Facility and Data AccessXX
T.01.A.05.aInformation AssuranceXX
T.01.A.06Systems EngineeringXX
T.01.A.07Configuration ManagementXX
T.01.A.08Safety, Quality, and Mission AssuranceXX
T.01.A.08.aSafetyXX
T.01.A.08.bQuality AssuranceXX
T.01.A.09InfrastructureXX
T.01.A.09.aIntegrated System Test Capability (ISTC-1) LabXX
T.01.A.09.bIntegrated System Test Capability (ISTC-2) LabXX
T.01.A.09.cPrime Contractor Integrated Lab (PCIL)XX
T.01.A.10Integration Benchmark 1-3 TestingXX
T.01.BTest and EvaluationXX
T.01.B.1BMDS Ground TestsXX
T.01.B.1.aGTI-04e (N/P)XX
T.01.B.1.a.iRequirementsXX
T.01.B.1.a.iiPlanningXX
T.01.B.1.a.iiiIntegrationXX
T.01.B.1.a.ivExecutionXX
T.01.B.1.a.vAnalysisXX
T.01.B.1.bGTD-04e (N/P)XX
T.01.B.1.b.iRequirementsXX
T.01.B.1.b.iiPlanningXX
T.01.B.1.b.iiiIntegrationXX
T.01.B.1.b.ivExecutionXX
T.01.B.1.b.vAnalysisXX
T.01.B.1.cGTX-06aXX
T.01.B.1.c.iRequirementsXX
T.01.B.1.c.iiPlanningXX
T.01.B.1.c.iiiIntegrationXX
T.01.B.1.c.ivExecutionXX
T.01.B.1.c.vAnalysisXX
T.01.B.2BMDS Flight TestsXX
T.01.B.2.aFTG-08XX
T.01.B.2.a.iRequirementsXX
T.01.B.2.a.iiPlanningXX
T.01.B.2.a.iiiIntegrationXX
T.01.B.2.a.ivExecutionXX
T.01.B.2.a.vAnalysisXX
T.01.B.3Satellite Test Campaign (Reserved)XX
T.01.B.4Element Ground TestXX
T.01.B.4.aG-39-HXX
T.01.B.4.a.iRequirementsXX
T.01.B.4.a.iiPlanningXX
T.01.B.4.a.iiiIntegrationXX
T.01.B.4.a.ivExecutionXX
T.01.B.4.a.vAnalysisXX
T.01.B.4.bG-55-HXX
T.01.B.4.b.iRequirementsXX
T.01.B.4.b.iiPlanningXX
T.01.B.4.b.iiiIntegrationXX
T.01.B.4.b.ivExecutionXX
T.01.B.4.b.vAnalysisXX
T.01.B.5Test ProvisioningXX
T.01.CWarfighter Support (Reserved)XX
T.01.DModeling and Simulation (Reserved)XX
T.01.ETransition PeriodsX
T.01.E.1Transition InX
T.01.E.2Transition Out (Reserved)X

T.01.F Additional Test Effort (Reserved) X X

Subtotal Cost X X

Reporting Contractor General & Administrative (G&A)XX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor Facilities Capital Cost of Money (FCCM)XX

Total Cost X X

Reporting Contractor Profit or Fee X X

Total Price X X

DD FORM 2794, 20070416 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (CSDR Plan)

14. CSDR SUBMISSION DATES
a.
SUBMISSIONb.
FORM(S)c.
EVENTd. AS OF DATEe. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1CWBSCWBS & CWBS Dictionary submissionTBDTBD
21921Annual SubmissionTBDTBD
15. REMARKS
1. Non-Recurring/Recurring Definitions: The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the DD Form 1921 to segregate recurring and non-recurring costs. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.

2. Cost Accounting Standards (CAS) Disclosure Statement Differences: TBD

DD FORM 2794 (BACK), 20070416 PREVIOUS EDITION IS OBSOLETE

File details come from the government source that posted it. Updated .