This is Amendment 0002 to the Solicitation. See Explicit Access Request for Sample Task 3

View the file

Other files

File Type Posted
Answers to Questions 56 57 09 07 15.pdf PDF
Amendment 0004 Final 09 07 10.pdf PDF
Amendment 0004 Conformed Final 09 07 10.pdf PDF
09 07 08 Answers to Questions 26 27 29-32.pdf PDF
09 06 30 Answers to Questions Final 17-25.pdf PDF
Amendment 0003 Final.pdf PDF
Amendment 0003 Conformed.pdf PDF
09 06 22 Answers to Questions 1-16 .doc DOC document
Amendment 0002 Conformed Final.pdf PDF
CDRL A014 TIR _2_x.pdf PDF
CDRL A019 SAR.pdf PDF
CDRL A013 Conceptual Design.pdf PDF
CDRL A007 ERR.pdf PDF
09 06 09 PWS Final.pdf PDF
CDRL A011 Critical Safety.pdf PDF
CDRL A009 Transp Report.pdf PDF
Amendment 0001 Conformed Final.pdf PDF
CDRL A005 ECP _2_.pdf PDF
CDRL A018 Engineering Services Report.pdf PDF
CDRL A010 Agenda.pdf PDF
CDRL A004 Parts Mgt Plan _2_.pdf PDF
CDRL A006 NOR.pdf PDF
CDRL A016 Meeting Minutesx.pdf PDF
Amendment 0001 Final.pdf PDF
CDRL A008 CSAR.pdf PDF
Atch 03 - SOO Sample 2 GMV —
CDRL A003 Product Dwgs.pdf PDF
CDRL A012 FIR.pdf PDF
CDRL A001 Cost Report.pdf PDF
CDRL A002 Tech Rpt Study.pdf PDF
CDRL A015 RFD _2_.pdf PDF
CDRL A017 ESM _2_.pdf PDF
CDRL A011 Critical Safety.doc DOC document
H9222-09-R-0027 Solicitation.doc DOC document
CDRL A007 ERR.doc DOC document
Atch 03 - SOO Sample 2 GMV Mod.doc DOC document
CDRL A006 NOR.doc DOC document
CDRL A004 Parts Mgt Plan.doc DOC document
CDRL A003 Product Dwgs.doc DOC document
CDRL A008 CSAR.doc DOC document
CDRL A005 ECP.doc DOC document
Atch 02 - SOO Sample Task 1 Armor Coupon Testing.docx DOCX document
CDRL A030 Meeting Minutes.doc DOC document
CDRL A012 FIR.doc DOC document
Atch 01 - STS PWS 09 05 29.docx DOCX document
CDRL A001 Cost Report.docx DOCX document
CDRL A009 Transp Report.doc DOC document
CDRL A002 Tech Rpt Study.docx DOCX document
090204 STS PWS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide Sample Task no. 3 and change the required release date of Sample Task no. 4.

1. CONTRACT ID CODE PAGE OF PAGES

U 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X H92222-09-R-0027

X 9B. DATED (SEE ITEM 11)

05-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jun-2009

CODE

HQ USSOCOM SOAL-K

ATTN: GLENN DERBY

7701 TAMPA POINT BLVD

MACDILL AFB FL 33621

H92222 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

H92222-09-R-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

1. The Performance Work Statement for Sample Task no. 3, entitled “Ground Mobility Vehicle (GMV) Run Flat Systems, dated June 17, 2009, is hereby provided as attachment # 24 to this Solicitation. Offerors shall submit their cost proposals for this task in accordance with Section L, paragraph L-3.3.1, no later than the date specified in block 9 of the Solicitation. The description of CLIN 4003 is changed as listed in Section B below.

2. Section L, paragraph L-3.1.2.4, is hereby changed from:

The sample task requirements will be released via amendment to the RFP on or about five (5) days before the proposal due date in paragraph L-1.3.1.

To read:

The sample task requirements will be released via amendment to the RFP on or about fifteen (15) days before the proposal due date in paragraph L-1.3.1.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 4003

The CLIN extended description has changed from:

The soliciation will be amended to provide this Sample Task in accordance with Sections L and M. The Offeror's cost proposal shall be prepared in accordance with Sections L and M of this soliciation.

Total Estimated Cost ________ Fixed Fee ________ Total CPFF price ________

Note: The Government reserves the right to order one (1) or all of the Sample Tasks under CLIN's 4001, 4002, 4003, and 4004 at the time of award. The Government will order at least one (1) Sample Task. The proposed amounts for all Sample Tasks will be used for evaluataions purposes in accordance with Sections L and M.

Therefore, the Offeror must provide CPFF prices for all Sample Tasks under Section B of this solication for the Offeror's proposal to be considered responsive.

To:

Test and evaluate Run Flat Systems for the GMV in accordance with Performance Work Statement entitled GROUND MOBILITY VEHICLE (GMV) RUN FLAT SYSTEMS, dated June 17, 2009, Attachment # 24 of this

H92222-09-R-0027 solicitation. The Offeror's cost proposal shall be prepared in accordance with Sections L and M of this soliciation.

Total Estimated Cost ________ Fixed Fee ________ otal CPFF price ________

Note: The Government reserves the right to order one (1) or all of the Sample Tasks under CLIN's 4001, 4002, 4003, and 4004 at the time of award. The Government will order at least one (1) Sample Task. The proposed amounts for all Sample Tasks will be used for evaluataions purposes in accordance with Sections L and M.

Therefore, the Offeror must provide CPFF prices for all Sample Tasks under Section B of this solication for the Offeror's proposal to be considered responsive..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The section is hereby modified to include the following attachment:

Attachment 24: Performance Work Statement for Ground Mobility Vechicle (GMV) Run Flat Sytems, dated June 17, 2009, 3 pages.