CDRL A006 NOR.pdf
PDF 12 KB Posted
- Solicitation number
- H92222-09-R-0027
- Issued by
-
United States Special Operations Command
About this file
Attachment 9
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
TDP X TM OTHER
D. SYSTEM/ITEM.
FOSOV System Technical Support (STS)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
NOTICE OF REVISION (NOR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-80642C
5. CONTRACT REFERENCE
C.2.10.1.1
6. REQUIRING OFFICE
AMSRD-TAR-E/CDM
7. DD 250 REQ
LT *
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST
SUBMISSION
SEE BLK 16 14. DISTRIBUTION
8. APP CODE
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLKS 10 & 16 a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
16 REMARKS
Prepare NOR detailing proposed changes for each specification, drawing, and associated document as part of the ECP submittal.
NORs are not required for clearly identified digital data marked-up electronically or CAD data (models, drawings) reflecting preliminary changes.
BLK 9: Distribution Statement D required. Request completed DIST D Statement from the CDM Representative after contract award.
BLK 14b – Email Addresses:
* Letter of Transmittal, AMSRD-TAR-E mark.fox1@us.army.mil
This shall be transmitted via email that includes the ECP Number, Title, and ECP Class (1 or 2).
SOFSA mike.doroha.ctr@SOFSA.mil
SOAL-SW, PM-FOSOV Michael.ellis1@socom.mil
Distribution shall also include any others specified in the Task Order.
SOFSA 1
PM-FOSOV 1
AMSRD-TAR-E 1
15. TOTAL 3
G. PREPARED BY
Mark Fox
H. DATE
08 Jun 09
I. APPROVED BY
J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages
File details come from the government source that posted it. Updated .